Loading...
HomeMy WebLinkAboutRS_Longacres_Master_Plan_EIS_Site_Coverages LONGACRES MASTER PLAN EIS SITE COVERAGES Existing Site Alternative 1 Alternative 2 Alternative 3 Conditions No Action Preferred Development Max Development (ac) (ac) (ac) (ac) Impervious Areas Building Footprint 7.20 9.10 33.96 34.50 Surface Parking 20.54 28.30 7.69 7.69 Roadways 3.08 6.00 22.60 22.60 PGIS Sports Fields 9.97 9.97 9.97 9.97 NPGIS Paving 13.65 38.10 15.63 15.63 Built Area Subtotals: 54.44 91.47 89.85 90.39 Pervious Areas Landscape/Lawn 57.76 20.73 22.35 21.81 Critical Areas & Buffers 15.02 15.02 15.02 15.02 Built Area Subtotals: 72.78 35.75 37.37 36.83 Total Area: 127.22 127.22 127.22 127.22 Impervious Percentage: 43% 72% 71% 71%