FIELD REPORT
Project No. 5719.05 Page 1 of 3 Report ID 5719.05 S 2025 0613
Date Fri 6/13/2025 Weather 66°F, Cloudy
Arrival/Departure Time(s) 12:30pm/12:40pm Travel Time (hr) 1.0
Project Name Solera
Location 2902 NE Sunset Blvd, Renton
ESNW Rep., CESCL No.,
Phone No. & Report Statement
Jessie Gilbert, ECO-3-6132204, (206) 468-0991
“This report is true, accurate, and complete to the best of my knowledge and belief.”
Client Info/Contact Heartland Construction, LLC | Mike Vaughan, Benham Hansen
Permit No(s). WAR310291
Reviewed By JB
Initials/Date
N/A
Field Supervisor Project Manager Initials/Date
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s
observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for
obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible
for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
Type of visit: Daily Weekly Monthly Other
Precipitation since last inspection (approximate): 0.00 inches
Precipitation in last 24 hours (approximate): 0.00 inches
Phase of active construction (check all that apply):
Pre-construction Clearing, demolition, or grading Infrastructure or roads
Concrete handling Vertical construction Utilities
Off-site improvements Site temporarily stabilized Final stabilization
Was water quality sampling part of this inspection? Yes No
If “Yes”:
• Record results in the table below.
• Hanna Turbidity Meter No. 30
Monitoring
Point Monitoring Location Turbidity
(NTU) pH Description of
Discharge Notes
MP 1 NE 10th St - - N/A
MP 2 Infiltration facility - - N/A
MP 3 N Kirkland Ave NE - - N/A
MP 4 S Kirkland Ave NE - - N/A
MP 5 NE 12th St - - N/A
MP 6 Harrington Place NE - - N/A
5 '0 1'
3$
i 9 5 '$ esn w.com
*HRWHFKQLFDO(QJLQHHULQJ
(QYLURQPHQW DO6HUYLFHV
(DUWKZRUN2EVHUYDWLRQ 7HVWLQJ
&(6&/ 6WRUPZDWHU6HUYLFHV
Report ID 5719.05 S 2025 0613 Page 2 of 3
Erosion Control BMPs
(13 Elements)
Overall
Condition
(Good; Fair; Poor)
Needs
Repair?
(Yes; No)
Comments
1. Preserve Vegetation; Mark Clearing Limits
• Buffer zones around sensitive areas • Fence G N -Construction fence around site perimeter.
2. Establish Construction Access
• Fabric; quarry spalls
• Wheel wash
• Sweeper truck
G N
-Jefferson Ave NE and NE 11th St entrances are
paved.
-Quarry spall entrance at Block C.
-No visible sign of track-out during visit.
3. Control Flow Rates • Stormwater vault; facility
• Straw wattles
• Check dams
G N -Infiltration facility under Building B.
4. Install Sediment Controls
• Silt fence
• Vegetation
• Sediment ponds; traps • Treatment
F Y -Silt fence along Blocks C and D down in
multiple areas; repair silt fence.
5. Stabilize Soils
• Nets and blankets • Mulch; bark; rock
• Vegetation
• Plastic covering
• Water truck
G N
-Final pavement throughout majority of site roads.
-Buildings A and B are landscaped.
-Block C is covered in grass.
-Block D is stabilized with gravel.
-Exposed soils appear covered.
6. Protect Slopes • Benching; track-walking - - N/A
7. Protect Drain Inlets • Catch basin inserts G N
-Inserts in catch basins along S perimeter of
Buildings A and B.
-No construction activity along Jefferson Ave NE
and NE 11th St.
8. Stabilize Channels and Outlets
• Channel lining
• Check dams
- - N/A
9. Control Pollutants
• Chemical storage area covered • Concrete handling G N -Chemical/material storage onsite.
10. Control Dewatering - - N/A
11. Maintain BMPs F Y -See action item below.
12. Maintain SWPPP & Site Logbook G N -Available upon request.
13. Protect Low-Impact Development (LID BMPs) • Bioretention rain garden facilities
• Permeable pavement G N -Bioretention ponds and swales are mulched and
hydroseeded.
Do existing BMPs need to be modified or removed, or do other BMPs need to be installed? Yes No
List the action items in the table below:
Element
# Description and Location Action Required Completion
Date
4 Silt fence along Blocks C and D down in multiple areas Repair silt fence
Report ID 5719.05 S 2025 0613 Page 3 of 3
BMP LEGEND
MONITORING POINT
HYDROSEED
FINAL STABILIZED
CHEMICAL/MATERIAL STORAGE
INFILTRATION FACILITY
STABILIZED CONSTRUCTION ACCESS
GRAVEL
PAVEMENT
SILT FENCE
CHAIN-LINK FENCE
BIOSWALE
BIORETENTION RAIN GARDEN
CATCH BASIN INSERT
MP 3
MP 4
MP 5
MP 6
MP 1
MP 2
Repair silt fence.