CITY OF RENTON EROSION AND SEDIMENT CONTROL (ESC)
STANDARD PLAN NOTES (CITY STANDARD PLAN 268.00)
THE FOLLOWING IS A LISTING OF GENERAL NOTES THAT SHALL BE INCORPORATED IN THE EROSION AND SEDIMENT CONTROL ( ESC) PLAN
SET. ALL THE NOTES ON THE LIST MAY NOT PERTAIN TO EVERY PROJECT. THE APPLICANT OR OWNER, HEREBY REFERRED TO AS APPLICANT,
MAY STRIKE OUT IRRELEVANT NOTES IF NOT APPLICABLE TO THE PROJECT. HOWEVER, THE APPLICANT SHALL NOT RENUMBER NOR EDIT THE
REMAINING NOTES. IF ADDITIONAL NOTES ARE NEEDED FOR SPECIFIC ASPECTS, THEY SHALL BE ADDED AFTER THE ESC STANDARD PLAN
NOTES.
1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE- CONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF
RENTON, HEREBY REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANT' S CONTRACTOR.
2. THE APPLICANT IS RESPONSIBLE FOR OBTAINING THE WASHINGTON STATE DEPARTMENT OF ECOLOGY (ECOLOGY) CONSTRUCTION
STORMWATER GENERAL PERMIT, IF IT IS REQUIRED FOR THE PROJECT. THE APPLICANT SHALL PROVIDE THE CITY COPIES OF ALL
MONITORING REPORTS PROVIDED TO ECOLOGY ASSOCIATED WITH THE CONSTRUCTION STORMWATER GENERAL PERMIT.
3. THE ESC PLAN SET SHALL INCLUDE AN ESC CONSTRUCTION SEQUENCE DETAILING THE ORDERED STEPS THAT SHALL BE FOLLOWED FROM
CONSTRUCTION COMMENCEMENT TO POST- PROJECT CLEANUP IN ORDER TO FULFILL PROJECT ESC REQUIREMENTS.
4. THE BOUNDARIES OF THE CLEARING LIMITS, SENSITIVE AREAS AND THEIR BUFFERS, AND AREAS OF VEGETATION PRESERVATION AND TREE
RETENTION AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY DELINEATED BY FENCING AND PROTECTED IN THE FIELD IN ACCORDANCE
WITH APPENDIX D OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL ( RENTON SWDM) PRIOR TO THE START OF CONSTRUCTION.
DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL
BE MAINTAINED BY THE APPLICANT/ ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION.
5. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION
OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE
THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK- OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT.
IF SEDIMENT IS TRACKED OFFSITE, PUBLIC ROADS SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY, OR MORE FREQUENTLY
DURING WET WEATHER, AS NECESSARY TO PREVENT SEDIMENT FROM ENTERING WATERS OF THE STATE.
6. WASHOUT FROM CONCRETE TRUCKS SHALL BE PERFORMED OFF- SITE OR IN DESIGNATED CONCRETE WASHOUT AREAS ONLY. DO NOT WASH
OUT CONCRETE TRUCKS ONTO THE GROUND, OR TO STORM DRAINS OR OPEN DITCHES. ON- SITE DUMPING OF EXCESS CONCRETE SHALL
ONLY OCCUR IN DESIGNATED CONCRETE WASHOUT AREAS.
7. WASHOUT AREAS. ALL REQUIRED ESC BMPS SHALL BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/ OR
CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL
ESC BMPS SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/ OR CONSTRUCTION IS COMPLETE
AND POTENTIAL FOR ON- SITE EROSION HAS PASSED. ALL ESC BMPS SHALL BE REMOVED AFTER CONSTRUCTION IS COMPLETED AND THE
SITE HAS BEEN STABILIZED TO ENSURE POTENTIAL FOR ON- SITE EROSION DOES NOT EXIST. THE IMPLEMENTATION, MAINTENANCE,
REPLACEMENT, ENHANCEMENT, AND REMOVAL OF ESC BMPS SHALL BE THE RESPONSIBILITY OF THE APPLICANT.
