HomeMy WebLinkAboutHEX_Fountain of Hope CUP_FINALDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Project Location Map
SR_Fountain of Hope CUP_FINAL
A. REPORT TO THE HEARING EXAMINER
Hearing Date: July 8, 2025
Project File Number: PR25-000023
Project Name: Fountain of Hope Ministries International Church
Land Use File
Number:
LUA25-000077, CU-H, ECF
Project Manager: Jill Ding, Senior Planner
Owner: Nhi Nguyen & Toan Ngo, 18312 112th Ave SE, Renton, WA 98055
Contact: Dawa Loga Kamanga, Fountain of Hope Ministries International Church, 7911
165th St Ct E, Puyallup, WA 98375
Project Location: 300 S 3rd St, Renton, WA 98057 (APNs 0007200184 and 0007200157)
Project Summary: The applicant is requesting a Hearing Examiner Conditional Use Permit and
Environmental (SEPA) Review for the change of use of an existing building into a
religious institution. The project site is comprised of two (2) parcels (parcel nos.
0007200184 and 0007200157) located at the northeast corner of the
intersection of S 3rd St and Shattuck Ave S, a former funeral home. The project
site totals 27,666 square feet (0.64 acres) in area and is located within the
Center Downtown (CD) zone and Urban Design District A. The existing building
totals 7,005 square feet in area with 23 surface parking stalls. No expansion of
the existing building is proposed. The proposal would include converting the
existing garage into a community outreach support space with a recreation
area, commercial kitchen, shower, and two (2) bathrooms. The commercial
kitchen would also provide space to expand meal service and food pantry. A
portion of the existing parking lot and pavement space is proposed to be
developed with picnic tables, a gardening space, and an outdoor
futsal/basketball court. The futsal and basketball court would be used for
parking during church services. A church use was permitted temporarily under
Temporary Use Permit (LUA10-062) that was granted on September 20, 2010,
and expired September 20, 2011. According to City of Renton (COR) Maps, high
seismic hazard areas and Downtown Wellhead Protection Area Zone 2 are
mapped on the project site.
Site Area: 27,666 square feet (0.64 acres)
City of Renton Department of Community & Economic Development
Fountain of Hope Ministries International Church
Staff Report to the Hearing Examiner
LUA25-000077, CU-H, ECF
Report of July 8, 2025 Page 2 of 16
SR_Fountain of Hope CUP_FINAL
B. EXHIBITS:
Exhibits 1-11: As shown in the Environmental Review Committee (ERC) Report
Exhibit 12: Staff Report to the Hearing Examiner
Exhibit 13: SEPA Determination of Non-Significance (DNS), dated June 2, 2025
Exhibit 14: Project Narrative
Exhibit 15: Title Report
Exhibit 16: Conditional Use Justification
Exhibit 17: On Hold Notice, dated April 23, 2025
Exhibit 18: Off Hold Notice, dated May 15, 2025
C. GENERAL INFORMATION:
1. Owner(s) of Record: Nhi Nguyen & Toan Ngo
18312 112th Ave SE
Renton, WA 98055
2. Zoning Classification: Center Downtown (CD)
Urban Design District A
3. Comprehensive Plan Land Use
Designation:
Commercial Mixed Use (CMU)
4. Existing Site Use: A funeral home use previously occupied the site. A
church use was permitted temporarily under
Temporary Use Permit (LUA10-062) that was granted
on September 20, 2010 and expired September 20,
2011.
5. Critical Areas: According to City of Renton (COR) Maps, high
seismic hazard areas and Downtown Wellhead
Protection Area Zone 2 are mapped on the project
site.
6. Neighborhood Characteristics:
a. North: Multi-family residential, Center Downtown (CD) zone and Commercial Mixed Use
(CMU) land use designation
b. East: Harambee Church, Center Downtown (CD) zone and Commercial Mixed Use (CMU)
land use designation
c. South: Multi-tenant retail building, Center Downtown (CD) zone and Commercial Mixed
Use (CMU) land use designation
d. West: Retail uses, Commercial Arterial (CA) zone and Commercial Mixed Use (CMU) land
use designation
7. Site Area: 27,666 square feet (0.64 acres)
D. HISTORICAL/BACKGROUND:
City of Renton Department of Community & Economic Development
Fountain of Hope Ministries International Church
Staff Report to the Hearing Examiner
LUA25-000077, CU-H, ECF
Report of July 8, 2025 Page 3 of 16
SR_Fountain of Hope CUP_FINAL
Action Land Use File No. Ordinance No. Date
Comprehensive Plan N/A 6153 12/09/2024
Zoning N/A 6154 12/09/2024
Annexation (Smithers) N/A 156 05/18/1909
Temporary Use Permit LUA10-062 N/A 09/20/2010
E. PUBLIC SERVICES:
1. Existing Utilities:
a. Water: The proposed development is within City of Renton water service area. There is an existing
12-inch (12”) City water main located in Shattuck Ave S that can deliver a maximum flow capacity
of 5,000 GPM. There is an existing 12-inch (12”) City water main located in S 3rd St that can deliver
a maximum flow capacity of 5,400 GPM.
b. Sewer: The proposed development is within the City’s sewer service area. There is an existing
eight-inch (8”) gravity wastewater main located in Shattuck Ave S. There is an existing 24-inch
(24”) gravity wastewater main located in S 3rd St.
c. Surface/Storm Water: The site is relatively flat. There is no public storm main fronting the parcel.
There is an existing 18-inch (18”) stormwater main in the north side of S 3rd St. There is an existing
12-inch (12”) stormwater main in the east side of Shattuck Ave S. There is an existing 18-inch
(18”) stormwater main in the west side of Shattuck Ave S.
