Loading...
HomeMy WebLinkAboutCity of Renton KC000818 Solar LT Improvements 90%KNOW WHAT'S BELOW. BEFORE YOU DIG. (UTILITY LOCATIONS ARE APPROX.) R CALL 2 BUSINESS DAYS SHEETS OF SHEET Christie True, Director REV #REVISION BY Department of Natural Resources and Parks Parks and Recreation Division Capital Projects Section 201 S. Jackson St., Suite 700, Seattle, WA 98104 DRAWN REVIEWED VERIFIED PROJECT MANAGER: DESIGN DATE ELEC. DESIGN TEAM STRUCT. CIVIL L.ARCH GEOTECH SOLAR LIGHTING IMPROVEMENTS KING COUNTY PARKS & RECREATION DIVISION 51 90% DESIGN SUBMITTAL DARBBY TE, TOM EARLY R. XIA 10/11/2024 N. ALEXANDER 10/11/2024 X. ZHANG 10/11/2024 R. XIA 10/11/2024 X. ZHANG 10/11/2024 X. ZHANG S. CHUDGAR B. HAWKINS PR E L I M I N A R Y BACKCHECKED NO T F O R C O N S T R U C T I O N Solar Lighting Improvements For Parks & Recreation Division Contract KC 000818 SL SL TOLT PIPELINE TRAIL AL TL AL AL AL AL AL AL TL TL TL TL TL TL TL TL TL TL AL AL SL AL SL SL AL AL AL TL TL TL TL TL TL TL TL AL SL TL NORTH GREEN RIVER PARK (PL-109) KENT (UNINCORPORATED KING COUNTY) WHITNEY BRIDGE PARK (PL-108) AUBURN (UNINCORPORATED KING COUNTY) FIVE MILE LAKE PARK (PL-106) AUBURN (UNINCORPORATED KING COUNTY) METZLER PARK (PL-107) AUBURN (UNINCORPORATED KING COUNTY) SKYWAY PARK (PL-104) SEATTLE (UNINCORPORATED KING COUNTY) BOULEVARD LANE PARK (PL-112) RENTON (UNINCORPORATED KING COUNTY) KING COUNTY AQUATIC CENTER (PL-111) FEDERAL WAY TOLT PIPELINE TRAIL (TL-101 & TL-102) WOODINVILLE/ REDMOND (UNINCORPORATED KING COUNTY) STEVE COX MEMORIAL PARK (PL-101) SEATTLE (UNINCORPORATED KING COUNTY) ALAL BLACK DIAMOND PARKING (PL-113) BLACK DIAMOND (UNINCORPORATED KING COUNTY) AL ALSL SOUTH COUNTY BALLFIELDS PARK (PL-105) AUBURN (UNINCORPORATED KING COUNTY) COVER SHEET 1 G-001 VICINITY MAP KEY SHELTER LIGHT AREA LIGHT TRAIL LIGHT AL TL SL AL COALFIELD PARK (PL-110) RENTON (UNINCORPORATED KING COUNTY) AL AL AL AL SL TL WHITE CENTER HEIGHTS PARK (PL-102) SEATTLE (UNINCORPORATED KING COUNTY) DICK THURNAU (LAKEWOOD) PARK (PL-103) SEATTLE (UNINCORPORATED KING COUNTY) S O O S C R E E K T R A I L ( T L - 1 0 6 ) C O V I N G T O N POO POO POINT TRAILHEAD (TL-107) ISSAQUAH (UNINCORPORATED KING COUNTY) LAKE T O S O U N D T R A I L (TL-1 0 9 ) R E N T O N EA S T R A I L T R A I L (T L - 1 1 0 ) R E N T O N SL FO O T H I L L S T R A I L ( T L - 1 0 8 ) EN U M C L A W (U N I N C O R P O R A T E D K I N G C O U N T Y ) AL PINNACLE PEAK PARKING (PL-114) ENUMCLAW (UNINCORPORATED KING COUNTY) TL AL LAKE GENEVA PARK (PL-115) AUBURN (UNINCORPORATED KING COUNTY) Project No. XXXXXXX Volume 1 OF 1 Contract Plans October 2024 C E D A R R I V E R T R A I L ( T L - 1 0 5 ) R E N T O N / M A P L E V A L L E Y ( U N I N C O R P O R A T E D K I N G C O U N T Y ) S N O Q U A L M I E V A L L E Y T R A I L ( T L - 1 0 3 & T L - 1 0 4 ) C A R N A T I O N / S N O Q U A L M I E / N O R T H B E N D ( U