Loading...
HomeMy WebLinkAboutC_250305_ECY 65% Plans_ECY Design Report_veg area calcs Springbrook Terrace Water Quality Retrofit Draft Design Report Springbrook Terrace Water Quality Retrofit Draft Design Report Appendix B – Preliminary Plan Sheets DEA PROJECT ID RENT00001903 SPRINGBROOK TERRACE WATER QUALITY RETROFIT CAG-24-081 CITY OF RENTON Sa v e D a t e : Plo t D a t e : 3/ 3 / 2 0 2 5 1 : 3 8 P M 3/ 3 / 2 0 2 5 3 : 1 4 P M By : Cg b P:\ R \ R E N T 0 0 0 0 1 9 0 3 \ 0 4 0 0 C A D \ W A \ S H E E T S \ E C - G N - R E N T 1 9 0 3 . d w g Ch a d B o o t h By : Fil e : SHEET NO. DATE:REVIEWED BY: DATENO.REVISION CKBY FILE NO. PROJECT NO.SEC: TWP: RGE: DATUM: HOR: VERT: CHECKED BY: DESIGNED BY: DRAWN BY: ® 14432 SE Eastgate Way Suite 400 Bellevue, WA 98007 Phone: 425.519.6500 Draft Design Report Submittal CITY OF RENTON, WASHINGTON Springbrook Terrace Water Quality Retrofit CAG-24-081 RENT00001903 NAD 83 WA S.P. N NAVD 88 06 22N 5E ASR CGB WDM NOT FOR CONSTRUCTION COVER SHEET INDEX OF SHEETS SHEET NUMBER DESCRIPTION G1 COVER SHEET G2 LEGEND AND ABBREVIATIONS G3 GENERAL NOTES G4 STANDARD ESC NOTES C1 EXISTING CONDITIONS C2 ESC AND DEMOLITION PLAN & DETAILS C3 SITE PLAN C4 DRAINAGE DETAILS AND SECTIONS C5 MISC. CIVIL DETAILS (SHEET 1 OF 2) C6 MISC. CIVIL DETAILS (SHEET 2 OF 2) C7 SURVEY, HORIZONTAL CONTROL, AND SITE ACCESS PLAN G1 MARCH, 2025 Not to Scale PROJECT LOCATION VICINITY MAP Sa v e D a t e : Plo t D a t e : 3/ 3 / 2 0 2 5 1 : 3 8 P M 3/ 3 / 2 0 2 5 3 : 1 4 P M By : Cg b P:\ R \ R E N T 0 0 0 0 1 9 0 3 \ 0 4 0 0 C A D \ W A \ S H E E T S \ E C - G N - R E N T 1 9 0 3 . d w g Ch a d B o o t h By : Fil e : SHEET NO. DATE:REVIEWED BY: DATENO.REVISION CKBY FILE NO. PROJECT NO.SEC: TWP: RGE: DATUM: HOR: VERT: CHECKED BY: DESIGNED BY: DRAWN BY: ® 14432 SE Eastgate Way Suite 400 Bellevue, WA 98007 Phone: 425.519.6500 Draft Design Report Submittal CITY OF RENTON, WASHINGTON Springbrook Terrace Water Quality Retrofit CAG-24-081 RENT00001903 NAD 83 WA S.P. N NAVD 88 06 22N 5E ASR CGB WDM NOT FOR CONSTRUCTION LEGEND AND ABBREVIATIONS G2 EXISTING LEGEND EDGE OF PAVEMENTEP INVERT ELEVATIONIE ASPHALTASPH CURB AND GUTTER CHAIN LINK FENCE CMP CG CLF CONCRETE CULVERT CONCRETE SIDEWALKCW CPP CONC CULV CORRUGATED PLASTIC PIPE CORRUGATED METAL PIPE DRIVEWAY ECC DW EXTRUDED CONCRETE CURB CATCH BASINCB PVC PA RCP TOE TOP WDF WOOD FENCE TOE OF SLOPE TOP OF SLOPE REINFORCED CONCRETE PIPE PLANTED AREA POLYVINYL CHLORIDE PIPE EASEMENT LINE PROPERTY LINE EXISTING RIGHT-OF-WAY LINE FENCE LINE (TYPE AS NOTED) BUILDING OVERHANG BUILDING LINE VEGETATION/BRUSH LINE EXISTING RIGHT-OF-WAY CENTER LINE BUSH TELEPHONE RISERTJR SIGN LIGHT POLE WITH ARM POST OR BOLLARD MAILBOX DECIDUOUS TREE CONIFEROUS TREE WATER VALVE WATER METER STORM DRAIN MANHOLE STORM CATCH BASIN SEWER MANHOLE POWER VAULT POWER CABINET POWER TRANSFORMER GAS VALVE STORM CULVERT END WATER BLOW-OFF S D P P GV WM WV CABLE TV LINETVTV NATURAL GAS PIPEGG POWER LINEPP SANITARY SEWER PIPESSSS STORM SEWER PIPESDSD TELEPHONE LINETT WATER PIPEWW ECB CEDARC ALDERA MAPLEM LAURELLL ROCKERY TAX LOT / PARCEL NUMBER0123456789 MONUMENT (FOUND AS NOTED) CABLE TV RISERTVR CITY OF RENTONCOR STANDARDSTD POINTPT ELEVATIONEL SANITARY SEWER PIPE FROM RECORD DRAWINGSS(R)SS(R) WATER SURFACE ELEVATIONWSE ACCESS EASEMENT x x Sa v e D a t e : Plo t D a t e : 3/ 3 / 2 0 2 5 1 : 3 8 P M 3/ 3 / 2 0 2 5 3 : 1 4 P M By : Cg b P:\ R \ R E N T 0 0 0 0 1 9 0 3 \ 0 4 0 0 C A D \ W A \ S H E E T S \ E C - G N - R E N T 1 9 0 3 . d w g Ch a d B o o t h By : Fil e : SHEET NO. DATE:REVIEWED BY: DATENO.REVISION CKBY FILE NO. PROJECT NO.SEC: TWP: RGE: DATUM: HOR: VERT: CHECKED BY: DESIGNED BY: DRAWN BY: ® 14432 SE Eastgate Way Suite 400 Bellevue, WA 98007 Phone: 425.519.6500 Draft Design Report Submittal CITY OF RENTON, WASHINGTON Springbrook Terrace Water Quality Retrofit CAG-24-081 RENT00001903 NAD 83 WA S.P. N NAVD 88 06 22N 5E ASR CGB WDM NOT FOR CONSTRUCTION GENERAL NOTES G3 GENERAL NOTES: 1.ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE LOCAL, STATE, AND FEDERAL LAWS. 2.ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE CITY OF RENTON STANDARDS AND SPECIFICATIONS AND WASHINGTON STATE DEPARTMENT OF TRANSPORTATION "STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION", 2025 AND AS AMENDED BY THE CITY OF RENTON SUPPLEMENTAL SPECIFICATIONS AND THE CONTRACT SPECIAL PROVISIONS. 3.ALL WORK SHALL BE SUBJECT TO THE INSPECTION OF THE CITY ENGINEER OR DESIGNATED REPRESENTATIVE. 4.A COPY OF THESE APPROVED PLANS AND PROJECT SPECIFICATIONS MUST BE ON THE SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 5.THE CONTRACTOR SHALL COMPLY WITH ALL PERMITS AND ALL OTHER REQUIREMENTS BY THE CITY OF RENTON. SEE APPROVED PERMITS AND PERMIT REQUIREMENTS IN THE PROJECT SPECIFICATIONS. 6.CONTRACTOR SHALL BE RESPONSIBLE FOR PREPARATION OF ALL TRAFFIC CONTROL PLANS. CONTRACTOR SHALL SUBMIT PLANS TO THE ENGINEER FOR APPROVAL PRIOR TO THEIR IMPLEMENTATION. SEE TRAFFIC CONTROL REQUIREMENTS IN SECTION 1-10 OF THE SPECIAL PROVISIONS. 7.SEE THE "STANDARD" DETAILS SECTION OF THE PROJECT SPECIFICATIONS FOR REFERENCED CITY OF RENTON (COR) STANDARD DETAILS AND REFERENCE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION (WSDOT) STANDARD DETAILS. 8.NO STAGING AREA IS PROVIDED TO THE CONTRACTOR. ALL STAGING AREAS SHALL BE ON A CONTRACTOR SECURED AREA. ALL ESC REQUIREMENTS SHALL APPLY TO ALL STAGING AREAS. 9.THE LOCATIONS OF ALL EXISTING UTILITIES SHOWN HEREON HAVE BEEN ESTABLISHED BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND SHALL THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN, AND TO FURTHER DISCOVER AND AVOID ANY OTHER UTILITIES NOT SHOWN HEREON THAT MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. 10.STORM SEWER LENGTHS ARE MEASURED BETWEEN CENTERS OF MANHOLES AND CATCH BASINS UNLESS OTHERWISE NOTED. 11.ALL UTILITY TRENCH BACKFILL AND ROADWAY SUBGRADE SHALL BE COMPACTED TO 95% MAXIMUM DRY DENSITY PER SECTION 2-03.3(14)D - COMPACTION AND MOISTURE CONTROL TESTS OF THE WSDOT STANDARD SPECIFICATIONS. IN PERMEABLE PAVEMENT AND OTHER INFILTRATION AREAS, ALL TRENCH BACKFILL SHALL BE FIRM AND UNYIELDING BUT IN NO CASE SHALL BE COMPACTED TO MORE THAN 92% OF MAXIMUM DRY DENSITY. 12.ALL PIPE AND STRUCTURES SHALL BE STAKED FOR SURVEY LINE AND GRADE PRIOR TO THE START OF CONSTRUCTION. WHERE SHOWN ON THE PLANS OR WHERE DIRECTED BY THE CITY, THE EXISTING MANHOLES, CATCH BASINS, OR INLETS SHALL BE ADJUSTED TO THE GRADE AS STAKED. 13.ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL, AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. ALL PIPE BEDDING AND BACKFILL SHALL BE AS SHOWN ON THE CITY STANDARD PLAN 220.00, 220.10, AND 220.20. 14.STEEL PIPE SHALL BE ALUMINIZED, OR GALVANIZED WITH ASPHALT TREATMENT 1, 2, OR 5 INSIDE AND OUTSIDE. 15.ALL DRAINAGE STRUCTURES SUCH AS CATCH BASINS AND MANHOLES SHALL BE FITTED WITH DUCTILE IRON, BOLT-LOCKING LIDS PER THE CITY STANDARD PLAN 204.10, 204.20, 204.30, 204.40, AND 204.50. STRUCTURES SHALL HAVE: ·RECTANGULAR OR ROUND, SOLID LIDS WHEN NOT COLLECTING RUNOFF, AND OUTSIDE OF THE ROADWAY. ·ROUND, SOLID LIDS DISPLAYING THE CITY LOGO WHEN WITHIN THE PUBLIC RIGHT-OF-WAY OR IN AN EASEMENT TO THE CITY. 16.THE END OF EACH STORM DRAIN STUB SHALL BE CAPPED. A CLEANOUT TOPPED WITH A BOLT- LOCKING LID MARKED "STORM” OR "DRAIN" SHALL BE LOCATED AT THE PROPERTY LINE OR AT THE POINT OF CONNECTION OF A PRIVATE STORM DRAINAGE CONVEYANCE SYSTEM PER THE CITY STANDARD PLAN 227.00. 