No preview available
HomeMy WebLinkAboutRC 20250625000952Instrument Number: 20250625000952 Document:COV Rec: $312.50 Page-1 of 10 Record Date:6/25/2025 4:24 PM Electronically Recorded King County, WA City Clerk's Office City of Renton 1055 S Grady Way Renton, WA 98057 � I I 111trigy1ir WTA'Aw ON. -SITE BMPS Grantor� D Grantee� of Rer� on, a Washington.munidual corLworation Legal Description: IN CONSIDERATION of the approved City of Renton (check one of the following) 5J Residential Building Permit E]Commercial Building Permit E] Clearing and Grading Permit E] Civil Construction or Utility Permit for Permit(s)_.2p�_Sa t_ (ConstructionlguildingltJtilityPerniit#) relatingto the real property ("Property") described above, the Grantor(s), the owner(s) in fee of that Property, hereby covenants (covenant) with the City of Renton ("City of Renton" or "City"), a municipal corporation of the state of Washington, that he/she (they) will observe, consent to, and abide by the conditions and obligations set forth and described in Paragraphs 1 through 9 below with regard to the Property, and hereby grants (grant) an easement as described in Paragraphs 2 and 3. Grantor(s) hereby grants (grant), covenants (covenant), and agrees (agree) as followso 1. The Grantor(s) or his/her (their) successors in interest and assigns ("Owners ") shall at their own cost, operate, maintain, and keep in good repair, the Property's drainage facilities constructed as required in the approved construction plans and specifications A (Project Plan #) on file with the City of Renton and submitted to the City of Rento nfoar the review and approval of permit(s) aL2_ CC) 5 .�a 16 , (ConstructiornIguildingliJtility Permit #). The Property's drainage facilities are shown and/or listed on Exhibit A .— Site Plan. The Property's drainage facilities shall be maintained in compliance with the operation and maintenance schedule included and attached herein as Exhibit B — Operations and Maintenance. Drainage facilities include pipes, channels, flow control facilities, water quality facilities, on -site best management practices (BMPs) and other engineered structures designed to manage and/or Instrument Number: 20250625000952 Document:COV Rec: S312.50 Page-2 of 10 Record Date:6/25/2025 4:24 PM King County, WA treat stormwater on the Property. On -site BMPs include dispersion and infiltration devices, bioretention, permeable pavements, rainwater harvesting systems, tree retention credit, reduced impervious surface footprint, vegetated roofs and other measures designed to mimic pre -developed hydrology and minimize stormwater runoff on the Property. 2. City of Renton shall have the right to ingress and egress over those portions of the Property necessary to perform inspections of the stormwater facilities and BMPs and conduct maintenance activities specified in this Declaration of Covenant and in accordance with the Renton Municipal Code. City of Renton shall provide at least thirty (30) days' written notice to the Ownersthatentry on the Property is planned forthe inspection of drainage facilities. After the thirty (30) days, the Owners shall allow the City of Renton to enter for the sole purpose of inspecting drainage facilities. In lieu of inspection by the City, the Owners may elect to engage a licensed civil engineer registered in the state of Washington who has expertise in drainage to inspect the drainage facilities and provide a written report describing their condition. If the engineer option is chosen, the Owners shall provide written notice to the City of Renton within fifteen (15) days of receiving the City's notice of inspection. Within thirty (30) days of giving this notice, the Owners, or engineer on behalf of the Owners, shall provide the engineer's report to the City of Renton. If the report is not provided in a timely manner as specified above, the City of Renton may inspect the drainage facilities without further notice. 