2. Streets: The proposed development fronts S 3rd St along the south property line. S 3rd St is classified
as a Principal Arterial street with an existing ROW width of approximately 60 feet (60’). The proposed
development fronts Shattuck Ave S along the west property line. Shattuck Ave S is classified as a
Collector Arterial street with an existing ROW width of approximately 60 feet (60’).
3. Fire Protection: Renton Regional Fire Authority (RRFA)
F. APPLICABLE SECTIONS OF THE RENTON MUNICIPAL CODE:
1. Chapter 2 Land Use Districts
a. Section 4-2-020: Purpose and Intent of Zoning Districts
b. Section 4-2-060: Zoning Use Table – Uses Allowed in the Zoning Designations
c. Section 4-2-120: Commercial Development Standards
2. Chapter 3 Environmental Regulations and Overlay Districts
a. Section 4-3-050: Critical Area Regulations
b. Section 4-3-100: Urban Design Regulations
3. Chapter 4 City-Wide Property Development Standards
4. Chapter 6 Streets and Utility Standards
a. Section 4-6-060: Street Standards
5. Chapter 9 Permits – Specific
a. Section 4-9-030: Conditional Use Permits
City of Renton Department of Community & Economic Development
Fountain of Hope Ministries International Church
Staff Report to the Hearing Examiner
LUA25-000077, CU-H, ECF
Report of July 8, 2025 Page 4 of 16
SR_Fountain of Hope CUP_FINAL
6. Chapter 11 Definitions
G. APPLICABLE SECTIONS OF THE COMPREHENSIVE PLAN:
1. Land Use Element
H. FINDINGS OF FACT (FOF):
1. The Planning Division of the City of Renton accepted the above master application for review on
March 31, 2025 and determined the application complete on April 8, 2025. Review of the project was
placed “On Hold” on April 23, 2025 (Exhibit 17). The project was taken “Off Hold” on May 15, 2025
(Exhibit 18). The project complies with the 170-day review period.
2. The project site is located at 300 S 3rd St, Renton, WA 98057.
3. The project site is currently developed with an existing 7,005 square foot building, formerly used as
a funeral home, with 23 surface parking stalls.
4. Access to the site would be provided via existing curb cuts off Shattuck Ave S and S 3rd St.
5. The property is located within the Commercial & Mixed Use (CMU) Comprehensive Plan land use
designation.
6. The site is located within the Center Downtown (CD) zoning classification and within Design District
A.
7. There are approximately two (2) trees located on-site. No trees are proposed for removal.
8. The site is mapped with high seismic hazard areas and Downtown Wellhead Protection Area Zone 2.
9. No grading is proposed as no exterior excavation is proposed.
10. The applicant is proposing to begin construction in summer 2025 and end in fall 2025.
11. Staff received two (2) agency comment letters (Exhibits 6 & 8). To address comments received, the
ERC Report (Exhibit 1) included a discussion on archaeologic preservation and utilities. In addition,
staff provided a written response to the comments received (Exhibits 7 & 9). No other public or
agency comments were received.
12. Pursuant to the City of Renton's Environmental Ordinance and SEPA (RCW 43.21C, 1971 as
amended), on June 2, 2025 the Environmental Review Committee issued a Determination of Non-
Significance (DNS) for the Fountain of Hope Ministries International Church (Exhibit 13). A 14-day
appeal period commenced on June 2, 2025 and ended on June 16, 2025. No appeals of the threshold
determination have been filed as of the date of this report.
13. Representatives from various city departments have reviewed the application materials to identify
and address issues raised by the proposed development. These comments are contained in the
official file, and the essence of the comments has been incorporated into the appropriate sections
of this report and the Departmental Recommendation at the end of this report.
14. Comprehensive Plan Compliance: The site is designated Commercial & Mixed Use (CMU) on the
City’s Comprehensive Plan Map. The intention of this designation is to transform strip commercial
development into business districts through the maximization of uses and with cohesive site
planning, landscaping, signage, circulation, parking, and the provision of public amenity features. The
proposal is compliant with the following development standards if all conditions of approval are met:
City of Renton Department of Community & Economic Development
Fountain of Hope Ministries International Church
Staff Report to the Hearing Examiner
LUA25-000077, CU-H, ECF
Report of July 8, 2025 Page 5 of 16
SR_Fountain of Hope CUP_FINAL
Compliance Comprehensive Plan Analysis
✓ Goal LU-BB: Ensure new development supports a high quality of life with design
that is functional and attractive.
✓ Goal LU-FF: Strengthen the visual identity of Renton and its Community Planning
Areas and neighborhoods through quality design and development.
✓ Policy LU-48: Consider scale and context for infill project design to preserve
privacy and quality of life for residents.
15. Zoning Development Standard Compliance: The purpose of the Center Downtown Zone (CD) is to
provide a mixed-use urban commercial center serving a regional market as well as high-density
residential development. Uses include a wide variety of retail sales, services, multi-family residential
dwellings, and recreation and entertainment uses. The proposal is compliant with the following
development standards, as outlined in RMC 4-2-120.B, if all conditions of approval are met:
Compliance CD Zone Develop Standards and Analysis
Compliant
if
conditions
of approval
are met
Use: A religious institution use is permitted within the CD zone, subject to the
approval of a Hearing Examiner Conditional Use Permit. Typical accessory uses
associated with religious institutions include licensed day care facilities,
playground, community meeting facilities, and private schools, rectory or convent,
and offices for administration of the institution.
Social service organizations are permitted within the CD zone, subject to the
approval of a Hearing Examiner Conditional Use Permit. Social service
organizations are public or nonprofit agencies that provide counseling, therapy,
job training, educational classes, food banks, clothing banks, or other social or
human services to persons needing such services, but do not provide crisis
intervention, day or night shelter, or case management. This does not include
religious institutions, offices, government facilities, schools, hospitals, clinics, day
care, homeless services uses, medical institutions, diversion facilities, lodging in
any form, or residential uses.