17.ALL STORM SYSTEM EXTENSIONS SHALL BE STAKED FOR LINE AND GRADE BY A SURVEYOR LICENSED IN WASHINGTON STATE, AND CUT SHEETS SHALL BE PROVIDED TO THE CITY PRIOR TO CONSTRUCTION. 18.ALL NEWLY-INSTALLED AND NEWLY-REHABILITATED (PUBLIC AND PRIVATE) STORM CONVEYANCE SYSTEMS SHALL BE INSPECTED BY MEANS OF REMOTE CCTV ACCORDING TO THE CITY STANDARD PLAN 266.00. CCTV INSPECTIONS AND REPORTS SHALL BE SUBMITTED TO THE CITY PRIOR TO RECEIVING APPROVAL TO INSTALL PROJECT CURBS, GUTTERS AND/OR PAVEMENT. 19.ALL STORM SYSTEMS AND CONNECTIONS TO EXISTING MAINS SHALL BE TESTED IN ACCORDANCE WITH SECTION 7-04.3(1) OF THE WSDOT STANDARD SPECIFICATIONS AND IN THE PRESENCE OF A REPRESENTATIVE OF THE CITY. STORM DRAIN STUBS SHALL BE TESTED FOR ACCEPTANCE AT THE SAME TIME THE MAIN STORM IS TESTED. 20.FOR ALL DISTURBED PERVIOUS AREAS (COMPACTED, GRADED, LANDSCAPED, ETC.) OF THE DEVELOPMENT SITE, TO MAINTAIN THE MOISTURE CAPACITY OF THE SOIL EITHER STOCKPILE AND REDISTRIBUTE THE EXISTING DUFF LAYER AND NATIVE TOPSOIL OR AMEND THE SOIL WITH COMPOST IN ACCORDANCE WITH STANDARD PLAN 264.00. 21.ADEQUATE SAFEGUARDS, SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER ACTIONS NEEDED TO PROTECT THE LIFE, HEALTH, AND SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK SHALL BE PROVIDED. ANY WORK WITHIN THE TRAVELED RIGHT-OF-WAY THAT MAY INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE A TRAFFIC CONTROL PLAN APPROVED BY THE CITY. ALL SECTIONS OF THE WSDOT STANDARD SPECIFICATIONS 1-10 TEMPORARY TRAFFIC CONTROL SHALL APPLY. 22.MINIMUM COVER OVER STORM DRAINAGE PIPE SHALL CONFORM TO TABLE 4.2.1.A2 OF THE RENTON SWDM. 23.CONTRACTOR SHALL PROVIDE CONTINUOUS ACCESS WITHIN THE ACCESS EASEMENT SHOWN ON SHEET C1 IN ACCORDANCE WITH TEMPORARY TRAFFIC CONTROL SPECIAL PROVISION 1-10.2(1). Sa v e D a t e : Plo t D a t e : 3/ 3 / 2 0 2 5 1 : 3 8 P M 3/ 3 / 2 0 2 5 3 : 1 4 P M By : Cg b P:\ R \ R E N T 0 0 0 0 1 9 0 3 \ 0 4 0 0 C A D \ W A \ S H E E T S \ E C - G N - R E N T 1 9 0 3 . d w g Ch a d B o o t h By : Fil e : SHEET NO. DATE:REVIEWED BY: DATENO.REVISION CKBY FILE NO. PROJECT NO.SEC: TWP: RGE: DATUM: HOR: VERT: CHECKED BY: DESIGNED BY: DRAWN BY: ® 14432 SE Eastgate Way Suite 400 Bellevue, WA 98007 Phone: 425.519.6500 Draft Design Report Submittal CITY OF RENTON, WASHINGTON Springbrook Terrace Water Quality Retrofit CAG-24-081 RENT00001903 NAD 83 WA S.P. N NAVD 88 06 22N 5E ASR CGB WDM NOT FOR CONSTRUCTION STANDARD ESC NOTES G4 STANDARD EROSION AND SEDIMENT CONTROL (ESC) NOTES: 1.THE BOUNDARIES OF THE CLEARING LIMITS, SENSITIVE AREAS AND THEIR BUFFERS, AND AREAS OF VEGETATION PRESERVATION AND TREE RETENTION AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY DELINEATED BY FENCING AND PROTECTED IN THE FIELD IN ACCORDANCE WITH APPENDIX D OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL (RENTON SWDM) PRIOR TO THE START OF CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION. 2.STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK-OUT TO PAVED AREAS DOES NOT OCCUR FOR THE DURATION OF THE PROJECT. IF SEDIMENT IS TRACKED OFFSITE, PAVED AREAS SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY, OR MORE FREQUENTLY DURING WET WEATHER, AS NECESSARY TO PREVENT SEDIMENT FROM ENTERING WATERS OF THE STATE. 3.WASHOUT OF CONCRETE TRUCKS SHALL BE PERFORMED OFF-SITE OR IN DESIGNATED CONCRETE WASHOUT AREAS ONLY. DO NOT WASH OUT CONCRETE TRUCKS ONTO THE GROUND, INTO STORM DRAINS, OR OPEN DITCHES. ON- SITE DUMPING OF EXCESS CONCRETE SHALL ONLY OCCUR IN DESIGNATED CONCRETE WASHOUT AREAS. 4.ALL REQUIRED ESC BMPS SHALL BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL ESC BMPS SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON-SITE EROSION HAS PASSED. ALL ESC BMPS SHALL BE REMOVED AFTER CONSTRUCTION IS COMPLETED AND THE SITE HAS BEEN STABILIZED TO ENSURE POTENTIAL FOR ON-SITE EROSION DOES NOT EXIST. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT, ENHANCEMENT, AND REMOVAL OF ESC BMPS SHALL BE THE RESPONSIBILITY OF THE APPLICANT. 5.ANY HAZARDOUS MATERIALS OR LIQUID PRODUCTS THAT HAVE THE POTENTIAL TO POLLUTE RUNOFF SHALL BE DISPOSED OF PROPERLY. 6.THE ESC BMPS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE CONTRACTOR SHALL ANTICIPATE THAT MORE ESC BMPS WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE CONTRACTOR TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL ESC BMPS, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM. 7.ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST THROUGH APRIL 30TH) OR SEVEN DAYS DURING THE DRY SEASON ( MAY 1ST THROUGH SEPTEMBER 30TH) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.) IN CONFORMANCE WITH APPENDIX D OF THE RENTON SWDM. 8.WET SEASON ESC REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES BETWEEN OCTOBER 1ST AND APRIL 30TH, UNLESS OTHERWISE APPROVED BY THE CITY. 9.ANY AREA NEEDING ADDITIONAL ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS. 10.THE ESC BMPS ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED AT A MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT. INSPECTION AND MAINTENANCE SHALL OCCUR MORE FREQUENTLY AS REQUIRED BY THE CITY. 11.BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, CATCH BASIN INSERTS PER THE CITY STANDARD PLAN 216.30 SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR CONSTRUCTION AREA, UNLESS THE RUNOFF THAT ENTERS THE INLET WILL BE CONVEYED TO A SEDIMENT POND OR TRAP. ALL CATCH BASIN INSERTS SHALL BE PERIODICALLY INSPECTED AND REPLACED AS NECESSARY TO ENSURE FULLY FUNCTIONING CONDITION. 12.AT NO TIME SHALL SEDIMENT ACCUMULATION EXCEED 2/3 OF THE CAPACITY OF THE CATCH BASIN SUMP. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT-LADEN WATER INTO THE DOWNSTREAM SYSTEM. 13.ANY PERMANENT STORMWATER FACILITY LOCATION USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY ESC BMPS AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE TEMPORARY FACILITY IS TO ULTIMATELY FUNCTION AS AN INFILTRATION SYSTEM IN ITS PERMANENT STATE, THE TEMPORARY FACILITY SHALL BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY. 14.PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, THE PROJECT SITE SHALL BE STABILIZED TO PREVENT SEDIMENT-LADEN WATER FROM LEAVING THE PROJECT SITE, ALL ESC BMPS SHALL BE REMOVED, AND STORMWATER CONVEYANCE SYSTEMS, FACILITIES, AND ON-SITE BMPS SHALL BE RESTORED TO THEIR FULLY FUNCTIONING CONDITION. ALL DISTURBED AREAS OF THE PROJECT SITE SHALL BE VEGETATED OR OTHERWISE PERMANENTLY STABILIZED. AT A MINIMUM, DISTURBED AREAS SHALL BE SODDED OR SEEDED AND MULCHED TO ENSURE THAT SUFFICIENT COVER WILL DEVELOP SHORTLY AFTER FINAL APPROVAL. MULCH WITHOUT SEEDING IS ADEQUATE FOR AREAS TO BE LANDSCAPED BEFORE OCTOBER 1ST. 210 SS ( R ) SS SS SS SS SS SS SS SS SS SD SD SD SD SD SD SD SD SD SD SD S D S D S D SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD G P P P P P P T T T T T T T T x x x x x x x x x x x x xxxxxxxx x x x x x x x x x x x x x x x x x TV TV TV W W W W W W W W G G G TV T P P P P TV TV TV TV T T T T T T P P P P P P Px x x x x x x x x x x xxx W W S S SD D 8557200190 7941200010 7941200020 7941200030 7941200230 794120TRCT 195190 185 190 200 HVAC DECK 2 STORY BUILDING CW CW CW CG CW CW CG CONC DW ASPH DWASPH P A R K I N G L O T GRA S S SHED CG CG CWASPH ASPH PA GRASS EP EP EC C E C C ECC EP PA PA CONC WALL S42 ° 1 2 ' 0 7 " E 22.1 7 ' S00°23'08"W 126.99' S00°23'08"W 29.56' S30°20'10"E 40.05' S05°28'09"E 16.10' S89°36'52"E 22.90' N00°09'56"E 223.32' N89°36'52"W 59.15' 190 195 185 205 215 Sa v e D a t e : Plo t D a t e : 3/ 3 / 2 0 2 5 1 : 3 8 P M 3/ 3 / 2 0 2 5 3 : 1 5 P M By : Cg b P:\ R \ R E N T 0 0 0 0 1 9 0 3 \ 0 4 0 0 C A D \ W A \ S H E E T S \ E C - E X - R E N T 1 9 0 3 . d w g Ch a d B o o t h By : Fil e : SHEET NO. DATE:REVIEWED BY: DATENO.REVISION CKBY FILE NO. PROJECT NO.SEC: TWP: RGE: DATUM: HOR: VERT: CHECKED BY: DESIGNED BY: DRAWN BY: ® 14432 SE Eastgate Way Suite 400 Bellevue, WA 98007 Phone: 425.519.6500 Draft Design Report Submittal CITY OF RENTON, WASHINGTON Springbrook Terrace Water Quality Retrofit CAG-24-081 RENT00001903 NAD 83 WA S.P. N NAVD 88 06 22N 5E ASR CGB WDM NOT FOR CONSTRUCTION EXISTING CONDITIONS C1 98TH A V E S 10' DRAINAGE EASEMENT PER AFN 198507020780 SANITARY SEWER EASEMENT PER AFN 8412140947 10' D R A I N A G E E A S E M E N T PER A F N 1 9 8 5 0 7 0 2 0 7 8 0 ACC E S S E A S E M E N T PER A F N 1 9 8 5 0 7 0 2 0 7 8 0 PROJECT SITE PARCEL BOUNDARY CB TYPE 2 RIM=210.78 12" CMP SE IE=203.2 12" CMP N IE=203.2 12" CMP W IE-203.1 CB TYPE 1 RIM=200.17 12" CMP E IE=197.0 12" CMP SW IE=196.9 CB TYPE 1 RIM=200.41 8" CMP NW IE=198.1 BLIND TIE TO NW PER RECORDS CB TYPE 2 RIM=190.90 21" CMP SE IE=185.7 21" CMP N IE=185.7 CULVERT 12" RCP N IE=187.44 CULVERT 21" CMP NW IE=186.66 CULVERT 15" CMP E IE=191.84 CB TYPE 2 RIM=212.55 6" PVC E IE=208.8 15" CMP S IE=197.8 15" CMP W IE=197.7 SSMH RIM=190.49 6" PVC NE IE=182.4 8" PVC S IE=183.1 BUILDING CORNER TRANSFORMER BOX CHAIN LINK FENCE EX. PIPE SLOPE 0.51% Feet 0 20 40 10' DRAINAGE EASEMENT PER AFN 198507020780 SS ( R ) SS SS SS SS SS SS SS SS SS SD SD SD SD SD SD SD SD SD SD SD S D S D S D SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD G P P P P P P T T T T T T T T x x x x x x x x x x x x xxxxxxxx x x x x x x x x x x x x x x x x x TV TV TV W W W W W W W W G G G TV T P P P P TV TV TV TV T T T T T T P P P P P P Px x x x x x x x x x x xxx W W S S SD D185 190 190 190 195 187 195 20 0 205 210 21 5 P Sa v e D a t e : Plo t D a t e : 3/ 3 / 2 0 2 5 1 : 4 3 P M 3/ 3 / 2 0 2 5 3 : 1 5 P M By : Cg b P:\ R \ R E N T 0 0 0 0 1 9 0 3 \ 0 4 0 0 C A D \ W A \ S H E E T S \ E C - D M - R E N T 1 9 0 3 . d w g Ch a d B o o t h By : Fil e : SHEET NO. DATE:REVIEWED BY: DATENO.REVISION CKBY FILE NO. PROJECT NO.SEC: TWP: RGE: DATUM: HOR: VERT: CHECKED BY: DESIGNED BY: DRAWN BY: ® 14432 SE Eastgate Way Suite 400 Bellevue, WA 98007 Phone: 425.519.6500 Draft Design Report Submittal CITY OF RENTON, WASHINGTON Springbrook Terrace Water Quality Retrofit CAG-24-081 RENT00001903 NAD 83 WA S.P. N NAVD 88 06 22N 5E ASR CGB WDM NOT FOR CONSTRUCTION ESC AND DEMOLITION PLAN & DETAILS C2 Feet 0 20 40 98TH A V E S LEGEND INLET PROTECTION SILT FENCE 1.CONSTRUCT SILT FENCE PER COR STD DETAIL 214.00. SILT FENCE SHALL BE INSTALLED PRIOR TO ANY EARTH DISTURBING ACTIVITIES. 2.INSTALL INLET PROTECTION PER COR STD DETAIL 216.30. INLET PROTECTION SHALL BE INSTALLED PRIOR TO ANY EARTHE DISTURBING ACTIVITIES. 3.THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD THE CONTRACTOR SHALL MODIFY THIS TESC PLAN TO ACCOMMODATE CHANGES TO THE PROJECT SITE AND STORM EVENTS. 4.CONSTRUCT STABILIZED CONSTRUCTION ENTRANCE PER COR STD DETAIL 215.10. 5.CONSTRUCT SEDIMENT TRAP PER COR STD DETAIL 211.00 TO THE MAXIMUM EXTENT THE SITE ALLOWS. 6.PROVIDE TEMPORARY PUMPING AS NEEDED TO CONVEY POND INFLOWS TO EXISTING POND OUTLET DRAINAGE STRUCTURE. TEMPORARY EROSION CONTROL CONSTRUCTION NOTES REMOVE 15 FEET OF EXISTING STORM SEWER PIPE REMOVE 38 FEET OF EXISTING WOODEN FENCE REMOVE 203 FEET OF EXISTING CHAIN LINK FENCE (INCLUDING GATES) REMOVE 22 FEET OF EXISTING STORM SEWER PIPE SALVAGE EXISTING SIGN 1.ALL ITEMS CALLED OUT FOR REMOVAL SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND MUST BE DISPOSED OF OFFSITE. 