Appendix A
July 8, 2025, Hearing Transcript
Fountain Hope Ministries International Church Conditional Use Permit
File No. – LUA25-000077
Note: This is a computer-generated transcript provided for informational purposes only. The reader
should not take this document as 100% accurate or take offense at errors created by the limitations of
the programming in transcribing speech. A recording of the hearing is available from the City should
anyone need an accurate rendition of the hearing testimony.
Speaker 1 (00:00):
Recorder is going
Speaker 2 (00:06):
Recording in progress.
Speaker 1 (00:07):
There we go. Yeah, that comes in nice and loud. Alright. Good morning everybody. It's July 8th, 2025,
11:00 AM I'm alb Break the hearing examiner for the City of Renton holding a hearing this morning on a
conditional use permit application for the Fountain of Hope Ministries International Church. They'll be
taking up the space of an existing building. This is PR 25 dash 0 0 0 0 2 3. The hearing format today is
we'll have a presentation from staff and it looks like that's Ms. Dingus. It will give us an overview of the
project once she's finished, then we'll move on to applicant comments. Anyone on the applicant team
who wants to speak in favor of their project, they'll have that chance. After that, then we'll move on to
public comments and that'll be anybody else who wants to speak and that would include if there are
attending members of the church or something that want to say something, that'd be your chance. After
all that, we'll go back to Ms. Sting to answer any questions people had and to present any rebuttal
evidence she finds necessary. Then applicant gets final word, they get final chance to present rebuttal
evidence and make final comments. And after that I get a couple weeks, 10 business days to issue a final
decision. So by state law I'm only allowed to consider evidence that's put into the record. And I'm going
to share my screen real quick too.
(01:26):
Pardon?
Speaker 2 (01:27):
I have them ready.
Speaker 1 (01:28):
Oh, okay. You go ahead then. Sure. Alright, so there we go. We got a total of 11 documents. The first, is
it the environmental review committee report? That was to determine whether an environmental
impact statement was necessary for the project or any environmental impacts had to be mitigated and
we have plans for the design of the remodel, that kind of thing. Utilities, we have the environmental
review determination, which was no environmental impact statement was necessary. We have
Appendix A - Fountain of Hope 7 (Completed 07/08/25)
Transcript by Rev.com
Page 2 of 5
comment letters from the Duwamish tribe and the city response comment letter from the wastewater
treatment division of King County Transportation Analysis and City Responses to the King County
Wastewater Treatment Division. So total of 11 documents at this point. Just need to ask if anyone needs
to see any of these documents or has any objection to their entry. No, we got a few more there. The
staff report that determination, nons significance, that's the determination.
(02:23):
No environmental impact statement is necessary. And we have a project narrative that goes over what
the project is about. Title reports, how the criteria for conditional use are met and then some hearing
notices. Alright. And then do you still have more Ms Cisneros? The other three? Yeah, there we go. The
staff PowerPoint, the City of Renton Maps, which is available at the website for the project site and then
Google Earth as well, which gives us aerial maps. So all that, that's all the information Ms. Sting found
necessary to support her recommendation and for me to review. Does anyone need to see any of those
documents or have any objections to their entry in the record? If you do, just click on the raise hand
button at the bottom of your screen and let's see if there are any takers there. I'm not seeing any
objections or request to see, which is pretty standard. So we'll go ahead and admit exhibits one through
18, Ms. Thing, I'll swear you in at this point. Just raise your right hand. Do you swear affirm to tell the
truth, nothing but the truth in this proceeding? I
Speaker 3 (03:17):
Do.
Speaker 1 (03:17):
Okay, great. Go ahead.
Speaker 3 (03:20):
Thank you Mr. Examiner. See I'll, okay, hopefully you all are seeing my PowerPoint presentation. Please
speak up if you are not, it's not, what is it coming up as?
Speaker 2 (03:58):
All right, let me try again. Let's try this.
Speaker 1 (04:18):
There you go. Great.
Speaker 3 (04:20):
Is that working now?
Speaker 1 (04:21):
Yes.
Speaker 3 (04:22):
Okay, excellent. So good morning everyone. My name is Jill Ding. I am a senior planner here with the city
of Renton and I am here to present the staff recommendation for the Fountain of Hope Ministries
International Church. That is file number LU a 25 dash 0 0 0 7 7. Just to start off with a brief description
Appendix A - Fountain of Hope 7 (Completed 07/08/25)
Transcript by Rev.com
Page 3 of 5
of the proposal, the applicant is requesting a hearing examiner conditional use permit to establish a
religious institution in downtown Renton at 3 0 3 South third Street. The project site is currently zoned
center downtown or cd. It is about 0.64 acres in area and is comprised of a total of two parcels, high
seismic hazard areas and a downtown wellhead protection area. Zone two are mapped on site.
