Loading...
HomeMy WebLinkAboutC_Response_Letter_Wilson_Law_Group_180430-v2.pdf April 30, 2018 Jill Ding City of Renton Department of Community And Economic Development 1055 South Grady Way Renton, Washington 98057 RE: Resubmittal of 4-Lot Preliminary Short Plat Dalpay Associates Short Plat Tax Parcel Number 042305-9032 WLG Job No. 15870 City of Renton No. LUA17-000234 SHPL-A, ECF, MOD, MOD Dear Jill: On behalf of our client, Dalpay Properties, LLC, we are hereby responding to the comments we received from the City in response to our preliminary short plat submittal. Enclosed are several items requested in the City’s comments: 1. Correction letter from Jill Ding, City of Renton, dated January 31, 2018. 2. Comment response letter from Don Dawes, Barghausen Consulting Engineers, Inc., dated April 30, 2018. 3. Response to review comments from Scott S. Riegel, Earth Solutions NW, LLC, dated February 21, 2018. 4. Landscape Plans/Tree Retention/Land Clearing Plan (including Tree Retention Worksheet) prepared by Barghausen Consulting Engineers, Inc. dated April 26, 2018. 5. Utility Plans prepared by Barghausen Consulting Engineers, Inc. dated April 26, 2018. 6. Drainage Control Plan prepared by Barghausen Consulting Engineers, Inc. dated April 26, 2018. 7. Grading Elevation and Plan prepared by Barghausen Consulting Engineers, Inc. dated April 26, 2018. 8. Technical Information Report (TIR) Report prepared by Barghausen Consulting Engineers, Inc. dated April 25, 2018. Responses 1. The drainage report and Drainage Plan must be revised to comply with the current adopted (as of January 1, 2017) 2017 City of Renton Surface Water Design Manual (RSWDM). Modeling to be done using WWHM or MS Flood models. All requirements based on RSWDM should be provided. Please see the comment response letter from Don Dawes. PO Box 158 Kent, WA 98035 │ (206) 805-6238 Office │ WilsonLawGroupWA.com Jill Ding City of Renton -2- April 30, 2018 2. The geotech report needs to be revised per the 2017 RSWDM to provide the infiltration rate, recommendations based on actual field criteria, to back up the on-site BMP selection that is mentioned in the RSWDM. Please see the response to review comments from Scott S. Riegel. 3. The water main is required to extend approximately additional 100 feet to the north property line of Lot 3. A minimum of 15 feet wide public easement is required for water main located outside public right of way. Informational comment – public easement is required for the individual water meters. Please see the Utility Plans prepared by Barghausen Consulting Engineers, Inc. regarding extension of the water main. The required water easement will be shown on the face of the final plat map. Please review the enclosed information at your earliest convenience. If you have any questions or need additional information, please do not hesitate to contact me at this office. Thank you. Respectfully, Terrance Randall Wilson Attorney at Law enc: As Noted cc: Jim Dalpay, Dalpay Properties, LLC