HomeMy WebLinkAboutChange Order - 41Contract Title: Change Order No. 41 Rainier Ave S Corridor Improvements -Phase 4 Contractor: Pivetta Brothers Construction, Inc. Contract No.: CAG-22-163 Federal Aid No.: STPUL-1615(005) � Ordered by Engineer � Force Account □Proposed by the Contractor (VECP)□Bid Item□Unilateral □Bid Item Price Adjustment□Lump Sum Affects DBE Work: 0 No � Yes If yes, must receive concurrence from Local Programs prior to execution. Amount Working Days Original Contract: $28,284,172.90 500 Current Contract: $35,696,706.45 654 Estimated Net Change This Order: $117,000.00 0 New Contract: $35,813,706.45 654 P � pated B� l � s d By: ___,__,,.....J<-+-�------c;�/ <P_.b-�ois � . �� � R�e'fit Engineer Date �er(Cityof Renton Transportation Reviewed By: 5/7/2025 Date Design Manager) Consent By: Surety (Greater than 25% cost and/or 20% time increase) Endorsed By: Date 5/12/2025 B • 11 Ad Digitally signed by Bill Adams I a ms Date: 2025.05.19 15:04:58-07'0�/19/2025 Reviewed By: City Attorney Change Order No. Contract Title: Contract No. Date Date 41 Contractor Executed By: City of Renton Public Works Administrator/ Mayor Rainier Ave S. Corridor Improvements -Phase 4 CAG-22-163 Date Date Page 1 of 8 CAG-22-163, CO #41-25 6/17/2025Approved by Cheryl Beyer via email 5/16/2025 Attest:_______________________________ Jason Seth, City Clerk THE CONTRACT IS MODIFIED AS FOLLOWS: Description of Change: The City of Renton directed the Contractor to install and relocate signal junction boxes, illumination junction boxes, SG junction boxes, and interconnect vaults as shown in Field Directive #74 Revision 3. The junction boxes and vaults are to be located and installed in the planter strip where feasible, or at the back of sidewalk as shown in the Field Directive. Proposal Schedule of Prices: ADD the following to Schedule A: 41-A206 -Additional Work to Install and Relocate Signal Junction Boxes, Illumination Junction Boxes, SG Junction Boxes, and Interconnect Vaults Per FD #74 Rev. 3, 1 EST@ $117,000.00 = $117,000.00 Specification and/or Special Provision: None. Description: ADD the following to 8-20.3(6): The Contractor shall work to install and relocate signal junction boxes, illumination junction boxes, SG junction boxes, and interconnect vaults as shown in Field Directive #74 Revision 3. Materials: None. Measurement: ADD the following to 8-20.4: No specific unit of measurement shall apply to the force account item of "Additional Work to Install and Relocate Signal Junction Boxes, Illumination Junction Boxes, SG Junction Boxes, and Interconnect Vaults Per FD #74 Rev. 3." Payment: ADD the following to 8-20.5: "Additional Work to Install and Relocate Signal Junction Boxes, Illumination Junction Boxes, SG Junction Boxes, and Interconnect Vaults Per FD #74 Rev. 3," force account. Plans: Field Directive #74, Revision 3 roll plot. Change Order No. Contract Title: Contract No. 41 Rainier Ave S. Corridor Improvements -Phase 4 CAG-22-163 Page 2 of 8 Reason for Change: The plans orig inally required signal junction boxes, illu mination junction boxes, SG junction boxes, and interc onnect vaults to be installed within the sidewalk. This change relocates those elements outside of the Pedestrian Access Route (PAR) where possible, helping to maintain a clear and continuous sidewalk. The adju stment aligns with the City's intent of minimizing obstructions within the sidewalk area. Equitable Adjustment: This Change Order do es include an equitable adjustment per Section 1-09.4 of the 2022 WSDOT/APWA Standard Spec if ications. See attached. Estimated Cost: $ 117,000.00 Extended Overhead: $ 0.00 Force Account Time Related Damages per 1-09.6.6.d: $ 0.00 Sales Tax (if applicable) 10.1% $ 0.00 Total: $ 117,000.00 41-A206 -Additional Work to Install and Relocate Signal Junction Boxes, Illumination Junction Boxes, SG Junction Boxes, and Interconnect Vaults Per FD #74 Rev. 3 An independent estimate was prepared for the cost of installing and relocating signal junction boxes, illumination junction boxes, SG junction boxes, and interc onnect vaults per Field Directive #74 Rev. 3. This cost was calculated to be $116,728.09 and has been rounded to an estimated cost of $117,000.00. Extension of Time: The Time for Completion is extended _O_ Working Days. Affects DBE Work: Yes. Sections 