HomeMy WebLinkAbout5.02.25 InspectionProject Name Hazen High School Permit #   Inspection Date 5/02/25 Time 11AM   Name of Certified Erosion Sediment Control Lead (CESCL) or qualified inspector if less than one acre Print Name: Charles Blankenship   Approximate rainfall amount since the last inspection (in inches): 0.19”   Approximate rainfall amount in the last 24 hours (in inches): 0”   Current Weather Clear X Cloudy  Mist  Rain  Wind  Fog    A. Type of inspection: Weekly X  Post Storm Event  Other    B. Phase of Active Construction (check all that apply): Pre Construction/installation of erosion/sediment controls X Clearing/Demo/Grading X Infrastructure/storm/roads   Concrete pours  Vertical Construction/buildings   Utilities   Offsite improvements  Site temporary stabilized  Final stabilization    C. Questions: 1. Were all areas of construction and discharge points inspected? Yes X No   2. Did you observe the presence of suspended sediment, turbidity, discoloration, or oil sheen Yes  No X  3. Was a water quality sample taken during inspection? (refer to permit conditions S4 & S5) Yes  No X  4. Was there a turbid discharge 250 NTU or greater, or Transparency 6 cm or less?* Yes  No X  5. If yes to #4 was it reported to Ecology? Yes  No X  6. Is pH sampling required? pH range required is 6.5 to 8.5. Yes  No X   If answering yes to a discharge, describe the event. Include when, where, and why it happened; what action was taken, and when. There was no stormwater accumulation on site.        *If answering yes to # 4 record NTU/Transparency with continual sampling daily until turbidity is 25 NTU or less/ transparency is 33 cm or greater. Sampling Results:  Date:    Parameter Method (circle one) Result Other/Note    NTU cm pH   Turbidity tube, meter, laboratory      pH Paper, kit, meter       D. Check the observed status of all items. Provide “Action Required “details and dates. Element # Inspection BMPs Inspected BMP needs maintenance BMP failed Action required (describe in section F)    yes no n/a     1 Clearing Limits Before beginning land disturbing activities are all clearing limits, natural resource areas (streams, wetlands, buffers, trees) protected with barriers or similar BMPs? (high visibility recommended) X       2 Construction Access Construction access is stabilized with quarry spalls or equivalent BMP to prevent sediment from being tracked onto roads? X        Sediment tracked onto the road way was cleaned thoroughly at the end of the day or more frequent as necessary.  X      3 Control Flow Rates Are flow control measures installed to control stormwater volumes and velocity during construction and do they protect downstream properties and waterways from erosion? X         If permanent infiltration ponds are used for flow control during construction, are they protected from siltation?   X     4 Sediment Controls All perimeter sediment controls (e.g. silt fence, wattles, compost socks, berms, etc.) installed, and maintained in accordance with the Stormwater Pollution Prevention Plan (SWPPP). X        Sediment control BMPs (sediment ponds, traps, filters etc.) have been constructed and functional as the first step of grading. X        Stormwater runoff from disturbed areas is directed to sediment removal BMP. X       5 Stabilize Soils Have exposed un-worked soils been stabilized with effective BMP to prevent erosion and sediment deposition? X        Element # Inspection BMPs Inspected BMP needs maintenance BMP failed Action required (describe in section F)    yes no n/a     5 Stabilize Soils Cont. Are stockpiles stabilized from erosion, protected with sediment trapping measures and located away from drain inlet, waterways, and drainage channels?   X      Have soils been stabilized at the end of the shift, before a holiday or weekend if needed based on the weather forecast?   X      6 Protect Slopes Has stormwater and ground water been diverted away from slopes and disturbed areas with interceptor dikes, pipes and or swales? X        Is off-site storm water managed separately from stormwater generated on the site? X        Is excavated material placed on uphill side of trenches consistent with safety and space considerations?   X      Have check dams been placed at regular intervals within constructed channels that are cut down a slope? X       7 Drain Inlets Storm drain inlets made operable during construction are protected. X        Are existing storm drains within the influence of the project protected? X       8 Stabilize Channel and Outlets Have all on-site conveyance channels been designed, constructed and stabilized to prevent erosion from expected peak flows? X        Is stabilization, including armoring material, adequate to prevent erosion of outlets, adjacent stream banks, slopes and downstream conveyance systems? X       9 Control Pollutants Are waste materials and demolition debris handled and disposed of to prevent contamination of stormwater? X        Has cover been provided for all chemicals, liquid products, petroleum products, and other material? X        Has secondary containment been provided capable of containing 110% of the volume? X        Were contaminated surfaces cleaned immediately after a spill incident?   X      Were BMPs used to prevent contamination of stormwater by a pH modifying sources?   X      Element # Inspection BMPs Inspected BMP needs maintenance BMP failed Action required (describe in section F)    yes no n/a     9 Cont. Wheel wash wastewater is handled and disposed of properly.   X     10 Control Dewatering Concrete washout in designated areas. No washout or excess concrete on the ground.   X      Dewatering has been done to an approved source and in compliance with the SWPPP.   X      Were there any clean non turbid dewatering discharges?  X      11 Maintain BMP Are all temporary and permanent erosion and sediment control BMPs maintained to perform as intended? X       12 Manage the Project Has the project been phased to the maximum degree practicable? X        Has regular inspection, monitoring and maintenance been performed as required by the permit? X        Has the SWPPP been updated, implemented and records maintained? X       13 Protect LID Is all Bioretention and Rain Garden Facilities protected from sedimentation with appropriate BMPs? X        Is the Bioretention and Rain Garden protected against over compaction of construction equipment and foot traffic to retain its infiltration capabilities? X        Permeable pavements are clean and free of sediment and sediment laden-water runoff. Muddy construction equipment has not been on the base material or pavement.   X      Have soiled permeable pavements been cleaned of sediments and pass infiltration test as required by stormwater manual methodology?   X      Heavy equipment has been kept off existing soils under LID facilities to retain infiltration rate.   X      E. Check all areas that have been inspected. All in place BMPs X All disturbed soils  All concrete wash out area X All material storage areas X  All discharge locations X All equipment storage areas X All construction entrances/exits X   F. Elements checked “Action Required” (section D) describe corrective action to be taken. List the element number; be specific on location and work needed. Document, initial, and date when the corrective action has been completed and inspected. Element # Description and Location Action Required Completion Date Initials                                             Attach additional page if needed Sign the following certification: “I certify that this report is true, accurate, and complete, to the best of my knowledge and belief” Inspected by: (print) Charles Blankenship (Signature)  Date:   Title/Qualification of Inspector: Certified Erosion & Sediment Control Lead