HomeMy WebLinkAboutAddendum - 5Docusign Envelope ID: 2485F9D8-60ED-4AB8-9DF9-88D142881980 AMENDMENT NO. 5 TO AGREEMENT CAG-20-031 FOR THE RAINIER AVE. AND OAKESDALE AVE. STORMWATER PUMP STATION UPGRADES PROJECT THIS AMENDMENT, dated for reference purposes only as June 6, 2025, is by and between the City of Renton (the "City"), a Washington municipal corporation, and RH2 Engineering, Inc. ("Consultant"), a Washington corporation. The City and the Consultant are referred to collectively in this Amendment as the "Parties." Once fully executed by the Parties, this Amendment is effective as of the last date signed by both parties. Whereas, the City engaged the services of the Consultant under Agreement CAG-20-031, dated January 24, 2020, to provide necessary services for the Rainier Ave. and Oakesdale Ave. Stormwater Pump Station Upgrades Project (referred to herein as the "Agreement"); Whereas, the Parties wish to amend the Agreement to add additional scope of work, and to add additional compensation, in order to add services associated with the replacement of the pump at the Rainier Ave S Pump Station . NOW THEREFORE, it is mutually agreed upon that CAG-20-031 is amended as follows: 1.Scope of Work: Section 1, Scope of Work, is amended to include additional technical evaluation, and design and drafting services, as specified in Exhibit A-5, which is attached and incorporated herein. 2.Compensation: Section 4, Compensation, is amended so that the maximum amount of compensation payable to Consultant is increased by $42,000 from $252,650 to $294,650, plus any applicable state and local sales taxes. The additional compensation shall be paid based upon Work actually performed according to the rate(s) or amounts specified in Exhibit B-5, which is attached and incorporated herein. 3.All terms of the Agreement not explicitly modified herein shall remain in full force and effect and such terms shall apply to Work performed according to this Amendment as if fully set forth herein. IN WITNESS WHEREOF, the Parties have voluntarily entered into this Amendment as of the date last signed by the Parties below. CAG-20-031, Adden #5-25 6/16/2025 n/a Approved by Cheryl Beyer via email 6/15/2025 1 5/13/2025 8:50:47 AM J:\DATA\REN\119-215\00 CONTRACT\AMEND NO. 5\AMND_NO. 5_EXH A-5_SOW_RAINIER SWPS FINAL DESIGN.DOCX EXHIBIT A-5 Scope of Work City of Renton Rainier and Oakesdale Stormwater Pump Stations Alternatives and Feasibility Evaluation Amendment No. 5 to CAG-20-031 Rainier SWPS Final Design and Services During Bidding May 2025 Background The City of Renton (City) retained RH2 Engineering, Inc., (RH2) to perform an alternatives evaluation of its Rainier and Oakesdale Stormwater Pump Stations (SWPS). The Rainier SWPS was constructed in the 1960s. Itselectrical equipment is from the original construction and does not meet the current electrical code with regards to the location in a Class 1, Division 2 area. To meet current electrical code, new electrical equipment will need to be relocated to a separate electrical building or under a shelteroutside of the classified area.In addition to electrical equipment upgrades, the City requested RH2 evaluate alternatives for equipping the station with a permanent emergency generator. Based on the alternatives evaluation and preliminary design prepared by RH2, the City has chosen to locate the emergency generator for the Rainier SWPS within the Rainier Avenue right-of-way (ROW), just south of the existing pump station. Improvements also will include upgrades to the existing electrical system. The City recently determined that the existing pumps are aging and replacement parts are becoming difficult to source. This Scope of Work includes evaluation of the wet well and pump cycling, updating the design to include replacement of the pumps and associated mechanical and electrical components, and reevaluation of the generator to determine whether the size can be reduced with the replacement pumps and motor starters. This Scope of Work presumes that there will be minimal impact to the rest of the design and no substantial redesign will need to occur for the pumps to be replaced as part of the project. Task 8A 90-Percent Plans, Specifications, and OPCC for Pump Replacement Objective: Update the design to include replacement of the existing pumps. Prepare 90-percent design plans, general and technical specifications, and opinion of probable construction costs (OPCC) for the pump replacement. Perform internal quality assurance and quality control (QA/QC) review and submit 90-percent design documents to the City for review. Approach: Select replacement pumps to replace the aging pumps within the existing wet well. Advance the pump replacement design plans to 90 percent. Attend one (1) site visit to confirm piping and the planned replacement. City of Renton Exhibit A-5 Rainier and Oakesdale Stormwater Pump Stations Scope of Work Rainier SWPS Final Design and Services During Bidding Amendment No. 5 2 5/13/2025 8:50:47 AM J:\DATA\REN\119-215\00 CONTRACT\AMEND NO. 5\AMND_NO. 5_EXH