HomeMy WebLinkAboutChange Order - 01Change Order No. 1 Contract Title: Windsock & 243 Bldg. GA Apron & Parking Lot Rehabilitation Project Contract No. CAG 25 013 Page 1 of 2 Change Order No. 1 Contract Title: Windsock & 243 Bldg. GA Apron & Parking Lot Rehabilitation Project Contractor:Westwater Construction Company Contract No. : CAG 25 013 Federal Aid No. : Ordered by Engineer Proposed by the Contractor (VECP) Unilateral Amount Notice to Proceed Date 05/14/2025 Original Contract:2,404,287.41 Original Working Days 66 Current Contract:2,404,287.41 Previous Substantial Completion Date 08/26/2025 Estimated Net Change This Order:72,438.81 Revised Calendar Days (This Change Order) 3 New Contract:2,476,726.22 Total Revised Calendar Days to Date 3 Revised Substantial Completion Date 08/29/2025 Prepared By:Reviewed By: City of Renton Principal Engineer Airport Date Airport Director Date Endorsed By:Endorsed By: Contractor Date Date Reviewed By:Executed By: City Attorney Date City of Renton Public Works Administrator / Mayor Date 5/30/25 MICHAEL J CAPLIS-PRESIDENT WESTWATER CONSTRUCTION COMPANY 5/30/2025 CAG-25-013, CO #1-25 6/16/2025Approved by Cheryl Beyer via email 5/30/2025 Attest:___________________________________________ Jason Seth, City Clerk Change Order No. 1 Contract Title: Windsock & 243 Bldg. GA Apron & Parking Lot Rehabilitation Project Contract No. CAG 25 013 Page 2 of 2 THE CONTRACT IS MODIFIED AS FOLLOWS: Description of Change:Adding Change Order Proposal 1. Reason for Change:(COP 1) The airport wanted to take advantage of the fact that this area was going to dug up to install underground conduit. Installing the underground conduit at this stage will save the City of Renton money down the road by not having to tear up the brand new asphalt. This COP covers the placement of necessary conduit underground for future electrification projects. COP 1 = $65,674.35 + Sales Tax (10.3%) = $65,674.35 + $6,764.46 = $72,438.81 Materials:See the attached price breakdown for the lump sum labor. Plans:N/A Equitable Adjustment:N/A Extension of Time:The Time for Completion is extended 3 Working Days. Sections 1 04.4 and 1 04.5 of the 2018 WSDOT/APWA Standard Specifications shall govern this Change Order. The Work of the referenced Contract is modified to include the changes detailed herein. The payment provided for herein shall constitute the complete and final settlement for all costs of labor, equipment, materials, overhead, profit, permit fees, and all other claims that may be made by the Contractor as a result of this change. Attachments: Forms to be attached to Change Order Plans Field Directive Change Order Quotation Estimated Change Order Cost Project Labor List Force Account Equipment Rate Request (DOT Form 422 010 EF) Equitable Adjustment Determination DATE EST# ITEM # LABOR NAME WORKER'S OCCUPATION REG HRS OT HRS RATE AMOUNT MICK CAPLIS FOREMAN 4 0 $116.45 $465.80 CHRIS WEBER OPERATOR 24 0 $99.21 $2,381.04 JULIANNE MCQUADE TRUCK DRIVER 8 0 $87.90 $703.20 FELIPE DURAN LABORER 24 0 $96.93 $2,326.32 $5,876.36 $1,704.14 $7,580.50 EQUIPMENT EQUIPMENT TYPE HOURS RATE AMOUNT MACK DUMP TRUCK 3 AXLE 8 76.81$ 614.48$ 2500 RAM(CAPLIS) 25004X4 4 18.10$ 72.40$ 4500 RAM(WEBER) 4500 4X2 24 27.22$ 653.28$ MIDI EX