Loading...
HomeMy WebLinkAboutChange Order - 2Docusign Envelope ID: A29D196F-B879-4971-BEBD-F6B829DB0499 Public Works Facilities Division CONTRACT CHANGE ORDER (CO) TO: OM Pacific CONTRACT NO: PROJECT TITLE: 1------------------------ CAG-24-327 CONO. 2 HMAC Maintenance and Repairs (CONTRACTOR) The following mutually agreed to and Owner approved Change Order Proposal(s) are hereby incorporated by reference into the contract. Description Mold Abatmnt at Windows, Casework & Walls Solid Surface Countertops to Window Sills Add Labor and Material Marlin Window Fabricate and Install HVAC Screen CONTRACT SUM: $ $ $ $ $ $ Amo_unt 8,160.34 2,285.28 23,442.90 2,785.10 0 INCREASE _o_F= ___________________ .. l _s ___ 3_&_,&_1_3 _.&_2 ...) ONOCHANGE } 0 DECREASE (WASHINGTON STATE SALES TAX EXCLUDED) CONTRACT TIME: 0NOCHANGE } □1NcREAsE _o_F_: ___________________________ o_l 0 DECREASE CALENDAR DAYS The foregoing amount covers everything required in connection with the change. All other provisions of the contract remain in full force and effect. CONTRACT SUMMARY (Internal Use Only) ORIGINAL CONTRACT SUM PREVIOUS ADDITIONS/DELETIONS PREVIOUS TOTAL CHANGE AMOUNT THIS CHANGE ORDER $ $ $ $ 1,410,240.00 48,700.06 1,458,940.06 36,673.62 REVISED CONTRACT TOTAL $ PERCENT TOTAL CHANGE FROM ORIGINAL 1,495,613.68 6.05% NOTICE TO PROCEED DATE PREVIOUS CONTRACT CALENDAR DAYS PREVIOUS SUBSTANTIAL COMPLETION DATE REVISED CONTRACT CALENDAR DAYS THIS CHANGE ORDER CURRENT SUBSTANTIAL CO June 2, 2025 Architect Acl<nowledgement Date March 11, 2025 120 July 9, 2025 120 July 9, 2025 Date The City of Renton hereby accepts the foregoing Change Order Proposal(s). This formal acceptance constitutes a Change to the contract only when authorizing signature Is affixed. Invoices incorporating this Change Order constitute acceptance by the Contractor as total reimbursement due in connection with this Change Order. GDocuS;gnod by, Martin Pastucha AUTHORIZING SIGNATU0Rr'0 6/11/2025 I 7:42 PM PDT DATE CAG-24-327, CO #2-25 Docusign Envelope ID: A29D196F-B879-4971-BEBD-F6B829DB0499 CHANGE ORDER PROPOSAL #5 Attn: Debbie BoodeU, City of Renton 1055 S. Grady Way Renton, WA 98057 Project: Henry Moses Aquatic Center Change: Labor and Materials to abate visable mold found in the concessions window area during demolition; including casework bases. GCCOST MATERIAL COST LABOR COST 8 hrs. @$86.06/hr. $ EQUIPMENT COST SUBTOTAL: OVERHEAD/PROFIT 15% $ SUBTOTAL SUB COST Abatement: Rivers Edge $ Casework: GenOne $ SUBTOTAL: $ O&P ON SUBS (8%) $ SUBTOTAL ADDITIONAL COST BOND s GENERAL LIABILITY INS. $ UMBRELLA INS. s BUILDER'S RISK INS. $ SUBTOTAL 688.48 103.27 1,323.60 5,387.00 6,710.60 536.85 11.88 18.21 87.09 3.96 TOTAL CHANGE ORDER PROPOSAL: Approved by: (Owner) d.0/2 L2r27�Approved by: (Architect) �0 Is 791.75 ! Is 7,247.451 I s 121.14 ! $ 8,160.34 Date: UJ;�/45· Date: 6/2/25