8. ANY HAZARDOUS MATERIALS OR LIQUID PRODUCTS THAT HAVE THE POTENTIAL TO POLLUTE RUNOFF SHALL BE DISPOSED OF PROPERLY.
9. THE ESC BMPS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS
CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE APPLICANT SHALL ANTICIPATE THAT MORE ESC
BMPS WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION,
IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE APPLICANT TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE
ACTIVITIES AND TO PROVIDE ADDITIONAL ESC BMPS, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT
ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM.
10. APPROVAL OF THIS PLAN IS FOR ESC ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF
PIPES, RESTRICTORS, CHANNELS, OR STORMWATER FACILITIES.
11. ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF STORMWATER FACILITIES SHALL BE SUBMITTED TO THE CITY FOR
REVIEW AND APPROVAL.
12. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET
SEASON (OCTOBER 1ST THROUGH APRIL 30TH) OR SEVEN DAYS DURING THE DRY SEASON ( MAY 1ST THROUGH SEPTEMBER 30TH) SHALL
BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODS ( E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.) IN
CONFORMANCE WITH APPENDIX D OF THE RENTON SWDM.
13. WET SEASON ESC REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES BETWEEN OCTOBER 1ST AND APRIL 30TH, UNLESS OTHERWISE
APPROVED BY THE CITY.
14. ANY AREA NEEDING ADDITIONAL ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN ( 7) DAYS.
15. THE ESC BMPS ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED AT A MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS
FOLLOWING A STORM EVENT. INSPECTION AND MAINTENANCE SHALL OCCUR MORE FREQUENTLY AS REQUIRED BY THE CITY.
16. BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, CATCH BASIN INSERTS PER THE CITY STANDARD PLAN 216. 30 SHALL BE
PROVIDED FOR ALL STORM DRAIN INLETS DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR CONSTRUCTION AREA, UNLESS THE
RUNOFF THAT ENTERS THE INLET WILL BE CONVEYED TO A SEDIMENT POND OR TRAP. ALL CATCH BASIN INSERTS SHALL BE PERIODICALLY
INSPECTED AND REPLACED AS NECESSARY TO ENSURE FULLY FUNCTIONING CONDITION.
17. AT NO TIME SHALL SEDIMENT ACCUMULATION EXCEED 2/3 OF THE CAPACITY OF THE CATCH BASIN SUMP. ALL CATCH BASINS AND
CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT- LADEN WATER INTO
THE DOWNSTREAM SYSTEM.
18. ANY PERMANENT STORMWATER FACILITY LOCATION USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY
ESC BMPS AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE TEMPORARY FACILITY IS TO ULTIMATELY FUNCTION AS AN
INFILTRATION SYSTEM IN ITS PERMANENT STATE, THE TEMPORARY FACILITY SHALL BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES
ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY.
19. AREAS DESIGNATED ON THE PLAN(S) CONTAINING EXISTING STORMWATER FACILITIES OR ON- SITE BMPS ( AMENDED SOILS, BIORETENTION,
PERMEABLE PAVEMENT, ETC.) SHALL BE CLEARLY FENCED AND PROTECTED USING ESC BMPS TO AVOID SEDIMENTATION AND COMPACTION
DURING CONSTRUCTION.
20. PRIOR TO THE BEGINNING OF THE WET SEASON (OCTOBER 1ST), ALL DISTURBED AREAS SHALL BE INSPECTED TO IDENTIFY WHICH ONES
SHALL BE SODDED OR SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SODDED OR SEEDED WITHIN ONE
WEEK OF THE BEGINNING OF THE WET SEASON. AN EXHIBIT OF THOSE AREAS TO BE SODDED OR SEEDED AND THOSE AREAS TO REMAIN
UNCOVERED SHALL BE SUBMITTED TO THE CITY FOR REVIEW.
21. PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, THE PROJECT SITE SHALL BE STABILIZED TO PREVENT SEDIMENT- LADEN WATER FROM
LEAVING THE PROJECT SITE, ALL ESC BMPS SHALL BE REMOVED, AND STORMWATER CONVEYANCE SYSTEMS, FACILITIES, AND ON- SITE
BMPS SHALL BE RESTORED TO THEIR FULLY FUNCTIONING CONDITION. ALL DISTURBED AREAS OF THE PROJECT SITE SHALL BE VEGETATED
OR OTHERWISE PERMANENTLY STABILIZED. AT A MINIMUM, DISTURBED AREAS SHALL BE SODDED OR SEEDED AND MULCHED TO ENSURE
THAT SUFFICIENT COVER WILL DEVELOP SHORTLY AFTER FINAL APPROVAL. MULCH WITHOUT SEEDING IS ADEQUATE FOR AREAS TO BE
LANDSCAPED BEFORE OCTOBER 1ST.
22. ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND EROSION CONTROL. ROCKERIES SHALL NOT BE CONSTRUCTED
TO SERVE AS RETAINING WALLS. ALL ROCKERIES IN CITY ROAD RIGHTS- OF- WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH CITY
STANDARDS. ROCKERIES OUTSIDE OF ROAD RIGHTS- OF- WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE INTERNATIONAL
BUILDING CODE.
�.
w _
W�
43667
JACOBSON �s �C.sT�R�
mirm CONSULTING ENGINEERS
CITY OF RENTON SURFACE WATER STANDARD PLAN NOTES (CITY STANDARD PLANS 267.00 & 267.10)
1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE- CONSTRUCTION MEETING
SHALL BE HELD AMONG THE CITY OF RENTON, HEREBY REFERRED TO AS THE CITY, THE APPLICANT,
AND THE APPLICANT'S CONTRACTOR.
2. THE APPLICANT SHALL BE RESPONSIBLE FOR SECURING ALL NECESSARY CITY, STATE, AND
FEDERAL PERMITS PRIOR TO CONSTRUCTION.
3. ALL STORM DRAINAGE IMPROVEMENTS SHALL BE DESIGNED AND CONSTRUCTED IN ACCORDANCE
WITH THE LATEST EDITION OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL ( RENTON
SWDM), RENTON MUNICIPAL CODE (RMC), AND THE STANDARD SPECIFICATIONS FOR ROAD,
BRIDGE AND MUNICIPAL CONSTRUCTION PREPARED BY WSDOT AND THE AMERICAN PUBLIC WORKS
ASSOCIATION (APWA). IT SHALL BE THE SOLE RESPONSIBILITY OF THE APPLICANT TO CORRECT ANY
ERROR, OMISSION OR VARIATION FROM THE ABOVE REQUIREMENTS FOUND IN THE PLANS. ALL
CORRECTIONS SHALL BE AT NO ADDITIONAL COST TO THE CITY.
4. APPROVAL OF THE ROAD, GRADING, PARKING, BUILDING, AND DRAINAGE PLAN DOES NOT
CONSTITUTE AS APPROVAL OF ANY OTHER CONSTRUCTION ( E.G. WATER, SEWER, GAS, ELECTRICAL.
ETC.). PLANS FOR STRUCTURES SUCH AS BRIDGES, VAULTS, AND RETAINING WALLS REQUIRE A
SEPARATE REVIEW AND APPROVAL BY THE CITY PRIOR TO CONSTRUCTION. THE SURFACE WATER
DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED PLANS. ANY
DEVIATION FROM THE APPROVED PLANS WILL REQUIRE COORDINATION FOLLOWED BY WRITTEN
APPROVAL FROM THE CITY.
5. A COPY OF THE APPROVED PLANS SHALL BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN
PROGRESS.
6. HE LOCATIONS OF ALL EXISTING UTILITIES SHOWN HEREON HAVE BEEN ESTABLISHED BY FIELD
SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND SHALL THEREFORE BE CONSIDERED
APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE
APPLICANT AND THE APPLICANT'S CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL
UTILITY LOCATIONS SHOWN, AND TO FURTHER DISCOVER AND AVOID ANY OTHER UTILITIES NOT
SHOWN HEREON THAT MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. THE APPLICANT
SHALL RECORD ON THE AS- BUILT DRAWINGS ALL UNDOCUMENTED UTILITIES DISCOVERED AND
ANY CHANGES TO THE APPROVED PLANS. THE APPLICANT SHALL IMMEDIATELY NOTIFY THE
ENGINEER OF RECORD IF A CONFLICT EXISTS.
7. VERTICAL DATUM SHALL BE NAVD 88 AND HORIZONTAL DATUM SHALL BE NAD 83 (WA STATE
PLANE, NORTH), UNLESS OTHERWISE APPROVED BY THE CITY. REFERENCE BENCHMARK, DATUM,
AND ELEVATIONS SHALL BE NOTED ON THE PLANS.