3. If City of Renton determines from its inspection, or from an engineer's report provided in accordance with Paragraph 2, that maintenance, repair, restoration, and/or mitigation work is required to be done to any of the drainage facilities, City of Renton shall notify the Owners of the specific maintenance, repair, restoration, and/or mitigation work ("Work") required pursuant to the Renton Municipal Code. The City shall also set a reasonable deadline for the Owners to complete the Work, or to provide an engineer's report that verifies completion of the Work. After the deadline has passed, the Owners shall allow the City access to re -inspect the drainage facilities unless an engineer's report has been provided verifying completion of the Work. If the Work is not completed within the time frame set by the City, the City may initiate an enforcement action and/or perform the Work and hereby is given access to the Property for such purposes. Written notice will be sent to the Owners stating the City's intention to perform such Work. This Work will notcommence until at least seven (7) days after such notice is mailed. If, within the sole discretion of the City, there exists an imminent or present danger, the seven (7) day notice period will be waived and Work will begin immediately. 4. The Owners shall assume all responsibility for the cost of any Work, or any measures taken by the City to address conditions as described in Paragraph 3. Such responsibility shall include reimbursement to the City within thirty (30) days of the receipt of the invoice for any such Work performed. Overdue payments will require payment of interest at the maximum legal rate allowed by RCW 19.52.020 (currently twelve percent (12%)). If the City initiates legal action to enforce this agreement, the prevailing party in such action is entitled to recover reasonable litigation costs and attorney's fees. 5. The Owners are required to obtain written approval from City of Renton prior to filling, piping, cutting, or removing vegetation (except In routine landscape maintenance) in open vegetated stormwater facilities (such as swales, channels, ditches, ponds, etc.), or performing any alterations or modifications to the drainage facilities referenced in this Declaration of Covenant. Page 2 of 8� Instrument Number: 20250625000952 Document:COV Rec: S312.511 Page-3 of 111 Record Date:6/25/2025 4:24 PM King County, WA 6. Any notice or consent required to be given or otherwise provided for by the provisions of this Agreement shall be effective upon personal delivery, or three (3) days after mailing by Certified Mail, return receipt requested. 7. With regard to the matters addressed herein, this agreement constitutes the entire agreement between the parties, and supersedes all prior discussions, negotiations, and all agreements whatsoever whether oral or written. 8. This Declaration of Covenant is intended to protect the value and desirability and promote efficient and effective management of surface water drainage of the real property described above, and shall inure to the benefit of all the citizens of the City of Renton and its successors and assigns. This Declaration of Covenant shall run with the land and be binding upon Grantor(s), and Grantor's(s`) successors in interest, and assigns. 9• This Declaration of Covenant may be terminated by execution of a written agreement by the Owners and the City that is recorded by King County in its real property records. IN WITNESS WHEREOF, this Declaration of Cove ant for the Inspection and r�Maintenance of Drainage Facilities ?/7 uted thi� day of 2011 KARAN SINGH MANAGER OF VOYAGER DEVELOPMENT LLC GRANTOR, ow r of the Property STATE OF WASHINGTON ) COUNTY OF KING )ss. On this day personally appeared before me: GRANTOR, owner of the Property rw-'� to me known to be the individual(s) described in and who executed the within and foregoing instrument and acknowledged that they signed the same as their free and voluntary act and deed, for the uses and purposes therein stated. Given under my hand and official seal this OZJ day of �� ' 20 2-3. TATIANA KUZMINA Notary PublicFzci C( drl t`rt- State of Washington Printed name Commission M 20101519 My Comm. Expires Dec 4, 2023 Notary Public in and for the State of