KOMATSU 78US 24 65.17$ 1,564.08$ $2,904.24 $609.89 $3,514.13 MATERIALS OR SERVICES VENDOR & INVOICE # MATERIAL QUANTITY UNIT PRICE UNIT AMOUNT BACKFILL MATERIAL TYPE 17 100 30 TN $3,000.00 DUMP FEE TRENCH SPOILS 100 27 TN $2,700.00 $5,700.00 $1,197.00 $6,897.00 Subcontractor COMPANY WORK AMOUNT COLVICO PROVIDE AND INSTALL CONDUIT 29,181.00$ SUBTOTAL SUBS 29,181.00$ 12% GENERAL CONTRACTOR MARKUP ON SUB CONTRACT WORK LESS THAN $50,000 $3,501.72 TOTAL $32,682.72 TOTAL $50,674.35 INSPECTOR CONTRACTOR'S REPRESENTATIVE Michael J Caplis TITLE Project Manager Junction Box 2500 6 15000 Subtotal $65,674.35 Tax (10.3%) $6,764.46 Total $72,438.81 DAILY REPORT OF FORCE ACCOUNT WORKED 05/30/2025 ADDED ELECTRICAL WORK PROPOSAL Westwater Construction WINDSOCK/243 ABD GA APRON REHAB CONTRACTOR EQUIPMENT SUBTOTAL COR01SUBCONTRACTORCOLVICO-ELEC WORK ONLY TOTAL MATERIALS 21% OVERHEAD AND PROFIT, BONDING, INSURANCE AND TAX MATERIALS SUBTOTAL INCLUDING TAX 21% OVERHEAD AND PROFIT, BONDING, INSURANCE AND TAX 29% OVERHEAD AND PROFIT, BONDING,INSURANCE AND TAX TOTAL LABOR EQUIPMENT SIZE LABOR SUBTOTAL TOTAL EQUIPMENT 5/ 2 9 / 2 0 2 5 TO : W E S T W A T E R C O N S T R U C T I O N AT T N . M I C K C A P L I S RE N T O N M U N I C P A L A I R P O R T WI N D S O C K & 2 4 3 B L D G . G A A P R O N & P A R K I N G L O T R E H A B CO P 1 RE V I S E D C O N D U I T I N S T A L L A T I O N F O R 1 - 4 " & 2 - 2 " P V C C O N D U I T S P E R P R O V I D E D D E T A I L ** * * EX C A V A T I O N B Y O T H E R S ** * * AD D 5 C O N T R A C T D A Y S MA T E R I A L 4" P V C S C H E D U L E 4 0 41 0 FT 2. 9 5 $ 1, 2 0 9 . 5 0 $ 0. 0 5 5 22 . 5 5 2" P V C S C H E D U L E 4 0 82 0 FT 1. 1 0 $ 90 2 . 0 0 $ 0. 0 3 5 28 . 7 4" P V C S C H E D U L E 4 0 S T U B 30 FT 2. 9 5 $ 88 . 5 0 $ 0. 0 5 5 1. 6 5 2" P V C S C H E D U L E 4 0 S T U B 60 FT 1. 2 0 $ 72 . 0 0 $ 0. 0 3 5 2. 1 4" B A S E S P A C E R S 82 EA 2. 8 6 $ 23 4 . 5 2 $ 0. 1 8. 2 2" B A S E S P A C E R S 82 EA 2. 4 5 $ 20 0 . 9 0 $ 0. 0 7 5. 7 4 2" I N T E R M E D I A T E S P A C E R S 82 EA 2. 4 5 $ 20 0 . 9 0 $ 0. 0 7 5. 7 4 4" P V C 9 0 E L B O W 12 EA 56 . 0 4 $ 67 2 . 4 8 $ 0. 9 5 11 . 4 2" P V C 9 0 E L B O W 24 EA 22 . 3 3 $ 53 5 . 9 2 $ 0. 5 5 13 . 2 4" P V C C O U P L I N G S 16 EA 8. 1 2 $ 12 9 . 9 2 $ 0. 1 1. 6 2" P V C C O U P L I N G S 32 EA 1. 8 1 $ 57 . 9 2 $ 0. 1 3. 2 4" B E L L E N D S 12 EA 12 . 1 4 $ 14 5 . 6 8 $ 0. 1 1. 2 2" B E L L E N D S 19 EA 4. 8 8 $ 92 . 7 2 $ 0. 1 1. 9 6" D E T E C T A B L E M A R K I N G T A P E 40 0 FT 0. 1 6 $ 64 . 0 0 $ 0. 0 0 3 1. 2 MA T E R I A L S U B T O T A L 4, 6 0 6 . 9 6 $ 10 8 . 3 8 MA R K U P 96 7 . 4 6 $ 21 % TO T A L M A T E R I A L 5, 5 7 4 . 4 2 $ LA B O R FO R E M A N E L E C T R I C I A N 10 8 . 3 8 HR S 13 0 . 3 3 $ 14 , 1 2 5 . 2 7 $ LO D G I N G 11 NI G H T S 15 0 . 0 0 $ 1, 6 5 0 . 0 0 $ PE R D I E M 11 D A Y S 20 . 0 0 $ 22 0 . 0 0 $ LA B O R S U B T O T A L 15 , 9 9 5 . 2 7 $ M A R K U P 4, 6 3 8 . 6 3 $ 29 % TO T A L L A B O R 20 , 6 3 3 . 9 0 $ EQ U I P M E N T 20 2 2 F - 2 5 0 4 X 4 E X T C A B / U T I L I T Y B O X 54 HR 45 . 4 9 2, 4 5 6 . 4 6 $ EQ U I P M E N T T O T A L 2, 4 5 6 . 4 6 $ MA R K U P 51 5 . 8 6 $ 21 % TO T A L E Q U I P M E N T 2, 9 7 2 . 3 2 $ TO T A L C H A N G E 29 , 1 8 0 . 6 4 $ HO U R S