8. ALL UTILITY TRENCH BACKFILL AND ROADWAY SUBGRADE SHALL BE COMPACTED TO 95% MAXIMUM
DRY DENSITY PER SECTION 2-03.3(14)D - COMPACTION AND MOISTURE CONTROL TESTS OF THE
WSDOT STANDARD SPECIFICATIONS. IN PERMEABLE PAVEMENT AND OTHER INFILTRATION AREAS,
ALL TRENCH BACKFILL SHALL BE FIRM AND UNYIELDING BUT IN NO CASE SHALL BE COMPACTED TO
MORE THAN 92% OF MAXIMUM DRY DENSITY.
9. OPEN CUTTING OF EXISTING ROADWAYS FOR STORM DRAINAGE WORK IS NOT ALLOWED UNLESS
SPECIFICALLY APPROVED BY THE CITY AND NOTED ON THESE APPROVED PLANS. ANY OPEN CUT
SHALL BE RESTORED IN ACCORDANCE WITH THE CITY TRENCH RESTORATION STANDARDS.
10. ALL PIPE AND STRUCTURES SHALL BE STAKED FOR SURVEY LINE AND GRADE PRIOR TO THE START
OF CONSTRUCTION. WHERE SHOWN ON THE PLANS OR WHERE DIRECTED BY THE CITY, THE
EXISTING MANHOLES, CATCH BASINS, OR INLETS SHALL BE ADJUSTED TO THE GRADE AS STAKED.
11. ALL FLOW CONTROL FACILITIES SHALL BE INSTALLED AND IN OPERATION PRIOR TO, OR IN
CONJUNCTION WITH, ANY CONSTRUCTION ACTIVITY UNLESS OTHERWISE APPROVED BY THE CITY.
12. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN
ACCORDANCE WITH THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATION FOR ROAD
AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH
BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL, AS WELL AS PLACEMENT AND COMPACTION
OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE
WILL BE SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. ALL PIPE BEDDING AND
BACKFILL SHALL BE AS SHOWN ON THE CITY STANDARD PLAN 220. 00, 220. 10, AND 220. 20.
13. STEEL PIPE SHALL BE ALUMINIZED, OR GALVANIZED WITH ASPHALT TREATMENT 1, 2, OR 5 INSIDE
AND OUTSIDE.
14. ALL DRAINAGE STRUCTURES SUCH AS CATCH BASINS AND MANHOLES SHALL BE FITTED WITH
DUCTILE IRON, BOLT- LOCKING LIDS PER THE CITY STANDARD PLAN 204. 10, 204. 20, 204. 30,
204. 40, AND 204. 50. STRUCTURES SHALL HAVE:
• RECTANGULAR OR ROUND, SOLID LIDS WHEN NOT COLLECTING RUNOFF, AND OUTSIDE OF THE
ROADWAY.
• ROUND, SOLID LIDS WHEN NOT COLLECTING RUNOFF, AND LOCATED WITHIN THE ROADWAY,
BUT OUTSIDE OF THE CURB/ GUTTER LINE.
• ROUND, SOLID LIDS DISPLAYING THE CITY LOGO WHEN WITHIN THE PUBLIC RIGHT- OF- WAY OR
IN AN EASEMENT TO THE CITY. PRIVATE STRUCTURE LIDS OUTSIDE PUBLIC RIGHT- OF- WAY AND
EASEMENTS TO THE CITY SHALL NOT DISPLAY THE CITY LOGO.
15. BUILDINGS AND OTHER STRUCTURES SHALL BE PLACED IN ACCORDANCE WITH TABLE 4.1
EASEMENT WIDTHS AND BUILDING SETBACKS LINES OF THE RENTON SWDM.
CIVIL CONSTRUCTION PERMIT
NO. I REVISION
✓V
/21/25
JAJ
SURVEYED:
✓V
/14/25
JAJ
DESIGNED:
ACW
N/06/25
JAJ
DRAWN:
DJD/AJJ
CHECKED:
JAJ
BY
DATE
APPR
APPROVED:
JAJ
16. LIDS OF MANHOLES/ CATCH BASINS WITHIN PUBLIC RIGHT- OF- WAY SHALL NOT BE ADJUSTED TO
FINAL GRADE UNTIL AFTER PAVING. ALL MANHOLE/ CATCH BASIN RIMS SHALL BE ADJUSTED TO BE
FLUSH WITH FINAL FINISHED GRADES, UNLESS OTHERWISE SHOWN.