Homeless service uses are prohibited within the CD zone. Homeless service uses
include day shelters, emergency shelters, and emergency housing.
Day shelters are defined as a facility that offers a haven to people experiencing
homelessness by providing a safe place to rest during the day or evening, but with
no overnight stays. Support services for homeless populations is an integral part
of a day shelter use and may include access to food, seating, showers, laundry,
restrooms, storage, a computer lab, phones, fax, and a critical mailing address.
Spaces for meetings and examinations are generally provided to accommodate
counseling and access to medical/dental and legal assistance.
Emergency shelter is defined as a facility that provides a temporary shelter for
individuals or families who are currently homeless. Emergency shelter may not
require occupants to enter into a lease or an occupancy agreement. Emergency
shelter facilities may include day and warming centers that do not provide
overnight accommodations.
Emergency housing is defined as temporary indoor accommodations for
individuals or families who are homeless or at imminent risk of becoming
homeless that is intended to address the basic health, food, clothing, and personal
City of Renton Department of Community & Economic Development
Fountain of Hope Ministries International Church
Staff Report to the Hearing Examiner
LUA25-000077, CU-H, ECF
Report of July 8, 2025 Page 6 of 16
SR_Fountain of Hope CUP_FINAL
hygiene needs of individuals or families. Emergency housing may or may not
require occupants to enter into a lease or an occupancy agreement.
Staff Comment: According to the project narrative (Exhibit 14) submitted with the
application materials, the proposal includes the establishment of a religious
institution for the Fountain of Hope Ministries International Church on the project
site. With adequate funding, the applicant has a vision that would include creating
a space for bringing hope to the hopeless and salvation to the lost souls. This vision
includes bringing stability to the underserved black, indigenous, and people of
color (BIPOC) community whether youth, adult, or elderly. To bring this vision to
life, the applicant proposes to convert the existing garage (located at the northwest
corner of the existing building) into a community outreach support space with a
recreation area, commercial kitchen, shower, and two (2) bathrooms for those in
need of basic resources. The commercial kitchen would provide space for meal
service and a food pantry. The proposed vision for the outside of the building would
be to utilize a portion of the parking lot and pavement space for picnic tables, a
gardening space, and an outdoor futsal/basketball court. The creation of a futsal
and basketball space would still be used for parking during days/hours of church
service.
Floor plans (Exhibit 4) were also included with the project application materials.
The floor plans identify the sanctuary, administrative offices, banquet hall, and
shine bright room on the first floor. The second floor would include three (3) guest
spaces, lounge areas, a kitchen, and a bathroom. The third floor includes an attic.
It appears that the second floor includes habitable living space for a residential
dwelling. Staff recommends, as a condition of approval, that any residential
occupants of the building be limited to clergy members in leadership positions of
the Fountain of Hope Ministries International Church.
Based on the uses proposed, it appears that the Fountain of Hope Ministries
International Church would also include social services organization and
potentially homeless services uses. The proposed religious institution and social
service organization uses can be permitted in the CD zone through the approval of
a Hearing Examiner Conditional Use Permit, see further Conditional Use Permit
discussion below under FOF 17. A homeless services use is not permitted within
the CD zoning designation.
A Title Report (Exhibit 15) was submitted with the project application materials.
There is a use restriction on the property that includes funeral services. Staff
recommends, as a condition of approval, that the use restriction be removed from
the property if funeral services or any other restricted uses are proposed to be
included as accessory to the proposed primary religious institution use.
N/A
Density: The density range permitted in the CD zone is a minimum of 75.0 up to a
maximum of 150.0 dwelling units per net acre. Density may be increased to 200
dwelling units per net acre subject to conditional use permit approval.
Staff Comment: Not applicable, as no residential dwelling units are proposed.
✓
Lot Dimensions: There are no minimum lot size, width, or depth requirements in
the CD zone.
Staff Comment: The southern lot (APN 0007200157) is approximately 121 feet
(121’) in width and 150 feet (150’) in depth, with a total lot area of approximately
City of Renton Department of Community & Economic Development
Fountain of Hope Ministries International Church
Staff Report to the Hearing Examiner
LUA25-000077, CU-H, ECF
Report of July 8, 2025 Page 7 of 16
SR_Fountain of Hope CUP_FINAL
18,166 square feet. The northern lot (APN 0007200184) is approximately 125 feet
(125’) in width and 75 feet (75’) in depth, with a total area of approximately 10,000
square feet.
N/A
Setbacks: There is no minimum front yard setback. The maximum front yard
setback is 15 feet for that portion of the building that is 25 feet or less in height.
There is no minimum secondary front yard setback. The maximum secondary front
yard setback is 15 feet for that portion of the building that is 25 feet or less in height.
There is no minimum rear yard setback, unless the ground floor facade provides
windows for living rooms of attached dwellings – then 10 ft. – unless adjacent to an
alley, then none. Additionally, if the CD lot abuts a lot zoned residential, then there
shall be a 15 ft. landscaped strip or a 5 ft. wide sight-obscuring landscaped strip
and a solid 6 ft. high barrier along the common boundary with an additional 5 ft.
setback from the barrier. There is no minimum side yard setback unless the ground
floor facade provides living room windows of attached dwellings – then 10 ft. –
unless adjacent to an alley, then none. Additionally, if the CD lot abuts a lot zoned
residential, then there shall be a 15 ft. wide landscaped strip or a 5 ft. wide sight-
obscuring landscaped strip and a solid 6 ft. high barrier along the common
boundary with an additional 5 ft. setback from the barrier.
Staff Comment: The existing building has a front setback of approximately 41 feet
(41’), a secondary front setback that ranges from zero feet (0’) to approximately 25
feet (25’), a side yard setback of approximately 29 feet (29’) and a rear setback of
approximately 91 feet (91’). No exterior building additions are proposed at this
time.