N I N C O R P O R A T E D K I N G C O U N T Y ) KNOW WHAT'S BELOW. BEFORE YOU DIG. (UTILITY LOCATIONS ARE APPROX.) R CALL 2 BUSINESS DAYS SHEETS OF SHEET Christie True, Director REV #REVISION BY Department of Natural Resources and Parks Parks and Recreation Division Capital Projects Section 201 S. Jackson St., Suite 700, Seattle, WA 98104 DRAWN REVIEWED VERIFIED PROJECT MANAGER: DESIGN DATE ELEC. DESIGN TEAM STRUCT. CIVIL L.ARCH GEOTECH SOLAR LIGHTING IMPROVEMENTS KING COUNTY PARKS & RECREATION DIVISION 51 90% DESIGN SUBMITTAL DARBBY TE, TOM EARLY R. XIA 10/11/2024 N. ALEXANDER 10/11/2024 X. ZHANG 10/11/2024 R. XIA 10/11/2024 X. ZHANG 10/11/2024 X. ZHANG S. CHUDGAR B. HAWKINS PR E L I M I N A R Y BACKCHECKED NO T F O R C O N S T R U C T I O N TOLT PIPELINE TRAIL SHEET INDEX 2 G-002 SHEET INDEX SHEET NO DRAWING NO SHEET NAME 1 G-001 COVER SHEET 2 G-002 SHEET INDEX 3 G-003 GENERAL NOTES, CONSTRUCTION NOTES, LEGENDS, AND SYMBOLS 4 PL-101 PARK LIGHTING PLAN STEVE COX MEMORIAL PARK SHELTER(BL-412) AND AREA LIGHTING 5 PL-102 PARK LIGHTING PLAN WHITE CENTER HEIGHTS PARK SHELTER(BL-413) AND AREA LIGHTING 6 PL-103 PARK LIGHTING PLAN DICK THURNAU (LAKEWOOD) PARK SHELTER (BL-14, BL-15) AND AREA LIGHTING 7 PL-104 PARK LIGHTING PLAN SKYWAY PARK SHELTER(BL-347) AND AREA LIGHTING 8 PL-105 PARK LIGHTING PLAN SOUTH COUNTY BALLFIELDS PARK SHELTER(BL-409, BL-411) AND AREA LIGHTING 9 PL-106 PARK LIGHTING PLAN FIVE MILE LAKE PARK SHELTER(BL-404) AND AREA LIGHTING 10 PL-107 PARK LIGHTING PLAN METZLER PARK AREA LIGHTING 11 PL-108 PARK LIGHTING PLAN WHITNEY BRIDGE PARK AREA LIGHTING 12 PL-109 PARK LIGHTING PLAN NORTH GREEN RIVER PARK AREA LIGHTING 13 PL-110 PARK LIGHTING PLAN COALFIELD PARK AREA LIGHTING 14 PL-111 PARK LIGHTING PLAN KING COUNTY AQUATIC CENTER AREA LIGHTING 15 PL-112 PARK LIGHTING PLAN BOULEVARD LANE PARK AREA LIGHTING 16 PL-113 PARK LIGHTING PLAN BLACK DIAMOND PARKING LOT/TRAILHEAD AREA LIGHTING 17 PL-114 PARK LIGHTING PLAN PINNACLE PEAK PARKING AREA LIGHTING 18 PL-115 PARK LIGHTING PLAN LAKE GENEVA PARK AREA LIGHTING 19 TL-101 TRAIL LIGHTING PLAN TOLT PIPELINE TRAIL 20 TL-102 TRAIL LIGHTING PLAN TOLT PIPELINE TRAIL 21 TL-103 TRAIL LIGHTING PLAN SNOQUALMIE VALLEY TRAIL 22 TL-104 TRAIL LIGHTING PLAN SNOQUALMIE VALLEY TRAIL 23 TL-105 TRAIL LIGHTING PLAN CEDAR RIVER TRAIL 24 TL-106 TRAIL LIGHTING PLAN SOOS CREEK TRAIL 25 TL-107 TRAIL LIGHTING POO POO POINT TRAIL 26 TL-108 TRAIL LIGHTING PLAN FOOTHILLS TRAIL 27 TL-109 TRAIL LIGHTING PLAN LAKE TO SOUND TRAIL 28 TL-110 TRAIL LIGHTING PLAN EASTRAIL TRAIL 29 E-501 ELECTRICAL DETAILS SHELTER BL-412 30 E-502 ELECTRICAL DETAILS SHELTER BL-413 31 E-503 ELECTRICAL DETAILS SHELTER BL-14 32 E-504 ELECTRICAL DETAILS SHELTER BL-15 33 E-505 ELECTRICAL DETAILS SHELTER BL-347 34 E-506 ELECTRICAL DETAILS SHELTER BL-409 35 E-507 ELECTRICAL DETAILS SHELTER BL-411 36 E-508 ELECTRICAL DETAILS SHELTER BL-404 37 