17. ALL DRIVEWAY CULVERTS LOCATED WITHIN CITY RIGHT- OF- WAY SHALL BE OF SUFFICIENT LENGTH
TO PROVIDE A MINIMUM 3:1 SLOPE FROM THE EDGE OF THE DRIVEWAY TO THE BOTTOM OF THE
DITCH.
18. ROCK FOR EROSION PROTECTION OF ROADSIDE DITCHES, WHERE REQUIRED, SHALL BE OF SOUND
QUARRY ROCK PLACED TO A MINIMUM DEPTH OF ONE ( 1) FOOT AND SHALL MEET THE FOLLOWING
SPECIFICATIONS:
• 4 - 8 INCH ROCK / 40 - 70% PASSING;
• 2 - 4 INCH ROCK / 30 - 40% PASSING; AND
• LESS THAN 2 INCH ROCK / 10 - 20% PASSING.
19. FOOTING DRAINAGE SYSTEMS AND ROOF DOWNSPOUT SYSTEMS SHALL NOT BE INTERCONNECTED
AND SHALL SEPARATELY CONVEY COLLECTED FLOWS TO THE CONVEYANCE SYSTEM OR FLOW
CONTROL FACILITY ON THE SITE, UNLESS APPROVED BY THE CITY. FOOTING DRAINS SHALL NOT BE
CONNECTED TO ON- SITE BMPS.
20. THE END OF EACH STORM DRAIN STUB SHALL BE CAPPED. A CLEANOUT TOPPED WITH A BOLT -
LOCKING LID MARKED " STORM" OR " DRAIN" SHALL BE LOCATED AT THE PROPERTY LINE OR AT THE
POINT OF CONNECTION OF A PRIVATE STORM DRAINAGE CONVEYANCE SYSTEM PER THE CITY
STANDARD PLAN 227. 00.
21. ALL STORM SYSTEM EXTENSIONS SHALL BE STAKED FOR LINE AND GRADE BY A SURVEYOR
LICENSED IN WASHINGTON STATE, AND CUT SHEETS SHALL BE PROVIDED TO THE CITY PRIOR TO
CONSTRUCTION.
22. ALL NEWLY- INSTALLED AND NEWLY- REHABILITATED ( PUBLIC AND PRIVATE) STORM CONVEYANCE
SYSTEMS SHALL BE INSPECTED BY MEANS OF REMOTE CCTV ACCORDING TO THE CITY STANDARD
PLAN 266. 00. CCTV INSPECTIONS AND REPORTS SHALL BE SUBMITTED TO THE CITY PRIOR TO
RECEIVING APPROVAL TO INSTALL PROJECT CURBS, GUTTERS AND/ OR PAVEMENT.
23. ALL STORM SYSTEMS AND CONNECTIONS TO EXISTING MAINS SHALL BE TESTED IN ACCORDANCE
WITH SECTION 7-04.3(1) OF THE WSDOT STANDARD SPECIFICATIONS AND IN THE PRESENCE OF A
REPRESENTATIVE OF THE CITY. STORM DRAIN STUBS SHALL BE TESTED FOR ACCEPTANCE AT THE
SAME TIME THE MAIN STORM IS TESTED.
24. FOR ALL DISTURBED PERVIOUS AREAS ( COMPACTED, GRADED, LANDSCAPED, ETC.) OF THE
DEVELOPMENT SITE, TO MAINTAIN THE MOISTURE CAPACITY OF THE SOIL EITHER STOCKPILE AND
REDISTRIBUTE THE EXISTING DUFF LAYER AND NATIVE TOPSOIL OR AMEND THE SOIL WITH
COMPOST IN ACCORDANCE WITH STANDARD PLAN 264. 00.
25. ISSUANCE OF THE BUILDING OR CONSTRUCTION PERMITS BY THE CITY DOES NOT RELIEVE THE
APPLICANT OF THE CONTINUING LEGAL OBLIGATION AND/ OR LIABILITY CONNECTED WITH
STORMWATER DISPOSAL. THE CITY DOES NOT ACCEPT ANY OBLIGATION FOR THE PROPER
FUNCTIONING AND MAINTENANCE OF THE STORM SYSTEM PROVIDED DURING CONSTRUCTION.
