Loading...
HomeMy WebLinkAboutR-432711ti N co I uj I— N Q L J I U 12" MIN. LEVEL BOTTOM 2' MIN. SWALE SPACING DEPENDS ON SLOPE GRADIENT 2 2 MAX. MAX. ,! 1. CONDITIONS OF USE 1.1. REQUIRED AT: 1.1.1. THE TOP OF ALL SLOPES IN EXCESS OF 3H:1V AND WITH MORE THAN 20 FEET OF VERTICAL RELIEF. 1.1.2. AT INTERVALS ON ANY SLOPES THAT EXCEEDS THE DIMENSIONS SPECIFIED BELOW. AVERAGE SLOPE SLOPE PERCENT FLOW PATH LENGTH 20HAV (OR LESS) 3-5% 300 FEET (10 TO 20)H:1V 5-10% 200 FEET (4 TO 10)HAV 10-25% 100 FEET (2 TO 4)H:1 V 25-50% 50 FEET 2. DESIGN AND INSTALLATION SPECIFICATIONS 2.1. FOR SLOPES STEEPER THAN 2H:1 V WITH MORE THAN 10 FEET OF VERTICAL RELIEF, BENCHES MAY BE CONSTRUCTED OR CLOSER SPACED INTERCEPTOR SWALES MAY BE USED. THE DESIRED MEASURE MUST BE DESIGNED BY AN ENGINEER TO EFFECTIVELY INTERCEPT THE HIGH VELOCITY RUNOFF TO A SEDIMENT POND OR TRAP. 2.2. CONSTRUCTION TRAFFIC OVER TEMPORARY SWALES SHALL BE MINIMIZED. 3. MAINTENANCE STANDARDS 3.1. DAMAGE RESULTING FROM RUNOFF OR CONSTRUCTION ACTIVITY SHALL BE REPAIRED IMMEDIATELY. 3.2. IF THE FACILITIES DO NOT REGULARLY RETAIN STORM RUNOFF, THE CAPACITY AND/OR FREQUENCY OF THE SWALES SHALL BE INCREASED. UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS) STD. PLAN - 217.10 c PUBLIC WORKS APPR 6t D: DEPARTMENT INTERCEPTOR SWALE GAZ 9/28/2018 " AMOF Pubrc Works Administrator DATE 4 C-502 INTERCEPTOR SWALE DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878 TOE IN 4" x 4" 7 w C-502 Q Z W NOTES: 1. CONDITIONS OF USE 1.1. PLASTIC COVERING MAY BE USED ON DISTURBED AREAS THAT REQUIRE COVER MEASURES FOR LESS THAN 30 DAYS. 1.2. PLASTC IS PARTICULARLY USEFUL FOR PROTECTING CUT AND FILL SLOPES AND STOCKPILES. 1.3. CLEAR PLASTIC SHEETING MAY BE USED OVER NEWLY -SEEDED AREAS TO CREATE A GREENHOUSE EFFECT AND ENCOURAGE GRASS GROWTH. CLEAR PLASTIC SHOULD NOT BE USED FOR THIS PURPOSE DURING THE SUMMER MONTHS. 1.4. THIS METHOD SHALL NOT BE USED UPSLOPE OF AREAS THAT MIGHT BE ADVERSELY IMPACTED BY RUNOFF. SUCH AREAS INCLUDE STEEP AND UNSTABLE SLOPES. 2. DESIGN AND INSTALLATION SPECIFICATIONS 2.1. PLASTIC SHEETING SHOULD HAVE A MINIMUM THICKNESS OF 0.06 MILLIMETERS. 2.2. IF EROSION AT THE TOE OF A SLOPE IS LIKELY, A GRAVEL BERM, RIPRAP, OR OTHER SUITABLE PROTECTION SHALL BE INSTALLED AT THE TOE OF THE SLOPE IN ORDER TO REDUCE THE VELOCITY OF RUNOFF. 2.3. TIRES, SAND BAGS, OR EQUIVALENT MAY BE USED TO WEIGHT PLASTIC. 2.4. SEAMS BETWEEN SHEETS MUST OVERLAP A MINIMUM OF 12 INCHES AND BE WEIGHTED OR TAPED. 3. MAINTENANCE STANDARDS 3.1. TORN SHEETS MUST BE REPLACED AND OPEN SEAMS REPAIRED. 3.2. IF THE PLASTIC BEGINS TO DETERIORATE DUE TO ULTRAVIOLET RADIATION, IT MUST BE COMPLETELY REMOVED AND REPLACED. 3.3. WHEN THE PLASTIC IS NO LONGER NEEDED, IT SHALL BE COMPLETELY REMOVED. UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS) PUBLIC WORKS PRO STD. PLAN - 213.30 DEPARTMENT PLASTIC COVERING TGAZ 9/28/2018 Gr DATE Public Works Adminis[ra[or PLASTIC COVERING :45 AM NTS :45 AN NTS 0 5 C-502 DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878 T-30'. SEE NOTE 2.3 EDIMENT, ORGANIC MATTER, ND NATIVE SEEDS ARE APTURED BEHIND THE ROLLS STRAW ROLLS MUST BE PLACED ALONG SLOPE CONTOURS JACENT ROLLS SHALL HTLY ABUT WOODEN STAKE LIVE STAKE 10" DIA. 1. CONDITIONS OF USE 1.1. INSTALL ON DISTURBED AREAS THAT REQUIRE IMMEDIATE EROSION PROTECTION. 1.2. USE ON SLOPES REQUIRING STABILIZATION UNTIL PERMANENT VEGETATION CAN BE ESTABLISHED. 1.3. CAN BE USED ALONG THE PERIMETER OF A PROJECT, AS A CHECK DAM IN UNLINED DITCHES AND AROUND TEMPORARY STOCKPILES. 