00 DEMOLITION NOTES
co 1. DEMOLITION NOTES ARE FOR CLARIFICATION ONLY AND ARE SHOWN FOR THE CONTRACTOR'S BENEFIT. THESE NOTES ARE NOT
6 INTENDED TO BE COMPREHENSIVE. THE CONTRACTOR SHALL REMOVE OR RELOCATE ALL EXISTING ON -SITE IMPROVEMENTS
NECESSARY TO ACCOMMODATE THE PROPOSED CONSTRUCTION.
2. THE DESIGN SHOWN IS BASED UPON THE ENGINEER'S UNDERSTANDING OF THE EXISTING CONDITIONS. THE PLAN DOES NOT
LJJ REPRESENT A DETAILED FIELD SURVEY. THE EXISTING CONDITIONS SHOWN ON THIS PLAN SHEET ARE BASED UPON THE SURVEY
~ PREPARED BY PACE ENGINEERS, INC., DATED 1 /16/2015. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING FIELD CONDITIONS
PRIOR TO BIDDING THE PROPOSED SITEWORK IMPROVEMENTS. IF CONFLICTS ARE DISCOVERED, THE CONTRACTOR SHALL NOTIFY
THE OWNER PRIOR TO INSTALLATION OF ANY PORTION OF THE SITEWORK WHICH WOULD BE AFFECTED. IF CONTRACTOR DOES
NOT ACCEPT EXISTING SURVEY, INCLUDING TOPOGRAPHY AS SHOWN ON THE PLANS, WITHOUT EXCEPTION, HE SHALL HAVE MADE,
AT HIS OWN EXPENSE, A TOPOGRAPHIC SURVEY BY A REGISTERED LAND SURVEYOR AND SUBMIT IT TO THE OWNER FOR REVIEW.
3. CAUTION - NOTICE TO CONTRACTOR
THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON
THESE PLANS IS BASED ON RECORDS OF THE VARIOUS UTILITIES, AND WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD.
THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE APPROPRIATE
UTILITY COMPANY AT LEAST 48 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES. IT SHALL BE
THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES AND EXISTING IMPROVEMENTS WHICH CONFLICT
WITH THE PROPOSED IMPROVEMENTS ON THE PLANS.
4. CONTRACTOR IS TO REMOVE ALL EXISTING SURFACE IMPROVEMENTS AND DEBRIS WITHIN THE LIMITS OF WORK UNLESS OTHERWISE
NOTED. ALL DEBRIS FOUND ON SITE SHALL BE DISPOSED OF IN ACCORDANCE WITH APPLICABLE STATE CODES.
5. CONTRACTOR TO PROTECT EXISTING FEATURES WHICH ARE TO REMAIN.
6. ABANDONED PIPES LOCATED OUTSIDE PROPOSED BUILDING PAD LIMITS WITH AN EXCESS OF 3' COVER MAY BE DECOMMISSIONED
AND ABANDONED IN PLACE, PROVIDED THAT THESE ABANDONED UTILITIES ARE GROUTED AND CAPPED. EXISTING SUBSURFACE
IMPROVEMENTS AND DEBRIS WITHIN THE PROPOSED BUILDING PAD AREA, INCLUDING 10' BEYOND FOUNDATIONS, SHALL BE
REMOVED.
7. CONTRACTOR SHALL ADJUST ALL EXISTING MANHOLE RIMS, DRAINAGE STRUCTURES, VALVE BOXES, VAULT LIDS AND UTILITY
ACCESS STRUCTURES TO FINISH GRADE WITHIN AREAS AFFECTED BY PROPOSED CONSTRUCTION.
EROSION CONTROL NOTES
1. THESE NOTES SHALL APPEAR FOR ALL PROJECTS - SITE IMPROVEMENTS, SURFACE WATER UTILITY,
WASTEWATER UTILITY, WATER UTILITY, AND TRANSPORTATION PLANS:
2. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING MUST BE HELD WITH THE
CITY OF RENTON, PUBLIC WORKS DESIGN ENGINEER.
