HomeMy WebLinkAboutMASONRY DAM FLOOD OPERATIONS STUDYMASONRY DAM
FLOOD OPERATIONS STUDY
Flood Frequency Curves
Flow Duration Curves
Event Hydrographs
Prepared for:
Seattle Public Utilities, Seattle, Washington
King County Water and Land Resources Division, Washington
City of Renton, Washington
Prepared by:
Northwest Hydraulic Consultants
Tukwila, Washington
November 1997
FLOOD FREQUENCY CURVES
LANDSBURG
100000
Y
CO
CU
n
1000
+ Baseline Conditions
_ _ _ _ Alternative la
4
f
.001 .01 .10 .50 .90 .99
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Landsburg (USGS gage 12117500)
W
100000
Ul
Y
Q)
n
1000
+ Baseline Conditions
_ _ _ _ Alternative 1b
�E
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Landsburg (USGS gage 12117500)
100000
Y
(D
U
n
1000
+ Baseline Conditions
.x _ _ _ _ . Alternative 2a
001 .01 .10 .50 .90 .99
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Landsburg (USGS gage 12117500)
100000
Mj 1111
c-
ro
L
U
U1
O
1000
+ Baseline Conditions
.x _ _ _ _ Alternative 2b
-------------
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Landsburg (USGS gage 12117500)
100000
9WOO
L
fD
U
Cf]
Y
f�
U
r
1000
+ Baseline Conditions
x _ _ _ _ Alternative 2c
/
/
- -
X
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Landsburg (USGS gage 12117500)
100000
iff,wo
1000
+ Baseline Conditions
— — — — Alternative 3a
++ iE
-----------4--------
.001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Landsburg (USGS gage 12117500)
100000
dl0000
L
CO
L
U
(n
co
�o
CD
a
1000
+ Baseline Conditions
.x - --- Alternative 3b
~- ++/
+H+ �
-- ---* -
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Landsburg (USGS gage 12117500)
100000
L
M
c-
U
U)
1II
1000
+ Baseline Conditions
-- -- Alternative 3c (1)
/
/
+++
+ .4+
i
*-
-- - - - - -----
------
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Landsburg (USGS gage 12117500)
1 I IIIII]
U
11II
1000
+ Baseline Conditions
.x - - - - Alternative 3c (2)
/
/
/
X'
++yi��F
# ++ A
_ xx_
--------+--J----
.001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Landsburg (USGS gage 12117500)
100000
�.IZJTIWI
co
W
a
1000
+ Baseline Conditions
.x _ _ _ _ Alternative 3c (3)
7% A 7% n
_ _ _ — � "
+
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Landsburg (USGS gage 12117500)
�o
CU
CL
1111,
1000
+ Baseline Conditions
.x - - - - Alternative 3c (4)
/
++//
+ #
-------------%-
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Landsburg (USGS gage 12117500)
100000
Y
(a
QJ
r
1111,
111110
+ Baseline Conditions
— — — — Alternative 3c (5)
X /
+ +
+++ '
X
if �E X x X X-X��ASAHB
------------ '----
+
.001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Landsburg (USGS gage 12117500)
100000
=; 1111
1000
+ Baseline Conditions
_ _ Alternative 3c (6)
_____-__I - - L
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Landsburg (USGS gage 12117500)
100000
11II
1000
+ Baseline Conditions
x - - - - Alternative 3c (7)
+
,
A xx*)�
------------ -"-
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Landsburg (USGS gage 12117500)
9A0000
Co
au
n
1000
+ Baseline Conditions
x - - - _ Alternative 3c (8)
,
/
i
++cif
J+
----------�-----
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Landsburg (USGS gage 12117500)
i[IO IN
U
-a 1111
L
f0
U
W
Y
f0
CLJ
d
1000
+ Baseline Conditions
x - - - - Alternative 3c (9)
ii
/
y , /
+++,
x-X)(X.X�
- - - - - - - - - - - - -
+
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Landsburg (USGS gage 12117500)
100000
=; 11 I I
Co
CD
a
10141]
+ Baseline Conditions
-- -- Alternative 3c (10)
+ + + .11
+++
+
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Landsburg (USGS gage 12117500)
100000
d10000
1000
+ Baseline Conditions
x - - - - Alternative 3d (1)
++ + +//
+++ x
+ E )W
IrAA
g6AAP°`
--------
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Landsburg (USGS gage 12117500)
IIIIA
d40000
L
(O
L
U
co
1000
+ Baseline Conditions
x - - - - Alternative 3d (2)
/
+
+ +
++ /
++ y
+ A^
- - - - - - - - - - -
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Landsburg (USGS gage 12117500)
100000
f
L
CO
U
W
co
1000
+ Baseline Conditions
X - - - - Alternative 3d (3)
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Landsburg (USGS gage 12117500)
100000
=; 1111
Y
ro
QJ
cl-
1000
+ Baseline Conditions
x - - - - Alternative 3d (4)
y /
++ /
+
�E�E�EiE6�
--------*--
.001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Landsburg (USGS gage 12117500)
100000
Y
CO
CD
d
1000
+ Baseline Conditions
* - - - - Alternative 3d (5)
,K/ /
�. + /
i+
+
-- - - - - --- -----* _
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Landsburg (USGS gage 12117500)
100000
f0
U
CL
1111
1000
+ Baseline Conditions
.x - - - - Alternative 3d (6)
X
+ +
++
--------I--�-�-�-�xx**
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Landsburg (USGS gage 12117500)
M
100000
1111
1000
+ Baseline Conditions
- - - - Alternative 3d (7)
} +/
+ +�H } wo*
X
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Landsburg (USGS gage 121l7500)
100000
co
a)
a
11II
011A
+ Baseline Conditions
x — — — — Alternative 3d (8)
X
++ +
+++ iF 3f / X
+ J+
-------------J--_-
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Landsburg (USGS gage 12117500)
100000
�0000
1000
+ Baseline Conditions
x - - - - Alternat i:e 3d (9)
/
/
+ /
++ # jE
x /
- - - -_-
X
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Landsburg (USGS gage 12117500)
100000
I
1000
} Baseline Conditions
Alternative 3d (10)
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Landsburg (USGS gage 12117500)
100000
MINI
1000
+ Baseline Conditions
Alternative 4a
