HomeMy WebLinkAboutRenton RFP - Addendum 1 - Attach D - Revised Draft Base ContractCity of Renton RFP for Solid Waste Services
Addendum 1 – Attachment D. Revised Draft Base Contract
The City of Renton has revised language in three sections of the RFP Draft Base Contract to clarify
services during labor disruptions, routine disposal sites, and services provided to municipal sites.
The revised language appears below and is indicated by redlines.
Section 4.17 Performance Under Labor Disruption – The seventh paragraph of this section is
revised as follows:
If a Labor Disruption lasts more than one (1) three (3) business days Single-family Residential
collection cycle, the Contractor, with the City’s approval, shall provide staffed Containers and
collection vehicles from 9:00 a.m. to 6:00 p.m. for Customer use for each affected material stream
in approved locations throughout the affected route areas, as well as the collection of reasonable
quantities of accumulated materials at no additional charge on the next regular collection cycle for
each material. The Contractor shall report the total tonnage collected at the event for each
material stream by 9 a.m. on the day following each collection event.
Section 11.1 Municipal Services – The first three paragraphs of this section are revised as follows:
The Contractor shall provide weekly Garbage, Recyclables, and Compostables collection to all City
facilities as a part of this Contract and at no additional charge. Those facilities include the
following:
Facility Address
Airport 243, 616, 790 W. Renton Field, 600 Perimeter
Rd.
Cedar River Dog Park 1500 Houser Way S.
City center parking garage 655 S. Second St.
City hall 1055 S. Grady Way
Community center 1715 Maple Valley Hwy.
Gene Coulon Memorial Beach Park 1201 Lake Washington Blvd. N.
Henry Moses Aquatic Center
(waste only collected June through September)
1719 Maple Valley Hwy.
History museum 235 Mill Ave. S.
Maplewood Golf Course 4050 Maple Valley Hwy.
Senior activity center 211 Burnett Ave. N.
Shop for facilities and trails 713 N. First St.
Shop for parks 1100 Bronson Way N.
Shop for public works 3555 NE Second St.
At any time during the term of this Contract, the City may add facilities to those listed above.
Additional City facilities added during the term of the Contract shall also be provided collection,
including new facilities developed within the Service Area and City facilities in future annexation
areas covered by this Contract, provided that no more than six (6) additional facilities are added
over the Term of the Contract without additional compensation to the Contractor.
Regular Garbage, Recyclables, and Compostables generated on an ongoing basis at all City
facilities in the ordinary course of their operations, whether generated by staff or third parties (e.g.,
community groups renting a space at a community center) will be collected by the Contractor
without charge to the City. This includes extra Compostables collection for vegetative storm debris
generated at City facilities and as needed collection of Recyclables Carts used for ad hoc office
clean outs at city hall. Temporary garbage Containers for City services other than the City-
sponsored community events described in Section 11.2 will be paid by the City at the Contractor
rates listed in Exhibit B.
Section 15.3.2 Changes in Disposal or Compostables Processing Sites – This section is revised
as follows to clarify that no compensation adjustment will be made for routine disposal at King
County’s Algona transfer station:
If the Contractor is required by the City or another governmental authority to routinely use a
Garbage disposal site more than ten (10) twelve (12) miles from the Renton city limits, or if the
Contractor is required by the City or another governmental authority to routinely use a
Compostables processing site other than that used at the initiation of this Contract, the Contractor
shall submit a detailed proposal for the adjustment of the Contractor rates to reflect any additional