Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout* CFB Ad - CAG-25-155 - Lift Station & Force Main Improvements Phase 4Publication - Call for Bid -S-4323 - js edits Page 1 of 2
CALL FOR BIDS
LIFT STATION AND FORCE MAIN IMPROVEMENTS PHASE 4
CAG-25-155
WWP-27-04323
Sealed bids will be received until 2 PM, Tuesday, 07/22/2025 at the lobby of Renton City Hall, 1055
South Grady Way, Renton WA 98057. No mailed, USPS, FedEx, or UPS delivered bids will be
accepted. Please include the bidder’s name, address, and the name of the project on the envelope.
Sealed bids will be opened and publicly read via the Zoom video-conferencing web application at 3 PM,
Tuesday, 07/22/2025 (60 minutes after published bid submittal time). Any bids received after the
published bid submittal time cannot be considered and will not be accepted.
The bid opening meeting can be accessed via videoconference by:
Clicking this link to join the Zoom meeting:
https://us06web.zoom.us/j/81984014027?pwd=eKY2C4JWVyVusfL6tpmZusUbyOx7qg.1
Using the Zoom app: Meeting ID:819 8401 4027; Passcode: 469118
Via telephone by dialing:1-253-215-8782, followed by 81984014027#,,,,*469118#
Zoom is free to use and is available at https://zoom.us/.
The work involved under the terms of this contract document shall be full and complete installation of
the facilities, as shown on the plans and as described in the construction specifications, to include but
not be limited to:
Site improvements including the installation of bollards, buried conduit and drain piping, site
grading, slurry seal surface treatment improvements, and surface restoration,
Mechanical improvements including the abandonment of existing and installation of new vent
piping,
Structural improvements including the installation of a cast-in place retaining wall and slab with a
contractor designed shoring system, and interior structural modifications to an existing vault,
Electrical improvements including the installation of generators, power distribution equipment,
conductors, and modifying and replacing existing control panels.
The estimated project cost is $1,600,000 – $1,700,000.
A total of 240 working days is allowed for completion of the project.
For Bid Item Descriptions see Technical Specifications Division 18
Any contractor connected with this project shall comply with all Federal, State, County, and city codes
and regulations applicable to such work and perform the work in accordance with the plans and
specifications of this contract document.
The City reserves the right to reject any and/or all bids and to waive any and/or all informalities. Bid
documents will be available 6/30/2025.
CAG-25-155
Publication - Call for Bid -S-4323 - js edits Page 2 of 2
Plans, specifications, addenda, and the plan holders list for this project are available online through
Builders Exchange of Washington, Inc., at http://www.bxwa.com. Click on “bxwa.com”; “Posted
Projects”, “Public Works”, “City of Renton”, “Projects Bidding”. (Note: Bidders are encouraged to
“Register as a Bidder,” in order to receive automatic email notification of future addenda and to be
placed on the “Bidders List”). Bid documents will also be available at http://rentonwa.gov/bids/ under
“Calls for Bids”. Should you require further assistance, contact Builders Exchange of Washington at
(425) 258-1303. Bidders are not to contact the City of Renton or the Engineer to obtain bidding
documents.
A certified check or bid bond in the amount of five percent (5%) of the total of each bid must accompany
each bid.
Women and Minority Business Enterprises (WMBE) are encouraged to bid.
The city's Fair Practices, Non-Discrimination, and Americans with Disability Act Policies shall apply.
Questions about the project shall be addressed to Michael Benoit, Public Works Department, at 1-425-
430-7206 or mbenoit@rentonwa.gov.
Jason A. Seth, CMC, City Clerk
Published: Daily Journal of Commerce 6/30/2025
Daily Journal of Commerce 7/07/2025
Daily Journal of Commerce 7/14/2025