Loading...
HomeMy WebLinkAbout00-Cover Letter-2025-03-26 March 26, 2025 Electronic Submittal via FTP Link Yong Qi, Civil Engineer City of Renton Department of Community and Economic Development 1055 South Grady Way Renton, WA 98057 RE: Final Plat Submittal Harmony Ridge – Phase 1 15509 116th Ave SE Parcel No. 202305-9067 Our Job No. 22298 Dear Yong: On behalf of Ichijo USA Co., Ltd, we are submitting a Final Plat application for the project referenced above. Phase 1 is intended solely to segregate the Church parcel from the residential development parcel, designated “Tract Z – Future Development” on the Final Plat Map. Tract Z is comprised of the future residential development area and the full length of the right-of-way dedication. The enclosed are the following items for routing and review: 1. Waiver Form (Email from Yong Qi dated March 4, 2025 listing required documents) 2. Signed Land Use Permit Master Application 3. Lot Closure Calculations prepared by Barghausen Consulting Engineers, LLC dated March 4, 2025 4. Title Report prepared by Chicago Title dated March 20, 2025 5. Final Plat Map prepared by Barghausen Consulting Engineers, LLC dated March 26, 2025 HOA documents are not applicable to Phase 1 of this plat. Fees will be paid promptly upon receipt of the invoice. If you have any questions or need additional information, please contact me at this office. Thank you. Sincerely, Margi Fosdick Project Administrator MF 22298c.012.docx enc: As Noted cc: Kanon Kupferer, Ichijo USA Co., Ltd Amy Tovel, Ichijo USA Co., Ltd Ivana Halvorsen, Barghausen Consulting Engineers, LLC Barry Talkington, Barghausen Consulting Engineers, LLC