Loading...
HomeMy WebLinkAboutR-434426W & & — 4 —/ \ _ NOTE LEGEND \ \\ \ \ - 1. (INDICATES GENERAL CONSTRUCTION NOTE) ------ ------ \ \ / 3. i (INDICATES SPECIFIC CONSTRUCTION KEYNOTE) _--- W W _ - ---------- 403.39 n, _ DRAINAGE NOTES o N\ 1. SUBSURFACE DRAINAGE AND SITE STORMWATER INFRASTRUCTURE SHALL BE PRESERVED AND w / PROTECTED EXCEPT AS SPECIFICALLY AND EXPLICITLY DIRECTED BY THE ENGINEER. ALL EXISTING SYSTEM COMPONENTS ARE SCHEDULED FOR RE -USE. w— ��✓ i\ \ / , �\C \ / /�\ / \ I I I ,I 1 �- �� 2. FIELD SUBSURFACE DRAINAGE FINISH WORK MAY NOT BE PERFORMED PRIOR TO THE APPROVAL OF THE j %// / /�\\ / \� i�\ /' `/ /�\\�\�/ \\, I I II I I I I o / \\ _ FIELD SUBGRADE ESTABLISHMENT. �// �\ / 3. FOLLOWING MASS EXCAVATION OF THE EXISTING OVER -BURDEN OF ROOT ZONE SANDS AND /'/ / \\� q�I II O AGGREGATES AND APPROVAL OF THE SUBGRADE, LOCATE AND MARK WITH LATH AND FLAGGING EACH // ��//f� ��C. 'I\� ��\�/ J.\ //\\\\/ /\\ / ./ \C ' \� ��\�/ �\ ` / ..:� I I I I �+� mIfll\/If11141 FIFI fl CI IRCI IRG4(F f1R41r\14(,F 14TFR41 4Nf1 RFM(1\/F FXICTIr\I(, f1R41r\14(-F R4f'vFII I //' BOG/ \ ' / / ' ' \` / ' / �\\ / / I I I I I \ 4. SURPLUS EXCAVATED SOIL AND AGGREGATE MATERIALS SHALL BE REMOVED FROM THE FIELD 00'/ Cl SUBGRADE PRIOR TO COMMENCING ON THE NEXT ADJACENT TRENCH. EXCAVATED MATERIAL MAY NOT *,000, 0,� REMAIN ON SUBGRADE. O° r STORMWATER DETENTION ' �` /� \ �\ / I I I ( I <\ 5. PROVIDE A SMOOTH EVEN SUBGRADE AFTER REMOVAL OF THE TRENCH MATERIAL. SUBGRADE TO BE A '/ / � I �� \ ' �\ / SEE CIVIL �\ /� ' �\ I I ( COMPACTED TO 95%. LEAVE NO LOOSE MATERIAL ON THE SUBGRADE. SUBGRADE STRUCTURAL SOIL CD E TRENCH CLEAN-UP, /' 00C,//' \ �//' r/ �\\ / ' \` / i�\ ' �\\ / \ 4 /I I I I \ PLAC MENT OF TR NCFABRIC PLACEMENT OHBWALLLCOORDINATED FABRIC, AND BACKFILLWIITHLETION CL AN,OAPPROV APPROVED AI AGE AGGREGATE. t Oo� - C /// - O� // �0 \ i�\ / �\� �\� \� I 6. WHERE DIRECTED, REMOVE EXISTING FIELD SUBSURFACE DRAINAGE LATERAL AND REPLACE WITH NEW O �� i\\ /�\\�\�/ \\�/ /� �/ \\� 5.o I i I I o j O AS FOLLOWS; , / \ \ / �\\ / ' A. EXCAVATION BELOW INVERT GRADE MUST BE ESTABLISHED TO A DEPTH SO AS TO PROVIDE FOR / \� / /ri ' 0' /'' \� I I / O/ �\ SPECIFIED PLACEMENT OF PEA GRAVEL BEDDING AT BOTTOM OF PIPE ELEVATION PRIOR TO LAYING / / // // / / /0�//' /j/ - _ /�0°/,/� T?c/ /j ,// ,// / i\\ /\\� �\\/ \ / 04. 