2.APPROXIMATE MEASUREMENTS OF ITEMS TO BE REMOVED ARE PROVIDED FOR CONVENIENCE. THE REMOVAL OF ALL ITEMS SHALL BE PAID FOR UNDER THE LUMP SUM BID ITEM REMOVAL OF STRUCTURES AND OBSTRUCTIONS AND NOT PAID FOR ON AN INDIVIDUAL MEASURABLE BID ITEM BASIS. DEMOLITION CONSTRUCTION NOTES STABILIZED CONSTRUCTION ENTRANCE HIGH-VISIBILITY FENCE DECOMISSION EXISTING GROUNDWATER MONITORING WELL CLEAR AND GRUB TREE TEMPORARY PUMPING SEDIMENT TRAP SS ( R ) SS SS SS SS SS SS SS SS SS SD SD SD SD SD SD SD SD SD SD SD S D S D S D SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD G P P P P P P T T T T T T T T x x x x x x x x x x x x xxxxxxxx x x x x x x x x x x x x x x x x x TV TV TV W W W W W W W W G G G TV T P P P P TV TV TV TV T T T T T T P P P P P P Px x x x x x x x x x x xxx W W S S SD D 187 190 195 200 190 185 205 185 SDMH #1, 48" TYPE 1 N: 159732.23 E: 1299560.05 RIM: 191.75 IE: 188.90 (12" N) IE: 188.30 (12" S) CONNECT TO EXISTING CMP DRAINAGE PIPE 19 LF 12" PP SDCB #4, 54" N: 159723.77 E: 1299540.22 RIM: 190.80 IE: 189.00 (12" SE) IE: 185.90 (8" SE) IE: 185.80 (15" N) 8 LF 15" PP 15 LF 8" PP VALVE AT D/S END 15 LF 12" RCP 190 185 185 190 195 200 Sa v e D a t e : Plo t D a t e : 3/ 3 / 2 0 2 5 2 : 3 1 P M 3/ 3 / 2 0 2 5 3 : 1 6 P M By : Cg b P:\ R \ R E N T 0 0 0 0 1 9 0 3 \ 0 4 0 0 C A D \ W A \ S H E E T S \ E C - S T - R E N T 1 9 0 3 . d w g Ch a d B o o t h By : Fil e : SHEET NO. DATE:REVIEWED BY: DATENO.REVISION CKBY FILE NO. PROJECT NO.SEC: TWP: RGE: DATUM: HOR: VERT: CHECKED BY: DESIGNED BY: DRAWN BY: ® 14432 SE Eastgate Way Suite 400 Bellevue, WA 98007 Phone: 425.519.6500 Draft Design Report Submittal CITY OF RENTON, WASHINGTON Springbrook Terrace Water Quality Retrofit CAG-24-081 RENT00001903 NAD 83 WA S.P. N NAVD 88 06 22N 5E ASR CGB WDM NOT FOR CONSTRUCTION SITE PLAN C3 Feet 0 20 40 98TH A V E S INSTALL PERMANENT PUBLIC STORMWATER SIGN 3:1 3: 1 3:1 6:1 BOTTOM OF POND, EL 184.25 ACCESS ROAD AT 20% MAX SLOPE TOP OF POND, EL 190.0 C4 2BEGIN EMERGENCY SPILLWAY IE = 189.65 GRADE SPILLWAY EDGES TO ADJACENT FINISH GRADE END EMERGENCY SPILLWAY TIE INTO EXISTING AT ELEV 189.00 POND INLET PROTECTION IE 186.75 IE 186.00 CONNECT TO EXISTING DRAINAGE STRUCTURE IE: 185.70 (15" E) PLUG EXISTING PIPE CONNECTION IN EXISTING STRUCTURE AFTER EXISTING PIPE IS REMOVED IN ACCORDANCE WITH STANDARD SPECIFICATION 7-08.3(4). LEGEND PROPOSED CHAIN LINK FENCE 1.CONSTRUCT GRAVEL POND ACCESS ROAD PER COR STD DETAIL 234.50 AT THE GRADE, ELEVATION, AND WIDTHS SHOWN ON THIS PLAN SHEET. 2.CONSTRUCT 6-FOOT TALL CHAIN LINK FENCE AND 6-FOOT TALL CHAIN LINK FENCE GATE PER COR STD DETAIL 234.60 AND COR STD DETAIL 234.70. 3.CONSTRUCT 18-INCH THICK LAYER OF LOW PERMEABILITY COMPACTED TILL LINER TO EXTENTS SHOWN ON THIS SHEET PER SPECIAL PROVISIONS AND DETAIL ON SHEET C4. 4.RESTORE ALL DISTURBED AREAS OF PROJECT NOT PROPOSED TO BE IMPERVIOUS SURFACE WITH A 4-INCH THICK LAYER OF TOPSOIL TYPE A AND ACHIEVE REVEGETATION WITH HYDROSEED. 5.SALVAGE AND REINSTALL PERMANENT PUBLIC STORMWATER SIGN PER COR STD DETAIL 234.30. SIGN SHALL BE INSTALLED ON THE PROPOSED CHAIN LINK FENCE. 6.STORM SEWER LENGTHS ARE MEASURED BETWEEN CENTERS OF MANHOLES AND CATCH BASINS UNLESS OTHERWISE NOTED. 7.CONSTRUCT SDCB #4 PER OUTLET STRUCTURE DETAIL ON SHEET C4. 8.POND INLET SPILLWAY AND POND EMERGENCY SPILLWAY SHALL BE CONSTRUCTED PER DETAILS ON SHEET C4. 9.QUARRY SPALLS FOR PERMANENT EROSION CONTROL SHALL BE PLACED IN A LAYER 12 INCHES THICK. CONSTRUCTION GEOTEXTILE FOR PERMANENT EROSION CONTROL PER WSDOT STD SPECIFICATION 9-33 SHALL BE PLACED UNDER THE QUARRY SPALLS. 10.ALL PROPOSED STORM SEWER PIPE SHALL BE POLYPROPYLENE PIPE (PP), REINFORCED CONRETE PIPE (RCP), OR APPROVED EQUAL. 