CITY OF RENTON
AGENDA - Special Committee of the Whole Meeting
5:45 PM - Monday, June 16, 2025
7th Floor Conferencing Center
1. PAVILION AND PIAZZA UPDATE
a) Presentation
RENTON MARKET
AND
PIAZZA
JUNE 2025 UPDATE
COW, June 16, 2025
Jeff Minisci, Facilities Director
Deb Boodell, Capital Project Coordinator
AG
E
N
D
A
I
T
E
M
#
1
.
a
)
UPDATES
For 2025
Design
Budget
Schedule
Operator
Renton Market and Piazza
AG
E
N
D
A
I
T
E
M
#
1
.
a
)
Schedule
AG
E
N
D
A
I
T
E
M
#
1
.
a
)
Schedule
•Market concept briefed at COW - April 2019
•Request for Proposal (RFP) posted – May 2019
•City staff presented the Pavilion market concept and recommended tenant to COW – August 2019
•Concept Approved – December 2021
•Concept Completed – January 2022
•Design Phase and Negotiation with Tenant – September 2019 – May 2025
•Bid Opening – June 10, 2025
•Notice to Proceed – July 2025
•Construction – July 2025 through January 2026
•Closeout – February/March 2026
AG
E
N
D
A
I
T
E
M
#
1
.
a
)
Renton
Market
Design AG
E
N
D
A
I
T
E
M
#
1
.
a
)
Renton Market
•Designed for 2
anchor tenants, 12
kiosks, 2 long term
kiosks, and kitchen
classroom.
•Construction
Bidding May 2025,
Bid opening June
2026 AG
E
N
D
A
I
T
E
M
#
1
.
a
)
•Floor Plan
North
COR Parking Garage
Piazza
AG
E
N
D
A
I
T
E
M
#
1
.
a
)
Activation
Operator Activation City Activation
•Warm and inviting with
seasonal decorations
throughout the year
•Floral accents and seating
that is clean and
comfortable for all
patriates
•Anchor Tenants will have
warm and inviting outdoor
spaces that are softly railed
either by plantings or railing
per city code
•Vendors will be small and,
in some cases start up
businesses
•Downtown partnerships that
involve the downtown
businesses to utilize the space
both in the market and Piazza
•Marketing near by businesses
as destinations while and after
visiting the market
•Partnerships with the city to
ensure all opportunities are
captured to benefit the
community and local
businesses AG
E
N
D
A
I
T
E
M
#
1
.
a
)
Piazza
Design
AG
E
N
D
A
I
T
E
M
#
1
.
a
)
Piazza
•Design is inviting,
well lit, and with
multiple seating
options
•Design and
Construction
Bidding is included
in the Renton
Market package
•Catenary Lighting
will run along
Logan Avenue from
3rd Avenue to
Gateway Park
Permitting Complete
AG
E
N
D
A
I
T
E
M
#
1
.
a
)
Piazza Salvaged Items Lighting Elements
•Fountain will be
repurposed as a plant bed
with PNW plantings
•Statues to be salvaged
•Plaques to be salvaged
•Garbage Cans to be
salvaged
•Mast lighting will illuminate the
site with the ability to project
images and be multi directional
•Catenary Lighting will run
along Logan Avenue from 3rd
Avenue
AG
E
N
D
A
I
T
E
M
#
1
.
a
)
Branding and Signage
•Large metal and neon sign an ode to the history
of downtown Renton
•Large welcoming vestibule welcoming
community and visitors
•Operator will be able to use branding for market
merchandise and advertising
AG
E
N
D
A
I
T
E
M
#
1
.
a
)
Budget
AG
E
N
D
A
I
T
E
M
#
1
.
a
)
Budget
Update
Balances and
Expenditures
AG
E
N
D
A
I
T
E
M
#
1
.
a
)
Operator
and
Activation AG
E
N
D
A
I
T
E
M
#
1
.
a
)
Lease & Operator
Agreement
Lease Highlights Operator Highlights
•Public Works Facilities
issued a draft lease to the
operator after working with
various city departments
•Operator is discussing
project with potential
tenants
•Operator Agreement is an
exhibit to the lease agreement
•Operator has been given a draft
operator agreement
AG
E
N
D
A
I
T
E
M
#
1
.
a
)
Thank
You!
Q&A?AG