Loading...
HomeMy WebLinkAboutTransportation Committee - 16 Jun 2025 - Agenda - Pdf CITY OF RENTON AGENDA - Transportation Committee Meeting 4:45 PM - Monday, June 16, 2025 7th Floor Council Conference Room/Videoconference 1. CHANGE ORDER NO 41 TO CAG-22-163 WITH PIVETTA BROTHERS CONSTRUCTION FOR THE RAINIER AVENUE CORRIDOR IMPROVEMENTS - PHASE 4 PROJECT a) AB - 3845 Public Works Transportation Systems Division recommends execution of Change Order No. 41 to CAG-22-163, contractor Pivetta Brother's Construction, Inc., in the amount of $117,000 for the relocation of signal and other junction boxes helping to maintain clear and continuous sidewalks. 2. ADDENDUM 10-25 TO LAG-99-002 WITH 540 RENTON HANGAR LLC a) AB - 3847 Public Works Airport recommends execution of Addendum 10-25 to LAG-99- 002, lease with 540 Renton Hangar, LLC, which adjusts the annual lease revenue to $58,731.75 plus leasehold excise tax, updates insurance requirements, and the lessee's address. 3. WEEKEND CLOSURE OF NE 44TH STREET AND LAKE WASHINGTON BLVD NE a) AB - 3854 Public Works Transportation Systems Division recommends adoption of a resolution authorizing the full weekend closure of the intersection of NE 44th St and Lake Washington Blvd NE, east of I-405 to occur between July 18 - July 21, 2025, for the purpose of lowering NE 44th St east of I-405 to its final grade and constructing a roundabout at the intersection of NE 44th St, Lake Washington Blvd NE, and Northbound I-405 on and off ramps. 4. EMERGING ISSUES IN TRANSPORTATION a) 2024 Renton Transportation Benefit District (TBD) Report If you would like to attend this week's meeting remotely, you can do so by going to https://us02web.zoom.us/j/83331604294?pwd=U3BLbUJZK0ExeWJaTFNWYWx5WGE0dz09 Zoom Meeting ID: 833 3160 4294, Passcode: 352696 You can call through Zoom at (253) 215-8782 and use the Meeting ID. AB - 3845 City Council Regular Meeting - 09 Jun 2025 SUBJECT/TITLE: Change Order No. 41 to CAG-22-163 with Pivetta Brother’s Construction, Inc. for the Rainier Ave S Corridor Improvements - Phase 4 Project RECOMMENDED ACTION: Refer to Transportation (Aviation) Committee DEPARTMENT: Public Works Transportation Systems Division STAFF CONTACT: Bob Hanson, Transportation Design Manager EXT.: 7223 FISCAL IMPACT SUMMARY: The fiscal impact of Change Order No. 41 to CAG-22-163 with Pivetta Brother’s Construction Inc. is $117,000.00. The Rainier Ave S Corridor Improvement Project has a current unencumbered balance of $1,094,217.91. There is sufficient funding for this change order. SUMMARY OF ACTION: The Rainier Ave S - Phase 4 (S 3rd St to NW 3rd Pl) Project will extend previous corridor improvements from South 3rd Street to 1,000 feet north of Airport Way (NW 3rd Pl). Project elements include extending a southbound BAT lane from S 2nd St to S 3rd St, pedestrian improvements with street scaping, pedestrian actuated traffic signal (HAWK), transit facility upgrades, access management, and a segment of a regional pedestrian/bike path trail (Lake Washington Loop Trail). The initial plans positioned various junction boxes (signal, illumination, 5G) and interconnect vaults directly in the sidewalk. During construction, pedestrian safety became a primary concern, as both the lids and the gaps created by hinges were identified as potential hazards. Consequently, the project team opted to move these boxes out of the sidewalk. This change order facilitates the relocation of the underground conduit to new junction box locations outside the Pedestrian Access Route (PAR) where feasible. This adjustment helps maintain a clear and unobstructed sidewalk, consistent with the City's commitment to minimizing pedestrian impediments. EXHIBITS: A. Change