HomeMy WebLinkAboutTransportation Committee - 21 Jul 2025 - Agenda - Pdf
CITY OF RENTON
AGENDA - Transportation Committee Meeting
6:00 PM - Monday, July 21, 2025
7th Floor Council Conference Room/Videoconference
1. 120-DAY CLOSURE OF HOUSER WAY NORTH BETWEEN LAKE
WASHINGTON BOULEVARD NORTH AND LOWE’S BUSINESS DELIVERY
ACCESS
a) AB - 3875 Public Works Transportation Systems Division recommends adoption of a
resolution authorizing a 120-day closure of Houser Way N, between Lake Washington
Blvd N and the Lowe's business delivery access, to occur between September 2, 2025 and
December 31, 2025, for the purpose of constructing a City of Renton watermain and
improving storm drainage facilities supporting the I-405, Renton to Bellevue, Widening
and Express Toll Lanes project.
2. EMERGING ISSUES IN TRANSPORTATION
If you would like to attend this week's meeting remotely, you can do so by going to
https://us02web.zoom.us/j/83331604294?pwd=U3BLbUJZK0ExeWJaTFNWYWx5WGE0dz09
Zoom Meeting ID: 833 3160 4294, Passcode: 352696
You can call through Zoom at (253) 215-8782 and use the Meeting ID.
AB - 3875
City Council Regular Meeting - 07 Jul 2025
SUBJECT/TITLE: 120-day Closure of Houser Way North between Lake Washington
Boulevard North and Lowe’s business delivery access
RECOMMENDED ACTION: Refer to Transportation (Aviation) Committee
DEPARTMENT: Public Works Transportation Systems Division
STAFF CONTACT: Jim Seitz, Transportation Systems Director
EXT.: 7245
FISCAL IMPACT SUMMARY:
There is no fiscal impact to the City by adopting the resolution.
SUMMARY OF ACTION:
The I-405, Renton to Bellevue Widening and Express Toll Lanes (ETL) Project is intended to increase the
capacity of the I-405 freeway. The project also builds infrastructure for Sound Transit’s Stride Bus Rapid
Transit system including a new inline transit station at Northeast 44th Street in Renton. Bus rapid transit, paired
with the ETL system, will provide more reliable transportation options for people.
120-day Closure – Houser Way North between Lake Washington Boulevard North and the Lowe’s
business delivery access (9/2/25-12/31/25):
This closure was previously approved by City Council to take place between January 21, 2025, and May 22,
2025. Due to delays in the permitting process with BNSF Railway, the contractor did not implement this closure
during the approved time frame. The contractor continues to work with BNSF Railway to begin work on the
City of Renton water main and the construction of a storm drainage outfall structure beginning as early as
September 2, 2025.
The contractor is requesting approval of a 120-day closure of Houser Way North between Lake Washington
Boulevard North and Lowe’s business access road to construct the City of Renton water main and storm
drainage outfall structures. This 120-day closure will occur between September 2, 2025, and December 31,
2025, with notifications provided to the public in accordance with the Public Outreach Plan in Exhibit A. All
business access will be maintained throughout the duration of the closure.
Work performed during this period includes the following:
1. Installation of a 12” City of Renton watermain.
2. Installation of soldier pile shoring to support two storm drainage outfall structures.
3. Storm drainage structure excavation.
4. Jack and bore of (3) 42” diameter storm drainage pipes.
The milestones achieved during the full closures detailed above will create the space needed to increase
capacity and provide Express Toll Lane Infrastructure on I-405.
AGENDA ITEM #1. a)
WSDOT’s public outreach plans for each requested closure are attached in Exhibit B and include one flier for
businesses and residences within proximity to the street closures along with the localized detour plans.