5 I i I I I �/ a THE PERFORATED PIPE. / D�,r/ /// / ,, / �' ,// GoC �O /// i��,// \ / \\� B. CONNECTION OF LATERALS TO COLLECTOR DRAINS SHALL BE MADE WITH A COMBINATION REDUCING \ �\\ TEE AND REDUCING SADDLE TEE. ��/'� '/ O� '� �� '/ \\. / ' /\� I I o C. NO FOREIGN MATERIAL WILL BE PERMITTED INSIDE ALONGSIDE UNDER OR ON TOP OF THE / // / �/ ,// gh,�/\ •Sp/ /r ,�/ /r \: J'!��1 /�\\�\�/ i\\C i\\ / ,1�� x I I I I PERFORATED DRAIN PIPE. �F '\` / i\\ / D. THE BACKFILL FOR ALL PERFORATED PIPE SHALL BE CLEAN WASHED PEA GRAVEL. REFER TO THE % l/ �/r /j/ // / r it tp� jj/ �F1_; 'A rr� / \\� \ I I II I I \ SPECIFICATIONS FOR THE GRADATION REQUIREMENTS. � /�/�\\/� / \: o I I ` I I E. ALLTRENCHES TO HAVE BACKFILL MATERIAL "CROWNED" A MINIMUM OF 2" ABOVE SUBGRADE TO ,r/ I / / / \, 1�r/ //j/ / �/j \\ /� / \\� /' �/ /*> i I I PROTECT FROM FOREIGN MATERIAL AND PROVIDE FOR EASE OF LOCATION IDENTIFICATION. ,��?/,� / /� �,�/,/ r� �,\ /,\ �c ,,� �h ,,/' �Q� ,,/ ,/ \ / /�\\� i\\ //\\\\� �I I o CROWNS WITH FOREIGN MATERIAL CONTAMINATION SHALL BE REMOVED PRIOR TO PLACEMENT OF �� r/ / \ /' \` / I \ 3981 BASE AGGREGATE. rj' �°,�i/ , r ,/� r \� \ / �\\ �� \ 396 F. DURING PLACEMENT OF SPECIFIED TRENCH BACKFILL, PIPE MUST BE HELD IN PLACE TO PREVENT / // ��, �\,' I \ 6. EX DISPLACEMENT AND PROVIDE FOR ACHIEVING SPECIFIED INVERT ELEVATION. DO NOT DAMAGE PIPE /�� ���' /�O �� ' O�`b/ j / j/ ,// \\ , / �\\ i o I ( ) OR ALLOW PIPE TO BE DISPLACED BY PLACEMENT OF BACKFILL MATERIAL. // / // // \\�X '/ ' INSERTA-TEE TAP Uj // / // // / / / i \ �\ CONNECTION / s 7. CAP THE ENDS OF ALL LATERAL RUNS WHERE THE PIPE END IS EXPOSED. ALL OPEN ENDS DURING /'/ ///�O p \ �, � e IV 38(718 ( / CONSTRUCTION ARE TO BE TEMPORARILY CAPPED OR PLUGGED. /� 41, �� // ,j �i ,/ ��� \ / / g NO TRUCKS OR EQUIPMENT WILL BE ALLOWED TO DRIVE OVER THE TOP OF THE TRENCHES EXCEPT r/ °' TO .2 .2 I \ TRACK -EQUIPPED MACHINERY UTILIZED IN SPREADING BASE AGGREGATE MATERIALS. BACKFILLED /� /� 00� /� �O A G \ 00,,/ ��� /\:\ �\ I I I W 00 TRENCHES ARE TO BE STAKED AND FLAGGED 3' ABOVE GRADE AT MAXIMUM 30' SPACING. �¢/// , rr , ri ii ri ii� �' % /i c° // / / �- I I o I �w 9 00 0 �`/ ,/ , i ,% , rj �o �� / �� ri �� l l I ��✓ nor ,i i , ,. r , 411 / , / O\ // QOQ /i // \ / // /i/ /r rj 10/ >i// < / /xO�, \ i/ > ' /////i °//j> � \_ \�\ \ /�' /r' ' / /� �ii ,r/ /��0�// A �� °o/, O /// > / 0 �,/ / / '/ // I III I05.21 II I 05/.2,1/ /i TW 'IIr' / / D[RAINAGE LEGEND i /i' 'i' ' t� i// //i /O• kEX0 7O2 (EX) A' �/ // ,�END CAP,, /6`11,,,,iO/r405.23(i/ I I \ Q)\ I / ,r/ ,�/ ,r/ 0� /r ,j/ Off. Fs, r // / / i — EXISTING 6" PERF. CORR. POLY DRAIN TUBING I I l / / / d / ii r/ rr ii // /r a I\ i/ ,� r ,/ ooS �J ,� / /r/ , /i // /r rr �o� o /i ° ,�° l , / I // I // // // N \ \ \ II I/ \ I I I �i�✓, , / j—O //v� ri/ jr//r, , / ri/ ,/i ,ii� //i/,/ /r i/r�i i/r %i r /j % �� r// ��/i /i/j• � � ��1s �/°� /�o� /0rj ,�/r �II, / /( �/ i/ \ \ / / w EXISTING 6" OR 8" CPEP DRAIN COLLECTOR , A o CLEANOUT/V /,/ / /,�/,/, rI /// \ r / l / f JI FLOW DIRECTION /'' /// // r// //// //' /// / 00 \cb j, / �F // \ �/ G0/ p ICY° /� / / / / / / ,// j O� // �. IE 414.30 INVERT ELEVATION \ , J , / // // I // // /� /, / /� ��,, / j / 40 .23 (/X� / 4�15!21 ' /' /� //� r irk /'j % i'r ,% Qj/ r/���� r �\ / ,// ,j/ / / ,, / �O , I� / / / �, CIE 413.00 COLLECTOR INVERT ELEVATION / // r/� , / // // // r/ / / �� // �` r °� O� � 0 4 5.59/(E� BW 65. � � - ,r 410 / ,, O ��� )/ / , Y - - - - - - - - - - - EXISTING CATCH BASIN /'r I /%'� , rr r / O �)'/ i'/ 405.27— j N / r /r ' / i o�irr ,ii� ro // ,____ // L' I �/ \ /r // O /� �� j, / / `� /i� A O I� I% / // / / / / _ - _ HAND EXCAVATE EXISTING DRAINAGE // �/ °/ / / / / / /% d 40533 Xy /// / / / / ' '' TRENCHES FOR EXISTING DRAINAGE PIPE 0 3. 3 1�01,/ ✓ - G� �/ / / / /' / �_ INSPECTION, REPAIR, AND DRAINAGE \ r — / // o O // �, // /� / // �O / /� / / / - AGGREGATE REPLACEMENT �. NO T 404.28 404.2 405.35 (EX) 40 405.28 (EX)/cl �� �� \ \ / �— — �— _ ——405-38 (EX) — _ = = _�-- 405.3 ) / / X \ / / / / / / �01' / / / / / �_ \ R-434426 \ \ \ \��o - - -- - _ z/* �/, // // / _ IN COMPLIANCE WITH CITY OF RENTON STANDARDS \------------ = _ __ _ - - - - _ / / / / / ' DEVELOPMENT ENGINEERING ��----------------- �- -- — _ _ i MATCHLINE-TO SHEET F131 / / // ^i7 - 1 (NOTE PLAN VIEW ORIENTATION CHANGE) \J >/ HBra 06/24/2025 Z. � CIVIL CONSTRUCTION PERMIT 2/21/25 SURVEYED: SCALE: VEffnCAL- NAw lsae DATE: �. r� OF As CIVIL CONSTRUCTION PERMIT RESUBMITTAL 4 14 25 DESIGNED: I =20 HORIZONTAL- NAD 1983/1991 . CITY OF LINDBERGH HIGH SCHOOL 21 FEB 2025 FlELDBOOK: `a CIVIL CONSTRUCTION PERMIT RESUBMITTAL 6/4/25 EJG � RENTON !1 HOGAN Z DRAWN: FIELD IMPROVEMENTS PAGE: LRB ONE INCH DRAWING NO: � �ATU M D.A. Hogan & Associates, inc. �- FG�STER \ CHECKED: AT FULL SCALE Planning/Building/Public Works Dept. BASEBALL DRAINAGE PLAN F 13 0 1450 114th Ave. SE, Suite 225 sIo EPA IF NOT ONE INCH Bellevue, WA 98004 206-285-0400EJG NAL NO. REVISION BY DATE AP P R APPROVED: SCALE ACCORDINGLY SHEET: 2 6 OF, 42 O O N 00 O O i N Q J T LO C) O O N Q J