Loading...
HomeMy WebLinkAboutR-434406s I 0 W O i 0 M I 0 0 0 0 g 0 a 0 CL Tn Vl Lm r a N i 0 C 0 e 0 r i G.i Q U- U ' c I\ o 1\\ J� / / Call before you \ IP --_ — Dag' 8-1-1 / / _ D \ or1-800-424-5555 / / _�— .� IP UNDERGROUND Cc s — _ / _ — I — — — — — — — c n D 3 SERVICE (USA) 0 h s r SUMP AND PUMP 1 \ D 0 10 20 40 O G Tom__--- ------ --- `�` INSTALLED AT I �� • O C\QQ�39�' _ _ s-- i I LOW POINT SEE DETAIL; /j _ �— SCALE 1 �� = 20' Ln �� /��,399-------—I---------- —V - I c110 s —402---- L \ s __--- LEGEND nc SAVE AND PROTECT i' /�— — \ — QJ PROPERTY LINE N 7933'06" E - 46.81' EX8"WATER i— // INTERCEPTOR SWALE $„ W �J°_ _ --6. \ FCuL F� J� ^ \\\\ w �� w J[ � I SF SILT FENCE cbI ' / i �' / ® w i ��/' / \ �J� RIM LL \ \ \ \\ I \ —� / 8 CF TEMP CONSTRUCTION FENCING �� J / / �= j w �J g8� RE1PI \ \I \ I o \ �` • TEMPORARY FORCE MAIN �� — 00 0 I PUMP TO SEDIMENT I 0 \ — CG TEMP CONSTRUCTION GATE oC�'�_Q SETTLING TANKS O CED C LT FENCE (TYP) `° J 5 C )I SAVE A D CE TEMP CONSTRUCTION ENTRANCE (�r��Q(�r�j Q J� RIM�39 I I I 1 PROTECT EX O / / / � � � � SEE DETAIL /' � RIED, 3 (N� ) /y I I � I I ,� O ��/ "� / �I 2 SDCg C,3930 \ \ I I I I I 1 ELEC/COMM \ INLET PROTECTION IP ° ✓ / �� / / / c11 J� CDN 3g3.23 / I� I I iLO p�C�C, g3 ` I I I I VEG TREE PROTECTION N 4 E TEMP SUMP AND PUMP ® 0- •49<<Wi ��� 94REMOVE CONCRETE PAVEMENT c�� �\�J� J� �J J� 1 I 1 I I 1\ IP SAWCUT AND REMOVE REMOVE ASPHALT PAVEMENT yc' c' �J0 O AND REPLACE CONCRETE \ �\ � �J // �J RIM,3g \-------- / IS \A \ ���O / Gam/ J� S 12' Cpp,38g 1��E) UTIDLITYTRENCHIING �9� IE ,38 I \ \ ` SAWCUT LINE - /,�pp ,38g 25 �Si �J° / TEMPORARY STORM PIPE LSD 1112 (2) 21,000 & (1) 8,400 GALLON CAPACITY \ l / J° �J� 12 Cp 10 TEMPORARY SEDIMENT SETTLEMENT TANKS 1J o \ / / J� Gj Q �J IE C,392• W DEMO SUBDRAINAGE SUBS 3gg. ("BAKER TANK OR APPROVED EQUAL). CONTRACTOR SHALL PROVIDE ALL PUMPS r IN ALL INLET PROTECTION ON CATCH REQUIRED TO MANAGE CONSTRUCTIONLO BASINS IMMEDIATELY DOWNSTREAM AND \ / �/ / / / �' O STORMWATER AND DISCHARGE AT THE SITE. O UP TO 500 FEET FROM PROJECT 4 ( / / / / / G'J / \ \ c,JO \ J� �J° �'�MIN j � �' \\\� / / OO DISTURBANCE AREA SEE DETAIL I I P D \ 1 O / / / \ g �p9 \ 6 \ e Ln 5 f / / ���/ / �J0 \ A \ �J� lE „ pvC,3 69 �w� I 1 M=3g6 26 �N S) \ �' N ,393 �J" I \\�� pp=3g ' \ Q 19) / / / / / j / / / �J\ �� APPROXIMATE OUTLINE J� �J I \19 / / / / REMOVE EX / / A \ OF STORMTECH SF 6 60 0 �✓ / / O J I // / CONCRETE SIGN PAE / G �J0 / \ CHAMBER EXCAVATION J� �J0 �,� - 1 IP o g RIM,39 85 (E� \� / c I IP PUMP CLEAN STORMWATER FROM I JR5 �J� I \ \ \ / \ TEMP SEDIMENT SETTLEMENT TANKS TO - I Opp_ / / / / / / / , /J� �J � �� ��1 \ \ \ O ( ENISURE ALL DISCHARGE MEESTING CATCH BASIN. TS TO I \ CE INTERCEPTOR SWALE - / J� 0 / \ \ J0 `ah \ CONSTRUCTION �" QV��� �J / e �, O�. hh I \ TURBIDITY AND NPDES REQUIREMENTS. I FENCESEE DETAIL ��� On��OC WITH ROCK CHECK DAMS / / �J \ ° \ �/� / / 0 Q%� �O� \ \ \ � j j 6Or )C AT 50' O.C. SPACING / 0 / \ / / �J OQ SNOW / / DETAILS / �J / \ S�'� �J� / �J QUO% J� �J° \ I \ \ ~ ' WOW - SEE c i I 4 'o 0 _ �Q' TEMPORARY STORM STABILIZED,CONSTRUCTION PIPE CULVERT / �J0 / % / \ / / /J� / �� ,�°� \ I 1 1 \ \ _ _ �� ENTRANCE (TYP) I w / / c� O 0 / / / / 0 A SG� J� 0�/ � / �R), OQQ '' `o III SEE DETAIL / / / �Q 5 `b 3 �J0 J0 � � / / �' / � / JO\� \ / / J� �'� � �� '`� �`l� ���5\1 I I I I c9 — ------ -- ' `d✓ c110 �/ i / /� �P\/ �J� // // / /� A\\ ///� /�O,,Q�� 40 CIF / I411 J� / / J0 J0 J��QQ / J� / / / \ / / �� O 1 I 401 I / WALL / / / l / / I ✓ / \ / / / / / / / / J0 / F �1 J0 I I / / 401 RETAINING 4 / / / 1 I `L _ _ Ji / �Jo �J° / s�� / / J� / �I I /�� 9 ' 3 _ — I 4 O 0.2 8 40 63 0 0 / ,o / c° cn � —i 1 / / / / / / J0 \\ J� / �J° w w J� \ I I o — / �\—� D 0 0 R . \ D 0 CONTRACTOR STAGING 1 /// �JO // �/ �/ I0 1J0 /�/�/� / —, `1� � A D LAYDOWN AREA \ / / �J �J / A S / � C�l/ �J0 / / / / / / 1 / c' / / / / / \ �J0 I 0 / o z \ ` I AWCUT AND RE OQ / / r �� O 400.28 J� �J 4 v EX CON ETE ' 40 / 11 ��� �o�� 1 400.34 4)" / / 0 �J \ /� / / PAV ENT ( P) o�'j� / .�3� , �� c�. 1 OCTAGON J J J S \ +\ % �o o`� O O R. 6 2 coNc 0 1J0 00 < / I I c�JO \ cJ� �/ ��\ �J� / �J� / �Jo / / / cJ / �J0 CJ� \\ ��I Pil _ 1 _ / O i00��00 REMOVE EX N // // // // \\ IPQQ' �� o,°�' / / J0 J� J� ti DUGOUT AND —/ - / �----- - a a Q�k GQQQ,��JO c,JO /G' �/ �/\ �J0 /� /� 440 / `�� APPURTENANCES / / // / 41. 3 / __---------- 2 D P 0 Q / _ — -/412- \ 0/ \ '�G� / // //� / _------413------ ��' 41' \ / / \ \� / / 0 �J �1 i J� �J Off. �p���Q AP ��-414_ 5„5 f� L �P / 4J / h`b O�1` / �5r / o f \ d <10 O J i REMOVE EX CY / / / , s.3y —416- - oO�� 11 INLET PROTECTION (TYP) / / 4� \ t TREE PROTECTION / / O� �O�h QoAQ, / / O / / / �� Q /o�O DUGOUT AND SEE DETAIL 4 / / / / / / /41s IS FENCING SEE DETAIL �,o % cQ/Q% / �J / / oG ° 1' c110 r I IN COMPLIANCE WITH CITY OF RENTON STANDARDS Q J J� 5, C, APPURTENANCES 4) 6� O / `� \ / 0 F � �Q<n SAVE AND PROTECT �I FO���� �J c11 /�` O 0 / / �J O/ / �� EX RETAINING WALL Q O J� J / / i DEVELOPMENT ENGINEERING \a �' /� >� �, I /� / / J0 / �/ / 1P / / / / // / / �� HBra 06/24/2025 '� / R> �J �� 25 CH �I LINK FE / / y < � \ / V / s�/ / �' � _ � , r '¢o� J `�FF� E� I Pi /i r/ X / / / cQ/ QQi w./ / VE E0�1 AQT9.R �� ' A• q C � I� P�20�-eT-EXISTIN,G \ Ip v �F w9s�1� CIVIL CONSTRUCTION PERMIT CW /21/25 AJ SURVEYED: SCALE: 1 \ DATE: -- � � VERTICAL LINDBERGH HIGH SCHOOL 02-21-25 / t- EC�'RiG9LVA�61L� F• jf1 HORIZONTAL: NAD 1983/1991 \ �ti CIVIL CONSTRUCTION PERMIT RESUBMITTAL CW /14/25 AJ DESIGNED: 111-20 CITY OF ACW FlELDEIOOK: / /' ✓ �/ / �� ^ �� \ \ \ �- CIVIL CONSTRUCTION PERMIT RESUBMITTAL CW /06/25 AJ ' RENTON FIELD IMPROVEMENTS PAGE / \ DRAWN: DJD/AJJ DRAWING N0: ONE INCH JACOBSON 41 s6TER�� ~ CHECKED: AT FULL SCALE DATUM NOT ONE INCH Planning/Building/Public Works Dept. DEMOLITION AND TESC PLAN NORTH C 101 / �S-0NAL �APPROVED: SCALE ACCORDINGLY SHEET: OF: CONSULTING ENGINEERS NO- REVISION BY DATE APPR o� o� 25 JAJ i 6 OF 4 R-434406