- - - - - - - - - - - X - -
.001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Landsburg (USGS gage 12117500)
100000
4--
,
WOO
.001 .01
[,onditions
ve 4b
.10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Landsburg (USGS gage 12117500)
100000
U
1000
Baseline Conditions
Alternative 4c
/
/
.001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Landsburg (USGS gage 12117500)
FLOOD FREQUENCY CURVES
RENTON
100000
U
ff$Wl
c-
ro
U
U)
0
1000
+ Baseline Conditions
X _ _ _ _ Alternative la
II
.1
f
I
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Renton (USGS gage 12119000)
fM410]
240000
L
CD
L
U
U)
0
1000
+ Baseline Conditions
X _ _ _ _ Alternative 1b
7
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Renton (USGS gage 12119000)
100000
L
ro
U
U')
0
1000
+ Baseline Conditions
X - - -_ Alternative 2a
/
/
i
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Renton (USGS gage 12119000)
100000
U
.01 11 I I
1000
+ Baseline Conditions
X _ _ _ _ Alternative 2b
/
/
.001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Renton (USGS gage 12119000)
100000
cu
cl-
1000
+ Baseline Conditions
X _ _ _ _ Alternative 2c
+ '
,
,
,
i
,
,
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Renton (USGS gage 12119000)
100000
U
-, 1111
101410
+ Baseline Conditions
x - - -- Alternative 3a
,
,
i
+ESE
+
X
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Renton (USGS gage 12119000)
xWorll
4-
U
MW 1I1I
1000
{ Baseline Conditions
x _ _ _ _ Alternative 3b
++ +//
+ +
+
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Renton (USGS gage 12119000)
100000
Ills,
1000
+ Baseline Conditions
.x - _ _ _ Alternative 3c (1)
,
+ '
- + �E �E iE�E3E
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Renton (USGS gags 12119000)
100000
O111
1000
+ Baseline Conditions
x _ _ _ - Alternative 3c (2)
,
,
+++'
+
- ++
+
X
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Renton (USGS gage 12119000)
100000
a)
n
1111
1000
+ Baseline Conditions
x _ _ _ _ Alternative 3c (3)
+
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Renton (USGS gage 12119000)
100000
210000
1000
+ Baseline Conditions
.x — — — — Alternative 3c (4)
+
/
+ r
+ +/
- + r
r
+JLY
+ �f�E �4 iF)EiE
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Renton (USGS gage 12119000)
100000
9A0000
1000
+ Baseline Conditions
_ _ _ _ Alternative 3c (5)
+ /
,
/
++ +
/
+
+ # + x *Y
X
.001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Renton (USGS gage 12119000)
100000
�40000
L
f0
U
co
0
1000
+ Baseline Conditions
x _ _ _ _ Alternative 3c (6)
.001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Renton (USGS gage 12119000)
100000
in
U
CD
n
1111,
1000
+ Baseline Conditions
_ _ _ _ Alternative 3c (7)
/
+
/
/
/
/
/
++ +'.
+
+ *0
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Renton (USGS gage 12119000)
100000
Owl
Y
[O
Q)
cl-
1000
+ Baseline Conditions
.x _ _ _ _ Alternative 3c (B)
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Renton (USGS gage 12119000)
100000
U
Y
00
CD
0-
1000
+ Baseline Conditions
.x - _ - - Alternative 3c (9)
/
X
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Renton (USGS gage 12119000)
100000
910000
1000
+ Baseline Conditions
..x _ _ _ _ Alternative 3c (10)
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Renton (USGS gage 12119000)
100000
2 1111
1000
+ Baseline Conditions
x _ _ _ _ Alternative 3d (1)
+ xE X Xc I A
001 .01 .10 .50 .90 .99
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Renton (USGS gage 12119000)
• • •
100000
;dill
(o
a.)
n
1000
+ Baseline Conditions
.x _ _ _ — Alternative 3d (2)
- y �
++I}H
+ +
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Renton (USGS gage 12119000)
100000
c-
ro
r-
U
CO -
CD
�v
n
1000
+ Baseline Conditions
x _ _ _ _ Alternative 3d (3)
001 .01 .10 .50 .90 .99
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Renton (USGS gage 12119000)
100000
U
d10000
L
C0
L
U
0
1000
+ Baseline Conditions
X - - _ - Alternative 3d (4)
/
/
++ +'�/
+
+
+ }
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Renton (USGS gage 12119000)
100000
v-
L
fo
c-
U
W
O
(10
CD
a
1111
1000
+ Baseline Conditions
_ _ _ _ Alternative 3d (5)
,
,
+
,
,
++ + �.
0.1
+
+ +
+ XE X- �E-3E iE
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Renton (USGS gage 12119000)
100000
�40000
L
Co
cj
cn
0
N/
ro
cu
1000
+ Baseline Conditions
x _ _ _ _ Alternative 3d (6)
001 .01 .10 .50 .90 .99
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Renton (USGS gage 12119000)
100000
d10000
Y
CO
U
n
101410
+ Baseline Conditions
_ _ _ _ Alternative 3d (7)
+ +
+
+ X X x I �f
001 .01 .10 .50 .90 .99
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Renton (USGS gage 12119000)
e
1011111410
ro
CD
n
1111,
1000
+ Baseline Conditions
_ _ _ _ Alternative 3d (8)
/
,
++ �E
+ +
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Renton (USGS gage 12119000)
111 I IZIl
�0000
1000
+ Baseline Conditions
_ _ _ _ Alternative 3d (9)
/
i
X /
/
* * X"
+1 x*
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Renton (USGS gage 12119000)
100000
Ulm,
L
CO
U
Ln
0
1000
+ Baseline Conditions
X _ _ _ _ Alternative 3d (10)
+
/
/
/
X /
�.Y
i
X
+ +
+
�*
001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Renton (USGS gage 12119000)
100000
1000
Baseline Conditions
Alternative 4a
'
+
,
.001 .01 .10 .50 .90 .99 .999
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Renton (USGS gage 12119000)
100000
y--
co
N
CL
1111
1000
+ _ Baseline Conditions
Alternative 4b
7
.001 .01 .10 .50 .90 .99
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flo;s in the Cedar River at Renton (USGS gage 12119000)
...