EXHIBITS:
A. Public Outreach Plan
B. WSDOT Project Flier with Primary Detour Routes
C. Resolution
STAFF RECOMMENDATION:
Adopt the resolution authorizing the 120-day Closure of Houser Way North between Lake Washington
Boulevard North and the Lowe’s business delivery accessto occur between September 2, 2025, and December
31, 2025 for the purpose of constructing the City of Renton watermain and improving storm drainage facilities
supporting the I-405, Renton to Bellevue, Widening and Express Toll Lanes Project.
AGENDA ITEM #1. a)
Page | 1
I-405 Renton to Bellevue Widening and Express Toll Lanes Project
2025 Closure of Houser Way North between Lake Washington Boulevard North
and the Lowe’s Business Delivery Access Road
Houser Way North: 120 Day Closure – occurring between September 2, 2025,
and December 31, 2025
Scope of work: 120-day closure of Houser Way North between Lake Washington Boulevard
North and Lowes Business Delivery Access to install a City of Renton watermain and
construct storm drainage improvements. Completing this work supports the construction of
WSDOT Express Toll Lanes and Sound Transit Bus Rapid Transit systems.
Outreach methods:
• 14-day advanced notification to
businesses and residents
• Fliers to businesses and
residents outlined in the
Figure 1 map to the right
• Flier provided to City of Renton
for internal distribution
o Notifications also to be
provided to PACCAR
• Social media and WSDOT Blog
posts notifying the public of the
closure
o Coordination with the
City of Renton to share
social media posts from
the project
• Hotline and project inbox
information provided on fliers,
blogposts, and project
website
• Message boards will be placed
14 days before the closure to
notify the traveling public
• Emergency services briefing
ahead of closure
• WSDOT availability for
media
Figure 1: Business flier area
AGENDA ITEM #1. a)
I-405, Renton to Bellevue Widening a n d Express Toll Lanes Project
120-day Closure of Houser Way North between Lake Washington
Boulevard North and the Lowe’s Business Delivery Access
Overview
Crews working for the Washington State
Department of Transportation are fully
closing Houser Way North for 120 days
for crews to install a City of Renton water
main and construct critical storm drainage
infrastructure. Houser Way North will be
closed between Lake Washington
Boulevard North and the Lowe’s Business
Access. Detours will be provided for
bicyclists and pedestrians within the work
area. Motorists and material deliveries will
be routed to Garden Avenue and North
8th Street. Access to all businesses is
maintained throughout the duration of
the closure.
This key milestone for the I-405, Renton to
Bellevue Widening and Express Toll Lanes
project is necessary to complete widening
of the I-405 freeway.
Work during this closure period will
include:
Installation of a 12” City of Renton
Watermain
Installation of soldier pile
shoring to support two storm
drainage outfall structures
Storm drainage structure
excavation
Houser Way North will be closed between Lake Washington Boulevard North and Lowe’s
Business Access Road. Access to all businesses is maintained.
Jack and bore of (3) 42” diameter storm
drainage pipes
Lane and Ramp Closures
120-day closure between September 2, 2025, and December 31, 2025 (advance notice provided)-Full
closure of Houser Way North between Lake Washington Boulevard North and Lowe’s Business Access
AGENDA ITEM #1. a)
CITY OF RENTON, WASHINGTON
RESOLUTION NO.
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, AUTHORIZING
TEMPORARY FULL STREET CLOSURE OF HOUSER WAY NORTH BETWEEN LAKE
WASHINGTON BOULEVARD NORTH AND LOWE’S BUSINESS ACCESS ROAD.
WHEREAS, the Washington State Department of Transportation (WSDOT) is constructing
the I-405, Renton to Bellevue Widening and Express Toll Lanes (ETL) project; and
WHEREAS, this construction activity will require a temporary street closure of Houser
Way North between Lake Washington Boulevard and Lowe’s business access road; and
WHEREAS, by Resolution 4545, the City Council previously authorized temporary closure
of Houser Way between Lake Washington Boulevard North and Lowe’s business access road for
a 120-day period to occur between the dates of January 21, 2025 through May 22, 2025; and
WHEREAS, the project was unable to implement the one hundred and twenty (120) day
closure between January 21, 2025, and May 22, 2025 due to delays in the permitting process
with BNSF; and
WHEREAS, pursuant to the City Code section 9-9-3, such street closures require City
Council authorization by means of a resolution;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO
RESOLVE AS FOLLOWS:
SECTION I. The City Council does hereby authorize the temporary closure of Houser Way
North between Lake Washington Boulevard North and Lowe’s business access road for a one
hundred and twenty (120) day period to occur between the dates of September 2, 2025, through
December 31, 2025 for the purpose of completing construction activities related to the I-405,
AGENDA ITEM #1. a)
2
RESOLUTION NO.