Order No. 41 STAFF RECOMMENDATION: Authorize the Mayor and City Clerk to execute Change Order No. 41 to CAG-22-163 in the amount of $117,000 with Pivetta Brother's Construction Inc. for the Rainier Ave S Corridor Improvements - Phase 4 project. AGENDA ITEM #1. a) AGENDA ITEM #1. a) Change Order No. 41 Contract Title: Rainier Ave S. Corridor Improvements – Phase 4 Contract No. CAG-22-163 Page 2 of 8 THE CONTRACT IS MODIFIED AS FOLLOWS: Description of Change: The City of Renton directed the Contractor to install and relocate signal junction boxes, illumination junction boxes, 5G junction boxes, and interconnect vaults as shown in Field Directive #74 Revision 3. The junction boxes and vaults are to be located and installed in the planter strip where feasible, or at the back of sidewalk as shown in the Field Directive. Proposal Schedule of Prices: ADD the following to Schedule A: 41-A206 – Additional Work to Install and Relocate Signal Junction Boxes, Illumination Junction Boxes, 5G Junction Boxes, and Interconnect Vaults Per FD #74 Rev. 3, 1 EST @ $117,000.00 = $117,000.00 Specification and/or Special Provision: None. Description: ADD the following to 8-20.3(6): The Contractor shall work to install and relocate signal junction boxes, illumination junction boxes, 5G junction boxes, and interconnect vaults as shown in Field Directive #74 Revision 3. Materials: None. Measurement: ADD the following to 8-20.4: No specific unit of measurement shall apply to the force account item of “Additional Work to Install and Relocate Signal Junction Boxes, Illumination Junction Boxes, 5G Junction Boxes, and Interconnect Vaults Per FD #74 Rev. 3.” Payment: ADD the following to 8-20.5: “Additional Work to Install and Relocate Signal Junction Boxes, Illumination Junction Boxes, 5G Junction Boxes, and Interconnect Vaults Per FD #74 Rev. 3,” force account. Plans: Field Directive #74, Revision 3 roll plot. AGENDA ITEM #1. a) Change Order No. 41 Contract Title: Rainier Ave S. Corridor Improvements – Phase 4 Contract No. CAG-22-163 Page 3 of 8 Reason for Change: The plans originally required signal junction boxes, illumination junction boxes, 5G junction boxes, and interconnect vaults to be installed within the sidewalk. This change relocates those elements outside of the Pedestrian Access Route (PAR) where possible, helping to maintain a clear and continuous sidewalk. The adjustment aligns with the City’s intent of minimizing obstructions within the sidewalk area. Equitable Adjustment: This Change Order does include an equitable adjustment per Section 1-09.4 of the 2022 WSDOT/APWA Standard Specifications. See attached. Estimated Cost: $ 117,000.00 Extended Overhead: $ 0.00 Force Account Time Related Damages per 1-09.6.6.d: $ 0.00 Sales Tax (if applicable) 10.1% $ 0.00 Total: $ 117,000.00 41-A206 – Additional Work to Install and Relocate Signal Junction Boxes, Illumination Junction Boxes, 5G Junction Boxes, and Interconnect Vaults Per FD #74 Rev. 3 An independent estimate was prepared for the cost of installing and relocating signal junction boxes, illumination junction boxes, 5G junction boxes, and interconnect vaults per Field Directive #74 Rev. 3. This cost was calculated to be $116,728.09 and has been rounded to an estimated cost of $117,000.00. Extension of Time: The Time for Completion is extended 0 Working Days. Affects DBE Work: Yes. Sections 1-04.4 and 1-04.5 of the 2022 WSDOT/APWA Standard Specifications shall govern this Change Order. The Work of the referenced Contract is modified to include the changes detailed herein. The payment provided for herein shall constitute the complete and final settlement for all costs of labor, equipment, materials, overhead, profit, permit