HomeMy WebLinkAboutP_ 4th Dim_LANDSCAPE_DWGS_042825_V1SHEET NO:
DATE:
,7.;
L-1
APPLICANT:
ODG PROJECT #: 18-214
DRAWN BY: KL
CHECKED BY: KL
REVISIONS:
DRAWING INFORMATION
ORIGIN
1031 185TH AVE NE
SNOHOMISH, WA 98290
TEL: 425.346.1905
4T
H
D
I
M
E
N
S
I
O
N
M
I
X
E
D
U
S
E
DESIGN GROUP
STATE OF
WASHINGTON
LICENSED
LANDSCAPE ARCHITECT
KRYSTAL LOWE
LICENCE NO. 1206
# DESCRIPTION DATE
OF 5
5'1(6*'595'%6+1061905*+20146*4#0)''#561(
6*'9+..#/'66'/'4+&+#0
DRAWING TITLE:
64''4'6'06+10.#0&
%.'#4+0)2.#0
N
8+%+0+6;/#2
5%#.'
NE 4TH ST
SI
T
E
BR
E
M
E
R
T
O
N
AV
E
N
E
UN
I
O
N
A
V
E
N
E
HO
Q
U
I
A
M
A
V
E
N
E
NE 5TH ST
NE 6TH ST
DU
V
A
L
L
A
V
E
N
E
NE 7TH PL
NE 2ND CT
NE 7TH PL
NE 5TH ST
NE 6TH ST
1 2 3 4
5 6 7 8 9 10 11 12
13
':+56+0)64''+08'0614;
':+56+0)64''#%%'55/'06
13 existing Black Cottonwoods are located within the proposed expansion of
Bremerton Avenue NE and are to be removed.
45
0
2
N
E
4
T
H
S
T
R
E
E
T
,
R
E
N
T
O
N
,
W
A
9
8
0
5
9
1 SITE PLAN CHANGES 9/5/18
SHEET NO:
DATE:
,7.;
L-2
APPLICANT:
ODG PROJECT #: 18-214
DRAWN BY: KL
CHECKED BY: KL
REVISIONS:
DRAWING INFORMATION
ORIGIN
1031 185TH AVE NE
SNOHOMISH, WA 98290
TEL: 425.346.1905
4T
H
D
I
M
E
N
S
I
O
N
M
I
X
E
D
U
S
E
DESIGN GROUP
STATE OF
WASHINGTON
LICENSED
LANDSCAPE ARCHITECT
KRYSTAL LOWE
LICENCE NO. 1206
# DESCRIPTION DATE
OF 5
5'1(6*'595'%6+1061905*+20146*4#0)''#561(
6*'9+..#/'66'/'4+&+#0
DRAWING TITLE:
.#0&5%#2'2.#0
45
0
2
N
E
4
T
H
S
T
R
E
E
T
,
R
E
N
T
O
N
,
W
A
9
8
0
5
9
1 SITE PLAN CHANGES 9/5/18
SHEET NO:
DATE:
,7.;
L-3
APPLICANT:
ODG PROJECT #: 18-214
DRAWN BY: KL
CHECKED BY: KL
REVISIONS:
DRAWING INFORMATION
ORIGIN
1031 185TH AVE NE
SNOHOMISH, WA 98290
TEL: 425.346.1905
4T
H
D
I
M
E
N
S
I
O
N
M
I
X
E
D
U
S
E
DESIGN GROUP
STATE OF
WASHINGTON
LICENSED
LANDSCAPE ARCHITECT
KRYSTAL LOWE
LICENCE NO. 1206
# DESCRIPTION DATE
OF 5
5'1(6*'595'%6+1061905*+20146*4#0)''#561(
6*'9+..#/'66'/'4+&+#0
DRAWING TITLE:
.#0&5%#2'2.#0
TREE PLANTING / STAKING1
3
TREE GUYING2
3
GROUNDCOVER PLANTING3
3
SHRUB PLANTING4
3
)'0'4#.016'5
The General Contractor is to provide subgrades 4" below hard surfaces plus/minus .1
foot.
All rough grading shall be positive, draining away from all structures.
All stones larger than 1.5" diameter shall be removed from the growing medium.
All new landscape areas shall incorporate soil amendments as follows: the uppermost
twelve (12) inches of soil shall be tilled and two (2) inches of composted
material shall be fully incorporated into the tilled soil; or to specifications as otherwise
provided in the Stormwater Management Manual of Western Washington,
Department of Ecology, dated August 2012, or as subsequently amended. Compaction
of landscaping areas from vehicles and heavy equipment shall be
avoided after tilling.
All bed areas to receive 2" of fine ground fir or hemlock bark, composition mulches are
not an acceptable alternative.
Trees and shrubs are to be planted at a depth 3/4" higher than the level that they were
grown in the nursery.
Bark mulch is not to be placed above the root crown.
All plants shall at least conform to the minimum standard established by the American
association of nurserymen.
Lawn areas are to be hydroseeded per manufacturer's specifications, or approved
equal. Remove all stones larger than 1" from lawn areas.
Substitutions are strongly discouraged. If plant availability is a problem, contact the
Landscape Architect for sources or acceptable alternatives.
If the site work is different than shown on the Landscape Plan, or poor soils and debris
are discovered, requiring changes to the Landscape Plan, contact the Landscape
Architect for instruction.