100000
M0000
1000
Baseline Conditions
y _ _ _ _ _ Alternative 4c
+
001 .01 .10 .50 .90 .99
Cumulative Probability (P)
Masonry Dam Flood Operations Study
Simulated Flows in the Cedar River at Renton (USGS gage 12119000)
...
FLOOD EVENT HYDROGRAPHS
14000
1 PI
8000
a�
U
6000
I/1
'l l
Fill
Base Case Simulated Flows
Altemative 2b Simulated Flows
I
I
I
I
I
I
I l
I I
11/ 1 /90 11/8/90 11/ 15/90 11 /22/90 11/29/90 12/6/90
Midnight (0001 A Vn on Date
Masonry Dam Flood Operations Shady - Event Flow Hydrograph
Discharge in Cedar River at Landsburg (USGS gage 12117500)
12/13/90
printed 12/04/97
:1 1
14000
12000
10000
8000
U
6000
111
0
Base Case Simulated Flows
Alternative 2b Simulated Flows
I
I
I
I
I
r
III r \ I
1
I I
I I
1 �
1
11 / 1 /90 11 /8/90 11 / 15/90 11 /22/90 11 /29/90 12/6/90
Midnight (0001 A1P on Date
Masonry Dan Flood Operations Study - Event Flow Hydrograph
a scharge in Cedar River at Renton(USGS gage 12119000)
12/13/90
printed 12/04/97
12000
8000
a�
6000
He "I
11/
ON
Base Case Simulated Flows
Altemative 3a Sinwlated Flows
If 1 _
r I It 4.11
, I
I
1 I
I I
� I
I
I �
1 I \
✓ r 1 V _ � 1 1 tti
J
11 / 1 /90 11 /8/90 11 / 15/90 11 /22/90 11 /29/90 12/6/90
NEdnight (0001 AM) on Date
Masonry Darn Flood Operations Study - Event Flow Hydrograph
Discharge in Cedar River at Landsburg (USGS gage 12117500)
12/13/90
printed 12/04t97
14000
12000
b
a�
8000
rA
M6,312
1/1
n
Base Case Simulated Flows
Altemative 3a Simulated Flows
r t'
Jl
� I �
� � 1
11/ 1/90 11/8/90 11/ 15/90 11/22/90 11/29/90 12/6/90
Midnight (0001 A" on Date
Masonry Dam Flood Operations Study - Event Flow Hydrograph
Discharge in Cedar River at Renton(USGS gage 12119000)
12/13/90
printed 1 v04/97
14000
8000
a�
U
6000
2000
M
Base Case Simulated Flows
Altemative 2b Simuated Flows
I
to
1
1 — _
11
I
�f I
Il I
1
11 / 1 /95 11/8/95 11/ 15/95 11/22/95 11/29/95 12/6/95
Midnight (0001 AN1) on Date
Masonry Darn Flood Operations Study - Event Flow Hydrograph
Discharge in Cedar River at Landsburg (USGS gage 12117500)
12/13/95
printed 12/(9/97
•111
14000
12000
//1/
8000
cn
6000
1_I
111
n
Base Case Simulated Flows
Alternative 2b Sinadated Flows
I �L
1 �
11 / 1 /9 5 11 / 8/95 11 / 15/95 11 /22/95 11 /29/95 12/6/95
Midnight (0001 AM) on Date
Masonry Dam Flood Operations Study - Event Flow Hydrograph
Discharge in Cedar River at Renton(USGS gage 12119000)
12/13/95
printed 12A)4/97
14000
8000
a�
�bn
U
6000
2000
as
Base Case Simulated Flows
Alternative 3a Simulated Flows
I
r
I '
I
I I
I l�
1 1/ 1 /95 11/8/95 11/ 15/95 11/22/95 11/29/95 12/6/95
Midnight (0001 AM) on Date
Masonry Dam Flood Operations Study - Event Flow Hydrograph
Discharge in Cedar River at Landsburg (USGS gage 12117500)
12/13/95
printed 12/04/97
•111
14000
12000
1A111
a�
8000
6000
i P11
111
n
Base Case Simulated Flows
Alternative 3a Sinndated Flows
1 I
I I
1
11 / 1 /9 5 11 /8/95 11 / 15/95 11 /22/95 11 /29/95 12/6/95
Midnight (0001 A1V1 on Date
Masonry Dam Flood Operations Study - Event Flow Hydrograph
Discharge in Cedar River at Renton(USGS gage 12119000)
12/13/95
printed 12/04/97
14000
12000
TOM
8000
a�
U
6000
PI 1
2000
"I
Base Case Simulated Flows
Altemadve 2b Simulated Flows
t
r
1 / 15/96 1 /22/96 1 /29/96 2/5/96 2/ 12/96 2/ 19/96
Midnight (0001 AM) on Date
Masonry Dam Flood Operations Study - Event Flow Hydrogiaph
Discharge in Cedar River at Landsbtwg (USGS gage 12117500)
2/26/96
printed 12/04/97
14000
12000
a�
8000
U
6000
9111
111
n
Base Case Simulated Flows
Alternative 2b Simulated Flows
1
1
ti
I%
I 1
1
ti
v
r♦ �r1�
� � V
v
t y
1 / 15/96 1 /22/96 1 /29/96 2/5/96 2/12/96 2/19/96
Midnight (0001 AM) on Date
Masonry Dam Flood Operations Study - Event Flow Hydrograph
Discharge in Cedar River at Renton(USGS gage 12119000)
2/26/96
printed 12/04/97
m
14000
12000
8000
0
to
6000
2000
n
Base Case Simulated Flows
Alternative 3a Simulated Flows
r�
1�
II ..
