Loading...
HomeMy WebLinkAbout00-Response Letter-2025-05-22 May 22, 2025 Yong Qi, Civil Engineer III City of Renton, Development Engineering 1055 South Grady Way Renton, WA 98057 RE: Response to First Review Comments Harmony Ridge Final Plat – Phase 1 File No. LUA25-000103 Our Job No. 22298 Dear Yong: We have revised the plans and technical documents for the above-referenced project in accordance with your comment letter dated April 28, 2025. Enclosed are the following documents for your review and approval: 1. Revised Final Plat Map prepared by Barghausen Consulting Engineers, LLC dated May 22, 2025 2. Updated Title Report prepared by Chicago Title Insurance Company dated April 24, 2025 3. Copy of Document, Rec. No. 5615593 (typo corrected on Sheet 2) 4. Revised Lot Closures prepared by Barghausen Consulting Engineers, LLC dated May 22, 2025 The following outline provides each of your comments in italics exactly as written, along with a narrative response describing how each comment was addressed: Sheet 1 Change to SHORT plat Response: It would be inappropriate to call Phase 1 a short plat because no preliminary short plat application exists, and no short plat decision has been issued. The Preliminary Plat decision (see Hearing Examiner decision, Page 2 at Lines 11 – 18) was issued as a Phased Plat (RMC 4-7-080-K). Phase 1 of the approved Preliminary Plat will segregate the church parcel from the subdivision Parcel. Phase 2 will be the final subdivision of the subdivision parcel [Confirmed with Yong Qi, email dated 5/21/2025]. Please provide draft of declaration Response: An HOA is not proposed for Phase 1 so the note has been removed. Declarations will be provided for Phase 2 final plat. Parcel Number: 2023059067 Response: The parcel number has been added to the Plat. Yong Qi, Civil Engineer III City of Renton, Development Engineering -2- May 22, 2025 LUA25-000103 / LND20-0659 Response: The file number has been added to the Plat. plats surveys Response: Corrected. Sheet 2 Title Note 14 – Is this Applicant’s fence or encroaching? Response: The fence encroachment has been noted on the plat. The encroachment will be resolved with Phase 2. Title Note 16 – What is Parcel A? Title report may need to be updated post-BLA. Response: An updated title report is enclosed. Title Note 17 – Please provide copy of document 5615563 Response: Document 5615593 (typo corrected on Sheet 2) is provided in the updated title report. Please update Tract Z if renamed Response: Tract Z has been renamed Lot B. Public and private utility easement 10 ft wide to 12-ft wide (adjacent to public ROW’s & Tract) Response: The variable width has been added. Temporary Public Easement Restrictions/Provisions Response: Corrected. Plat Short Plat, Phase 1 Response: See response above. Lot B? Shall not be a tract Response: Tract Z has been renamed Lot B. ROW dedication fronting the church building and parking lot shall be added here, what if the future frontage improvement requires more ROW dedication along with construction Response: Right of way dedication based on city road standards will be dedicated with Phase 2. If additional right of way or temporary construction easements are needed from the church Yong Qi, Civil Engineer III City of Renton, Development Engineering -3- May 22, 2025 during construction, it will be the responsibility of developer to negotiate said right of way or easement from the church. Provide temporary access easement provision on this sheet Response: A temporary easement note has been added (Note 3). Sheet 3 Separate text so all text is legible Response: Corrected. Please add monument # Response: Monument numbers have been added on Sheet 3. Please ensure/confirm fence is properly shown post-BLA Response: The fence line on the west boundary is shown correctly post BLA. Is this applicant’s fence or encroaching? Title note 14.D indicates it is 1’ north of property line Response: The fence encroachment has been noted on the plan. The encroachment will be resolved with Phase 2. Sheet 4 Please show monuments set at property corners and show in legend Response: Revision completed. Addresses: Lot 21: Address to remain 15509 116th Ave SE Tract Z: Address(es) to be assigned as part of potential future development If Tract Z is renamed, please update this to new name Response: Revision completed. Provide temporary access easement provision on Sheet 2 Response: Sheet Note 3, Sheet 2. Please ensure/confirm fence is properly shown post-BLA Response: The fence line on the west boundary is shown correctly post BLA. Lot B? Shall not be a tract. Potential future development Yong Qi, Civil Engineer III City of Renton, Development Engineering -4- May 22, 2025 Response: Tract Z has been renamed Lot B. Is this applicant’s fence or encroaching? Title note 14.D indicates it is 1’ north of property line Response: The fence encroachment has been noted on the plan. The encroachment will be resolved with Phase 2. We believe that the above responses, together with the enclosed revised plans and technical documents, address all of the comments in your letter dated April 28, 2025. Please review the enclosed at your earliest convenience. If you have questions or need additional information, please do not hesitate to contact me at this office. Thank you. Respectfully, Ivana Halvorsen Senior Planner IH/mf 22298c.013.docx enc: As noted cc: Kanon Kupferer, Ichijo USA Co., Ltd Barry Talkington, Barghausen Consulting Engineers, LLC