26. ADEQUATE SAFEGUARDS, SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER
ACTIONS NEEDED TO PROTECT THE LIFE, HEALTH, AND SAFETY OF THE PUBLIC, AND TO PROTECT
PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK SHALL BE PROVIDED. ANY WORK
WITHIN THE TRAVELED RIGHT- OF- WAY THAT MAY INTERRUPT NORMAL TRAFFIC FLOW SHALL
REQUIRE A TRAFFIC CONTROL PLAN APPROVED BY THE CITY. ALL SECTIONS OF THE WSDOT
STANDARD SPECIFICATIONS 1-10 TEMPORARY TRAFFIC CONTROL SHALL APPLY.
27. PROJECTS LOCATED WITHIN THE CITY' S AQUIFER PROTECTION AREA (APA) SHALL COMPLY WITH
SPECIAL REQUIREMENT # 6 OF THE RENTON SWDM AND AQUIFER PROTECTION REGULATIONS
RMC 4-3-050).
28. PLACEMENT OF SURFACE APPURTENANCES ( CATCH BASIN/ MANHOLE LIDS, CLEANOUTS, INLETS,
ETC.) IN THE STREET TRAVEL LANE WHEEL PATH, INTERSECTIONS OF STREET TRAVEL LANES, BIKE
LANES, SIDEWALKS, AND CROSSWALKS SHALL BE AVOIDED WHENEVER POSSIBLE. ANY SURFACE
APPURTENANCE PLACED IN A SIDEWALK OR CROSSWALK SHALL BE FITTED WITH A NON- SLIP OR
NON- SKID LID PER ADA REQUIREMENTS.
29. CLEARLY LABEL PUBLIC AND PRIVATE SYSTEMS ON THE PLANS. PRIVATE SYSTEMS SHALL BE
MAINTAINED BY THE APPLICANT.
30. MINIMUM COVER OVER STORM DRAINAGE PIPE SHALL CONFORM TO TABLE 4.2.1.A2 OF THE
RENTON SWDM.
31. CONSTRUCTED PERMEABLE PAVEMENT SHALL BE PERMEABLE ENOUGH TO ABSORB WATER AT A
MINIMUM RATE OF 20 INCHES PER HOUR IMMEDIATELY AFTER THE PAVEMENT SURFACE HAS BEEN
WETTED CONTINUOUSLY FOR AT LEAST 10 MINUTES. COMPLIANCE WITH THIS MINIMUM RATE
SHALL BE CHECKED PRIOR TO CONSTRUCTION APPROVAL OF THE PAVEMENT. COMPLIANCE MAY BE
CHECKED USING A SIMPLE BUCKET TEST IN WHICH 5 GALLONS OF WATER IS POURED ONTO THE
PAVEMENT SURFACE ALL AT ONCE. IF ONLY A MINOR AMOUNT OF WATER PONDS OR RUNS OFF THE
SURFACE, THEN THE PAVEMENT IS CONSIDERED TO MEET THE MINIMUM RATE OF ABSORPTION. AT
LEAST ONE TEST SHALL BE CONDUCTED PER 1,000 SQUARE FEET OF PERMEABLE PAVEMENT. IF
THIS TEST IS NOT CONCLUSIVE, THEN ANOTHER TEST PER ASTM C1701 SHALL BE CONDUCTED. FOR
LARGE AREAS ( E.G., PARKING AREAS), TESTING OBSERVATION MAY BE ACCOMPLISHED WHILE
WALKING BEHIND A SLOWLY MOVING WATER TRUCK DISCHARGING WATER AT A RATE SIMILAR TO
THE BUCKET TEST. PERMEABLE PAVERS SHALL BE TESTED USING ASTM C1781.
SCALE:
ONE INCH
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
VERTICAL: NAVD 1988
HORIZONTAL: NAD 1983/1991
DATUM
'R]
CITY OF
[7, RENTON
Nkav
Planning/Building/Public Works Dept.