1 / 15/96 1 /22/96 1 /29/96 2/5/96 2/ 12/96 2/ 19/96
Midnight (0001 A v1 on Date
Masonry Dam Flood Operations Shady - Event Flow Hydrograph
Discharge in Cedar River at Landsbtwg (USGS gage 12117500)
2/26/96
printed 12/04/97
•111
14000
12000
1-r111
a�
8000
U
6000
2000
[17
Base Case Simulated Flows
Alternative 3a Simulated Flows
I
I
I� 4
1
r
1 / 15/96 1 /22/96 1 /29/96 2/5/96 2/12/96 2/19/96
Midnight (0001 AM) on Date
Masonry Dam Flood Operations Study - Event Flow Hydrograph
Discharge in Cedar River at Renton(USGS gage 1211.9000)
2/26/96
printed 12/04/97
ANNUAL FLOW DURATION CURVES
LANDSBURG
14000
12000
10000
8000
a�
U
6000
M
U1
7
XA
�e
--.}.-- Base Case Simulated Flows
—p — Altema6ve 4b Simulated Flows
105 10-4 103 102 101
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Annual Flow DUration Analysis
Discharge in Cedar River at Landsbtrg
10°
printed 12/04/97
14000
12000 \
10000
8000
a�
U
A 6000
I11
2000
U
—+ Base Case Simulated Flows
p — Altemative la Simulated Flows
.q
10) 104 10-3 10 2 10-1 10°
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Annual Flow Duration Analysis
Discharge in Cedar River at Landsb> ug
printed 12/03/97
14000
12000
8000
aD
U
6000
/11
111
1❑
--+ Base Case Sunulated Flows
—p — Alternative I Shmdated Flows
IA
10-5 10 4 10 3 10-2 10-1 100
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Annual Flow Duration Analysis
Discharge in Cedar River at Landsburg
printed 12/03/97
14000
12000
10000
8000
a�
U
6000
111
11/
n
—+ Base Case SinmWed Flows
— — Alternative 2a Simulated Flows
10 5 104 10-3 10-2 10 1
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Annual Flow Duration Analysis
Discharge in Cedar River at Landsburg
100
printed 12/03/97
14000
111
an
6000
.11
1❑
—+ Base Case Simulated Flows
0 — Alternative 2b Simulated Flows
` 1\
10 5 104 10-3 10-2 10-1
Exceedance Probability (p)
Masonry Dam Flood Operations Shady - Annual Flow Duration Analysis
Discharge in Cedar River at Landsburg
100
printed 12ro3w7
14000
12000
Ar
10000
8000
U
bq
6000
2000
m
—+ Base Case SinWated Flows
—d — Altemative 2c Shadated Flows
10 5 104 10-3 10-2 10-1
Exceedance Probability (p)
Masonry Dam Hood Operations Study - Annual Flow Duration Analysis
Discharge in Cedar River at Landsburg
100
printed 12/03/97
14000
12000
8000
a�
cn
6000
9111
111
1❑
-+-_ Base Case Simmiated FloNks
—p — Alternative 3a Simulated Flows
\
10 5 104 10-3 10-2 10-1
Exceedance Probability (p)
Masonry Darn Flood Operations Study - Annual Flow Duration Analysis
Discharge in Cedar River at Landsburg
100
printed 12/03/97
14000
:111
a�
U
6000
191
111
1❑
-- ---- 4
+ Base Case Simulated Flows
—& — Altemative 3b Simulated Flows
1
—
10 5 104 10-3 10-2 1 l
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Annual Flow Duration Analysis
Discharge in Cedar River at Landsburg
100
printed 12/03/97
+ Base Case Simulated Flows
—& — Altemative 3b Simulated Flows
1
—
10 5 104 10-3 10-2 1 l
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Annual Flow Duration Analysis
Discharge in Cedar River at Landsburg
100
printed 12/03/97
12000
8000
6000
I/1
111
Id
--+ — Base Case Simulated Flows
Alternative 4a Simulated Flows
*--A " i� �-,
10 5 104 10-3 10 2 10-1
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Annual Flow Duration Analysis
Discharge in Cedar River at Landsburg
100
printed 12/03/97
14000
12000
10000
8000
6000
111
7
--+ — Base Case Simulated Flows
p — Alternative 4c Simulated Flows
10 5 104 10-3 10-2 10-1
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Annual Flow Duration Analysis
Discharge in Cedar River at Landsburg
100
printed 12/03/97
OCTOBER - MARCH
FLOW DURATION CURVES
LANDSBURG
12000
8000
U
A 6000
2000
0
--+ Base Case Simulated Flows
Altemafive la Sirmflated Flows
%4
10 5 10-4 10-3 10 2 101
Exceedance Probability (p)
Masonry Daln Flood Operations Study - Seasonal Flow Duration Analysis (October - March)
Discharge in Cedar River at LandsbL g (USGS gage 12117500)
100
printed 12A)4/97
14000
12000
NMI
6000
i11
2000
0
--+ Base Case Sirrndated Flows
A — Altemative lb Sinudated Flows
�Q
10-5 10-4 10-3 10-2 10-1
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duration Analysis (October - March)
Discharge in Cedar River at Landsburg (USGS gage 12117500)
10,
printed 12/04/97
14000
n \
12000 .�
8000
NMI
1/1
0
—+ Base Case Sinulated Flows
—,A — Alternative 2a Sirmilated Flows
10-5 104 10-3 10-2 10-1
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duration Analysis (October - March)
Discharge in Cedar River at Landsburg (USGS gage 12117500)
10O
printed 12/04/97
14000
12000
n
\
10000
2000
m
,4
'A
—+ Base Case SirmiWed Flows
Altemative 2b Simulated Flows
10 5 104 10-3 10-2 10-1
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Dimation Analysis (October - March)
Discharge in Cedar River at Landsbtwg (USGS gage 12117500)
100
printed 12A)4/97
14000
12000
8000
a�
U
6000
2000
0
—+ Base Case Sinulated Flows
--A — Altemative 2c Simulated Flows
10-5 10-4 10-3 10-2 10-1
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duration Analysis (October - March)
Discharge in Cedar River at Landsburg (USGS gage 12117500)
10O
printed 12/04/97
ffirolf-TIM
8000
U
6000
111
a
+ Base Case Simulated Flows
—d — Alternative 3a Sirmdated Flows
e�
`w.