(05:25):
The proposal would include the reuse of an existing 7,005 square foot former funeral home. The
retention of an existing 23 surface stall parking lot, the conversion of an existing garage into a
community outreach support space and access would remain via existing curb cuts off of Shaddock
Avenue South as well as South third Street. A 14 day public comment period began on April 8th, 2025
and ended on April 22nd, 2025. We received comments from the Duwamish tribe as well as the King
County Wastewater treatment Division. The Environmental Review Committee issued a CPA
determination of non-significant on June 2nd, 2025. Staff has reviewed the request and found that the
proposal would be consistent with the relevant comprehensive plan land use policies. It would
compliant with all relevant zoning regulations if all conditions of approval are complied with and the
proposal would be compliant with the CUP criteria if all conditions of approval are complied with
availability of public services. The application was routed. Police and fire prevention staff indicate that
sufficient resources exist to furnish services to the proposed development. Water service is provided by
the city of Renton Sewer services also provided by the city of Renton. There are no land disturbing
activities proposed as all the work proposed is generally internal to the site. So it would not be subject
to surface water regulations. The project fronts on South Third Street and Shaddock Avenue South.
However, interior remodels not involving building additions are exempt from street carnage
improvements.
(07:34):
So that concludes my presentation. Staff is recommending approval of the Fountain of Hope Ministries
International Church as depicted in Exhibits two and four, subject to three recommended conditions of
approval.
Speaker 1 (07:49):
Okay, sounds good. Just a couple questions. I think that your staff report mentioned they'll have Friday
night services and there's a restaurant located close by. I mean, did Public Works kind of consider the
traffic impacts there? It sounds like maybe if it's that evening that would be a busy time for the
restaurant as well. I mean, would that create an accumulation of the traffic that might be a problem?
Speaker 3 (08:13):
So got we win here with our developed engineering group, who should be able to answer that question?
Speaker 1 (08:23):
Okay, a letter answer the question. Let's see. I you swear you in there, sir. Do you just raise your hand,
do you swear affirm him to tell the truth, nothing but the truth in this proceeding?
Speaker 2 (08:33):
I do.
Speaker 1 (08:33):
Appendix A - Fountain of Hope 7 (Completed 07/08/25)
Transcript by Rev.com
Page 4 of 5
Okay, great. Go ahead. Yeah, I just was curious if you had looked into that or if you would under normal
circumstances because it looks like kind of peak times for both uses at the same time.
Speaker 4 (08:45):
Yeah, yeah. So development engineering actually did an analysis of that for our IT manual and found
that that was with the proposed change of views, the new use would generate one trip.
Speaker 1 (09:01):
Oh, okay. And you didn't find that significant, it was consistent with the city's level of service standards?
Speaker 2 (09:07):
Yes.
Speaker 1 (09:07):
Okay, perfect. Alright, thanks sir for your testimony. Much appreciated. And then Ms. Dig, just the other
one, your staff report mentions that social services are allowed at that site, but not homeless support
services. Was there any concern about within their use description that there could be a conflict there
or is that something that's been addressed with the applicant?
Speaker 3 (09:31):
I believe it is something that has been addressed with the applicant. We just wanted to clarify that some
of the uses, which could kind of lead from social services into homeless services, we wanted to make it
really clear that it could not be a homeless services facility. Okay. It can meet the definition of a social
service organization, but it can't lead into a shelter or other uses that are limited to that homeless
services
Speaker 1 (10:03):
Definition. Okay. Got it. Great. Okay, thank you. Alright, well let's move on to the applicant's then. Does
anyone want to speak on behalf of the applicants at this point? You don't have to, but now is your
opportunity if you want to take it. Any takers there, just click on the virtual hand at the bottom of your
screen. Let's see if we got any takers out there. Nope, nobody on the applicant team, which is perfectly
fine. Let's move on to then general public comments. If you're a member of the public right now, you
want to say something, now is the time to be heard. Click on the virtual hand at the bottom of your
screen. Pretty straightforward note takers there either. Okay, well if any of you're confused and can't
figure out how to be heard, you can't find that raise hand button. Go ahead and email Ms.
(10:45):
Cisneros before 5:00 PM tomorrow with your comments. Explain that you couldn't figure out how to be
recognized today. And if that's the case, I'll let your comments come in and I'll let the applicant and city
respond to that comment as well. And Mrs. SROs has her email address on video there behind her. It's
Jason sros@rewa.gov. So with that, I guess I can go ahead then and close the hearing. It's pretty
straightforward and oftentimes when you're just replacing a use in a building, it's usually not a huge deal
and it isn't in this case really. So should be an easy approval. We'll get that out and the next couple of
weeks. So thanks all for participating and have a great day. We're adjourned