Washington, residing at My appointment expires ✓)'(v10 Page 3 of 8 Instrument Number: 20250625000952 Document:COV Rec: $312.50 Page-4 of 10 Record Date:6/25/2025 4:24 PM King County, WA C> U.1 > "Z, U., K X I, 5, ? LU LLI ICUR I— e-i UUj, LLUL X x V 11 >( vx �<X"< 0 LU X X (D zg IL75 IU—j All LU 00 56 X, z 03 LLJ t CO U < (UDI ts CO tr W, W uj 4.7 UJ Co 0 W '>4 Z Ui Al y.X, VJ .......... . S's C> C�l ,a' !q?l IV V" Instrument Number: 20250625000952 Document:COV Rec: $312.50 Page-5 of 10 Record Date:6/25/2025 4:24 PM King County, WA MAINTENANCE INSTRUCTIONS FOR FULL INFILTRATION Your property contains an on -site BMP (best management practice) called "full infiltration," which was installed to mitigate the stormwater quantity and quality impacts of some or all of the impervious surfaces on your property. Full. infiltration is a method of soaking runoff from impervious area (such as paved areas and roofs) into the ground. If properly installed and maintained per Appendix A of the City of Renton's Surface Water Design Manual, full infiltration can manage runoff so that a majority of precipitation events are absorbed. Infiltration devices, such as gravel tilled trenches, drywells, and ground surface depressions, facilitate this process by putting runoff in direct contact with the soil and holding the runoff long enough to soak most of it into the ground. To be successful., the soil condition around the infiltration device must be reliably able to soak water into the ground for a reasonable number of years. Infiltration Devices The infiltration devices used on your property include the following as indicated on the site plan (CHECK THE BOX(ES) THAT APPLY): ❑gravel filled trenches, �Idrywells, ❑ground surface depressions. The size, placement, and composition of these devices as depicted by the site plan and design details must be maintained and may not be changed without written approval from the City of Renton or through a future development permit from the City of Renton. ► , K • Infiltration devices must be inspected annually and after major storm events to identify and repair any physical defects. • Maintenance and operation of the system should focus on ensuring the system's viability by preventing sediment -laden flows from entering the device. Excessive sedimentation will result in a plugged or non-functioning facility. • If the infiltration device has a catch basin, sediment accumulation must be removed on a yearly basis or more frequently if necessary. • Prolonged ponding around or atop a device may indicate a plugged facility. If the device becomes plugged, it must be replaced. • Keeping the areas that drain to infiltration devices well. swept and clean will enhance the longevity of these devices. • For roofs, frequent cleaning of gutters will reduce sediment loads to these devices. PAGE 5 OF 8 Instrument Number: 20250625000952 Document:COV Rec: $312.50 Page-6 of 10 Record Date:6/25/2025 4:24 PM King County, WA These full. infiltration on -site BMP maintenance and operation instructions must be recorded as an attachment to the required declaration of covenant and grant of easement per Requirement 3 of Section C.1.3.4 of the City of Renton Surface Water Design Manual. The intent of these instructions is to explain to future property owners, the purpose of the BMP and how it must be maintained and operated. These instructions are intended to be a minimum; the City of Renton may require additional instructions based on site -specific conditions. See the City of Renton's Surface Water Design Manual website for additional inforination and updates. PAGE 6 OF 8 Instrument Number: 20250625000952 Document:COV Rec: $312.50 Page-7 of 10 Record Date:6/25/2025 4:24 PM King County, WA 6" 6" 12" TYPICAL FULL, INVILTRATION APPLICATIONS 4" RIGID OR 6" FLEXIBLE PERFORATED PIPE INFILTRATION TRENCH LAI CB SUMP w/SOLID LID ROOF DRAIN C A_J TRENCH SETBACK FROM BUILDING AS REQUIRED, I 15'MIN. 4" RIGID OR 6" FLEXIBLE PERFORATED PIPE ------LEVEL IWASHED ROCK 1 ------------------------ VARIES FINE MESH SECTION VIEW SCREEN NTS 24., 12" MIN. VABOVE SEASONAL HIGH GROUNDWATER TABLE, SEE