0
b.,
10-5 10-4 10-3 10-2 10-1
Exceedance Probability (p)
Masonry Darn Flood Operations Study - Seasonal Flow Duration Analysis (October - March)
Discharge in Cedar River at Landsburg (USGS gage 12117500)
100
printed 12/Al4/97
14000
12000
8000
an
U
6000
0
0
—+ Base Case Simulated Flows
—d — Altemative 3b SimWated Flows
n
4
A,
10 5 10-4 10-3 10-2 10-1
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duration Analysis (October - March)
Discharge in Cedar River at Landsburg (USGS gage 12117500)
100
printed 12J04/97
111
8000
NMI
P
111
m
W
0
—+ Base Case Sinwlated Flows
—.A — Altemative 4a Simulated Flows
10-5 104 10-3 10-2 10-1
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duration Analysis (October - March)
Discharge in Cedar River at Landsbu g (USGS gage 12117500)
100
printed 12A)4/97
14000
12000
8000
a�
U
6000
m
—+ Base Case simulated Flows
Alternative 4b simulated Flows
.Q
10-5 104 10-3 10-2 10- l
Exceedance Probability (p)
Masonry Darn Flood Operations Study - Seasonal Flow Duration Analysis (October - March)
Discharge in Cedar River at l.andsburg (USGS gage 12117500)
100
printed 12/04/97
14000
12000
n
10000
8000
6000
PI 1
.11
10
--+ — Base Case Simulated Flows
—A — Altemative 4c Sirr"ated Flows
,A
10-5 10-4 10-3 10-2 10-1
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duration Analysis (October - March)
Discharge in Cedar River at Landsbtug (USGS gage 12117500)
100
printed 12/04/97
APRIL - JUNE
FLOW DURATION CURVES
LANDSBURG
14000
12000
10000
8000
U
N
c�
U
6000
4000
2000
0
—+ Base Case Sinulated Flows
—A — Alternative laSimuilatedFlows
10 5 104 10-3 10 2 10-1
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duration Analysis (April - Jtme)
Discharge in Cedar River at Landsburg (USGS gage 12117500)
100
printed 12/04/97
14000
12000
10000
8000
a�
U
6000
4000
2000
0
—+ Base Case Simulated Flows
-- p — Alternative 1 b Simulated Flows
10-5 10-4 10-3 10-2 10- t
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duration Analysis (April - June)
Discharge in Cedar River at Laridsbtwg (USGS gage 12117500)
100
printed 12/04/97
14000
12000
10000
8000
a�
�n
U
6000
4000
2000
0
—+ Base Case Sinnilated Flows
Alternative 2a Simulated Flows
10-5 10-4 10-3 10-2 10- I
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duration Analysis (April - June)
Discharge in Cedar River at Landsburg (USG'S gage 12117500)
10,
printed 12/04/97
14000
12000
10000
8000
a�
U
6000
4000
2000
0
--+ Base Case Simulated Flows
--p — Altemadve 2b Simulated Flows
10--) 104 10-3 10-2 10-1
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duration Analysis (April - June)
Discharge in Cedar River at Landsburg (USGS gage 12117500)
100
printed 12/04/97
14000
12000
10000
8000
a�
U
6000
4000
2000
0
—+ Base Case Shy dated Flows
--p — Altemadve 2c Sinuilated Flows
10-5 104 10-3 10-2 10- l
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duration Analysis (April - June)
Discharge in Cedar River at Landsburg (USGS gage 12117500)
10,
printed 12/04/97
14000
12000
8000
a�
U
6000
4000
111
0
—+ Base Case Simulated Flows
---A — Alternative 3a Simulated Flows
10-5 10-4 10-3 10 2 10-1
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duration Analysis (April - June)
Discharge in Cedar River at Landsbtu-g (USGS gage 12117500)
100
printed 12A)4/97
14000
12000
8000
a�
U
6000
2000
m
—.}.-- Base Case Simulated Flows
--A — Altemative 3b Simulated Flows
10 5 10 `t 10-3 10-2 10-1
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Dtuation Analysis (April - June)
Discharge in Cedar River at Landsbtug (USGS gage 12117500)
10°
printed 12/04/97
111
a�
U
6000
111
V
—+ Base Case Sirri lated Flows
d — Alteanative 4a SimWated Flows
10 5 104 10-3 10 2 10 1
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duration Analysis (April - June)
Discharge in Cedar River at Landsburg (USGS gage 12117500)
10()
printed 12/04/97
14000
12000
10000
8000
a�
�r
U
6000
4000
2000
0
—+ Base Case Sirrnilated Flows
— Alternative 4b Simulated Flows
10-) 104 10-3 10-2 10-1
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duration Analysis (April - June)
Discharge in Cedar River at Landsburg (USGS gage 12117500)
100
printed 12/04/97
14000
a�
U
6000
IJ 1
0
—+ Base Case Sinulated Flows
—p — Altema6ve 4c Sinwlated Flows
10' 10-4 10 3 10 2 10-1
Exceedance Probability (p)
Masonry Darn Flood Operations Study - Seasonal Flow Duration Analysis (April - June)
Discharge in Cedar River at Landsbtug (USGS gage 12117500)
100
printed 12/04/97
DULY - SEPTEM 3ER
FLOW DURATION CURVES
LANDSBURG
14000
12000
10000
8000
U
U
U
6000
4000
2000
0
—+ Base Case Simulated Flows
--� — Alternative la Simulated Flows
10-5 104 10-3 10-2 10 l
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duration Analysis (July - September)
Discharge in Cedar River at Landsburg (USGS gage 12117500)
100
printed 12A)4/97
14000
w 8000
U
N
U
Q 6000
111
0
—+-- Base Case Sirmrlated Flows
—d — Alternative ]b simulated Flows
10-5 10-4 10-3 10-2 10- l 100
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duration Analysis (July - September)
