Loading...
HomeMy WebLinkAboutChange Order - 44Docusign Envelope ID: 08B1D297-DD6B-4E02-B4FF-9281704D84BB Contract Title: Contractor: Contract No.: Federal Aid No.: Change Order No. 44 Rainier Ave S Corridor Improvements -Phase 4 Pivetta Brothers Construction, Inc. CAG-22-163 STPUL-1615(005) � Ordered by Engineer D Force Account D Proposed by the Contractor {VECP) D Bid Item D Unilateral Affects DBE Work: �No D Yes Original Contract: Current Contract: Estimated Net Change This Order: New Contract: Reviewed By: ��c:___ Enginee'rof Record < Reviewed By: Reviewed By: City Attorney 44 D Bid Item Price Adjustment � Lump Sum If yes, must receive concurrence from Local Programs prior to execution. G 5 :.zOLS Date 6/5/2025 Date 6/12/2025 Date Date Amount Working Days $28,284,172.90 500 $35,841,322.45 654 $8,939.41 0 $35,850,261.86 654 y of Renton Transportation Design Manager) Consent By: Surety (Greater than 25% cost and/or 20% time increase) Endorsed By: �•-111'"­ Russell Owen �- Contractor Executed ByG'00"•""" Martin Pastucha 888131 FEl�8B���El ... City of Renton Public Works Administrator/ Mayor Date 6/19/2025 Date 6/24/2025 I 2:26 PM P[ Date Change Order No. Contract Title: Rainier Ave S. Corridor Improvements -Phase 4 Contract No. CAG-22-163 Page 1 of9 CAG-22-163, CO #44-25 Approved by Cheryl Beyer via email 6/13/2025 Docusign Envelope ID: 08B1 D297-DD6B-4E02-B4FF-9281704D84BB THE CONTRACT IS MODIFIED AS FOLLOWS: Description of Change: The Contractor shall remove the tw o trees in the permanent easement at Safeway at approx. STA 204+35 LT and 204+53 LT per the response to RFI #324 to allow for the installation of the proposed sidewalk per plan. Proposal Schedule of Prices: ADD the following to Schedule A: 44-A207 -Added Tree Removal at Safeway, 1 LS @ $8,939.41 = $8,939.41 Specification and/or Special Provision: ADD the following to 2-01.3: The Contractor shall remove the trees in the permanent easement at approx. STA 204+35 LT and 204+53 LT per the response to RFI #324. Description: None. Materials: None. Measurement: ADD the following to 2-01.4: No specific unit of measurement shall apply to the lump sum item of "Added Tree Removal at Safeway." Payment: ADD the following to 2-01.5: "Added Tree Removal at Safeway," lump sum. Plans: None. Reason for Change: This Change is required because the roots of two trees at approx. STA 204+35 LT and 204+53 LT are in conflict with the proposed sidewalk, and removal of the ro ots would likely kill the trees and cause a safety hazard to the traveling public. After discussion with Safeway and Change Order No. Contract Title: Contract No. 44 Rainier Ave S. Corridor Improvements -Phase 4 CAG-22-163 Page 2 of 9 Docusign Envelope ID: 08B1 D297-DD6B-4E02-B4FF-9281704D84BB Sections 1-04.4 and 1-04.5 of the 2022 WSDOT/APWA Standard Specifications shall govern this Change Order. The Work of the referenced Contract is modified to include the changes detailed herein. The payment provided for herein shall constitute the complete and final settlement for all costs of labor, equipment, materials, overhead, profit, permit fees, and all other claims that may be made by the Contractor because of this change. To be attached to Change Order: IZI 1-Estimated Change Order Cost □2-Plans IZI 3-Field Directive/Request for Information Response IZI 4-Change Order Quotation □5-Project Labor List □6-Force Account Equipment Rate Request (DOT Form 422-010 EF) □7-Equitable Adjustment Determination □8-Additional Working Days Calculation Change Order No. Contract Title: Contract No. 44 Rainier Ave S. Corridor Improvements -Phase 4 CAG-22-163 Page 4 of 9