E-509 ELECTRICAL DETAILS TUNNEL 38 E-510 ELECTRICAL DETAILS TUNNEL 39 E-511 ELECTRICAL DETAILS TUNNEL 40 E-601 ELECTRICAL WIRING DIAGRAM 41 S-001 STRUCTURAL GENERAL NOTES 42 S-101 STRUCTURAL PLAN STEVE COX MEMORIAL PARK SHELTER 1 (BL-412) 43 S-102 STRUCTURAL PLAN WHITE CENTER HEIGHTS PARK SHELTER 1 (BL-413) 44 S-103 STRUCTURAL PLAN DICK THURNAU (LAKEWOOD) SHELTER 1 (BL-14) 45 S-104 STRUCTURAL PLAN DICK THURNAU (LAKEWOOD) SHELTER 2 (BL-15) 46 S-105 STRUCTURAL PLAN SKYWAY PARK SHELTER 1 (BL-347) 47 S-106 STRUCTURAL PLAN SOUTH COUNTY BALLFIELDS SHELTER 1 (BL-409) 48 S-107 STRUCTURAL PLAN SOUTH COUNTY BALLFIELDS SHELTER 2 (BL-411) 49 S-108 STRUCTURAL PLAN FIVE MILE LAKE PARK SHELTER 2 (BL-404) 50 S-501 SHELTER LIGHTING DETAILS 51 S-502 TRAIL LIGHTING FOUNDATION DETAILS KNOW WHAT'S BELOW. BEFORE YOU DIG. (UTILITY LOCATIONS ARE APPROX.) R CALL 2 BUSINESS DAYS SHEETS OF SHEET Christie True, Director REV #REVISION BY Department of Natural Resources and Parks Parks and Recreation Division Capital Projects Section 201 S. Jackson St., Suite 700, Seattle, WA 98104 DRAWN REVIEWED VERIFIED PROJECT MANAGER: DESIGN DATE ELEC. DESIGN TEAM STRUCT. CIVIL L.ARCH GEOTECH SOLAR LIGHTING IMPROVEMENTS KING COUNTY PARKS & RECREATION DIVISION 51 90% DESIGN SUBMITTAL DARBBY TE, TOM EARLY R. XIA 10/11/2024 N. ALEXANDER 10/11/2024 X. ZHANG 10/11/2024 R. XIA 10/11/2024 X. ZHANG 10/11/2024 X. ZHANG S. CHUDGAR B. HAWKINS PRE L I M I N A R Y BACKCHECKED NO T F O R C O N S T R U C T I O N GENERAL NOTES, CONSTRUCTION NOTES, LEGENDS, AND SYMBOLS 3 G-003 GENERAL NOTES:TEMPORARY EROSION AND SEDIMENTATION CONTROL (TESC) NOTES: 1.A PRE-CONSTRUCTION CONFERENCE SHALL BE HELD PRIOR TO THE START OF CONSTRUCTION. 2.THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING ALL NECESSARY PERMITS PRIOR TO CONSTRUCTION. 3.A COPY OF THE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 4.CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND FIELD LOCATING CONSTRUCTION FENCING, SIGNAGE AND BARRIERS AS REQUIRED TO PREVENT UNAUTHORIZED ACCESS INTO THE SITE. 5.CALL UTILITIES UNDERGROUND LOCATION CENTER AT 1-800-424-5555 48 HOURS PRIOR TO CONSTRUCTION. 6.ALL ROADWAY WORK AND MATERIAL SHALL BE IN ACCORDANCE WITH THE CURRENT KING COUNTY AND LOCAL AUTHORITY HAVING JURISDICTION STANDARDS AND SPECIFICATIONS. 7.SIDEWALK, CURB AND GUTTER CANNOT BE POURED MONOLITHICALLY. THERE MUST BE A COLD JOINT OR FULL-DEPTH EXPANSION JOINT BETWEEN THEM. 8.ANY EXISTING PUBLIC IMPROVEMENTS DAMAGED DURING CONSTRUCTION SHALL BE REPLACED PRIOR TO FINAL INSPECTION. 9.THE CONTRACTOR IS RESPONSIBLE FOR KEEPING ALL PUBLIC STREETS FREE FROM MUD AND DEBRIS AT ALL TIMES. THE CONTRACTOR SHALL BE PREPARED TO USE POWER SWEEPERS OR OTHER PIECES OF EQUIPMENT NECESSARY TO KEEP THE ROADWAYS CLEAN. 1.POST SIGN WITH NAME AND PHONE NUMBER OF EROSION AND SEDIMENTATION CONTROL (ESC) SUPERVISOR (MAY BE CONSOLIDATED WITH THE REQUIRED NOTICE OF CONSTRUCTION SIGN). 