Discharge in Cedar River at Landsbtug (USGS gage 12117500)
printed 12/04/97
14000
12000
10000
8000
a�
on
v
6000
4000
2000
0
—+ Base Case Simulated Flows
—,p — Altemative 2a Simulated Flox%s
10 5 10-4 10-3 10-2 10-1
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duration Analysis (July - September)
Discharge in Cedar River at Landsbiug (USGS gage 12117500)
100
printed 12/04/97
14000
12000
10000
8000
a�
bn
U
6000
4000
2000
0
—+-- Base Case Sinuilated Flows
Alternative 2b Sinudated Flows
10-5 10-4 10-3 10-2 10-1
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duration Analysis (July - September)
Discharge in Cedar River at Landsburg (USGS gage 12117500)
100
printed 12/04/97
14000
12000
10000
w 8000
U
N
U
6000
4000
2000
0
—+ Base Case simulated Flows
Alterative 2c SinUated Flows
10-5 104 10-3 10-2 10- l
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duration Analysis (July - September)
Discharge in Cechar River at Landsburg (USGS gage 12117500)
10O
printed 12/04/97
14000
12000
10000
8000
U
U
U
6000
4000
2000
0
— + Base Case Sirmflated Flows
—p — Altemative 3a Sirrnrlated Flows
10-5 10 4 10 3 10 2 10 1
Fxceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duation Analysis (July - September)
Discharge in Cedar River at Landsburg (USGS gage 12117500)
100
printed 12/04/97
14000
12000
8000
a�
cn
U
6000
'l l
0
—+ Base Case Simudated Flows
_d — Altemmtive 3b Simulated Flows
10 5 10-4 10-3 10 2 10 I
Exceedance Probability (p)
Masonry Dam Flood Operations Shady - Seasonal Flow Duration Analysis (July - September)
Discharge in Cedar River at Landsbtwg (USGS gage 12117500)
10()
printed 12/04/97
14000
12000
10000
8000
U
tU
cc
U
6000
4000
2000
0
—+ Base Case Sirrnilated Flows
—d — Altematiive 4a Siirnilated Flows
10 5 104 10-3 10 2 l 0- l
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duration Analysis (July - September)
Discharge in Cedar River at Landsbtug (USGS gage 12117500)
10O
printed 12/04/97
14000
12000
10000
8000
a�
U
6000
4000
2000
0
— + Base Case Simulated Flows
—p — Alternative 4b Simulated Flows
10 5 104 10-3 10-2 10-1
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Dtlration Analysis (July - September)
Discharge in Cedar River at Landsbu g (USGS gage 12117500)
10,
printed 12/04/97
14000
12000
10000
w 8000
U
U
bn
U
Q 6000
4000
2000
0
—+ — Base Case Sinnilated Flows
—p — Altemative 4c simulated Flows
10 5 104 10-3 10-2 10- I
Exceedance Probability (p)
Masonry Dahl Flood Operations Study - Seasonal Flow Duration Analysis (July - September)
Discharge in Cedar River at Landsburg (USGS gage 12117500)
100
printed 12/04/97
FLOW DURATION CURVES
16000
14000
12000 \
10000
a�
8000
U
ti
1=
111
C1]
—+ Base Case simulated Flows
Alternative 4b simulated Flows
10-5 10, 10-3 10-2 10 1
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Annual Flow Duration Analysis
Discharge in Cedar River at Renton (USGS gage 12119000)
m
printed 12/04/97
16000
14000
12000
10000
a�
8000
U
6000
4000
2000
0
--+— Base Case Simulated Flows
—p — Alternative la Sirrailated Flows
10 5 10-4 10-3 10 2 10-1 100
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Annual Flow Duration Analysis
Discharge in Cedar River at Renton (USGS gage 12119000)
printed 121C)3/97
16000
14000
12000
10000
a�
8000
U
6000
4000
2000
0
.} Base Case Sint"ed Flows
Alternative lb Simulated Flows
10-5 10-4 10-3 10 2 10-1 10,
ExceedanceProbability (p)
Masonry Dam Flood Operations Study - Annual Flow Duration Analysis
Discharge in Cedar River at Renton (USGS gage 12119000)
printed 12ro3/97
12000
/111
`i
8000
U
6000
2000
1❑
A,
A
16,
..�. -- Base Case Simudated Flows
— d — Alterative 2a Simulated Flows
10 5 104 10-3 10-2 10-1
Exceedance Probability (p)
Masonry Dam Flood Operations Shady - Annual Flow Duration Analysis
Discharge in Cedar River at Renton (USGS gage 12119000)
100
printed 12/03/97
16000
14000
12000 \
10000
8000
U
6000
m
--+-- Base Case Sin mated Flows
—A — Alternative 2b simulated Flows
10 5 104 10-3 10-2 10-1
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Annual Flow Duration Analysis
Discharge in Cedar River at Renton (LJSGS gage 12119000)
10°
printed 12/03/97
16000
14000
12000
10000
8000
U
1-
:I'11'
111
1
�.�._ _ Base Case Simulated Flows
Altmmfive 2c Simulated Flows
A
l 0 104 10-3 10-2 10-1 100
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Annual Flow Duration Analysis
Discharge in Cedar River at Renton (USGS gage 12119000)
printed 12/03/97
•111
12000
a�
8000
U
f-�
6000
.1/
U
--+ — Base Case Simulated Flows
—A -.- Altemative 3a Simulated Flows
�e
'4
10-5 104 10-3 10 2 10 1
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Annual Flow Duration Analysis
Discharge in Cedar River at Renton (USGS gage 12119000)
100
printed 12/03/97
1600(
14000
12000
U
N
8000
U
NOR
4000
wil 1
H
Ie
A
ems_
-- + Base Case Simulated Flows
-••-p - Alternative 3b Simulated Flows
10-5 104 10-3 10-2 10-1
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Annual Flow Duration Analysis
Discharge in Cedar River at Renton (USGS gage 12119000)
10()
printed 12/03/97
16000
