HomeMy WebLinkAboutChange Order - 41Contract Title:
Change Order No. 41
Rainier Ave S Corridor Improvements -Phase 4
Contractor: Pivetta Brothers Construction, Inc.
Contract No.: CAG-22-163
Federal Aid No.: STPUL-1615(005)
� Ordered by Engineer � Force Account □Proposed by the Contractor (VECP)□Bid Item□Unilateral □Bid Item Price Adjustment□Lump Sum
Affects DBE Work: 0 No � Yes If yes, must receive concurrence from Local Programs
prior to execution.
Amount Working Days
Original Contract: $28,284,172.90 500
Current Contract: $35,696,706.45 654
Estimated Net Change This Order: $117,000.00 0
New Contract: $35,813,706.45 654
P
�
pated B� l
�
s d By:
___,__,,.....J<-+-�------c;�/ <P_.b-�ois � . �� �
R�e'fit Engineer Date �er(Cityof Renton Transportation
Reviewed By:
5/7/2025
Date
Design Manager)
Consent By:
Surety (Greater than 25% cost and/or 20%
time increase)
Endorsed By:
Date
5/12/2025 B • 11 Ad Digitally signed by Bill Adams I a ms Date: 2025.05.19 15:04:58-07'0�/19/2025
Reviewed By:
City Attorney
Change Order No.
Contract Title:
Contract No.
Date
Date
41
Contractor
Executed By:
City of Renton Public Works
Administrator/ Mayor
Rainier Ave S. Corridor Improvements -Phase 4
CAG-22-163
Date
Date
Page 1 of 8
CAG-22-163, CO #41-25
6/17/2025Approved by Cheryl Beyer via email 5/16/2025
Attest:_______________________________
Jason Seth, City Clerk
THE CONTRACT IS MODIFIED AS FOLLOWS:
Description of Change:
The City of Renton directed the Contractor to install and relocate signal junction boxes,
illumination junction boxes, SG junction boxes, and interconnect vaults as shown in Field Directive
#74 Revision 3. The junction boxes and vaults are to be located and installed in the planter strip
where feasible, or at the back of sidewalk as shown in the Field Directive.
Proposal Schedule of Prices:
ADD the following to Schedule A:
41-A206 -Additional Work to Install and Relocate Signal Junction Boxes, Illumination Junction
Boxes, SG Junction Boxes, and Interconnect Vaults Per FD #74 Rev. 3, 1 EST@ $117,000.00 =
$117,000.00
Specification and/or Special Provision:
None.
Description:
ADD the following to 8-20.3(6):
The Contractor shall work to install and relocate signal junction boxes, illumination junction
boxes, SG junction boxes, and interconnect vaults as shown in Field Directive #74 Revision 3.
Materials:
None.
Measurement:
ADD the following to 8-20.4:
No specific unit of measurement shall apply to the force account item of "Additional
Work to Install and Relocate Signal Junction Boxes, Illumination Junction Boxes, SG Junction
Boxes, and Interconnect Vaults Per FD #74 Rev. 3."
Payment:
ADD the following to 8-20.5:
"Additional Work to Install and Relocate Signal Junction Boxes, Illumination Junction Boxes,
SG Junction Boxes, and Interconnect Vaults Per FD #74 Rev. 3," force account.
Plans:
Field Directive #74, Revision 3 roll plot.
Change Order No.
Contract Title:
Contract No.
41
Rainier Ave S. Corridor Improvements -Phase 4
CAG-22-163
Page 2 of 8
Reason for Change:
The plans orig inally required signal junction boxes, illu mination junction boxes, SG junction
boxes, and interc onnect vaults to be installed within the sidewalk. This change relocates
those elements outside of the Pedestrian Access Route (PAR) where possible, helping to
maintain a clear and continuous sidewalk. The adju stment aligns with the City's intent of
minimizing obstructions within the sidewalk area.
Equitable Adjustment:
This Change Order do es include an equitable adjustment per Section 1-09.4 of the 2022
WSDOT/APWA Standard Spec if ications. See attached.
Estimated Cost: $ 117,000.00
Extended Overhead: $ 0.00
Force Account Time Related Damages per 1-09.6.6.d: $ 0.00
Sales Tax (if applicable) 10.1% $ 0.00
Total: $ 117,000.00
41-A206 -Additional Work to Install and Relocate Signal Junction Boxes, Illumination Junction
Boxes, SG Junction Boxes, and Interconnect Vaults Per FD #74 Rev. 3
An independent estimate was prepared for the cost of installing and relocating signal
junction boxes, illumination junction boxes, SG junction boxes, and interc onnect vaults per
Field Directive #74 Rev. 3. This cost was calculated to be $116,728.09 and has been
rounded to an estimated cost of $117,000.00.
Extension of Time: The Time for Completion is extended _O_ Working Days.
Affects DBE Work:
Yes.
Sections 1-04.4 and 1-04.5 of the 2022 WSDOT / APWA Standard Specifications shall govern
this Change Order. The Work of the referenced Contract is modified to include the changes
detailed herein. The payment provided for herein shall constitute the complete and final
settlement for all costs of labor, equipment, materials, overhead, profit, permit fees, and all
other claims that may be made by the Contractor because of this change.
Change Order No.
