HomeMy WebLinkAboutChange Order - 23CAG-22-265, CO #23-25 Approvedy by Cheryl Beyer via email 6/18/2025 Docusign Envelope ID: 3FF60E5F-7452-4F9F-8A51-96D9C986ADDA THE CONTRACT IS MODIFIED AS FOLLOWS: Description of Change: Description: The intersection of Park Ave N and N Southport Dr. required the concrete pavement work to be finished, adequately cured, and accessible to traffic within a 24-hour period. This change order covers all overtime incurred due to the compressed schedule. Proposal Schedule of Prices: The new bid item A99 "757 Intersection'"' shall be measured by Lump Sum. Specification and/or Special Provision: Description: Measurement The new bid item A99 "757 Intersection" shall be measured by Lump Sum. Payment: The new Bid Item A99 "757 Intersection" shall be paid as a lump and shall cover the complete cost of providing all labor, materials, tools, equipment required to complete the concrete work. Materials: NA Plans: NA REASON FOR CHANGE: The Boeing Company agreed to a 24-hour closure of the Park Avenue N and 757th Ave intersection to minimize the impact on their operations. This allowed for the installation of the concrete pavement across Park Ave N. Crews worked overtime to complete the work within the agreed-upon 24-hour window. EQUITABLE ADJUSTMENT: This Change Order does/does not include an equitable adjustment per Section 1-09.4 of the 2022 WSDOT/APWA Standard Specifications. See attached. Change Order No. Contract Title: Contract No. 23 PARK AVE N CAG-22-265 Estimated Cost: $12,818.32 Extended Overhead: $ O Page 2 of 4 Docusign Envelope ID: 3FF60E5F-7452-4F9F-8A51-96D9C986ADDA Change Order Cost (Equitable Adjustment) Project Name: Contractor: Contract No: PARK AVENUE N EXTENSION Olson Brothers Excavation CAG-22-265 Federal Aid No: N/A Construction Manager: Perteet I I ' Item No. A99(new) ·-- A99 (new) Description 757 Intersection LABOR Laborer ($90/hr for Overtime) Laborer ($114/hr for Double time) Flagger ($75/hr for Overtime) Flagger ($95/hr for Double time) Operator ($120/hr for Overtime) Foreman ($130/hr for Overtime) Cement Mason ($115/hr for Overtime), crew of 6 people Cement Mason ($200/hr forDouble time), crew of 6 people Apprentice Mason ($85/hr for Overtime), 2 apprentices Apprentice Mason ($165/hr for Double time), 2 apprentices 12% Prime Contractor Markup Labor Markup (29 % Labor and 2 % Sick Leave) EQUIPMENT Highway Truck ($80/hr for concrete crew) Highway Truck ($52/hr for foreman) Loader Equipment ($60/hr for support) Equipment Markup (21 %) 757 Intersection 10/27/2023 -Sebastian OT 10/27/2023 -Sebastian Equipment 10/27/2023 -Olson OT and equipment 10/28/2023 -Olson OT and equipment Per attached determination I Estimated Change Order Cost Summary of Contractors Quotes: Item NA Quote Location NA Total Quoted Added Cost: $ Quoted Cost NA Lump Sum Estimate . Bid Item Change Overhead I Quantity 8 2 8 2 2 2 24 12 8 4 $6,500.00 $8,738.00 6 2 2 $704.00 1 1 1 1 Change Order No. 23 Unit HR HR HR HR HR HR HR HR HR HR Percentage HR HR HR Percentage By: Chris Brown Date: 12/5/2024 Unit Price $ 90.00 $ 114.00 $ 75.00 $ 95.00 $ 120,00 $ 130.00 $ iis.oo $ 200.00 $ 85.00 $ 165.00 12% 31% $ 80.00 $ 52.00 $ 60.00 21% CALCULATED TOTAL: ESTIMATED TOTAL: LS $ 9,429.55 LS $ 747.90 LS $ 1,776.64 LS $ 864.23 TOTAL By Agreement Estimated Cost $720.00 $228.00 $600.00 $190.00 $240.00 $260.00 $2,760.00 $2,400.00 $680.00 $660.00 $780.00 $2,708.78 $480.00 $104.00 $120.00 $147.84 $13,078.62 $12,818.32 $9,429.55 $747.9D $1,776.64 $864.23 $12,818.32 $D.00 $12,818.32 Docusign Envelope ID: 3FF60E5F-7452-4F9F-8A51-96D9C986ADDA Force Account Time related $ 0 damages per 1-09.6, 6.d.: Total: $12,818.32 EXTENSION OF TIME: The Time for Completion is extended O Working Days. AFFECTS DBE WORK: Explain how this Change Order affects DBE work. NA. Sections 1-04.4 and 1-04.5 of the 2022 WSDOT/APWA Standard Specifications shall govern this Change Order. The Work of the referenced Contract is modified to include the changes detailed herein. The payment provided for herein shall constitute the complete and final settlement for all costs of labor, equipment, materials, overhead, profit, permit fees, and all other claims that may be made by the Contractor as a result of this change. To be attached to Change Order: D 1-Field Directive/Request for Information Response � 2-Estimated Change Order Cost D 3-Plans D 4-Change Order Quotation D 5-Project Labor List D 6-Force Account Equipment Rate Request (DOT Form 422-010 EF) � 7-Equitable Adjustment Determination D 8-Additional Working Days Calculation Change Order No. Contract Title: Contract No. 23 PARK AVE N CAG-22-265 Page 3 of4