Loading...
HomeMy WebLinkAboutCompliance of Condition Page 1 of 1 DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Conditions for Plan LUA19-000087 Satisfied PLN - Administrative Decision Condition 1. A final landscape plan shall be submitted at the time of Construction Permit review. The final landscape plan shall include a mix of trees, shrubs, and groundcover within the 10-foot onsite landscape strip. Landscaping within the public right-of-way shall be installed prior to final short plat recording and onsite landscaping shall be installed prior to final inspection of the building permits for the new homes. Comments: Landscape plan showing a mix of trees, shrubs, and groundcover within the 10-foot onsite landscape strip was submitted and approved with the civil construction permit. 2. Project construction shall be required to comply with the recommendations provided within the Coal Mine Hazard Report, dated August 28, 2019, prepared by Icicle Creek Engineers. At building permit submittal a memo stamped by an engineer shall be provided identifying that the plans submitted for review comply with the recommendation in this report. Comments: A memo stamped by an engineer will be provided identifying the plans submitted for review comply with the Coal Mine Hazard Report, prepared by Icicle Creek Engineers. 3. Access to the proposed lots shall be provided via one joint use driveway in lieu of the 2 proposed curb cuts. Comments: A joint use driveway was proposed and constructed on-site to provide access for the short plat in lieu of 2 proposed curb cuts