fees, and all other claims that may be made by the Contractor because of this change. AGENDA ITEM #1. a) Change Order No. 41 Contract Title: Rainier Ave S. Corridor Improvements – Phase 4 Contract No. CAG-22-163 Page 4 of 8 To be attached to Change Order: ☒ 1-Estimated Change Order Cost ☐ 2-Plans ☒ 3-Field Directive/Request for Information Response ☐ 4-Change Order Quotation ☐ 5-Project Labor List ☐ 6-Force Account Equipment Rate Request (DOT Form 422-010 EF) ☐ 7-Equitable Adjustment Determination ☐ 8-Additional Working Days Calculation AGENDA ITEM #1. a) STPUL-1615(005)By: Perteet Date: Item No. Quantity Unit Price Estimated Cost 41-A206 55 118.00$ 6,490.00$ 110 118.00$ 12,980.00$ 110 111.00$ 12,210.00$ 110 65.00$ 7,150.00$ 38,830.00$ 0.31$ 12,037.30$ 110 46.00$ 5,060.00$ 110 30.00$ 3,300.00$ 110 68.00$ 7,480.00$ 55 68.00$ 3,740.00$ 19,580.00$ 0.21$ 4,111.80$ 1 10,000.00$ 10,000.00$ 10,000.00$ 0.21$ 2,100.00$ 25,000.00$ 0.12$ 3,000.00$ 61,659.10$ 0.10$ 6,165.91$ 95,825.01$ 146 65.00$ 9,490.00$ 9,490.00$ 0.31$ 2,941.90$ 73 46.00$ 3,358.00$ 73 20.00$ 1,460.00$ 4,818.00$ 0.21$ 1,011.78$ 18,261.68$ 0.12$ 2,191.40$ 20,453.08$ 116,278.09$ 117,000.00$ 41-A206 1 $ 117,000.00 $ 117,000.00 117,000.00$ Summary of Contractors Quotes: Item Quote Location N/A Total Quoted Added Cost: CALCULATED TOTAL: Subcontractor Markup, < $25,000 Cents/Dollar Equipment - Survey (Pickup Truck)Hours Equipment - Survey (GPS)Hours ESTIMATED TOTAL: Labor - Survey (2-Person Crew)Hours Labor Markup (Survey)Cents/Dollar CALCULATED TOTAL: Equipment Markup (Survey)Cents/Dollar Additional Work to Install and Relocate Signal Junction Boxes, Illumination Junction Boxes, 5G Junction Boxes, and Interconnect Vaults Per FD #74 Rev. 3 Labor - Golden Gate (Electrician Foreman)Hours Labor - Golden Gate (Electrician)Hours Independent Cost Estimate Item Change Change Order Cost (Equitable Adjustment) Change Order No. 41 Project Name:Rainier Ave S Corridor Improvements - Phase 4 Contractor:Pivetta Brothers Construction, Inc. Description Unit Contract No:CAG-22-163 Federal Aid No: Shannon Tremper Construction Manager: 5/5/2025 Cents/Dollar Additional Work to Install and Relocate Signal Junction Boxes, Illumination Junction Boxes, 5G Junction Boxes, and Interconnect Vaults Per FD #74 Rev. 3 EST TOTAL CHANGE ORDER COST Quoted Cost N/A Subcontractor Markup, > $25,000 Cents/Dollar Materials (Golden Gate) (Sweeps, Couplings)LS Materials Markup (Golden Gate)Cents/Dollar Subcontractor Markup, < $25,000 Cents/Dollar CALCULATED TOTAL: Hours Equipment Markup (Golden Gate) Labor - Golden Gate (Cable Splicer)Hours Labor - Golden Gate (Apprentice Electrician)Hours Labor Markup (Golden Gate)Cents/Dollar Equipment - Golden Gate (Pickup Truck)Hours Equipment - Golden Gate (Compact Excavator)Hours Equipment - Golden Gate (Pickup Truck)Hours Equipment - Golden Gate (Bobcat Excavator) Junction Box and Vault Relocation - Estimated Change Order Cost Change Order #41 - Page 5 of 8 AGENDA ITEM #1. a) Project name: CAG Number: Date: Sub-contractor name Golden Gate Electric Fiber Optic Sizing 4 $6,975,974.00 $38,616.76 $9,651.60 $6,985,625.60 $6,975,974.00 Change to Schedule 80 5 $6,975,974.00 $174,913.89 $148,411.10 $7,134,036.70 $6,975,974.00 Procure JUT Materials 7 $6,975,974.00 $99,090.00 $45,000.00 $7,179,036.70 $6,975,974.00 Overhead Added Days for JUT Material Delivery 8 $6,975,974.00 $231,454.42 $27,000.00 $7,206,036.70 $6,975,974.00 Victoria Sch 80 Conduit 9 $6,975,974.00 $103,853.14 $22,406.40 $7,228,443.10 $6,975,974.00 Removal of Private Lumianires & Business Sign in ROW 14 $6,975,974.00 $26,000.00 $13,000.00 $7,241,443.10 $6,975,974.00 CMP for Foundations 16 $6,975,974.00 $38,225.00 $29,581.00 $7,271,024.10 $6,975,974.00 