1-04.4 and 1-04.5 of the 2022 WSDOT / APWA Standard Specifications shall govern this Change Order. The Work of the referenced Contract is modified to include the changes detailed herein. The payment provided for herein shall constitute the complete and final settlement for all costs of labor, equipment, materials, overhead, profit, permit fees, and all other claims that may be made by the Contractor because of this change. Change Order No. Contract Title: Contract No. 41 Rainier Ave S. Corridor Improvements -Phase 4 CAG-22-163 Page 3 of 8 To be attached to Change Order: �1-Estimated Change Order Cost □2-Plans �3-Field Directive/Request for Information Response □4-Change Order Quotation □5-Project Labor List □6-Force Account Equipment Rate Request {DOT Form 422-010 EF) □7-Equitable Adjustment Determination □8-Additional Working Days Calculation Change Order No. Contract Title: Contract No. 41 Rainier Ave S. Corridor Improvements -Phase 4 CAG-22-163 Page 4 of 8 Junction Box and Vault Relocation -Estimated Change Order Cost Change Order Cost (Equitable Adjustment) Project Name: Contractor: Contract No: Federal Aid No: Construction Manager: Rainier Ave S Corridor Improvements -Phase 4 Pivetta Brothers Construction, Inc. CAG-22-163 STPUL-1615(005) Perteet Change Order No. 41 By: Shannon Tremper Date: 5/5/2025 Independent Cost Estimate Item No. Description Additional Work to Install and Relocate Signal Junction 41-A206 Boxes, Illumination Junction Boxes, 5G Junction Boxes, and Interconnect Vaults Per FD #74 Rev. 3 Labor -Golden Gate (Electrician Foreman) Labor -Golden Gate (Electrician) Labor -Golden Gate (Cable Splicer) Labor -Golden Gate (Apprentice Electrician) Labor Markup (Golden Gate) Equipment -Golden Gate (Pickup Truck) Equipment -Golden Gate (Pickup Truck) Equipment -Golden Gate (Bobcat Excavator) Equipment -Golden Gate (Compact Excavator) Equipment Markup (Golden Gate) Materials (Golden Gate) (Sweeps, Couplings) Materials Markup (Golden Gate) Subcontractor Markup, < $25,000 Subcontractor Markup, > $25,000 Labor -Survey (2-Person Crew) Labor Markup (Survey) Equipment -Survey (Pickup Truck) Equipment -Survey (GPS) Equipment Markup (Survey) Subcontractor Markup, < $25,000 Item Change Additional Work to Install and Relocate Signal Junction 41-A206 Boxes, Illumination Junction Boxes, 5G Junction Boxes, and Interconnect Vaults Per FD #74 Rev. 3 TOTAL CHANGE ORDER COST Summary of Contractors Quotes: Item Quote Location N/A Total Quoted Added Cost: Quoted Cost N/A $ $ $ $ $ $ $ $ Quantity Unit Unit Price Estimated Cost 55 Hours $ 118.00 $ 6,490.00 110 Hours $ 118.00 $ 12,980.00 110 Hours $ 111.00 $ 12,210.00 110 Hours $ 65.00 $ 7,150.00 38,830.00 Cents/Dollar $ 0.31 $ 12,037.30 110 Hours $ 46.00 $ 5,060.00 110 Hours $ 30.00 $ 3,300.00 110 Hours $ 68.00 $ 7,480.00 55 Hours $ 68.00 $ 3,740.00 19,580.00 Cents/Dollar $ 0.21 $ 4,111.80 1 LS $ 10,000.00 $ 10,000.00 10,000.00 Cents/Dollar $ 0.21 $ 2,100.00 25,000.00 Cents/Dollar $ 0.12 $ 3,000.00 61,659.10 Cents/Dollar $ 0.10 $ 6,165.91 CALCULATED TOTAL: $ 95,825.01 146 Hours $ 65.00 $ 9,490.00 9,490.00 Cents/Dollar $ 0.31 $ 2,941.90 73 Hours $ 46.00 $ 3,358.00 73 Hours $ 20.00 $ 1,460.00 4,818.00 Cents/Dollar $ 0.21 $ 1,011.78 18,261.68 Cents/Dollar $ 0.12 $ 2,191.40 CALCULATED TOTAL: $ 20,453.08 CALCULATED TOTAL: $ 116,278.09 ESTIMATED TOTAL: $ 117,000.00 1 EST $ 117,000.00 $ 117,000.00 $ 117,000.00 Change Order #41 -Page 5 of 8 Yu Hong Wu, President 5/8/2025 Junction Box and Vault Relocation -Field Directive #7 4 Revision 3 PERTEET FIELD DIRECTIVE 8012nd Avenue, Su;te 302, Seattle, WA 9810 4 I P206.436.0 515 Project Name Federal Aid # Contract No. Date Rainier Ave S Corridor Improvements Phase 4 (S 3rd ST to NW 3rd PL) STPUL-1615(005) CAG-22-163 10/17/2024 Field Directive Description Field Directive No. Revised Interconnect, Illumination, and Signal Box Locations 7 4 (Revised3) Contractor Pivetto Brothers Construction The following is documentation of on oral order given by the Engineer per WSDOT Specification 1-04.4. The Contractor shall install the interconnect, illumination, and signal boxes per the attached marked up roll plot. This work will be tracked by force account and paid as port of a future change order. Project Engineer (or Representative) Date Jordan Howe 10/17/2024 Change Order #41 -Page 7 of 8