2.FLAG OR FENCE CLEARING LIMITS. 3.INSTALL CATCH BASIN PROTECTION, IF REQUIRED. 4.INSTALL PERIMETER PROTECTION (SILT FENCE, STRAW WATTLE, ETC.). 5.CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR DIKES, PIPE SLOPE DRAINS, ETC.) SIMULTANEOUSLY WITH CLEARING AND GRADING FOR PROJECT DEVELOPMENT. 6.MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH KING COUNTY STANDARDS AND MANUFACTURER'S RECOMMENDATIONS. 7.RELOCATE EROSION CONTROL MEASURE, OR INSTALL NEW MEASURE SO THAT AS SITE CONDITIONS CHANGE, THE EROSION AND SEDIMENT CONTROL IS ALWAYS IN ACCORDANCE WITH THE KING COUNTY EROSION AND SEDIMENT CONTROL STANDARDS. 8.COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN (7) DAYS DURING THE DRY SEASON OR TWO (2) DAYS DURING THE WET SEASON WITH STRAW, WOOD FIBER, MULCH, COMPOST, PLASTIC SHEETING OR EQUIVALENT. 9.STABILIZE ALL AREAS WITHIN SEVEN (7) DAYS OF REACHING FINAL GRADE. 10.SEED, SOD, STABILIZE OR COVER ANY AREAS TO REMAIN UNWORKED FOR MORE THAN THIRTY (30) DAYS. 11.UPON COMPLETION OF THE PROJECT, STABILIZE ALL DISTURBED AREAS AND REMOVE BEST MANAGEMENT PRACTICES (BMP), IF APPROPRIATE. 12.IF A SITE HAS KNOWN SOIL CONTAMINATION AND IF DEWATERING OF FOUNDATION EXCAVATION IS REQUIRED IN AREAS OF CONTAMINATED SOILS, THE COLLECTED DEWATERING WATER MUST BE TREATED SEPARATELY. TRAFFIC CONTROL NOTES: 1.IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE ADEQUATE TEMPORARY TRAFFIC CONTROL TO ENSURE TRAFFIC SAFETY DURING CONSTRUCTION ACTIVITIES. THE CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN TO KING COUNTY AND THE PUBLIC WORKS DEPARTMENT OF LOCAL AUTHORITY HAVING JURISDICTION AT LEAST 48 HOURS PRIOR TO STARTING ANY WORK. ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" (MUTCD). 2.ALL WORK SHALL BE IN ACCORDANCE WITH THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) PART 6 STANDARDS. 3.A COPY OF THE APPROVED TRAFFIC CONTROL PLAN(S) SHALL BE ON SITE DURING CONSTRUCTION. 4.THE LOCATION OF EXISTING FEATURES AND UTILITIES SHOWN IN THESE PLANS ARE APPROXIMATE AND SHALL BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. 5.ALL SIGNS SHALL BE BLACK ON ORANGE, UNLESS OTHERWISE INDICATED. 6.TRAFFIC CONTROL DEVICES SHALL NOT ENCROACH ON ADJACENT TRAVELED LANE. IF ENCROACHMENT IS NECESSARY, LANE SHALL BE CLOSED USING AN APPROVED PLAN, UNLESS OTHERWISE SPECIFIED IN THESE PLANS. 7.CONTRACTOR SHALL PROVIDE WRITTEN NOTICE TO THE KING COUNTY ENGINEER AND THE AFFECTED LOCAL AGENCIES A MINIMUM OF THIRTY (30) DAYS PRIOR TO RESTRICTING LOCAL TRAFFIC. 8.CONTRACTOR SHALL FURNISH AND INSTALL INFORMATION SIGNS THAT PROVIDE ADVANCE NOTIFICATION OF RAMP AND ROADWAY CLOSURES A MINIMUM OF SEVEN (7) CALENDAR DAYS PRIOR TO SCHEDULED CLOSURES. 9.CONTRACTOR SHALL COORDINATE ALLOWABLE CLOSURE HOURS AND REQUIRED PERMITS WITH ALL AFFECTED LOCAL AGENCIES PRIOR TO IMPLEMENTING CLOSURES ON LOCAL ROADS. 