✓
Building Standards: There is no maximum building coverage requirement in the
CD zone. The maximum building height permitted is 150 ft., except when abutting
a residential zone, then the maximum height is 20 feet more than the maximum
height allowed in the abutting residential zone. Heights may exceed the maximum
height with a Hearing Examiner conditional use permit. Building height shall not
exceed the maximum allowed by the subject zoning district or the maximum
allowed pursuant to RMC 4-3-020, Airport Related Height and Use Restrictions,
whichever is less.
Staff Comment: As shown on the submitted site plan, the existing building has a
total footprint of approximately 4,961square feet, which would result in a building
coverage of 18% on the 27,666 square foot project site. The existing building has
two (2) stories plus an attic and appears to be less than the 150-foot (150’)
maximum height permitted in the CD zone. No new additions are proposed.
✓
Landscaping: New and existing development in the CD zone is subject to
subsection F2, Street Trees and Landscaping Required Within the Right-of-Way on
Public Streets, subsection F6, Parking Lots, and subsection P of the Landscaping
Regulations (RMC 4-4-070), Maintenance, but is exempt from other requirements
of this Section. Minimum planting strip widths between the curb and sidewalk are
established according to the street development standards of RMC 4-6-060. Street
trees and, at a minimum, groundcover shall be planted within planting strips
pursuant to the following standards, provided there shall be a minimum of one
street tree planted per lot.
a. Trees shall be selected from the City’s Approved Street Tree List based on
the width of the planting strip and the presence or lack of overhead power
City of Renton Department of Community & Economic Development
Fountain of Hope Ministries International Church
Staff Report to the Hearing Examiner
LUA25-000077, CU-H, ECF
Report of July 8, 2025 Page 8 of 16
SR_Fountain of Hope CUP_FINAL
lines; provided, the Administrator and City arborist shall each retain the
right to reject any proposed cultivar regardless of whether or not the
cultivar is on the City’s Approved Street Tree List.
b. Street trees shall have a minimum caliper of two inches (2"), and be planted
pursuant to the standards promulgated by the City, which may require root
barriers, structured soils, or other measures to help prevent tree roots from
damaging infrastructure.
c. Street trees shall be planted in the center of the planting strip between the
curb and the sidewalk at the following intervals; provided, that, where right-
of-way is constrained, irregular intervals and slight increases or decreases
may be permitted or required. Additionally, trees shall be planted in
locations that meet required spacing distances from facilities located in
the right-of-way including, but not limited to, underground utilities, street
lights, utility poles, traffic signs, fire hydrants, and driveways; such spacing
standards are identified in the City’s Approved Tree List. Generally, the
following spacing is required:
i. Small-sized maturing trees: thirty feet (30') on center;
ii. Medium-sized maturing trees: forty feet (40') on center; and
iii. Large-sized maturing trees: fifty feet (50') on center.
A permanent built-in irrigation system with an automatic controller shall be
installed, used, and maintained in working order in all landscaped areas.
Staff Comment: Existing, mature landscaping is located on the project site. Existing
landscaping is comprised of primarily lawn and mature ornamental shrubs. Two (2)
trees are located onsite and there are also existing mature street trees in grates
along the S 3rd St and Shattuck Ave S frontages. As the proposal does not include
the construction of a new building, or an addition to an existing building, the
proposal would be exempt from all but the maintenance requirement of the
Landscaping Regulations in accordance with RMC 4-4-070.
✓
Tree Retention: The City’s adopted Tree Retention and Land Clearing Regulations
(4-4-130) require the retention of 30 percent of trees in a commercial
development. Tree credit requirements shall apply at a minimum rate of thirty (30)
credits per net acre based on values for existing or new trees as provided in RMC
4-4-130H.1.b.v.
Significant trees shall be retained in the following priority order:
Priority One: Landmark trees; significant trees that form a continuous canopy;
significant trees on slopes greater than twenty percent (20%); significant trees
adjacent to critical areas and their associated buffers; and significant trees over
sixty feet (60') in height or greater than eighteen inches (18") caliper.
Priority Two: Healthy tree groupings whose associated undergrowth can be
preserved; other significant native evergreen or deciduous trees; and other
significant non-native trees.
Priority Three: Alders and cottonwoods shall be retained when all other trees have
been evaluated for retention and are not able to be retained, unless the alders and/
City of Renton Department of Community & Economic Development
Fountain of Hope Ministries International Church
Staff Report to the Hearing Examiner
LUA25-000077, CU-H, ECF
Report of July 8, 2025 Page 9 of 16
SR_Fountain of Hope CUP_FINAL
or cottonwoods are used as part of an approved enhancement project within a
critical area or its buffer.
Staff Comment: There are two (2) existing trees located on the project site, and no
trees are proposed for removal. Therefore, the proposal would retain 100% of all
existing trees onsite, which would comply with the tree retention requirements.
Interior remodels not involving any building additions, removal of trees, or
alteration of impervious areas are exempt from compliance with the Tree Credit
Requirements (RMC 4-4-130H.1.b).
N/A
Screening: All on-site surface mounted utility equipment shall be screened from
public view. Screening shall consist of equipment cabinets enclosing the utility
equipment, solid fencing or a wall of a height at least as high as the equipment it
screens, or a landscaped visual barrier allowing for reasonable access to
equipment. Equipment cabinets, fencing, and walls shall be made of materials
and/or colors compatible with building materials. All operating equipment located
on the roof of any building shall be enclosed so as to be screened from public view.
Staff Comment: No surface or roof-mounted utility equipment is proposed at this
time.
Compliant
if condition
of approval
is met
Refuse and Recycling: In office, educational and institutional developments, a
minimum of two (2) square feet per every one thousand (1,000) square feet of
building gross floor area shall be provided for recyclables deposit areas and a
minimum of four (4) square feet per one thousand (1,000) square feet of building
gross floor area shall be provided for refuse deposit areas. A total minimum area
of one hundred (100) square feet shall be provided for recycling and refuse deposit
areas.
