HomeMy WebLinkAbout4.25.25 InspectionProject Name
Hazen High School
Permit #
Inspection Date
4/25/25
Time
8AM
Name of Certified Erosion Sediment Control Lead (CESCL) or qualified inspector if less than one acre
Print Name:
Charles Blankenship
Approximate rainfall amount since the last inspection (in inches):
0.40”
Approximate rainfall amount in the last 24 hours (in inches):
0”
Current Weather
Clear
X
Cloudy
Mist
Rain
Wind
Fog
A. Type of inspection:
Weekly
X
Post Storm Event
Other
B. Phase of Active Construction (check all that apply):
Pre Construction/installation of erosion/sediment controls
X
Clearing/Demo/Grading
X
Infrastructure/storm/roads
Concrete pours
Vertical Construction/buildings
Utilities
Offsite improvements
Site temporary stabilized
Final stabilization
C. Questions:
1. Were all areas of construction and discharge points inspected?
Yes
X
No
2. Did you observe the presence of suspended sediment, turbidity, discoloration, or oil sheen
Yes
No
X
3. Was a water quality sample taken during inspection? (refer to permit conditions S4 & S5)
Yes
No
X
4. Was there a turbid discharge 250 NTU or greater, or Transparency 6 cm or less?*
Yes
No
X
5. If yes to #4 was it reported to Ecology?
Yes
No
X
6. Is pH sampling required? pH range required is 6.5 to 8.5.
Yes
No
X
If answering yes to a discharge, describe the event. Include when, where, and why it happened; what action was taken, and when.
There was no stormwater accumulation on site.
*If answering yes to # 4 record NTU/Transparency with continual sampling daily until turbidity is 25 NTU or less/ transparency is 33 cm or greater.
Sampling Results:
Date:
Parameter
Method (circle one)
Result
Other/Note
NTU
cm
pH
Turbidity
tube, meter, laboratory
pH
Paper, kit, meter
D. Check the observed status of all items. Provide “Action Required “details and dates.
Element #
Inspection
BMPs Inspected
BMP needs
maintenance
BMP
failed
Action required
(describe in section F)
yes
no
n/a
1
Clearing Limits
Before beginning land disturbing activities are all clearing limits, natural resource areas (streams, wetlands, buffers, trees) protected with barriers or similar BMPs? (high visibility
recommended)
X
2
Construction Access
Construction access is stabilized with quarry spalls or equivalent BMP to prevent sediment from being tracked onto roads?
X
Sediment tracked onto the road way was cleaned thoroughly at the end of the day or more frequent as necessary.
X
3
Control Flow Rates
Are flow control measures installed to control stormwater volumes and velocity during construction and do they protect downstream properties and waterways from erosion?
X
If permanent infiltration ponds are used for flow control during construction, are they protected from siltation?
X
4
Sediment Controls
All perimeter sediment controls (e.g. silt fence, wattles, compost socks, berms, etc.) installed, and maintained in accordance with the Stormwater Pollution Prevention Plan (SWPPP).
X
Sediment control BMPs (sediment ponds, traps, filters etc.) have been constructed and functional as the first step of grading.
X
Stormwater runoff from disturbed areas is directed to sediment removal BMP.
X
5
Stabilize Soils
Have exposed un-worked soils been stabilized with effective BMP to prevent erosion and sediment deposition?
X
Element #
Inspection
BMPs Inspected
BMP needs
maintenance
BMP
failed
Action required
(describe in section F)
yes
no
n/a
5
Stabilize Soils
Cont.
Are stockpiles stabilized from erosion, protected with sediment trapping measures and located away from drain inlet, waterways, and drainage channels?
X
Have soils been stabilized at the end of the shift, before a holiday or weekend if needed based on the weather forecast?
X
6
Protect Slopes
Has stormwater and ground water been diverted away from slopes and disturbed areas with interceptor dikes, pipes and or swales?
X
Is off-site storm water managed separately from stormwater generated on the site?
X
Is excavated material placed on uphill side of trenches consistent with safety and space considerations?
X
Have check dams been placed at regular intervals within constructed channels that are cut down a slope?
X
7
Drain Inlets
Storm drain inlets made operable during construction are protected.
X
Are existing storm drains within the influence of the project protected?
X
8
Stabilize Channel and Outlets
Have all on-site conveyance channels been designed, constructed and stabilized to prevent erosion from expected peak flows?
X
Is stabilization, including armoring material, adequate to prevent erosion of outlets, adjacent stream banks, slopes and downstream conveyance systems?
X
9
Control Pollutants
Are waste materials and demolition debris handled and disposed of to prevent contamination of stormwater?
X
Has cover been provided for all chemicals, liquid products, petroleum products, and other material?
X
Has secondary containment been provided capable of containing 110% of the volume?
X
Were contaminated surfaces cleaned immediately after a spill incident?
X
Were BMPs used to prevent contamination of stormwater by a pH modifying sources?
X
Element #
Inspection
BMPs Inspected
BMP needs
maintenance
BMP
failed
Action required
(describe in section F)
yes
no
n/a
9
Cont.
Wheel wash wastewater is handled and disposed of properly.
X
10
Control Dewatering
Concrete washout in designated areas. No washout or excess concrete on the ground.
X
Dewatering has been done to an approved source and in compliance with the SWPPP.
X
Were there any clean non turbid dewatering discharges?
X
11
Maintain BMP
Are all temporary and permanent erosion and sediment control BMPs maintained to perform as intended?
X
12
Manage the Project
Has the project been phased to the maximum degree practicable?
X
Has regular inspection, monitoring and maintenance been performed as required by the permit?
X
Has the SWPPP been updated, implemented and records maintained?
X
13
Protect LID
Is all Bioretention and Rain Garden
Facilities protected from sedimentation with appropriate BMPs?
X
Is the Bioretention and Rain Garden protected against over compaction of construction equipment and foot traffic to retain its infiltration capabilities?
X
Permeable pavements are clean and free of sediment and sediment laden-water runoff. Muddy construction equipment has not been on the base material or pavement.
X
Have soiled permeable pavements been cleaned of sediments and pass infiltration test as required by stormwater manual methodology?
X
Heavy equipment has been kept off existing soils under LID facilities to retain infiltration rate.
X
E. Check all areas that have been inspected.
All in place BMPs
X
All disturbed soils
All concrete wash out area
X
All material storage areas
X
All discharge locations
X
All equipment storage areas
X
All construction entrances/exits
X
F. Elements checked “Action Required” (section D) describe corrective action to be taken. List the element number; be specific on location and work needed. Document, initial, and
date when the corrective action has been completed and inspected.
Element #
Description and Location
Action Required
Completion Date
Initials
Attach additional page if needed
Sign the following certification:
“I certify that this report is true, accurate, and complete, to the best of my knowledge and belief”
Inspected by: (print)
Charles Blankenship
(Signature)
Date:
Title/Qualification of Inspector:
Certified Erosion & Sediment Control Lead