Contract Title:
Contract No.
41
Rainier Ave S. Corridor Improvements -Phase 4
CAG-22-163
Page 3 of 8
To be attached to Change Order:
�1-Estimated Change Order Cost
□2-Plans
�3-Field Directive/Request for Information Response
□4-Change Order Quotation
□5-Project Labor List
□6-Force Account Equipment Rate Request {DOT Form 422-010 EF)
□7-Equitable Adjustment Determination
□8-Additional Working Days Calculation
Change Order No.
Contract Title:
Contract No.
41
Rainier Ave S. Corridor Improvements -Phase 4
CAG-22-163
Page 4 of 8
Junction Box and Vault Relocation -Estimated Change Order Cost
Change Order Cost (Equitable Adjustment)
Project Name:
Contractor:
Contract No:
Federal Aid No:
Construction Manager:
Rainier Ave S Corridor Improvements -Phase 4
Pivetta Brothers Construction, Inc.
CAG-22-163
STPUL-1615(005)
Perteet
Change Order No. 41
By: Shannon Tremper
Date: 5/5/2025
Independent Cost Estimate
Item No. Description
Additional Work to Install and Relocate Signal Junction
41-A206 Boxes, Illumination Junction Boxes, 5G Junction Boxes, and
Interconnect Vaults Per FD #74 Rev. 3
Labor -Golden Gate (Electrician Foreman)
Labor -Golden Gate (Electrician)
Labor -Golden Gate (Cable Splicer)
Labor -Golden Gate (Apprentice Electrician)
Labor Markup (Golden Gate)
Equipment -Golden Gate (Pickup Truck)
Equipment -Golden Gate (Pickup Truck)
Equipment -Golden Gate (Bobcat Excavator)
Equipment -Golden Gate (Compact Excavator)
Equipment Markup (Golden Gate)
Materials (Golden Gate) (Sweeps, Couplings)
Materials Markup (Golden Gate)
Subcontractor Markup, < $25,000
Subcontractor Markup, > $25,000
Labor -Survey (2-Person Crew)
Labor Markup (Survey)
Equipment -Survey (Pickup Truck)
Equipment -Survey (GPS)
Equipment Markup (Survey)
Subcontractor Markup, < $25,000
Item Change
Additional Work to Install and Relocate Signal Junction
41-A206 Boxes, Illumination Junction Boxes, 5G Junction Boxes, and
Interconnect Vaults Per FD #74 Rev. 3
TOTAL CHANGE ORDER COST
Summary of Contractors Quotes:
Item Quote Location
N/A
Total Quoted Added Cost:
Quoted Cost
N/A
$
$
$
$
$
$
$
$
Quantity Unit Unit Price Estimated Cost
55 Hours $ 118.00 $ 6,490.00
110 Hours $ 118.00 $ 12,980.00
110 Hours $ 111.00 $ 12,210.00
110 Hours $ 65.00 $ 7,150.00
38,830.00 Cents/Dollar $ 0.31 $ 12,037.30
110 Hours $ 46.00 $ 5,060.00
110 Hours $ 30.00 $ 3,300.00
110 Hours $ 68.00 $ 7,480.00
55 Hours $ 68.00 $ 3,740.00
19,580.00 Cents/Dollar $ 0.21 $ 4,111.80
1 LS $ 10,000.00 $ 10,000.00
10,000.00 Cents/Dollar $ 0.21 $ 2,100.00
25,000.00 Cents/Dollar $ 0.12 $ 3,000.00
61,659.10 Cents/Dollar $ 0.10 $ 6,165.91
CALCULATED TOTAL: $ 95,825.01
146 Hours $ 65.00 $ 9,490.00
9,490.00 Cents/Dollar $ 0.31 $ 2,941.90
73 Hours $ 46.00 $ 3,358.00
73 Hours $ 20.00 $ 1,460.00
4,818.00 Cents/Dollar $ 0.21 $ 1,011.78
18,261.68 Cents/Dollar $ 0.12 $ 2,191.40
CALCULATED TOTAL: $ 20,453.08
CALCULATED TOTAL: $ 116,278.09
ESTIMATED TOTAL: $ 117,000.00
1 EST $ 117,000.00 $ 117,000.00
$ 117,000.00
Change Order #41 -Page 5 of 8
Yu Hong Wu, President
5/8/2025
Junction Box and Vault Relocation -Field Directive #7 4 Revision 3
PERTEET
FIELD DIRECTIVE
8012nd Avenue, Su;te 302, Seattle, WA 9810 4 I P206.436.0 515
Project Name Federal Aid # Contract No. Date
Rainier Ave S Corridor Improvements
Phase 4 (S 3rd ST to NW 3rd PL) STPUL-1615(005) CAG-22-163 10/17/2024
Field Directive Description Field Directive No.
Revised Interconnect, Illumination, and Signal Box Locations 7 4 (Revised3)
Contractor
Pivetto Brothers Construction
The following is documentation of on oral order given by the Engineer per WSDOT Specification 1-04.4.
The Contractor shall install the interconnect, illumination, and signal boxes per the attached marked up roll plot.
This work will be tracked by force account and paid as port of a future change order.
Project Engineer (or Representative) Date
Jordan Howe 10/17/2024
Change Order #41 -Page 7 of 8