1 CONSTRUCTION NOTES: INSTALL SHELTER SOLAR LIGHTING SYSTEM. SEE DRAWINGS E-500 SERIES AND S-500 SERIES FOR INSTALLATION DETAILS. INSTALL AREA SOLAR LIGHTING SYSTEM. SEE DRAWINGS E-500 SERIES AND S-500 SERIES FOR INSTALLATION DETAILS. INSTALL TRAIL SOLAR LIGHTING SYSTEM. SEE DRAWINGS E-500 SERIES AND S-500 SERIES FOR INSTALLATION DETAILS. 2 3 ABBREVIATIONS LT LIGHTING SL SHELTER LIGHT AL AREA LIGHT TL TRAIL LIGHT JBOX JUNCTION BOX NTS NOT TO SCALE RGS RIGID GALVANIZED STEEL KNOW WHAT'S BELOW. BEFORE YOU DIG. (UTILITY LOCATIONS ARE APPROX.) R CALL 2 BUSINESS DAYS SHEETS OF SHEET Christie True, Director REV #REVISION BY Department of Natural Resources and Parks Parks and Recreation Division Capital Projects Section 201 S. Jackson St., Suite 700, Seattle, WA 98104 DRAWN REVIEWED VERIFIED PROJECT MANAGER: DESIGN DATE ELEC. DESIGN TEAM STRUCT. CIVIL L.ARCH GEOTECH SOLAR LIGHTING IMPROVEMENTS KING COUNTY PARKS & RECREATION DIVISION 51 90% DESIGN SUBMITTAL DARBBY TE, TOM EARLY R. XIA 10/11/2024 N. ALEXANDER 10/11/2024 X. ZHANG 10/11/2024 R. XIA 10/11/2024 X. ZHANG 10/11/2024 X. ZHANG S. CHUDGAR B. HAWKINS PR E L I M I N A R Y BACKCHECKED NO T F O R C O N S T R U C T I O N RIPLEY LANE N N 43RD STREET N 41ST STREET TL1 TL2 TL3 3 3 3 TRAIL LIGHTING PLAN 28 EASTRAIL TRAIL TL-110 RIPLEY LANE N. CROSSINGTL1 2 TL3 2 MOUNTAIN VIEW AVE N TL4 3 TRAIL SOLAR LIGHTING LOCATION NORTH 43RD ST. CROSSINGTL2 1 NORTH 43RD ST. CROSSINGTL2 2 NORTH 41ST ST. CROSSINGTL3 2 MOUNTAIN VIEW CROSSINGTL4 2 TRAIL SOLAR LIGHTING LOCATION TL4 2 TL2 1 TL2 2 TL1 2 TRAIL SOLAR LIGHTING LOCATION TRAIL SOLAR LIGHTING LOCATION TRAIL SOLAR LIGHTING LOCATION 3 CONSTRUCTION NOTES: INSTALL TRAIL SOLAR LIGHTING SYSTEM. SEE DRAWINGS E-500 AND S-500 SERIES FOR INSTALLATION DETAILS. KNOW WHAT'S BELOW. BEFORE YOU DIG. (UTILITY LOCATIONS ARE APPROX.) R CALL 2 BUSINESS DAYS SHEETS OF SHEET Christie True, Director REV #REVISION BY Department of Natural Resources and Parks Parks and Recreation Division Capital Projects Section 201 S. Jackson St., Suite 700, Seattle, WA 98104 DRAWN REVIEWED VERIFIED PROJECT MANAGER: DESIGN DATE ELEC. DESIGN TEAM STRUCT. CIVIL L.ARCH GEOTECH SOLAR LIGHTING IMPROVEMENTS KING COUNTY PARKS & RECREATION DIVISION 51 90% DESIGN SUBMITTAL DARBBY TE, TOM EARLY R. XIA 10/11/2024 N. ALEXANDER 10/11/2024 X. ZHANG 10/11/2024 R. XIA 10/11/2024 X. ZHANG 10/11/2024 X. ZHANG S. CHUDGAR B. HAWKINS PR E L I M I N A R Y BACKCHECKED NO T F O R C O N S T R U C T I O N PARK LIGHTING PLAN 15 BOULEVARD LANE PARK AREA LIGHTING 12500 SE 188TH PL, RENTON, WA 98058 PL-112 AREA SOLAR LIGHTINGAL3 1 AREA SOLAR LIGHTING LOCATION 2 AL3 2 CONSTRUCTION NOTES: INSTALL AREA SOLAR LIGHTING SYSTEM. SEE DRAWINGS E-500 AND S-500 SERIES FOR INSTALLATION DETAILS. KNOW WHAT'S BELOW. BEFORE YOU DIG. (UTILITY LOCATIONS ARE APPROX.) R CALL 2 BUSINESS DAYS SHEETS OF SHEET Christie