Staff Comment: Based on an existing building area of 7,005 square feet, the
religious institution would require 14 square feet of recyclable deposit areas and
28 square feet of refuse deposit areas. A total minimum area of 100 square feet
shall be provided for recycling and refuse deposit areas. A refuse and recyclable
deposit area was not shown on the submitted application materials. Therefore,
staff recommends, as a condition of approval, that a site plan and screening detail
be submitted at the time of Building Permit review showing the proposed location,
size, and method of screening for a refuse and recycling deposit area. The revised
site plan and screening detail shall be submitted to the Current Planning Project
Manager for review and approval.
✓
Parking: Within the CD zone, except for subjections F1 through F9 and subsection
J, compliance with the Parking Regulations (RMC 4-4-080) only applies to new
buildings and building additions.
All parking shall be provided in the rear portion of the yard, with access taken from
an alley, when available. Parking shall not be located in the front yard, nor in a side
yard facing the street nor rear yard facing the street. Parking may be located off-
site or subject to a joint parking requirement.
Standard parking stall dimensions are 9 feet by 20 feet, compact stall dimensions
are 8 ½ feet by 16 feet.
Religious institutions require a minimum and maximum of 1.0 space for every 5
seats in the main auditorium; however, in no case shall there be less than 10.0
City of Renton Department of Community & Economic Development
Fountain of Hope Ministries International Church
Staff Report to the Hearing Examiner
LUA25-000077, CU-H, ECF
Report of July 8, 2025 Page 10 of 16
SR_Fountain of Hope CUP_FINAL
spaces. For all existing institutions enlarging the seating capacity of their
auditoriums, 1.0 additional parking space shall be provided for every 5 additional
seats provided by the new construction.
Staff Comment: The proposed project includes the change of use of an existing
building from a funeral home to a religious institution. No new buildings or building
additions are proposed, therefore other than compliance with the Parking Lot
Design Standards, the proposed project would be exempt from compliance with
the Parking Regulations.
The applicant indicates that up to 100 people may attend church services. Based
on the seating requirements for 100 people, a minimum and a maximum of 20
parking spaces would be required. The existing surface parking lot includes 23
parking spaces, two (2) of which would be ADA accessible. It appears that the
existing parking would be sufficient for the proposed religious institution.
✓
Bicycle Parking: The number of bicycle parking spaces shall be equal to ten
percent (10%) of the number of required off-street vehicle parking spaces.
Staff Comment: The proposed project includes the change of use of an existing
building from a funeral home to a religious institution. No new buildings or building
additions are proposed, therefore the proposed project would be exempt from
compliance with the bicycle parking requirements.
✓
Fences and Retaining Walls: The maximum height of any fence, hedge or
retaining wall is eight feet (8'), provided the fence, hedge, or retaining wall does not
exceed forty-eight inches (48") in height within fifteen feet (15’) of the front or
secondary front yard property line. Fences, hedges, or retaining walls shall not
exceed forty eight inches (48") in height within fifteen feet (15') of a rear yard
property line that abuts a public street. In no case shall a fence, hedge, or retaining
wall exceed forty-two inches (42") in height in any part of the clear vision area.
Chain-link fencing within commercial zones (outside of the Center Downtown
Zone) shall be coated with black, brown, grey, or green bonded vinyl.
Fences, hedges, and retaining walls shall not stand in or in front of any required
landscaping. If a new or replaced fence is proposed within fifteen feet (15’) of a
public street on a site that is nonconforming with regard to street frontage
landscaping requirements, the site shall be brought into compliance with street
frontage landscaping requirements prior to fence installation.
There shall be a minimum three-foot (3') landscaped setback at the base of
retaining walls abutting public rights-of-way.
Staff Comment: There is existing fencing around the perimeter of the existing
surface parking lot. If any changes to the existing fencing or new fencing is
proposed, compliance with these regulations would be required.
N/A
Special Development Standards:
Upper story setbacks: None, unless adjacent to and facing a residentially zoned
lot or if the facade contains living room windows – then 10 ft. for the second story
and 15 ft. for all upper stories.
Staff Comment: Not applicable as no building additions or new buildings are
proposed.
City of Renton Department of Community & Economic Development
Fountain of Hope Ministries International Church
Staff Report to the Hearing Examiner
LUA25-000077, CU-H, ECF
Report of July 8, 2025 Page 11 of 16
SR_Fountain of Hope CUP_FINAL
✓
Lighting: All building lights shall be directed onto the building itself or the ground
immediately abutting to it. The light emissions shall not be visible above the
roofline of the building.
Parking lot or display lot light fixtures shall be non-glare and mounted no more than
twenty five feet (25') above the ground to minimize the impact onto adjacent and
abutting properties. All fixtures shall be fitted with a cutoff type luminaire as
exemplified below.
Staff Comment: These standards apply to the addition or replacement of light
fixtures. If any fixtures are installed or replaced, a lighting plan in compliance with
these standards would be required.
16. Design Standards: The project site is located within Design District ‘A’. Exterior modifications such
as facade changes, windows, awnings, signage, etc., shall comply with the design requirements for
the new portion of the structure, sign, or site improvement. If any exterior modifications are proposed
to the building or site, compliance with the applicable design standards would be required.
17. Critical Areas: Project sites which contain critical areas are required to comply with the Critical Areas
Regulations (RMC 4-3-050). The proposal is consistent with the Critical Areas Regulations, if all
conditions of approval are complied with:
Compliance Critical Areas Analysis
✓
Geologically Hazardous Areas: Based upon the results of a geotechnical report
and/or independent review, conditions of approval for developments may include
buffers and/or setbacks from buffers.