A-5_SOW_RAINIER SWPS FINAL DESIGN.DOCX Develop 90-percent specifications for the proposed pumps and associated piping and electrical equipment. Update the OPCC to include work associated with the pump replacement. Perform an analysis of the existing wet well with the new pumps to determine if the pump . Assumptions: The pumps, motor starters, and piping will be replaced up to the existing check valves. No structural modifications to the building or floor slab will be required as part of the replacement of the pumps. Access hatches will be installed on a new concrete curb placed around the existing slab openings. RH2 Deliverables: Updated 90-percent review plans, technical specifications, and OPCC for the replacement pumps in electronic PDF. One (1) email summarizing the analysis of the wet well and pump cycling. Task 9A Bid-Ready Design for Pump Replacement Objective: Develop bid-ready design plans, specifications, and OPCC for the Rainier SWPS improvements pump replacement. Approach: Incorporate City comments from the 90-percent review meeting and internal QA/QC review on the pump replacement into the bid-ready design plans and specifications. Review non-technical specifications provided by the City. Prepare bid-ready OPCC. Assumptions: The City will combine the non-technical and technical specifications ahead of advertising the project for bids. RH2 Deliverables: Bid-ready plans, technical specifications, and OPCC in electronic PDF. City of Renton Exhibit A-5 Rainier and Oakesdale Stormwater Pump Stations Scope of Work Rainier SWPS Final Design and Services During Bidding Amendment No. 5 3 5/13/2025 8:50:47 AM J:\DATA\REN\119-215\00 CONTRACT\AMEND NO. 5\AMND_NO. 5_EXH A-5_SOW_RAINIER SWPS FINAL DESIGN.DOCX Fee for Services RH2 estimates this additional work to be $42,000 as shown in Exhibit B-5. Schedule The schedule for each Task is outlined in Exhibit C-5 for this Scope of Work. Docusign Envelope ID: 2485F9D8-60ED-4AB8-9DF9-88D142881980 Washington State Department of Transportation August 13, 2024 RH2 Engineering, Inc. 22722 29th Drive SE, STE 210 Bothell, WA 98021 Subject: Acceptance FYE 2023 ICR-Risk Assessment Review Dear Leilani McSpadden: Development Division Contract Services Office PO Box 47408 Olympia, WA 98504-7408 7345 Linderson Way SW Tumwater, WA 98501-6504 TTY: 1-800-833-6388 www.wsdot.wa.gov Based on Washington State Department of Transportation's (WSDOT) Risk Assessment review of your Indirect Cost Rate (ICR), we have accepted your proposed FYE 2023 ICR of 201.71 % of direct labor. This rate will be applicable for WSDOT Agreements and Local Agency Contracts in Washington only. This rate may be subject to additional review if considered necessary by WSDOT. Your ICR must be updated on an annual basis. Costs billed to agreements/contracts will still be subject to audit of actual costs, based on the terms and conditions of the respective agreement/contract. This was not a cognizant review. Any other entity contracting with your firm is responsible for determining the acceptability of the ICR. If you have any questions, feel free to contact our office at (360) 704-6397 or via email consultantrates@wsdot.wa.gov. Regards, chatz e Harve Schatzie Harvey (Aug 13, 2024 13:23 PD SCHATZIE HARVEY, CPA Contract Services Manager SH:kb Docusign Envelope ID: 2485F9D8-60ED-4AB8-9DF9-88D142881980 EXHIBIT B -5 Fee Estimate Amendment No. 5 to CAG-20-031 City of Renton Rainier and Oakesdale Stormwater Pump Stations Alternatives and Feasibility Evaluation Rainier SWPS Final Design and Services During Bidding May-25 Description Task SA 90-Percent Plans, Specifications, and OPCC for Pump Replacement 8.6 Select replacement pumps and attend site visit 8.7 Develop 90% specifications 8.8 Update OPCC 8.9 Perform analysis of existing wet well Task9A Bid-Ready Design for Pump Replacement 9.3 Incorporate City's 90% review comments 9.4 Prepare bid-ready OPCC PROJECT TOTAL J:\Data\REN\119-215\00 Contract\Amend No. 5\Amnd_No. S_EXH B-S_FEE_Rainier SWPS Final Design Total Hours $ 76 $ 26 $ 10 $ 14 $ $ 34 $ 12 $ is 112 I$ Total Total Expense Total Cost Labor 28,596 $ 2,206 $ 30,802 17,252 $ 1,399 $ 18,651 5,932 $ 396 $ 6,328 2,376 $ 169 $ 2,545 3,036 $ 241 $ 3,277 10,206 $ 993 $ 11,199 7,360 $ 812 $ 8,172 2,846 $ 181 $ 3,027 38,802 I $ 3,198 I $ 42,0001 5/13/2025 12:15 PM 1 5/13/2025 8:47:00 AM J:\Data\REN\119-215\00 Contract\Amend No. 5\Amnd_No. 5_EXH C-5_Schedule_Rainier SWPS Final Design.docx - Rainier and Oakesdale Stormwater Pump Stations Alternatives and Feasibility Evaluation Amendment No. 5 to CAG-20-031 Rainier SWPS Final Design and Services During Bidding ANTICIPATED NOTICE TO PROCEED DATE: May 2025 Task 8A 90-Percent Plans, Specifications, and OPCC for Pump Replacement June 2025 Pump replacement selection and site visit Develop 90-percent specifications Update OPCC Perform analysis of existing wet well Reevaluate generator sizing Task 9A Bid-Ready Design for Pump Replacement January 2026 Incorporate 90-percent review comments Prepare bid-ready OPCC ANTICIPATED CONTRACT COMPLETION DATE: July 2026