True, Director REV #REVISION BY Department of Natural Resources and Parks Parks and Recreation Division Capital Projects Section 201 S. Jackson St., Suite 700, Seattle, WA 98104 DRAWN REVIEWED VERIFIED PROJECT MANAGER: DESIGN DATE ELEC. DESIGN TEAM STRUCT. CIVIL L.ARCH GEOTECH SOLAR LIGHTING IMPROVEMENTS KING COUNTY PARKS & RECREATION DIVISION 51 90% DESIGN SUBMITTAL DARBBY TE, TOM EARLY R. XIA 10/11/2024 N. ALEXANDER 10/11/2024 X. ZHANG 10/11/2024 R. XIA 10/11/2024 X. ZHANG 10/11/2024 X. ZHANG S. CHUDGAR B. HAWKINS PR E L I M I N A R Y BACKCHECKED NO T F O R C O N S T R U C T I O N 3 BN S F U N D E R P A S S TL1 TRAIL LIGHTING PLAN 27 LAKE TO SOUND TRAIL TL-109 TL1 1 TRAIL SOLAR LIGHTING LOCATION BNSF UNDERPASS CROSSINGTL1 1 3 CONSTRUCTION NOTES: INSTALL TRAIL SOLAR LIGHTING SYSTEM. SEE DRAWINGS E-500 AND S-500 SERIES FOR INSTALLATION DETAILS. KNOW WHAT'S BELOW. BEFORE YOU DIG. (UTILITY LOCATIONS ARE APPROX.) R CALL 2 BUSINESS DAYS SHEETS OF SHEET Christie True, Director REV #REVISION BY Department of Natural Resources and Parks Parks and Recreation Division Capital Projects Section 201 S. Jackson St., Suite 700, Seattle, WA 98104 DRAWN REVIEWED VERIFIED PROJECT MANAGER: DESIGN DATE ELEC. DESIGN TEAM STRUCT. CIVIL L.ARCH GEOTECH SOLAR LIGHTING IMPROVEMENTS KING COUNTY PARKS & RECREATION DIVISION 51 90% DESIGN SUBMITTAL DARBBY TE, TOM EARLY R. XIA 10/11/2024 N. ALEXANDER 10/11/2024 X. ZHANG 10/11/2024 R. XIA 10/11/2024 X. ZHANG 10/11/2024 X. ZHANG S. CHUDGAR B. HAWKINS PR E L I M I N A R Y BACKCHECKED NO T F O R C O N S T R U C T I O N ELECTRICAL WIRING DIAGRAM 40 E-601 SCALE: SOLAR LIGHTING WIRING DIAGRAM DIAGRAM NTS SOLAR CABLE ROUTED THROUGH THE BATTERY BOX KNOCKOUT FOR STANDARD TOP OF POLE WIRING. VENTED ALUMINUM BATTERY BOX (12 OR 24 VDC) SOLAR ARRAY 30W - 300W SOUTH MC4 SOLAR ARRAY DISCONNECTS -+ FIXTURE/LOAD LIGHTING CONTROLLER LOAD FUSE -+ BATTERY MAIN FUSE DIMMING WIRE 4-PIN MALE CONNECTOR 4-PIN FEMALE CONNECTOR LED INDICATOR LIGHTS (+) (-) (+) (-) (+)(+) (-) CRITERIA 1.ALL MATERIALS AND WORKMANSHIP DESIGN, AND CONSTRUCTION SHALL CONFORM TO THE REQUIREMENTS OF THE DRAWINGS, SPECIFICATIONS AND THE 2021 INTERNATIONAL BUILDING CODE. 2.DESIGN CRITERIA ROOF DEAD LOAD =25 PSF ROOF SNOW LOAD =25 PSF WIND =EXPOSURE C 3.CONTRACTOR SHALL VERIFY DIMENSIONS AND CONDITIONS FOR COMPATIBILITY AND SHALL NOTIFY ENGINEER OF ANY DISCREPANCIES PRIOR TO CONSTRUCTION SO THE PROPER REVISIONS CAN BE PROVIDED. 4.CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS, MEMBER SIZES, AND CONDITIONS PRIOR TO COMMENCING ANY WORK. ALL DIMENSIONS OF EXISTING CONSTRUCTION SHOWN ON THE DRAWINGS ARE INTENDED AS GUIDELINES ONLY AND MUST BE VERIFIED. 5.CONTRACTOR SHALL PROVIDE TEMPORARY BRACING AND SHORING FOR THE STRUCTURE AND STRUCTURAL COMPONENTS UNTIL ALL FINAL CONNECTIONS HAVE BEEN COMPLETED IN ACCORDANCE WITH THE PLANS. 