HomeMy WebLinkAboutChange Order - 2C.O.# 2 SUMMARY OF PROPOSED CHANGE: BID ITEM NO. Unit Type ∆ Qty. Unit Price Total Amount 9 Ton (428) $65.00 -$27,820.00 11 Ton 39 $425.00 $16,575.00 12 Ton 64 $375.00 $24,000.00 Sub Total $12,755.00 Sales Tax (10.3%)$1,313.77 Total $14,068.77 APPROVAL SIGNATURES: Approved By: Date: Approved By: Date: Approved By: Date: Approved By: Date: Ronald Straka, Utility Systems Director Approved By: Date: Martin Pastucha, PW Administrator Approved By: Date: Shane Moloney, Renton City Attorney CITY OF RENTON Quantity Adjustment Bid Item Description Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT CAG#: CONTRACTOR: CAG-24-105 Rodarte Construction, Inc PROJECT NAME:Sanitary Sewer Replacement Phase 1 Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the adjusted quantities as outlined below: $806,084.29 $780,857.82 $14,068.77 Jared Rodarte, President/Owner, Rodarte Construction, Inc Jesse Newman, Project Manager Joe Stowell, Wastewater Utility Engineering Manager $820,153.06 Decrease Quantity: Select Import Backfill CURRENT CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT Removing excess quantity due to the use of native backfill instead of select import backfill. ESTIMATED NET CHANGE THIS ESTIMATED CONTRACT TOTAL AFTER CHANGE Additional asphalt quantities to account for the increased overlay area due to decision to overlay road instead of grind and overlay. Increase Quantity: 2-Inch Grind and Overlay Increase Quantity: Full Depth Hot Mix Asphalt CL. 1/2 in PG 58 H-22 Increase quantity due to the existing thicker asphalt and field revisions that increased asphalt quantities. H:\File Sys\WWP - WasteWater\WWP-27-04078 Sanitary Sewer Replacement Project PH1\110 - Construction\Change Orders and Force Accounts\Change Orders\CO 2\Backup\20250611 - CO 2 - SRP Phase 1 1 of 1                                               CAG-24-105, CO #2-25 Approved by Cheryl Beyer via email 6/20/2025