14000
12000
10000
8000
U
6000
111
n
�4
-,o
--+ Base Case Simulated Flows
Altemative 4a Sirrnilated Flows
10 5 104 10-3 10 2 10-1
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Annual Flow Duration Analysis
Discharge in Cedar River at Renton (USGS gage 12119000)
100
printed 12/03/97
16000
14000
12000
10000
8000
rA
6000
n
--+ Base Case Sirn fated Flows
Altemative 4c Simulated Flows
�Q
0
10-5 10-4 10-3 10-2 10-1
Exceedance Probability (p)
Masonry Darn Flood Operations Study - Annual Flow Dmation Analysis
Discharge in Cedar River at Renton (USGS gage 12119000)
10()
printed 12/03/97
OCTOBER - MARCH
FLOW DURATION CURVES
RENTON
16000
14000
12000
10000
a�
8000
U
6000
4000
2000
0
— + Base Case Simulated Flows
—p — Altemative la Sir n fated Flows
.4
10-5 104 10-3 10-2 10-1 100
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duation Analysis (October - March)
Discharge in Cedar River at Renton (USGS gage 12119000)
printed 12/tk1/97
16000
14000
12000
10000
8000
CA
6000
4000
2000
0
+ Base Case Simulated Flows
—p — Alternative lb Simulated Flows
.4
10-5 104 10-3 10-2 10-1 100
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duration Analysis (October - March)
Discharge in Cedar River at Renton (USGS gage 12119000)
printed 12/04/97
14000
12000
a�
8000
rA
111
2000
0
—+ Base Case Simulated Flows
4 —A — Alternative 2a Simulated Flows
�o
10 5 104 10-3 10-2 10 1
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duration Analysis (October - March)
Discharge in Cedar River at Renton (USGS gage 12119000)
10°
printed 12/04/97
16000
14000
4
12000 �.
10000
8000
i
1' 1
7
—+ Base Case Sinn fated Flows
---A — Alternative 2b Sinudated Flows
10 5 104 10-3 10-2 10-1
Exceedance Probability (p)
Masonry Darn Flood Operations Study - Seasonal Flow Duration Analysis (October - March)
Discharge in Cedar River at Renton (USGS gage 12119000)
100
printed 12/04/97
16000
14000
4
12000
P111`
8000
U
N
1-
4000
2000
0
--+ Base Case Simulated Flows
--A — Altemative 2c Simulated Flows
10 5 104 10-3 10-2 10 1
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duration Analysis (October - March)
Discharge in Cedar River at Renton (USGS gage 12119000)
10p
pruned 12A 4/97
109111111
14000
12000
a�
8000
Ln
6000
1' 1
a
—+ Base Case Sinndated Flows
p — Altemative 3a Simulated Flows
10) 10-4 10-3 10-2 10- l
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Dtlration Analysis (October - March)
Discharge in Cedar River at Renton (USGS gage 12119000)
10,
printed 12/t}4/97
14000
12000
8000
rA
6000
0
—. f.-- Base Case Simulated Flows
—p — Alternative 3b Simulated Flows
10 5 10-4 10-3 10-2 10-1
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duration Analysis (October - March)
Discharge in Cedar River at Renton (USGS gage 12119000)
100
printed 12/04/97
16000
14000
12000 \
8000
Ln
6000
2000
0
— + Base Case Simulated Flows
—p — Altmofive 4a Simulated Flows
10-5 104 10-3 10-2 10-1
Fxceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duration Analysis (October - March)
Discharge in Cedar River at Renton (USGS gage 12119000)
10()
printed 12/04/97
16000
14000
12000
I-
c6
a�
8000
CA
1=
PI f
/11
ID
+ Base Case Sinubted Flows
--d — Alternative 4b SimWated Flows
A,
A
10-5 10-4 10-3 10 2 10 t
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duration Analysis (October - March)
Discharge in Cedar River at Renton (USGS gage 12119000)
10,
printed 12/04/97
16000
'IC
14000
12000
a�
8000
U
6000
m
M
—+ Base Case SinuUted Flows
--A — Alternative 4c SimWated Flows
10-5 10-4 10-3 10 2 10 1
Exceeciance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Dmation Analysis (October - March)
Discharge in Cedar River at Renton (USGS gage 12119000)
100
printed 12/04/97
o
FLOW DURATION CURVES
RENTON
16000
14000
12000
10000
U
U
8000
U
6000
4000
2000
0
—+ Base Case Simmdated Flows
— Alternative la Simulated Flms
10-' 104 10-3 10.2 10- l 10°
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow DtuVion Analysis (April - June)
Discharge in Cedar River at Renton (USGS gage 12119000)
printed 12A)4/97
16000
14000
12000
10000
a�
8000
U
6000
4000
2000
0
—+ — Base Case Sinndated Flows
— Alternative lb Simulated Flows
10-5 10-4 10-3 10 2 IT 1 100
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duration Analysis (April - June)
Discharge in Cedar River at Renton (USGS gage 12119000)
printed 12/04/97
16000
14000
12000
10000
U
N
8000
U
6000
4000
2000
0
—+ Base Case Simulated Flows
--p — Alternative 2a Simulated Floes
10-5 10-4 10-3 10-2 10 1 100
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duration Analysis (April - June)
Discharge in Cedar River at Renton (USGS gage 12119000)
printed 12/04/97
16000
14000
12000
10000
w
U
U
8000
.0
CA
U
6000
4000
2000
0
_—+ Base Case Simulated Flows
—p — Alternative 2b Simulated Flows
10 5 104 10-3 10 2 10 1 10��
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duration Analysis (April - June)
Discharge in Cedar River at Renton (USGS gage 12119000)
printed 12A)4/97
16000
14000
12000
10000
a�
8000
v
6000
4000
2000
0
+ Base Case Sinndated Flows