TESC CONSTRUCTION SEQUENCE
1. SCHEDULE MAJOR LAND DISTURBING ACTIVITIES DURING THE DRY MONTHS AND
ALLOW TIME BEFORE THE WET SEASON BEGINS TO ADEQUATELY STABILIZE THE
DISTURBED GROUND.
2. PHASE AND/OR SCHEDULE CONSTRUCTION TO LIMIT THE AMOUNT OF
DISTURBED, UNSTABILIZED SOIL EXPOSED AT ANY ONE TIME.
3. FENCE OR FLAG AREAS TO BE PROTECTED OF LEFT UNDISTURBED DURING
CONSTRUCTION, INCLUDING INSTALLATION OF TEMPORARY CONSTRUCTION
FENCING.
4. STRIP AND CLEAR AND GRUB FIELD SUFFICIENTLY FOR INSTALLATION OF
TEMPORARY EROSION SEDIMENTATION CONTROL (ESC) BMPS.
5. INSTALL TEMPORARY ESC MEASURES INDICATED ON PLANS, INCLUDING SILT
FENCE, CATCH BASIN INSERTS, AND STRAW WATTLES. COORDINATE WITH CITY OF
RENTON INSPECTOR.
6. BEGIN GRADING AND EXCAVATION FOR FIELD UNDERDRAIN AND IRRIGATION
PIPING, AND FOR PAVEMENT SUBGRADES.
7. TEMPORARILY STABILIZE SITE, THROUGH RE -VEGETATION, HYDROSEED,
MULCHING OR OTHER APPROPRIATE BMPS AS A RESULT OF SITE GRADING IN
AREAS THAT WILL NOT RECEIVE HARDSCAPE.
8. CONSTRUCT STORM AND IRRIGATION UTILITIES, CONCRETE, ASPHALT, AND
PERMEABLE PAVEMENTS, AS WELL AS STAIRS, CHEEK WALLS, AND MOW STRIPS
FOR FENCING.
9. PLACE FILL SECTION AND LAWN/SEED FOR PLAYFIELD.
10. REMOVE TEMPORARY ESC FACILITIES UPON COMPLETION OF CONSTRUCTION AND
ONLY ONCE SITE IS STABILIZED, INSPECTED, AND APPROVED BY CITY OF RENTON
INSPECTOR.
CONSTRUCTION SEOUENCE
1. BEFORE ANY CONSTRUCTION ACTIVITY ARRANGE AND ATTEND PRE -CONSTRUCTION
CONFERENCES WITH CITY OF RENTON AND JACOBSON CONSULTING ENGINEERS.
2. COMPLY WITH CONSTRUCTION PHASING REQUIREMENTS IDENTIFIED IN DRAWINGS
AND SPECIFICATIONS.
3. PROVIDE TEMPORARY AND INTERIM MEASURES REQUIRED FOR EXECUTION OF THE
WORK.
4. VERIFY VERTICAL AND HORIZONTAL LOCATIONS OF ALL EXISTING UNDERGROUND
UTILITIES. CONTACT ALL UTILITY COMPANIES OR PROVIDERS THAT MAY BE
AFFECTED BY THE PROPOSED CONSTRUCTION. CALL 811 AND UTILIZE PRIVATE
LOCATING COMPANY ALONG THE ENTIRE WORK AREA.
5. PROVIDE CATCH BASIN PROTECTION AND OTHER APPROPRIATE TESC MEASURES,
INCLUDING STRAW WATTLES, ETC. COORDINATE WITH KING COUNTY INSPECTOR.
6. BACKFILL AND COMPACT TRENCH. PATCH AND RESTORE SITE PER PLANS
7. INSTALL ALL NEW PAVING, LANDSCAPING AND SITE STABILIZATION.
8. CONTACT DESIGN ENGINEER AND CITY SO THEY CAN PUNCH LIST THE SITE.
ADDRESS PUNCH LIST ITEMS AS REQUIRED.
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
DEVELOPMENT ENGINEERING
HBray 06/24/2025 '
LINDBERGH HIGH SCHOOL
FIELD IMPROVEMENTS
NOTES SHEET
DATE:
02-21-25
PAGE:
coo
SHEET: OF:
2 OF 42
R-434402
d�
0
L0
N
A,
u
GD
T
0
0
0
0
I
LO
N
r�1
T
Lid
0
0
0
1
Ln
N
Q
J