6.CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REQUIRED SAFETY PRECAUTIONS AND THE METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES REQUIRED TO PERFORM HIS WORK. 7.CONTRACTOR INITIATED CHANGES SHALL BE SUBMITTED IN WRITING TO OWNER'S REPRESENTATIVE FOR APPROVAL PRIOR TO FABRICATION OR CONSTRUCTION. CHANGES SHOWN ON SHOP DRAWINGS ONLY WILL NOT SATISFY THE REQUIREMENT. 8.DRAWINGS INDICATE GENERAL AND TYPICAL DETAILS OF CONSTRUCTION. WHERE CONDITIONS ARE NOT SPECIFICALLY INDICATED BUT ARE OF SIMILAR CHARACTER TO DETAILS SHOWN, SIMILAR DETAILS OF CONSTRUCTION SHALL BE USED, SUBJECT TO REVIEW AND APPROVAL BY THE STRUCTURAL ENGINEER. 9.INSPECTION: EXPANSION BOLTS AND THREADED EXPANSION INSERTS, AND EPOXY GROUTED INSTALLATIONS SHALL BE SUPERVISED IN ACCORDANCE WITH SECTION 109 AND SECTION 1704 OF THE INTERNATIONAL BUILDING CODE, AS REQUIRED BY THE PERMIT ISSUING AGENCY AND THE PROJECT SPECIFICATIONS BY A QUALIFIED TESTING AGENCY DESIGNATED BY THE ARCHITECT OR ENGINEER. THE ARCHITECT AND STRUCTURAL ENGINEER SHALL BE FURNISHED WITH COPIES OF ALL INSPECTION REPORTS AND TEST RESULTS. WOOD 1.FRAMING LUMBERS SHALL BE KILN DRIED OR MC-15%, AND GRADED AND MARKED IN ACCORDANCE WITH THE GRADE TRADEMARK OF THE WEST COAST LUMBER INSPECTION BUREAU (WCLIB), WESTERN WOOD PRODUCT ASSOCIATION (WWPA), OR OTHER AGENCY ACCREDITED BY THE AMERICAN LUMBER STANDARD COMMITTEE (ALSC). FURNISH TO THE FOLLOWING MINIMUM STANDARDS: 2.ALL NAILS AND STAPLES SHALL CONFORM TO ASTM F1667 INCLUDING SUPPLEMENT 1. UNLESS NOTED OTHERWISE ALL NAILS SHALL BE COMMON. PROVIDE MINIMUM NAILING PER IBC TABLE 2304.10.1 OR MORE. STAGGER ALL NAILING TO PREVENT SPLITTING OF WOOD MEMBERS. ALL WOOD IN CONTACT WITH CONCRETE OR MASONRY SHALL BE PRESERVATIVE TREATED. PROVIDE CUT WASHERS WHERE BOLT HEADS, NUTS, AND LAG SCREW HEADS BEAR ON WOOD. PROVIDE LEAD HOLES AS REQUIRED TO PREVENT SPLITTING OF WOOD MEMBERS. NAIL SIZES SPECIFIED ON THE DRAWINGS ARE BASED ON THE FOLLOWING SPECIFICATIONS: Size Length Diameter 8d 2-1/2"0.131" 10d 3"0.148" 12d (16d sinker) 3-1/4"0.148" 16d 3-1/2"0.162" 3.LAG BOLTS/LAG SCREWS SHALL CONFORM TO ANSI/ASME STANDARDS B18.2.1. LAG SCREWS SHALL BE OF A DIAMETER INDICATED ON DRAWINGS WITH A MINIMUM OF 8XDIA. EMBEDMENT IN SUPPORTING MEMBER UNLESS NOTED OTHERWISE. CLEARANCE HOLE FOR THE SHANK SHALL BE THE SAME DIAMETER AS THE SHANK AND THE SAME DEPTH OF PENETRATION AS THE UNTHREADED PORTION OF THE SHANK. THE LEAD HOLE FOR THE THREADED PORTION SHALL HAVE A DIAMETER EQUAL TO 60 TO 75 PERCENT OF THE SHANK DIAMETER AND A LENGTH EQUAL TO AT LEAST THE LENGTH OF THE THREADED PORTION. THE TREADED PORTION OF THE SCREW SHALL BE INSERTED IN ITS LEAD HOLE BY TURNING WITH A WRENCH. SOAP OR OTHER LUBRICANT SHALL BE USED ON THE SCREWS OR IN THE LEAD HOLE TO FACILITATE INSERTION AND PREVENT DAMAGE TO THE SCREW. LAG SCREWS SHALL NOT BE DRIVEN WITH A HAMMER. KNOW WHAT'S BELOW. BEFORE YOU DIG. (UTILITY