HomeMy WebLinkAboutContractAGREEMENT
CONTRACT NO. 25-090
THIS AGREEMENT, made and entered into this [Enter Date] day of [Enter Month], [Enter Year] by and between the
CITY OF RENTON, Washington, a municipal corporation of the State of Washington, hereinafter referred to as "City”
and Northwest Cascade, Inc., hereinafter referred to as "Contractor."
Now, therefore the parties agree as follows:
1.Agreement. This agreement incorporates the following documents as if fully set forth herein: the 2024
Standard Specifications for Road, Bridge, and Municipal Construction, as prepared by the Washington State
Department of Transportation and the Washington State Chapter of the American Public Works Association,
including all published amendments issued by those organizations (“Standard Specifications”); the City’s
Contract Bid Documents for the Project, including but not limited to Addenda, Proposal Form, Special
Provisions, Contract Plans, and Amendments to the Standard Specifications; Contractor’s Proposal and all
documents submitted therewith in response to the City’s Call for Bids Documents; and any additional
documents referenced as comprising the Contract and Contract Documents in Section 1-04.2 of the Standard
Specifications, as revised by the Amendments and Special Provisions included with the City’s Call for Bids
and Contract Documents.
2.Project. Contractor shall complete all work and furnish all labor, tools, materials, and equipment for the
project entitled Sanitary Sewer Replacement Project Phase 2, WWP-27-04273, including all changes to the
Work and force account work, in accordance with the Contract Documents, as described in Section 1-04.2 of
the Special Provisions.
3.Payments. City shall pay Contractor at the unit and lump sum prices, and by force account as specified in
the Proposal according to the Contract Documents as to time, manner, and condition of payment in a contract
amount not to exceed $2,855,293.08, unless modified by an approved change order or addendum. The
payments to Contractor include the costs for all labor, tools, materials and equipment for the Work.
4.Completion Date. Contract time shall commence upon City's Notice to Proceed to Contractor. The Work
under this Agreement shall be completed within the time specified in the Contract Bid Documents. If the
Physical Work under this Agreement is not completed within the time specified, Contractor shall pay
liquidated damages and all engineering inspection and supervision costs to City as specified in the Contract
Bid Documents.
5.Attorney's Fees. In the event litigation is commenced to enforce this Agreement, the prevailing party shall be
entitled to recover its costs, including reasonable attorney's and expert witness fees.
6.Disclaimer. No liability of Contractor shall attach to City by reason of entering into this Agreement, except as
expressly provided in this Agreement.
7.Counterparts. This Agreement is executed in two (2) identical counterparts, by the parties, each of which
shall for all purposes be deemed an original.
CAG-25-090
CONTRACTOR CONTACT INFORMATION:CITY CONTACT INFORMATION:
Northwest Cascade, Inc.City of Renton
P.O. BOX 73399 1055 South Grady Way
Puyallup, WA 98373 Renton, WA 98057
(206) –622 -2464 425-430-7211
clintmyers@nwcascade.com jnewman@rentonwa.gov
Attention:
If business is a CORPORATION, the name of the corporation should be listed in full and both the President and Secretary must
sign the contract. OR, if one signature is permitted by corporation by-laws, a copy of the by-laws shall be furnished to the City
and made a part of the contract document.
If the business is a PARTNERSHIP, the full name of each partner should be listed followed by d/b/a (doing business as) and fi rm
or trade name. Any one partner may sign the contract.
If the business is an limited Liability Company, an authorized managing member or manager must sign followed by his/her title.
IN WITNESS WHEREOF, the City has caused these presents to be signed by its Mayor and attested by its City Clerk
and the Contractor has hereunto set his hand and seal the day and year first above -written.
CONTRACTOR:CITY OF RENTON:CITY OF RENTON:
Armondo Pavone, Mayor
ATTEST
Jason Seth, City Clerk
FIRM INFORMATION
d/b/a Honey Bucket
CHECK ONE:܆ Limited Liability Company ☐Partnership ܈ Corporation
STATE OF
INCORPORATION:Washington
Sanitary Sewer Replacement Project Phase 2 CAG-25-090
06/05/2025
Contract Template Updated 12/29/2017
6/25/2025