The Landscape Contractor is responsible for maintaining the landscape during
installation, until final acceptance by the owner's representative.
The Landscape Contractor shall warranty all materials and workmanship for a period of
one year, from the time of final acceptance.
During the warranty period, the Landscape Contractor will not be responsible for plant
death caused by unusual climatic conditions, vandalism, theft, fire, or poor
maintenance practices.
Plant counts provided are estimates only. contractor is responsible for calculating all
final area and counts. Plan takes precedent over plant schedule.
All proposed landscape beds and containers shall received permanent irrigation by
means of sprinklers and drip irrigation.
+44+)#6+10
45
0
2
N
E
4
T
H
S
T
R
E
E
T
,
R
E
N
T
O
N
,
W
A
9
8
0
5
9
1 SITE PLAN CHANGES 9/5/18
SHEET NO:
DATE:
,7.;
L-4
APPLICANT:
ODG PROJECT #: 18-214
DRAWN BY: KL
CHECKED BY: KL
REVISIONS:
DRAWING INFORMATION
ORIGIN
1031 185TH AVE NE
SNOHOMISH, WA 98290
TEL: 425.346.1905
4T
H
D
I
M
E
N
S
I
O
N
M
I
X
E
D
U
S
E
DESIGN GROUP
STATE OF
WASHINGTON
LICENSED
LANDSCAPE ARCHITECT
KRYSTAL LOWE
LICENCE NO. 1206
# DESCRIPTION DATE
OF 5
5'1(6*'595'%6+1061905*+20146*4#0)''#561(
6*'9+..#/'66'/'4+&+#0
DRAWING TITLE:
+44+)#6+102.#0
ALL CITY RENTON STANDARDS SHALL BE FOLLOWED.
PLAN IS DIAGRAMMATIC AND CONCEPTUAL IN NATURE. STANDARD TRADE PRACTICES SHALL BE EMPLOYED TO INSURE
ECONOMY OF TRENCHING AND SLEEVING. EXACT LOCATION OF LINES AND HEADS MAY BE ALTERED BY CONTRACTOR
TO PROVIDE BEST WATER COVERAGE. MANUFACTURER'S RECOMMENDED HEAD SPACING SHALL BE EXCEEDED ONLY
WITH PERMISSION OF LANDSCAPE ARCHITECT.
ALL IRRIGATION SLEEVING TO BE THE RESPONSIBILITY OF THE IRRIGATION CONTRACTOR. ELECTRICAL WIRES FOR
IRRIGATION VALVES AND IRRIGATION LINES ARE TO BE PLACED IN SEPARATE SLEEVES.
IRRIGATION TRENCH DEPTHS, 18" FOR MAINLINE, 12" FOR LATERAL LINES. TRENCHES SHALL BE FREE OF ALL DEBRIS THAT
CAN RESULT IN DAMAGE TO THE PIPING.
SET VALVE BOXES SQUARE TO ADJACENT BUILDINGS, WALKS OR PARKING.
OWNER TO PROVIDE DEDUCT/EXEMPT METER AS REQUIRED BY WATER PURVEYOR.
SWING JOINTS TO BE EITHER TRIPLE SWING JOINTS OR TORO FUNNY PIPE.
LEAVE A MINIMUM OF 3' OF ADDITIONAL CONTROL WIRE LOOPED AT EACH VALVE BOX. ATTACH CONTROL WIRES TO
THE ADJACENT PIPING WITH ELECTRICAL TAPE, AT LEAST EVERY 20'. RUN 3 SPARE WIRES ALONG ENTIRE LENGTH OF
MAINLINE, LOOP THROUGH EACH VALVE BOX TO FARTHEST VALVE BOX EACH DIRECTION.
+44+)#6+10016'5
45
0
2
N
E
4
T
H
S
T
R
E
E
T
,
R
E
N
T
O
N
,
W
A
9
8
0
5
9
1 SITE PLAN CHANGES 9/5/18
SHEET NO:
DATE:
,7.;
L-5
APPLICANT:
ODG PROJECT #: 18-214
DRAWN BY: KL
CHECKED BY: KL
REVISIONS:
DRAWING INFORMATION
ORIGIN
1031 185TH AVE NE
SNOHOMISH, WA 98290
TEL: 425.346.1905
4T
H
D
I
M
E
N
S
I
O
N
M
I
X
E
D
U
S
E
DESIGN GROUP
STATE OF
WASHINGTON
LICENSED
LANDSCAPE ARCHITECT
KRYSTAL LOWE
LICENCE NO. 1206
# DESCRIPTION DATE
OF 5
5'1(6*'595'%6+1061905*+20146*4#0)''#561(
6*'9+..#/'66'/'4+&+#0
DRAWING TITLE:
+44+)#6+102.#0
DRIP ZONE KIT
XFS SUB-SURFACE DRIPLINE END FEED LAYOUTXFS SUB-SURFACE DRIPLINE BURIAL
XFS SUB-SURFACE DRIPLINE CENTER FEED LAYOUT4
5
6
5
5
5
3
5
REMOTE CONTROL VALVE POP UP SPRAY HEAD1
5
2
5
45
0
2
N
E
4
T
H
S
T
R
E
E
T
,
R
E
N
T
O
N
,
W
A
9
8
0
5
9
1 SITE PLAN CHANGES 9/5/18