Resolution of Conflicts for Signal & Illumination 17 $6,975,974.00 $50,000.00 $25,000.00 $7,296,024.10 $6,975,974.00 Electrical Service Connections 21 $6,975,974.00 $195,000.00 $143,913.71 $7,439,937.81 $6,975,974.00 JUT Dewatering and Utility Conflicts Impacts 22 $6,975,974.00 $146,498.27 $130,593.72 $7,570,531.53 $6,975,974.00 Additional Electrical Connection 26 $6,975,974.00 $3,800.00 $3,392.86 $7,573,924.39 $6,975,974.00 34-A198 Install Corrugated Metal Pipe at Signal Pole Foundations, 5-foot 34 6,975,974.00$ 9,828.00$ 8,775.00$ 8,775.00$ 6,975,974.00$ 34-A199 Install Corrugated Metal Pipe at Luminaire Pole Foundations, 4-Foot 4,000.00$ 3,575.00$ 3,575.00$ 6,975,974.00$ 34-A200 Install Corrugated Metal Pipe at Luminaire Pole Foundations, 8-Foot 1,200.00$ 1,075.00$ 1,075.00$ 6,975,974.00$ 34-A201 Install Corrugated Metal Pipe at Luminaire Pole Foundations, 10-Foot 7,000.00$ 6,250.00$ 6,250.00$ 6,975,974.00$ 38-D76 Resolution of Utility Conflicts Between Proposed JUT and Existing PSE Vault 38 6,975,974.00$ 10,000.00$ 2,500.00$ 2,500.00$ 6,975,974.00$ 38-D77 Resolution of Utility Conflicts With Live PSE Wires 30,000.00$ 10,000.00$ 10,000.00$ 6,975,974.00$ Previous Change Order Totals:$6,975,974.00 $1,169,479.48 $630,125.39 $7,606,099.39 $6,975,974.00 41-A206 Additional Work to Relocate and Install Interconnect Vaults, 5G, Illumination and Signal Junction Boxes 41 6,975,974.00$ 116,000.00$ 87,000.00$ 87,000.00$ 6,975,974.00$ Cumulative 6,975,974.00$ $1,285,479.48 642,625.39$ $7,693,099.39 6,975,974.00$ Totals 6,975,974.00$ 1,285,479.48$ 642,625.39$ 7,693,099.39$ 6,975,974.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Cumulative -$ -$ -$ -$ -$ Totals -$ -$ -$ -$ -$ 7,693,099.39$ -$ 7,693,099.39$ 6,975,974.00$ Alan Guthmiller, Senior Project Manager/ COO Date Golden Gate Electric & Construction LLC New non-COA DBE Status by subcontractor and bid item Change Order Amount (+/-) Description Change Order Original Contract Amount Rainier Ave. Corridor Improvements - Phase 4 4/29/2025 Change Order DBE Participation Tracking (LAG 26.35) New COA DBE Participation by Subcontractor and Bid Item Bid Item Number Change Order Contract COA Commitment Change Order Amount (+/-) Net Change Order Amount Assigned to COA DBE Description Current COA DBE Commitment (may be changed by WSDOT) CAG-22-163 COA DBEs Current Contract COA DBE Participation Available Current Contract Non-COA DBE Participation Current Contract COA plus non-COA DBE Participaton Amount of COA plus non-COA DBE Participaton Applied to COA Commitment (may be changed by WSDOT) Non-COA DBEs Bid Item Number Original Contract amount Assigned to non-COA DBE Net Change Order Amount Assigned to non-COA DBE Junction Box and Vault Relocation - DBE Change Order Table Change Order #41 - Page 6 of 8 Yu Hong Wu, President 5/8/2025 AGENDA ITEM #1. a) FIELD DIRECTIVE Project Name Federal Aid #Contract No.Date Field Directive Description Field Directive No. Contractor Project Engineer (or Representative) Date Jordan Howe Rainier Ave S Corridor Improvements - Phase 4 (S 3rd ST to NW 3rd PL) 801 2nd Avenue, Suite 302, Seattle, WA 98104 | P 206.436.0515 10/17/2024 Pivetta Brothers Construction Revised Interconnect, Illumination, and Signal Box Locations 74 (Revised3) STPUL-1615(005) CAG-22-163 10/17/2024 The following is documentation of an oral order given by the Engineer per WSDOT Specification 1-04.4. The Contractor shall install the interconnect, illumination, and signal boxes per the attached marked up roll plot. This work will be tracked by force account and paid as part of a future change order. Junction Box and Vault Relocation - Field Directive #74 Revision 3 Change Order #41 - Page 7 of 8 AGENDA ITEM #1. a)