3. THE BOUNDARIES OF THE CLEARING LIMITS AND AREAS OF VEGETATION PRESERVATION AS PRESCRIBED ON THE PLAN(S) SHALL
BE CLEARLY FLAGGED BY SURVEY TAPE OR FENCING IN THE FIELD PRIOR TO CONSTRUCTION IN ACCORDANCE WITH APPENDIX D
OF THE SURFACE WATER DESIGN MANUAL AND OBSERVED DURING CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO
DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE
APPLICANT/ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION.
4. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE
DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE
REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR
FOR THE DURATION OF THE PROJECT.
5. ALL REQUIRED SEDIMENTATION/EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND
CLEARING AND/OR CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND
ADJACENT PROPERTIES. ALL EROSION AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL
SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS PASSED THE
IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO EROSION/SEDIMENTATION CONTROL SYSTEMS SHALL BE THE
RESPONSIBILITY OF THE PERMITEE.
6. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM
REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL
CONDITIONS DICTATE, THE PERMITEE SHALL ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES WILL BE
NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT
SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE PERMITEE TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED
BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED,
TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM.
7. APPROVAL OF THIS PLAN IS FOR EROSION/SEDIMENTATION CONTROL ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF
STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS, OR RETENTION FACILITIES.
8. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING
THE WET SEASON (OCTOBER 1ST TROUGH MARCH 30 OR SEVEN DAYS DURING THE DRY SEASON (APRIL 1ST TOUGH SEPTEMBER
30) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODS (E.G., SEEDING, MULCHING, PLASTIC
COVERING, ETC.).
9. WET SEASON SEASONAL EROSION AND SEDIMENT CONTROL REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES CLEARING
BETWEEN OCTOBER 1 AND MARCH 30 INCLUSIVE, UNLESS OTHERWISE APPROVED BY THE CITY THROUGH AN ADJUSTMENT
PROCESS.
10. COVER MEASURES WILL BE APPLIED IN CONFORMANCE WITH APPENDIX D OF THE SURFACE WATER DESIGN MANUAL.
11. ANY AREA NEEDING ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS.
12. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN 24
HOURS FOLLOWING A STORM EVENT.
13. AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH
BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH
SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM.
In
14. DURING THE TIME PERIOD OF OCTOBER 1ST THROUGH MARCH 30TH, ALL PROJECT DISTRIBUTED SOIL
En
AREAS GREATER, THAT ARE TO BE LEFT UN -WORKED FOR MORE THAN 12 HOURS, SHALL BE COVERED BY MULCH, SODDING
N OR PLASTIC COVERING.
N 15. ANY PERMANENT RETENTION/DETENTION FACILITY USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE
NECESSARY EROSION CONTROL MEASURES AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE PERMANENT FACILITY IS
00 TO FUNCTION ULTIMATELY AS AN INFILTRATION SYSTEM, THE TEMPORARY FACILITY MUST BE ROUGH GRADED SO THAT THE
!; BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY.
00
16. PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1), ALL DISTURBED AREAS SHALL BE REVIEWED TO IDENTIFY WHICH ONES
z CAN BE SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SEEDED WITHIN ONE WEEK OF THE
W
BEGINNING OF THE WET SEASON. A SKETCH MAP OF THOSE AREAS TO BE SEEDED AND THOSE AREAS TO REMAIN UNCOVERED
SHALL BE SUBMITTED TO THE CITY OF RENTON FOR REVIEW.
0
`1
tY
2
U
Z
z �� OF WASH ���� ���� A WAS
����,
LU
TD
a A 37679 A 48855
m 1505 Westlake Ave. N. T (206) 522-9510 ��� ��GISTERly�`"4 �0 h�G1 TEg��
ej Suite 305 F (206) 522-8344 �SSIONAL�SSIONAL E��l
W Seattle, WA 98109 WWW.PAcLAND.COM N0.
El
^ YV 1.7C 1`tVL. 1 A
X 401.71
• 8" SIGN POST BASE
DEMOLITION KEY NOTES
OA COMPLETELY DEMOLISH EXISTING BUILDING AND ASSOCIATED APPURTENANCES,
INCLUDING BASEMENTS IN ACCORDANCE WITH APPLICABLE CODES. DISCONNECT
AND CAP EXISTING UTILITIES AT THEIR MAIN LINE. CONTRACTOR SHALL
REMOVE ALL ASBESTOS CONTAINING BUILDING MATERIALS IN ACCORDANCE
WITH APPLICABLE CODE REQUIREMENTS.