SECTION C.2.2.2 24" OVERFLOW SPLASH BLOCK 1' MIN VMIN. f SETBACK FROM BUILDING 5'MIN. CB SUMP w/SOLID LID COMPACTED BACKFILL F FILTER FABRIC ROOF DRAIN 4" RIGID OR 6" FLEXIBLE PERFORATED PIPE 1 "' - ' WASHED ROCK 2 4 " I- Page 7 of 8 (A) I Instrument Number: Duoumeut:COVRec:$312.5#Puge'0uY1# Record Date:6/25/2025 4:24 I'M King County, WA OVERFLOW 3/4"TO1'1/2r WASHED DRAIN ROCK M|N.1'ABOVE SEASONAL HIGH GROUNDWATER T88LE.OEE SECTION C.2.2.2 OVERFLOW O^M|N. FROM ROOF X-SECTION NTS FILTER STRIP SEE SECTIONS 6.3/4&085 WASHED DRAIN ROCK MIN. VABOVE SEASONAL HIGH 2'MIN. SECTION C.2.2.2 if NTS NOTE: SEE C.22.aFOR TRENCH LENGTHS, TRENCH SPACING AND SITE LIMITATIONS NOTE: SEE C22.3FOR TRENCH LENGTHS, TRENCH SPACING AND SITE LIMITATIONS Page 7mo(e) Instrument Number: 20250625000952 Document:COV Rec: $312.50 Page-9 of 10 Record Date:6/25/2025 4:24 PM King County, WA TYPICAL Futil INPItTRATION APPLICATIONS ROOF DOWNSPOUT HOUSE %1Z/ ROOF FLOW DOWNSPOUT CATCH BASIN (YARD DRAIN) PLAN VIEW NTS ROOF DOWNSPOUT OVERFLOW HOUSE _ SPLASH BLOCK FLOW 5' MIN. SETBACK l FROM BUILDING ------- FINE MESH SCREEN — O 48 INCH DIAMETER HOLE FILLED WITH 1 2' - 3" WASHED DRAIN ROCK / MARK CENTER OF HOLE WITH 1" CAPPED PVC OR OTHER MEANS FLUSH WITH SURFACE TOPSOIL ----\ MIN. 4" DIA. PVC PIPE CATCH BASIN-- SIDES OF HOLE (YARD DRAIN) LINED WITH FILTER FABRIC 15' MIN. AS REQUIRED, SEE SECTION C.2.2.3 SECTION NTS ---- ---1' MIN. - - -- - - 48 INCH DIAMETER VARIES HOLE FILLED WITH• j 1 z" - 3" WASHED Y DRAIN ROCK if MIN. V ABOVE SEASONAL HIGH GROUNDWATER TABLE, SEE SECTION C.2.2.2 J- I- Page 7 of 8 (C) Instrument Number: 20250625000952 Document:COV Rec: $312.50 Page-10 of 10 Record Date:6/25/2025 4:24 PM King County, WA MAINTENANCE INSTRUCTIONS FOR SOIL AMENDMENT Your property contains an on -site BMP (best management practice) called "soil amendment," which was installed to mitigate the stormwater quantity and quality impacts of some or all of the pervious surfaces on your property. Soil amendment is a method of regaining greater stormwater functions in the post development landscape by increasing treatment of pollutants and sediments, and minimizing the need for some landscaping chemicals. To be successful, the soil condition must be able to soak water into the ground for a reasonable number of years. This on -site BMP shall be maintained per Appendix A of the City of Renton's Surface Water Design Manual. The size, placement, and composition of these devices as depicted by the site plan and design details must be maintained and may not be changed without written approval from the City of Renton or through a future development permit from the City of Renton. INSPECTION FREQUENCY AND MAINTENANCE GUIDELINES To be successful, the soil must be able to soak water into the ground for a reasonable number of years. • Return leaf fall and shredded woody materials from the landscape to the site when possible in order to replenish soil nutrients and structure. • On turf areas, "grasscycle" (mulch -mow or leave the clippings) to build turf health. • Maintain 2 to 3 inches of mulch over bare areas in landscape beds. • Re -seed bare turf areas until the vegetation fully covers the ground surface. • Avoid using pesticides (bug and weed killers) which damage the soil. • Where fertilization is needed (mainly turf and annual flower beds), a moderate fertilization program. should be used which relies on compost, natural fertilizers, or slow -release synthetic balanced fertilizers. These on -site BMP maintenance and operation instructions must be recorded as an attachment to the required declaration of covenant and grant of easement per Requirement 3 of Section C.1.3.4 of the City of Renton Surface Water Design Manual. The intent of these instructions is to explain to future property owners, the purpose of the BMP and how it must be maintained and operated. These instructions are intended to be a minimum; the City of Renton may require additional instructions based on site -specific conditions. See the City of Renton's Surface Water Design Manual website for additional. information and updates. PAGE 8 OF 8