LOCATIONS ARE APPROX.) R CALL 2 BUSINESS DAYS SHEETS OF SHEET Christie True, Director REV #REVISION BY Department of Natural Resources and Parks Parks and Recreation Division Capital Projects Section 201 S. Jackson St., Suite 700, Seattle, WA 98104 DRAWN REVIEWED VERIFIED PROJECT MANAGER: DESIGN DATE ELEC. DESIGN TEAM STRUCT. CIVIL L.ARCH GEOTECH SOLAR LIGHTING IMPROVEMENTS KING COUNTY PARKS & RECREATION DIVISION 51 90% DESIGN SUBMITTAL DARBBY TE, TOM EARLY S. PANCHAGNULA 10/11/2024 S. PANCHAGNULA 10/11/2024 M. KARIMZADEH 10/11/2024 T. YARED 10/11/2024 S. CHUDGAR 10/11/2024 X. ZHANG S. CHUDGAR B. HAWKINS PRE L I M I N A R Y BACKCHECKED NO T F O R C O N S T R U C T I O N MINIMUM FRAMING GRADES 2X TO 4X JOISTS, PURLINS AND HEADERS DOUGLAS FIR-LARCH NO. 2 OR HEM-FIR NO. 1 6X BEAMS AND HEADERS DOUGLAS FIR-LARCH NO. 1 EXTERIOR STUDS, AND 4X COLUMNS DOUGLAS FIR-LARCH NO. 2 THE MINIMUM GRADE OF ALL OTHER STRUCTURAL FRAMING DOUGLAS FIR-LARCH NO. 2 OR HIM-FIR NO. 1 S-001STRUCTURAL GENERAL NOTES 41 GENERAL NOTES: STRUCTURAL STEEL: STRUCTURAL BOLTS (ASTM F3125) CHANNELS (ASTM A992)Fy = 50,000 PSI PLATES (ASTM A36) Fy = 36,000 PSI ANGLES AND PLATE WASHERS (ASTM 572 GRADE 50)Fy = 50,000 PSI STEEL CASING (ASTM A283 GRADE C, ASTM A36 OR ASTMA929)Fy = 36,000 PSI HOLLOW STRUCTURAL SECTION (ASTM A500 GRADE C)Fy = 50,000 PSI WELDING: ALL WELDING ELECTRODES SHALL BE E70XX SERIES CONFORMING TO ANSI/AWS D1.1/D1.1M:2020 STRUCTURAL WELDING CODE-STEEL. WELDERS SHALL BE CURRENTLY CERTIFIED BY WASHINGTON ASSOCIATION OF BUILDING OFFICIALS (WABO). 9' - 0 " 2' - 0 " O R 3' - 0 " 2' - 0 " O R 3' - 0 " 6" M I N 4' - 0 " M A X 2' - 0" DIA. AS R E Q U I R E D BY P R O J E C T SP E C I F I C A T I O N S 2' - 0 " D I A . 4" 6 1 / 2 " PLAN VIEW ARCHITECTURAL SURFACE FINISHES AVAILABLE FOR TOP SECTION BOLTS & BOLT PATTERN PER POLE MANUFACTURER BOLT PATTERN & BOLTS PER POLE MANUFACTURER 12" CHAMFER ELECTRICAL CONDUIT BY MANUFACTURER ELECTRICAL CONDUIT BY MANUFACTURER 12" CHAMFER 9 - 0 OMNI LIGHT POLE BASE PER MANUFACTURER HE I G H T TRAIL LIGHTING FOUNDATION DTLS S-502 KNOW WHAT'S BELOW. BEFORE YOU DIG. (UTILITY LOCATIONS ARE APPROX.) R CALL 2 BUSINESS DAYS SHEETS OF SHEET Christie True, Director REV #REVISION BY Department of Natural Resources and Parks Parks and Recreation Division Capital Projects Section 201 S. Jackson St., Suite 700, Seattle, WA 98104 DRAWN REVIEWED VERIFIED PROJECT MANAGER: DESIGN DATE ELEC. DESIGN TEAM STRUCT. CIVIL L.ARCH GEOTECH SOLAR LIGHTING IMPROVEMENTS KING COUNTY PARKS & RECREATION DIVISION 51 90% DESIGN SUBMITTAL DARBBY TE, TOM EARLY S. PANCHAGNULA 10/11/2024 S. PANCHAGNULA 10/11/2024 M. KARIMZADEH 10/11/2024 T. YARED 10/11/2024 S. CHUDGAR 10/11/2024 X. ZHANG S. CHUDGAR B. HAWKINS PRE L I M I N A R Y BACKCHECKED NO T F O R C O N S T R U C T I O N 51 SECTION SCALE: NTS 2 S-502 SECTION PRECAST LIGHT POLE FOUNDATION SCALE: NTS 1 S-502