11.EXISTING 6" PVC SANITARY SEWER ELEVATIONS ARE PER RECORD DRAWINGS. THE CONTRACTOR SHALL VERIFY THE ACTUAL ELEVATION AND NOTIFY THE ENGINEER BEFORE CONSTRUCTING PROPOSED STORM SEWER. CONSTRUCTION NOTES POND ACCESS ROAD ECOBLOCK WALL CHAIN LINK FENCE GATE LOW PERMEABILITY COMPACTED TILL LINER EXTENTS EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR C4 3 PROPOSED STORM SEWER STRUCTURE PROPOSED STORM SEWER PIPE QUARRY SPALLS FOR PERMANENT EROSION CONTROL EX. CB TYPE 2 RIM=190.90 21" CMP SE IE=185.7 21" CMP N IE=185.7 PROTECT EXISTING FLOW CONTROL FEATURES GROUNDWATER MONITORING WELL POND INLET PROTECTION IE 187.00 GRAVEL PARKING AREA PROTECT EXISTING INLET TOP OF ECOBLOCK WALL, EL 189.75 GRAVEL PARKING AREA PROTECT EXISTING SEWER PIPES R10 ' 10 . 5 ' (T Y P . ) 180 190 200 180 190 200 0+00 0+50 0+50 180 190 200 180 190 200 0+00 0+50 1+00 1+50 0+50 1+00 1+50 Sa v e D a t e : Plo t D a t e : 3/ 3 / 2 0 2 5 2 : 2 3 P M 3/ 3 / 2 0 2 5 3 : 1 6 P M By : Cg b P:\ R \ R E N T 0 0 0 0 1 9 0 3 \ 0 4 0 0 C A D \ W A \ S H E E T S \ E C - D R - D T - R E N T 1 9 0 3 . d w g Ch a d B o o t h By : Fil e : SHEET NO. DATE:REVIEWED BY: DATENO.REVISION CKBY FILE NO. PROJECT NO.SEC: TWP: RGE: DATUM: HOR: VERT: CHECKED BY: DESIGNED BY: DRAWN BY: ® 14432 SE Eastgate Way Suite 400 Bellevue, WA 98007 Phone: 425.519.6500 Draft Design Report Submittal CITY OF RENTON, WASHINGTON Springbrook Terrace Water Quality Retrofit CAG-24-081 RENT00001903 NAD 83 WA S.P. N NAVD 88 06 22N 5E ASR CGB WDM NOT FOR CONSTRUCTION DRAINAGE DETAILS AND SECTIONS C4 2-YEAR WSE = 189.48 SDCB #4 54" DIA. TYPE 2 CB W/ SOLID LID VALVE 8" GRAVITY DRAIN 18" 3.5'x0.5' (LxH) STRUCTURE OPENING W/ 3/4" BARS SPACED 4" O.C. IE = 189.39 SCALE: OUTLET STRUCTURE SECTION N.T.S. 1 C4 WQ DESIGN VOLUME = 6,955 CF 100-YEAR WSE AND EMERGENCY SPILLWAY = 189.65 OVERFLOW WSE = 189.39 WQ DESIGN WSE = 189.00 12" OUTLET PIPE IE 185.90 IE 186.00 IE 185.80 RIM EL 190.80 IE 186.75 IE 189.00 SCALE: WEST-EAST POND SECTION N.T.S. 2 C4 SEDIMENT STORAGE TOP ELEVATION = 184.75 LOW PERMEABILITY COMPACTED TILL LINER 18" EXISTING GROUND FINISH GROUND WQ DESIGN WSE = 189.00 SCALE: SOUTH-NORTH POND SECTION N.T.S. 3 C4 TOP OF SEDIMENT STORAGE ELEVATION = 184.75 LOW PERMEABILITY COMPACTED TILL LINER 18" EXISTING GROUND FINISH GROUND WQ DESIGN WSE = 189.00 SCALE: POND EMERGENCY SPILLWAY N.T.S. 5 C4SCALE: POND INLET PROTECTION N.T.S. 4 C4 12" QUARRY SPALLS SUBGRADE PREPARED PER WSDOT STD. SPEC. 2-12 SUBGRADE PREPARED PER WSDOT STD. SPEC. 2-12 FINISH GROUND (VARIES) 12" QUARRY SPALLS 9' 4' CONSTRUCTION GEOTEXTILE FOR PERMANENT EROSION CONTROL PER WSDOT STD SPEC. 9-33 CONSTRUCTION GEOTEXTILE FOR PERMANENT EROSION CONTROL PER WSDOT STD SPEC. 9-33 4" 3:1 (TY P . ) 15" OUTLET PIPE SUMP EL. 183.80 IE 185.70 EX. FLOW CONTROL STRUCTURE EX. OUTLET PIPE TOP OF ECOBLOCK WALL ELEVATION = 189.75 TOP OF ECOBLOCK WALL ELEVATION = 189.75 EX. OVERFLOW ORIFICE EX. TEE SECTION SHEAR GATE IE 185.70 2-YEAR WSE = 189.48 POND BOTTOM ELEVATION = 184.25 BOTTOM OF ECOBLOCK WALL ELEVATION = 181.75 POND BOTTOM ELEVATION = 184.25WALL AND AGGREGATE FOUNDATION NOT SHOWN BELOW GRADE FOR CLARITY FINISH GRADE PER SHEET C3 - SITE PLAN x x x x x x x x x x x x x x x xxxxxxxxxxxxxxx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xx Sa v e D a t e : Plo t D a t e : 3/ 3 / 2 0 2 5 2 : 2 5 P M 3/ 3 / 2 0 2 5 3 : 1 7 P M By : Cg b P:\ R \ R E N T 0 0 0 0 1 9 0 3 \ 0 4 0 0 C A D \ W A \ S H E E T S \ E C - D T - R E N T 1 9 0 3 . d w g Ch a d B o o t h By : Fil e : SHEET NO. DATE:REVIEWED BY: DATENO.REVISION CKBY FILE NO. PROJECT NO.SEC: TWP: RGE: DATUM: HOR: VERT: CHECKED BY: DESIGNED BY: DRAWN BY: ® 14432 SE Eastgate Way Suite 400 Bellevue, WA 98007 Phone: 425.519.6500 Draft Design Report Submittal CITY OF RENTON, WASHINGTON Springbrook Terrace Water Quality Retrofit CAG-24-081 RENT00001903 NAD 83 WA S.P. N NAVD 88 06 22N 5E ASR CGB WDM NOT FOR CONSTRUCTION MISC. CIVIL DETAILS (SHEET 1 OF 2) C5 A B C E 67.1' 56.1' 13.8' 29.9' D 2. 9 ' 14 . 8 ' 37.3' 6. 0 ' 15 . 4 ' 2. 7 ' 1 5 . 8 ' 22 . 