Staff Comment: The project site is located within a high seismic hazard area. A
Geotechnical Report was not included with the land use application materials as
no exterior improvements to the existing building are proposed. The proposed
project is limited to a change of use and interior tenant improvements. It is
anticipated that the city’s adopted building code and construction standards
would adequately mitigate any impacts of the proposed tenant improvements on
the project site.
✓ ✓
Wellhead Protection Areas:
Staff Comment: The project site is mapped within a Wellhead Protection Area,
zone 2. If any grading is proposed, a Fill Source Statement would be required for
any fill brought onto the project site. In addition, no hazardous material use or
storage is anticipated with the proposed change of use.
18. Conditional Use Analysis: The applicant is requesting a Conditional Use Permit to change the use of
an existing 7,005 square foot building into a Religious Institution and Social Service Organization for
the Fountain of Hope Ministries International Church. The proposal is compliant with the following
conditional use criteria, pursuant to RMC 4-9-030D. Therefore, staff recommends approval of the
requested Conditional Use Permit.
Compliance Conditional Use Criteria and Analysis
✓ a. Consistency with Plans and Regulations: The proposed use shall be
compatible with the general goals, objectives, policies and standards of the
City of Renton Department of Community & Economic Development
Fountain of Hope Ministries International Church
Staff Report to the Hearing Examiner
LUA25-000077, CU-H, ECF
Report of July 8, 2025 Page 12 of 16
SR_Fountain of Hope CUP_FINAL
Comprehensive Plan, the zoning regulations and any other plans, programs,
maps or ordinances of the City of Renton.
Staff Comment: See FOF 14 for Comprehensive Plan Compliance and FOF 15 for
Zoning Development Standard Compliance.
✓
b. Appropriate Location: The proposed location shall not result in the
detrimental overconcentration of a particular use within the City or within the
immediate area of the proposed use. The proposed location shall be suited
for the proposed use.
Staff Comment: The applicant contends that the proposed location is suited for
the proposed use. The proposed church has a maximum estimated population of
less than 100 and the proposed location of the church would not result in a
detrimental overconcentration of religious institutions or social service
organizations within the immediate area or the city (Exhibit 16).
Staff has reviewed the request and concurs that the proposed church would not
result in an overconcentration of religious institutions or social service
organizations within the immediate vicinity of the project site or within the city.
✓
c. Effect on Adjacent Properties: The proposed use at the proposed location
shall not result in substantial or undue adverse effects on adjacent property.
Staff Comment: The applicant contends that the proposed religious institution
and social service organization uses would not result in adverse effects on
adjacent properties. The proposed building space is located within downtown
Renton. Across the street to the west is a restaurant and to the south is a multi-
tenant retail building. Abutting the project site to the east is another church. The
proposed use would result in an increase in traffic to the site on Friday evenings
and Sunday mornings which is when church services are held. It is anticipated
that impacts to surrounding businesses would be minimized as the project site
includes adequate onsite parking. Onsite activities outside of church services
would include small group meetings, choir practice, and community outreach
activities.
Staff has reviewed the request and concurs that the proposed religious institution
and social service organization uses would not have adverse impacts on adjacent
properties.
✓
d. Compatibility: The proposed use shall be compatible with the scale and
character of the neighborhood.
Staff Comment: The applicant contends that the proposed church would improve
the value of the commercial activities in the area by supporting the goals of
Renton to decrease the number of homeless and decrease the statistics of
violence. In the past, this space was vacant, which led to people breaking and
entering the building for negative purposes. The applicant contends that their
presence in the building, would increase the value of the space and improve the
actions of others in the vicinity as people learn that services would be provided to
help those in need.
Staff has reviewed the request and concurs that a religious institution and social
service organization on the project site would be compatible with the scale and
character of the neighborhood. As previously discussed above, the applicant
City of Renton Department of Community & Economic Development
Fountain of Hope Ministries International Church
Staff Report to the Hearing Examiner
LUA25-000077, CU-H, ECF
Report of July 8, 2025 Page 13 of 16
SR_Fountain of Hope CUP_FINAL
indicates that the proposed church would have up to 100 people in attendance at
services and contends that the existing building would be sufficient to
accommodate the existing church population.
✓
e. Parking: Adequate parking is, or will be made, available.
Staff Comment: The applicant contends that onsite parking would consist of 23
existing parking spaces which would be adequate for patrons attending church
services or meetings. The applicant further contends that there is adequate on-
street parking within the vicinity of the project site if there is overflow. If overflow
parking is needed, the applicant anticipates people would utilize the street
parking on Sundays which is typically a day where most businesses are closed
and would be less likely to be affected.
Staff has reviewed the request and concurs that the 23 on-site surface parking
spaces would be adequate to provide the necessary parking for the proposed use
(see previous parking discussion above under FOF 15).
✓
f. Traffic: The use shall ensure safe movement for vehicles and pedestrians and
shall mitigate potential effects on the surrounding area.
Staff Comment: The applicant contends that the times of heaviest use would
occur during Friday evenings and Sunday mornings when traffic volumes in the
vicinity are lower. The existing layout provides adequate vehicular access to the
parking lot on the back side of the building.
Staff has reviewed the request and concurs that the existing site layout provides
for the safe movement of vehicular and pedestrian access onto the project site.
There are existing pedestrian connections between S 3rd St and Shattuck Ave S
and the building entrance on the south building facade. The primary vehicular
entry to the site would occur via the existing curb cut off Shattuck Ave S to the
parking lot. There is a secondary vehicular access off S 3rd St also via an existing
curb cut.
✓
g. Noise, Light and Glare: Potential noise, light and glare impacts from the
proposed use shall be evaluated and mitigated.
Staff Comment: The applicant contends that noise generated during worship
services would not be significant enough to impact other properties in the vicinity.