OB STORM DRAIN PIPE/STRUCTURE NOT SURVEYED, AND IS REPRESENTED BASED
ON CITY GIS INFORMATION; CONTRACTOR TO FIELD VERIFY
OC DEMOLISH EXISTING CONCRETE CURB (TYP).
OD DEMOLISH EX RETAINING WALL
EO DEMOLISH AND REMOVE EXISTING ASPHALT PAVEMENT TO DEPTH SUFFICIENT
TO CONSTRUCT NEW PAVING AND IMPROVEMENTS.
O DISCONNECT EXISTING ELECTRICAL SERVICES CAP AND PRESERVE FOR
RECONNECTION
OG REMOVE EXISTING SIGN
OH REMOVE AND SALVAGE EXISTING LIGHT STANDARD
OI REMOVE EXISTING TREE (TYP)
OJ REMOVE EXISTING 6" CHAIN LINK FENCE
REVISION
SURVEYED:
WRH
DESIGNED:
LRR
DRAWN:
CMD
CHECKED:
WFF
BY I DATE I APPR APPROVED:
I \ /A 4UD.130
TL 322305-9090
X 405.94 �
OK PROTECT EXISTING CHAIN LINK FENCE TO REMAIN
OL PROTECT EXISTING CATCH BASIN TO REMAIN
O DEMOLISH AND REMOVE EXISTING CONCRETE PAVEMENT TO DEPTH SUFFICIENT TO
CONSTRUCT NEW PAVING AND IMPROVEMENTS.
ON REMOVE EX UNDERGROUND ELECTRICAL
O DISCONNECT EXISTING WATER SERVICE CAP AND PRESERVE FOR RECONNECTION
OP DISCONNECT EXISTING GAS SERVICE CAP AND PRESERVE FOR RECONNECTION
OQ REMOVE EXISTING CATCH BASIN
OR REMOVE EXISTING STORM DRAIN PIPE
OS TREE PROTECTION FENCING PER RMC 4-4-130H.9, TREES WITHIN FENCE
ENCLOSURE TO BE PROTECTED DURING CONSTRUCTION, SEE SHEET CV-1.1 FOR
STANDARD TREE PROTECTION NOTES
OT REMOVE EX SIDEWALK
OU PROTECT EX SANITARY SEWER MANHOLE
SCALE:
AS SHOWN
ONE INCH
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
VERTICAL: NAVD 1988
HORIZONTAL- NAD 1983/1991
DATU M
I O
MB w
c�
8".16" CED x 410.2 I w
Know what's below.
Call before you dig.
x 410.7
-G �G-
GRAPHIC SCALE
10 20 40
( IN FEET )
1 inch = 20 ft.
LEGEND
REMOVE ASPHALT PAVEMENT
REMOVE CONCRETE PAVEMENT
REMOVE BUILDING FOUNDATION
2 STABILIZED CONSTRUCTION ENTRANCE �o��
D-2.0
1 SILT FENCE
D-2.0
ORANGE CONSTRUCTION FENCE X
CHAINLINK FENCE ow
3 CATCH BASIN FILTER 13
D-2.0
REMOVE EX TREE 0
EX. CONTOUR
ENGINEER'S RECORD
DRAWING CERTIFICATION
SEE SHEET CV-1.0 FOR SIGNED ENGINEER'S
RECORD DRAWING CERTIFICATION NOTE
CITY OF
RENTON
Planning/Building/Public Works Dept.
R-398804
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
RENTON DENTAL ARTS
17816 108TH AVE SE
RECORD DRAWINGS
DEMOLITION AND ESC PLAN
a�
H
U
0000
N
O
O
T
Q
J
W
Q
J
I-
z
I..0
DATE: Q
04/12/2019
FIELDBOOK: z
PAGE: O
DRAWING NO: I--
D-1 .0 Z I
SHEET: OF: W
04 27 Cr