1.4. WATTLES CAN BE STAKED TO THE GROUND USING WILLOW CUTTINGS FOR ADDED REVEGETATION. 1.5. RILLING CAN OCCUR BENEATH AND BETWEEN WATTLES IF NOT PROPERLY ENTRENCHED, ALLOWING WATER TO PASS BELOW AND BETWEEN WATTLES. 2. DESIGN AND INSTALLATION SPECIFICATIONS 2.1. IT IS CRITICAL THAT WATTLES ARE INSTALLED PERPENDICULAR TO THE FLOW DIRECTION AND PARALLEL TO THE SLOPE CONTOUR. 2.2. NARROW TRENCHES SHOULD BE DUG ACROSS THE SLOPE, ON CONTOUR, TO A DEPTH OF 3 TO 5 INCHES ON CLAY SOILS AND SOILS WITH GRADUAL SLOPES. ON LOOSE SOILS, STEEP SLOPES, AND DURING HIGH RAINFALL EVENTS, THE TRENCHES SHOULD BE DUG TO A DEPTH OF 5 TO 7 INCHES, OR 1/2 TO 2/3 OF THE THICKNESS OF THE WATTLE. 2.3. START CONSTRUCTION OF TRENCHES AND INSTALLING WATTLES FROM THE BASE OF THE SLOPE AND WORK UPHILL. EXCAVATED MATERIAL SHOULD BE SPREAD EVENLY ALONG THE UPHILL SLOPE AND COMPACTED USING HAND TAMPING OR OTHER METHOD. CONSTRUCT TRENCHES AT CONTOUR INTERVALS OF 3 TO 30 FEET APART DEPENDING ON THE STEEPNESS OF THE SLOPE, SOIL TYPE, AND RAINFALL. THE STEEPER THE SLOPE THE CLOSER TOGETHER THE TRENCHES SHOULD BE CONSTRUCTED. VERTICAL DISTANCE BETWEEN WATTLES IS NOT TO EXCEED 10 FEET. 2.4. INSTALL THE WATTLES SNUGLY INTO THE TRENCHES AND ABUT TIGHTLY END TO END. DO NOT OVERLAP THE ENDS. 2.5. INSTALL STAKES AT EACH END OF THE WATTLE, AND AT 4 FOOT CENTERS ALONG THE ENTIRE LENGTH OF THE WATTLE. 2.6. IF REQUIRED, INSTALL PILOT HOLES FOR THE STAKES USING A STRAIGHT BAR TO DRIVE HOLES THROUGH THE WATTLE AND INTO THE SOIL. 2.7. AT A MINIMUM, WOODEN STAKES SHOULD BE APPROXIMATELY 3/4 X 3/4 X 24 INCHES. WILLOW CUTTINGS OR 3/8-INCH REBAR CAN ALSO BE USED FOR STAKES. 2.8. STAKES SHOULD BE DRIVEN THROUGH THE MIDDLE OF THE WATTLE, LEAVING 2 TO 3 INCHES OF THE STAKE PROTRUDING ABOVE THE WATTLE. 3. MAINTENANCE STANDARDS 3.1. INSPECT WATTLES PRIOR TO FORECASTED RAIN, DAILY DURING EXTENDED RAIN EVENTS, AFTER RAIN EVENTS, WEEKLY DURING THE WET SEASON, AND AT TWO WEEK INTERVALS AT ALL OTHER TIMES OF THE YEAR. 3.2. REPAIR OR REPLACE SPLIT, TORN, RAVELING, OR SLUMPING WATTLES 3.3. REMOVE SEDIMENT ACCUMULATIONS WHEN EXCEEDING 1/2 THE HEIGHT BETWEEN THE TOP OF THE WATTLE AND THE GROUND SURFACE. UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS) STD. PLAN - 213.40 001PUBLIC WORKS APPR ED: DEPARTMENT STRAW WATTLES GAZ 9/28/2018 Public Works Administrator DATE FILTER SOCK REVISION SURVEYED: 04/01/21 DESIGNED: BB/AT/HD DRAWN: BB/AT/HD CHECKED: CM BY DATE APPR APPROVED: SCALE: AS SHOWN ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY :45 AN NTS DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878 6 C-502 VERTICAL: NAVD 1988 HORIZONTAL: NAD 1983/1991 DATU M 4' MIN. 12" OVERFLOW 12" DEPTH 2" - 4" ROCK DEPTH OUTFLOW CHANNEL IF 24" MIN. SETTLING DEPTH CONSTRUCTED BY 17 EXCAVATION 3 9 r 5' MAX. 3.5' - 5' FILTER FABRIC FENCING 1.5' MIN. SEDIMENT STORAGE 19" DEPTH 3/4"- 1 1/2" WASHED GRAVEL CROSS SECTION 1. MAY BE CONSTRUCTED BY EXCAVATION OR BY BUILDING A BERM 1 UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS) STD. PLAN - 211.00 PRIPUBLIC WORKS APPR ED: DEPARTMENT SEDIMENT TRAP GAZ 9/28/2018 Public Works Administrator DATE SEDIMENT TRAP CITY OF RENTON [;R valliv Planning/Building/Public Works Dept. R-432711 :45 AN NTS Cfl 0 IN- C) N �, L_J VJ C) C) C) 1 co NN Inf_ IN COMPLIANCE WITH CITY OF RENTON STANDARDS rJ V DEVELOPMENT ENGINEERING ` IL yqi 05/13/2025 ry Q DATE: 600 SW 10TH PARKING LOT 04/07/2025 FlELDBOOK: PAGE: TEMPORARY EROSION & DRAWING N0: U1 C-502 0 SEDIMENT CONTROL DETAILS SHEET: 12 OF: 28 0 Cfl