The existing building is a standalone building and does not have any shared walls
with adjacent buildings or uses. Sound and light would be at a level expected from
an occupied building and would not unduly impact other properties in the vicinity.
Staff has reviewed the request and concurs that the proposed religious institution
use and social service organization use would not generate noise, light, and glare
impacts that would unduly impact the surrounding neighborhood.
✓
h. Landscaping: Landscaping shall be provided in all areas not occupied by
buildings, paving, or critical areas. Additional landscaping may be required to
buffer adjacent properties from potentially adverse effects of the proposed
use.
Staff Comment: The applicant contends that existing landscaping would be
maintained by the Fountain of Hope International Ministries Church and that the
City of Renton Department of Community & Economic Development
Fountain of Hope Ministries International Church
Staff Report to the Hearing Examiner
LUA25-000077, CU-H, ECF
Report of July 8, 2025 Page 14 of 16
SR_Fountain of Hope CUP_FINAL
existing landscaping provides a sufficient buffer between the existing building and
surrounding properties and uses.
Staff has reviewed the request and concurs that there is existing mature
landscaping located on-site that would provide a sufficient buffer between the
existing building and surrounding uses.
N/A
i. Specific Requirements for Kennels and Pet Daycares: In addition to the
criteria above, the following criteria shall also be considered for kennel and
pet daycare applications:
a. History: Past history of animal control complaints relating to the
applicant’s dogs and cats at the address for which the kennel and/or pet
daycare is located or to be located. Conditional Use Permits shall not be
issued for kennels or pet daycares to applicants who have previously had
such permits revoked or renewal refused, for a period of one (1) year after
the date of revocation or refusal to renew.
b. Standards for Keeping Animals: The applicant or facility owner shall
comply with the requirements of RMC 4-4-010, Animal Keeping and
Beekeeping Standards.
Staff Comment: Not applicable.
N/A
j. Specific Requirements for Secure Community Transition Facilities
(SCTF), Crisis Diversion Facilities (CDF) and Crisis Diversion Interim
Service Facilities (CDIS): In addition to the criteria in RMC 4-9-030.D.1
through 4-9-030.D.8, the following criteria shall be considered for secure
community transition facilities, crisis diversion facilities, and interim service
facilities:
a. Whether alternative locations were reviewed and consideration was
given to sites that are farthest removed from any risk potential activity;
b. Whether adequate buffering is provided from abutting and adjacent uses;
c. Whether adequate security is demonstrated by the applicant;
d. Whether public input was provided during the site selection process; and
e. For SCTF there is no resulting concentration of residential facility beds
operated by the Department of Corrections or the Mental Health Division
of the Department of Social and Health Services, the number of
registered sex offenders classified as Level II or Level III, and the number
of sex offenders registered as homeless in a particular neighborhood,
community, jurisdiction or region.
Staff Comment: Not applicable.
N/A
k. Specific Requirements for Live-Work Units: In addition to the criteria in
RMC 4-9-030.D.1 through 4-9-030.D.8 and the development standards of the
zone where the unit(s) is proposed, the following criteria shall be considered;
a. Each unit shall:
i. Not exceed a maximum of one thousand (1,000) square feet of
nonresidential space for commercial activity;
City of Renton Department of Community & Economic Development
Fountain of Hope Ministries International Church
Staff Report to the Hearing Examiner
LUA25-000077, CU-H, ECF
Report of July 8, 2025 Page 15 of 16
SR_Fountain of Hope CUP_FINAL
ii. Include all nonresidential space, to the maximum allowed,
constructed to commercial building standards;
iii. Provide an internal connection between the residential and
nonresidential space within each unit; and
iv. Provide a street presence and pedestrian-oriented façade for the
nonresidential space.
b. Only following uses are allowed within the nonresidential space of a unit:
i. Eating and drinking establishments;
ii. On-site services; and
iii. Retail sales.
c. Within the Residential-14 (R-14) Zone, live-work units shall only be
allowed along primary, minor, and collector arterials.
d. Within the Commercial Arterial (CA) Zone, live-work units shall only be
allowed at a distance of one hundred fifty feet (150’) or greater from and
arterial.
Staff Comment: Not applicable.
19. Availability and Impact on Public Services:
Compliance Availability and Impact on Public Services Analysis
✓
Police and Fire: Police and Fire Prevention staff indicates that sufficient resources
exist to furnish services to the proposed development; subject to the condition
that the applicant provides Code required improvements and fees. Fire impact
fees for a church use are applicable at the rate of $0.24 per square foot. Credit for
the previous funeral home use would be granted at a rate of $0.13 per square foot.
This fee is paid at time of building permit issuance.
✓
Storm Water: An adequate drainage system shall be provided for the proper
drainage of all surface water.
Staff Comment: The topography of the site is relatively flat. There is no public storm
main fronting the parcel. There is an existing 18-inch (18”) stormwater main in the
north side of S 3rd St. There is an existing 12-inch (12”) stormwater main in the east
side of Shattuck Ave S. There is an existing 18-inch (18”) stormwater main in the
west side of Shattuck Ave S. There are no land disturbing activities proposed;
therefore, the proposal would not be subject to compliance with the surface water
regulations.
✓
Water: The proposed development is within City of Renton water service area.
There is an existing 12-inch (12”) water main located in Shattuck Ave S that can
deliver a maximum flow capacity of 5,000 GPM. There is an existing 12-inch (12”)
water main located in S 3rd St that can deliver a maximum flow capacity of 5,400
GPM.
The existing three-quarter inch (¾”) water service may be retained for the proposed
change of use. A utility plan showing a DCVA installed downstream of the existing
three-quarter inch (¾”) water service would be required at the time of Civil
Construction or Building Permit review.