Renton to Bellevue Widening and Express Toll Lanes (ETL) project.
SECTION II. Notice of the closure shall be posted and published as required by RMC 9-9-2
and RMC 9-9-3.
PASSED BY THE CITY COUNCIL the day of , 2025.
Jason A. Seth, City Clerk
APPROVED BY THE MAYOR this day of , 2025.
Armondo Pavone, Mayor
Approved as to form:
Shane Moloney, City Attorney
RES- PW: 25RES016: 6/30/2025
AGENDA ITEM #1. a)
I-405, Renton to Bellevue Widening
and Express Toll Lanes Project
120 Days – Houser Way North
July 2025
AG
E
N
D
A
I
T
E
M
#
1
.
a
)
120-day full closure of Houser Way North
To occur between September 2, 2025, to December 31, 2025
2
This closure was previously approved by City Council to take place between January 21, 2025, and May 22, 2025.
Due to delays in the permitting process with BNSF Railway, the contractor did not implement this closure during
the approved time frame. The contractor continues to work with BNSF Railway to begin work on the City of Renton
water main and the construction of the storm drainage outfall structure beginning as early as September 2, 2025.
Extent:
Full closure of Houser Way North between Lake Washington Boulevard North and the Lowe’s business
access material delivery road
*Access to all businesses is maintained throughout the closure period
**FLJV completed outreach to business owners with material deliveries that use the access road. They have
confirmed the closure will not impact their operations.
Work during this closure period will include:
• Installation of a 12” City of Renton watermain
• Installation of soldier pile shoring to support two storm drainage outfall structures
• Storm drainage structure excavation
• Jack and bore of (3) 42” diameter storm drainage pipes
AG
E
N
D
A
I
T
E
M
#
1
.
a
)
Detour route
3
Southbound Detour Route:
• Traffic headed southbound on Lake
Washington Blvd N will be rerouted
southward onto Garden Ave N, turning left
onto N 8th St., and left onto Houser Way N.
Northbound Detour Route:
• Traffic headed northbound on Logan Avenue
N will turn right onto Garden Ave N, taking a
left onto N 8th St., and then left onto Houser
Way N.
AG
E
N
D
A
I
T
E
M
#
1
.
a
)
4
Outreach Strategy
Outreach methods:
• Send mailer to residents and businesses as outlined in
the figure to the right
o Notifications also provided to PACCAR
• Flier provided to City of Renton for internal distribution
• Social media and WSDOT Blog posts notifying the
public of the closure
• Coordination with the City of Renton to share social
media posts from the project
• Hotline and project inbox information provided on
fliers, blogposts, and project website
• Message boards will be placed 14 days prior to the
closure to notify the traveling public
• Emergency services briefing ahead of the closure
• WSDOT availability for media AG
E
N
D
A
I
T
E
M
#
1
.
a
)
5
Staff Recommends
120-day Closure of Houser Way North between Lake Washington Boulevard North and the Lowe’s
business delivery access to occur between September 2, 2025 and December 31, 2025 for the purpose of
constructing the City of Renton watermain and improving storm drainage facilities supporting the I-405,
Renton to Bellevue, Widening and Express Toll Lanes Project.
AG
E
N
D
A
I
T
E
M
#
1
.
a
)
Questions?
7
AG
E
N
D
A
I
T
E
M
#
1
.
a
)