6 ' TOP OF WATER QUALITY POND EL 189.00 BOTTOM OF WATER QUALITY POND EL 184.75 BOTTOM OF POND EL 184.25WATER QUALITY POND MID-DEPTH EL 186.88 Feet 0 20 40 WATER QUALITY FLOWPATH LENGTH TO WIDTH FIGURE NOTE: THIS FIGURE IS TO DEMONSTRATE COMPLIANCE WITH WA DEPARTMENT OF ECOLOGY WATER QUALITY STANDARDS AND NOT FOR CONSTRUCTION PURPOSES. FLOW PATH (TYP.) Sa v e D a t e : Plo t D a t e : 3/ 3 / 2 0 2 5 2 : 2 5 P M 3/ 3 / 2 0 2 5 3 : 1 7 P M By : Cg b P:\ R \ R E N T 0 0 0 0 1 9 0 3 \ 0 4 0 0 C A D \ W A \ S H E E T S \ E C - D T - R E N T 1 9 0 3 . d w g Ch a d B o o t h By : Fil e : SHEET NO. DATE:REVIEWED BY: DATENO.REVISION CKBY FILE NO. PROJECT NO.SEC: TWP: RGE: DATUM: HOR: VERT: CHECKED BY: DESIGNED BY: DRAWN BY: ® 14432 SE Eastgate Way Suite 400 Bellevue, WA 98007 Phone: 425.519.6500 Draft Design Report Submittal CITY OF RENTON, WASHINGTON Springbrook Terrace Water Quality Retrofit CAG-24-081 RENT00001903 NAD 83 WA S.P. N NAVD 88 06 22N 5E ASR CGB WDM NOT FOR CONSTRUCTION MISC. CIVIL DETAILS (SHEET 2 OF 2) C6 TO BE COMPLETED AT 90% SS SS SS SS SD SD SD SD SD SD SD SD S D SD SD SD SD SD SD SD SD SD P TT x x x x x xxxx x x x x x x x x TV W P P PT TP P x x x x x x x S S D D 8557200190 7941200010 7941200020 7941200030 7941200230 794120TRCT 7941200040 7941200160 7931000153 7941200170 7941200150 7941200140 7941200050 7941200060 Sa v e D a t e : Plo t D a t e : 3/ 3 / 2 0 2 5 2 : 3 2 P M 3/ 3 / 2 0 2 5 3 : 1 7 P M By : Cg b P:\ R \ R E N T 0 0 0 0 1 9 0 3 \ 0 4 0 0 C A D \ W A \ S H E E T S \ E C - H Z - R E N T 1 9 0 3 . d w g Ch a d B o o t h By : Fil e : SHEET NO. DATE:REVIEWED BY: DATENO.REVISION CKBY FILE NO. PROJECT NO.SEC: TWP: RGE: DATUM: HOR: VERT: CHECKED BY: DESIGNED BY: DRAWN BY: ® 14432 SE Eastgate Way Suite 400 Bellevue, WA 98007 Phone: 425.519.6500 Draft Design Report Submittal CITY OF RENTON, WASHINGTON Springbrook Terrace Water Quality Retrofit CAG-24-081 RENT00001903 NAD 83 WA S.P. N NAVD 88 06 22N 5E ASR CGB WDM NOT FOR CONSTRUCTION SURVEY, HORIZONTAL CONTROL, AND SITE ACCESS PLAN C7 Feet 0 40 80 98TH A V E S SURVEY NOTES UTILITIES MAPPING: ALL EXISTING UTILITIES SHOWN HEREIN ARE TO BE VERIFIED HORIZONTALLY AND VERTICALLY PRIOR TO ANY CONSTRUCTION. ALL EXISTING FEATURES INCLUDING BURIED UTILITIES ARE SHOWN AS INDICATED BY RECORD LOCATION OR FIELD TIED AS A RESULT OF A UTILITY PAINT-OUT DURING THE COURSE OF THE FIELD SURVEY. DAVID EVANS & ASSOCIATES, INC. (DEA) ASSUMES NO LIABILITY FOR THE ACCURACY OF THE RECORD INFORMATION. FOR THE FINAL LOCATION OF THE EXISTING UTILITIES IN AREAS CRITICAL TO CONSTRUCTION, CONTACT THE UTILITY OWNER/AGENCY AND UTILITIES UNDERGROUND CENTER. TOPOGRAPHIC MAPPING: THE MAP SHOWN HEREON IS THE RESULT OF A TOPOGRAPHIC SURVEY BY DAVID EVANS & ASSOCIATES, INC. (DEA) COMPLETED IN AUGUST 2024. DEA ASSUMES NO LIABILITY, BEYOND SAID DATE, FOR ANY FUTURE SURFACE FEATURE MODIFICATIONS OR CONSTRUCTION ACTIVITIES THAT MAY OCCUR WITHIN OR ADJOINING THE PERIMETER OF THIS SURVEY. CONTACT DEA FOR SITE UPDATES AND VERIFICATIONS. HORIZONTAL DATUM: WASHINGTON STATE COORDINATE SYSTEM, NORTH ZONE NAD83, US FEET. VERTICAL DATUM: NORTH AMERICAN VERTICAL DATUM 1988 (NAVD88), US FEET. NOTES: THIS EXISTING BASE MAP WAS PREPARED FROM A SURVEY DRAWING PREPARED BY DAVID EVANS AND ASSOCIATES INC., SURVEYED IN AUGUST 2024, WITH MODIFICATIONS BASED ON FIELD OBSERVATIONS BY DEA STAFF. SURVEY CONTROL PT #DESCRIPTION NORTHING EASTING ELEVATION 1-3/4" BRASS DISC IN CONC MONUMENT 159588.78 1299689.07 211.75 1-3/4" BRASS DISC IN CONC MONUMENT 159824.90 1299660.90 212.79 MONUMENT (CENTER OF LID)159939.00 1299628.73 NOT AVAILABLE 1-3/4" BRASS DISC IN CONC MONUMENT 159969.08 1299629.60 210.68 1 2 3 4 1 2 3 4 S 5 5 T H S T ACCESS EASEMENT FROM CITY RIGHT-OF-WAY TO PROJECT SITE 98TH PL S CENTERLINE 98TH AVE S CENTERLINE