City of Renton Department of Community & Economic Development
Fountain of Hope Ministries International Church
Staff Report to the Hearing Examiner
LUA25-000077, CU-H, ECF
Report of July 8, 2025 Page 16 of 16
SR_Fountain of Hope CUP_FINAL
The development is subject to applicable water system development charges
(SDC). Fees will be charged based on the applicable rate at the time of Civil
Construction or Building Permit issuance. The SDC fee for water is based on the
size of the new domestic water to serve the project. The 2025 water fee is
$4,850.00 per 1-inch (1”) meter.
✓
Sanitary Sewer: The proposed development is within the City’s sewer service
area. There is an existing eight-inch (8”) gravity wastewater main located in
Shattuck Ave S. There is an existing 24-inch (24”) gravity wastewater main located
in S 3rd St. Sewer system improvement/alteration is not anticipated for the
proposed change of use.
The development will be subject to a wastewater system development charge
(SDC fee) if upgrading or additional domestic water meters are proposed. SDC fee
for sewer is based on the size of the new domestic water to serve the project. Fees
will be charged based on the rate in effect at the time of construction permit
issuance. The current sewer fee for a one-inch (1”) meter is $4,025.00 per meter,
a one and one-half inch (1-1/2”) meter is $20,125.00 and a two-inch (2”) meter is
$32,200.00.
✓
Streets: The proposed development fronts S 3rd St along the south property line. S
3rd St is classified as a Principal Arterial street with an existing right-of-way (ROW)
width of approximately 60 feet (60’). The proposed development fronts Shattuck
Ave S along the west property line. Shattuck Ave S is classified as Collector Arterial
street with an existing ROW width of approximately 60 feet (60’).
Per RMC 4.6.060D, interior remodels that do not involve a building addition are
exempt from frontage improvements.
The project proposal was subjected to the Transportation Concurrency Test
(Exhibit 10). The proposed development is anticipated to generate a decrease of
approximately one (1) weekday daily trip. During the weekday AM peak hour, the
project would generate a decrease of 51 weekday AM peak hour trips (25 in, 26
out). During the weekday PM peak hour, the project would generate a decrease of
approximately one (1) net new trip (1 in, -2 out). The proposed project passes the
City of Renton Traffic Concurrency Test. A Traffic Impact Analysis was not required
to be submitted with the application materials as the proposal would not generate
20 new AM or PM peak hour trips. The proposal is not anticipated to result in new
transportation impacts to the city’s transportation system.
I. CONCLUSIONS:
1. The subject site is located in the Commercial & Mixed Use (CMU) Comprehensive Plan designation
and complies with the goals and policies established with this designation, see FOF 5 and FOF 14.
2. The subject site is located in the Center Downtown (CD) zoning designation and complies with the
zoning and development standards established with this designation provided the applicant
complies with City Code and conditions of approval, see FOF 6 and FOF 15.
3. The proposed Conditional Use Permit complies with the Urban Design Regulations provided the
applicant complies with City Code and conditions of approval, see FOF 16.
4. The proposed Conditional Use Permit complies with the Critical Areas Regulations provided the
applicant complies with City Code and conditions of approval, see FOF 17.
City of Renton Department of Community & Economic Development
Fountain of Hope Ministries International Church
Staff Report to the Hearing Examiner
LUA25-000077, CU-H, ECF
Report of July 8, 2025 Page 17 of 16
SR_Fountain of Hope CUP_FINAL
5. The proposed Conditional Use Permit complies with all eight (8) of the applicable Conditional Use
Permit criteria as established by City Code provided all advisory notes and conditions are complied
with, see FOF 18.
6. The proposed Conditional Use Permit complies with the street standards as established by City
Code, provided the project complies with all advisory notes and conditions of approval contained
herein, see FOF 19.
7. There are adequate public services and facilities to accommodate the proposed Conditional Use
Permit, see FOF 19.
8. Key features, which are integral to this project include the provided on-site surface parking, the
pedestrian connections between the primary entrance and Shattuck Ave S and S 3rd St, articulation
and modulation of the existing public facing building facades, and the variety of building materials
on the existing building facades.
J. RECOMMENDATION:
Staff recommends approval of the Fountain of Hope Ministries International Church Conditional Use
Permit, File No. LUA25-000077, CU-H, ECF, as depicted in the Site Plan (Exhibit 2) and Floor Plan (Exhibit
4), subject to the following conditions:
1. Any residential occupants of the church building shall be limited to clergy members in leadership
positions of the Fountain of Hope Ministries International Church.
2. The use restriction recorded on title shall be removed from the property, if funeral services or any
other restricted uses are proposed to be included as accessory to the proposed primary religious
institution use.
3. The applicant shall submit a site plan and screening detail at the time of Building Permit review
showing the proposed location, size, and method of screening for a refuse and recycling deposit
area. The revised site plan and screening detail shall be submitted to the Current Planning Project
Manager for review and approval.
CITY OF RENTON
DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT
STAFF REPORT TO THE HEARING EXAMINER
EXHIBITS
Project Name:
Fountain of Hope Ministries International Church
Land Use File Number:
LUA25-000077, CU-H, ECF
Date of Hearing
July 8, 2025
Staff Contact
Jill Ding
Senior Planner
Project Contact/Applicant
Dawa Loga Kamanga
Fountain of Hope Ministries
International Church
7911 165th St Ct E,
Puyallup, WA 98375
Project Location
300 S 3rd St,
Renton, WA 98057
The following exhibits are included with the Staff Report to the Hearing Examiner:
Exhibits 1-11: As shown in the Environmental Review Committee (ERC) Report
Exhibit 12: Staff Report to the Hearing Examiner
Exhibit 13: SEPA Determination of Non-Significance (DNS), dated June 2, 2025
Exhibit 14: Project Narrative
Exhibit 15: Title Report
Exhibit 16: Conditional Use Justification
Exhibit 17: On Hold Notice, dated April 23, 2025
Exhibit 18: Off Hold Notice, dated May 15, 2025