HomeMy WebLinkAboutAddendum - 4Docusign Envelope ID: 8842B0BF-CA77-4530-BBD5-B6215846A59E AMENDMENT NO. 4 TO AGREEMENT FOR 116TH AVE SE SIDEWALK PROJECT CAG-23-387 THIS AMENDMENT, dated for reference purposes only as March 17, 2025, is by and between the City of Renton (the "City"), a Washington municipal corporation, and Shea Carr and Jewell, Inc (dba SCJ Alliance) ("Consultant"), a Washington Corporation. The City and the Consultant are referred to collectively in this Amendment as the "Parties." Once fully executed by the Parties, this Amendment is effective as of the last date signed by both parties. Whereas, the City engaged the services of the Consultant under Agreement CAG-23-387, dated November 9, 2023, to provide necessary services for the 116 th Ave SE Sidewalk Project (referred to herein as the "Agreement"); Whereas, the Parties wish to amend the Agreement to change the scope of work, and change the compensation in order to complete storm water drainage report, updated construction cost estimate, and collect additional survey. NOW THEREFORE, It is mutually agreed upon that CAG-23-387 is amended as follows: 1.Scope of Work: Section 1, Scope of Work, is amended to add work as specified in Exhibit A-4, which is attached and incorporated herein. 2.Compensation: Section 4, Compensation, is amended so that the maximum amount of compensation payable to Consultant is increased by $39,285.50 from $266,504.30 to $305,789.80, including any applicable state and local sales taxes. The additional compensation shall be paid based upon Work actually performed according to the rate(s) or amounts specified in Exhibit A-4, which is attached and incorporated herein. 3.All terms of the Agreement not explicitly modified herein shall remain in full force and effect and such terms shall apply to Work performed according to this Amendment as if fully set forth herein. CAG-23-387, Adden #4-25 Scott Sawyer for June 18, 2025 n/a Approved by Cheryl Beyer via email 6/16/2025 Docusign Envelope ID: 8842B0BF-CA77-4530-BBD5-B6215846A59E CONSUL TING SERVICES Exhibit A-4 Amendment #4 Scope of Work 116 th Avenue SE Sidewalk Project Renton, WA Prepared For: Blake Costa, PE, PTOE City of Renton 1055 South Grady Way, Renton, WA 98057 Prepared By: George Hilen, PE, Project Manager Date Prepared: May 30, 2025 Overview The project will advertise for bids in June of 2025. This Amendment includes the level of effort to add engineering support during construction. The City will provide Construction Management and Administration services. All of the original assumptions in the original contract apply unless specifically revised herein. Assumptions The following assumptions are incorporated into this amendment: •Assumes five (5) month duration of the work, approximately June -November 2025. Phase 12 Management/Coordination/Administration (Modified) The task covers the effort required to manage the project. This amendment assumes a 5-month contract extension. Task2 Administration Task 2.2 Progress Billings: Prepare monthly progress invoice. Invoices will show staff hours for each phase (i.e. Phase 1: Project Management). Progress reports previously provided in Task 2.1 will not be included. Phase 12 Engineering Support During Construction Provide support from the project design team to assist the City's construction administration and inspection. Task 5 Engineering Support During Construction Task 1.1 Materials Submittals: Support the Construction Administration with material submittal reviews. Task 1.2 Requests for Information: Provide review support for up to three (3) Requests for Information (RFI) submitted by the Contractor. CONSUL TING SERVICES City of Renton 116th Ave SE Sidewalk Project -Amendment #4 May 30, 2025 Page 2 of 2 Task 1.3 Field Changes and Change Orders: Provide design services for field changes or change orders requested by the City. Assume up to two (2) minor field changes or change orders. Task 1.4 Construction Meetings: Attend one (1) in-person pre-construction meeting and up to twelve (12) in-person weekly progress meetings, including field visits immediately following the meeting. Assume two (2) consultant staff for the pre-construction meeting and one (1) consultant staff for progress meetings. Docusign Envelope ID: 8842B0BF-CA77-4530-BBD5-B6215846A59E Subconsultant Labor Hour Estimate SCJ Alliance Client: City of Renton Project: 116th Ave SE Sidewalks Job#: 23-000984 File Name: 2025-0528 Renton 116th Ave SE Sidewalks Fee Estimate•, Phase& Task No. Phase Task Title PHASE 1 Management/Coordination/ Administration Task 1 Management 1 Management PHASE 12 Engineering Support During Construction Task 1 Engineering Support During Construction 1 Materials Submittals 2 Requests for Information 3 Field Changes and Change Orders 4 Construction Meetings Template Version: 12/11/2024 Contract Type: Billing Rate Schedule Principal PM2Project Manager 20.0 Subtotal Hours: 20.0 Total Phase Hours: 20.0 Total Phase Direct Labor: $4,160.00 12.0 12.0 12.0 78.0 Subtotal Hours: 114.0 Total Phase Hours: 114.0 Total Phase Direct Labor: $23,712.00 Total Hours All Phases 134.0 Total Direct Labor Estimate All Phases $27,872.00 Indirect Costs Subconsultants: Subconsultant Subtotal: Subconsultant Markup: Subconsultant Total: Reimbursable Expenses: Expenses Subtotal: Expenses Markup: Expenses Total: Management Reserve: Total Indirect Costs: Total: 1 of 1 SCJ ALLIANCE Project Total Direct Labor Tota/Cost E4Englneer El Engineer Accountant Hours& Cost $ 5,012.00 6.0 26.0 $ 5,012.00 6.0 26.0 $ 5,012.00 6.0 26.0 26.0 $852.00 $5,012.00 $ 5,012.00 $ 5,796.00 20.0 32.0 $ 5,796.00 8.0 4.0 24.0 $ 4,316.00 12.0 16.0 40.0 $ 6,476.00 5.0 83.0 $ 17,049.00 45.0 20.0 179.0 $ 33,637.00 45.0 20.0 179.0 $ 179.0 $7,425.00 $2,500.00 $33,637.00 $ 33,637.00 45.0 20.0 6.0 205.0 205.0 $7,425.00 $2,500.00 $852.00 $38,649.00 $ 38,649.00 $ $ $ Copies, Printing, etc. $ Mileage $ 636.50 $ 636.50 $ $ 636.50 $ $ 636.50 $ 39,285.50 5/30/2025 Docusign Envelope ID: 8842B0BF-CA77-4530-BBD5-B6215846A59E Subconsultant Fee Determination Summary SO Alliance Client: City of Renton Project: 116th Ave SE Sidewalks Job #: 23-000984 File Name: 202S-0528 Renton 116th Ave SE Sidewalks Fee Estimate -Amendment #4.xlsm Consultant Fee Determination DIRECT SALARY COST Classification Principal PM2 Project Manager E4 Engineer El Engineer Project Accountant TOTAL SALARY COST SUBCONSULTANTS REIMBURSABLE EXPENSES Hours 0.0 134.0 45.0 20.0 6.0 Fully Burdened Rate $280.00 $208.00 $165.00 $125.00 $142.00 Subconsultant Fee Subtotal: $0 Subconsultant Markup: 0% Copies, Printing, etc. Mileage 0.0% of the Total Salary Costs 950 miles at $0.670 Expenses Subtotal: Expenses Markup: 0% SUBTOTAL (SALARY, SUBCONSULTANTS AND EXPENSES) Subtotal (Salary, Subconsultants and Expenses) MANAGEMENT RESERVE FUND (MRF) Management Reserve: $0 SCJ ALLIANCE Template Version: Contract Type: Total Salary Cost per mile 12/11/2024 Billing Rate Schedule Amount $0.00 $27,872.00 $7,425.00 $2,500.00 $852.00 $38,649.00 $0.00 $0.00 $0.00 $636.50 $636.50 $0.00 $39,285.50 $0.00 Total Estimated Budget: $39,285.50