Altem five 2c Sinadated Flows
10 10-4 10-3 10-2 10-1 10°
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duration Analysis (April - June)
Discharge in Cedar River at Renton (USGS gage 12119000)
printed 12/04/97
•111
14000
12000
`i
a�
8000
U
R
2000
0
—+ Base Case Sicmdated Flows
—A — Altemative 3a Shnulated Flows
0 _ - -A — - - --- --- - -
10-5 10-4 10-3 10-2 10-1 100
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Thtration Analysis (April - June)
Discharge in Cedar River at Renton (USGS gage 12119000)
printed 12/tk1/97
•111
14000
12000
a�
8000
U
rUl
O I,
2000
M
—.f.— Base Case Sindated Flows
— Alternative 3b Simulated Flows
10 5 10-4 10-3 10-2 10-1 100
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duation Analysis (April - June)
P;scharge in Cedar River at Renton (USGS gage 12119000)
printed 1 v04/97
14000
12000
N
8000
U
1-
2000
A
—+ Base Case Simtilated Flows
A — Alternative 4a Simulated Flows
a - - —
10-5 104 10-3 10-2 10-1 100
Exceedance Probability (p)
Masonry Dam Flood Operations Shady - Seasonal Flow Duration Analysis (April - June)
Discharge in Cedar River at Renton (USGS gage 12119000)
printed 12A)4/97
:111
14000
12000
w
U
U
8000
U
6000
2000
m
—+ Base Case Sitmdated Flows
--.A — Altemative 4b Sini dated Flows
P71--A-
10 5 10-4 10-3 10.2 10-1 l 0°
Exceedance Probability (p)
Masonry Dam Flood Operations Shady - Seasonal Flow Duration Analysis (April - Jtme)
Discharge in Cedar River at Renton (USGS gage 12119000)
printed 12/04/97
•11/
14000
12000
10000
a�
8000
U
H
6000
1511
7
—+ Base Case Simulated Flows
—p — Alterative 4c Simulated Flows
10 5 10 10-3 10 2 10-1 100
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duration Analysis (April - June)
Discharge in Cedar River at Renton (USGS gage 12119000)
printed 12/04/97
DULY - SEPTEM 3ER
FLOW DURATION CURVES
RENTON
16000
14000
12000
10000
a�
8000
U
,,rtir
6000
4000
2000
0
—+-- Base Case Sinwlated Flows
—p — Alternative la Sirmflated Flows
10-) 104 10-3 10 2 10-1 10��
Exceedance Probability (p)
Masonry Darn Flood Operations Shady - Seasonal Flow Duration Analysis (July - September)
Discharge in Cedar River at Renton (USGS gage 12119000)
printed 12/tl4/97
16000
14000
12000
10000
a�
8000
U
y
6000
4000
2000
0
—+ Base Case Sinwlated Flows
--A — Alternative lb simulated Floes
10 ) 10-4 10-3 10-2 10 1 100
Exceedance Probability (p)
Masonry Darn Flood Operations Shady - Seasonal Flow Dwation Analysis (July - September)
Discharge in Cedar River at Renton (USGS gage 12119000)
printed 12A)4/97
16000
14000
12000
10000
a�
8000
U
6000
4000
2000
0
—+ Base Case Simulated Flows
--.A — Altemative 2a Simulated Flows
10 5 10-4 10-3 10 2 10 t 100
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Din-ation Analysis (July - September)
Discharge in Cedar River at Renton (USGS gage 12119000)
printed 12A)4/97
16000
14000
12000
10000
a�
8000
CA
CU
6000
4000
2000
0
—+ Base Case Simulated Flows
.-0 — Alternative 2b Simulated Flows
10 5 104 10-3 10 2 10 t
Fxceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duration Analysis (July - September)
Discharge in Cedar River at Renton (USGS gage 12119000)
printed 12/04/97
16000
14000
12000
10000
a�
8000
U
6000
4000
2000
0
—+ Base Case Sirn elated Flows
.—A — Alternative 2c Sirn alated Flows
10 5 104 10-3 10 2 10-1 10��
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duration Analysis (July - September)
Discharge in Cedar River at Renton (USGS gage 12119000)
printed 12A)4/97
16000
14000
12000
a�
8000
U
6000
H 1�11
2000
0
—+ Base Case Simmdated Flows
--d — Altemative 3a Simulated Flows
A- " ---- - - --- --- - -
10 5 104 10-3 10-2 10-1 10°
Exceeclance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duration Analysis (July - September)
Discharge in Cedar River at Renton (USGS gage 12119000)
printed 12/04/97
•111
14000
12000
U
8000
U
N
9
011E
I
PI I
0
Base Case Simudated Flows
p — Alternative 3b Simulated Flows
10 5 104 10 3 10-2 10 1 100
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duration Analysis (July - September)
Discharge in Cedar River at Renton (USGS gage 12119000)
printed 12A 4/97
16000
14000
12000
10000
a�
8000
U
,,terr
L--a
6000
4000
2000
0
—.}.-- Base Case Sinndated Flows
—,p — Alternative 4a Simulated Flows
10-5 104 10-3 10-2 10-1 1 Ot1
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duratipn Analysis (July - September)
Discharge in Cedar River at Renton (USGS 12119000)
printed 12/04/97
16000
14000
12000
10000
a�
8000
U
6000
4000
2000
0
—+ Base Case Sinwlated Flows
-_--A — Alternative 4b Simulated Flows
10-5 104 10-3 10 2 10-1 10�
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Dm-ation Analysis (July - September)
Discharge in Cedar River at Renton (USGS gage 12119000)
printed 12/04/97
16000
14000
12000
10000
a�
8000
U
6000
4000
2000
0
--+ Base Case Sinnilated Flows
— d — Alternative 4c SkmAated Flows
10) 104 10-3 10 2 10- l 10�'
Exceedance Probability (p)
Masonry Dam Flood Operations Study - Seasonal Flow Duation Analysis (July - September)
Discharge in Cedar River at Renton (USGS gage 12119000)
printed 12/04/97