HomeMy WebLinkAboutTED4003034r
R-30.31
Honey Crest
Technical Information Report
Submitted to:
City of Renton
1055 South Grady Way
Renton, WA 98055
Me Prepared by:
W A C�
o� Sh'I��� Haozous Engineering, P.S.
9957171StAvenue SE
Renton, WA 98059
Tel. (425) 235-2707
�0 28576 , Fax (425)254-0579
ONAL
September 30, 2001
EXPIRES: 2/19/ 03 Revised July 8, 2002
From: Allen Quynn
To: Henninger, Arneta
Date: 8/16/02 4:01PM
Subject: Honey Crest Dainage Review
My comments are as follows:
1. In reviewing the KCRTS output in Appendix B.2 of the pond design, I noticed
that the first cutoff in the Duration Comparison Analysis has a %change of
2.4%. The Run Off Time Series Section of the manual allows a % change equal
to 0.0 or less. Applicant will need to make corrections to pond design as
necessary to satisfy the above requirement.
2. The backwater analysis spreadsheet in Fig. C.1.1 shows a headwater
elevation for CB9 of 412.89 and a rim elevation of 413.11 or a difference of
0.22 feet. A minimum of 0.5 feet of freeboard is required when analyzing the
25-year storm event. Similarly, CB10 has only a 0.09 feet of freeboard.
Applicant will need to revise design to meet the minimum freeboard
requirement.
3. I did not see any design calculations for the emergency spillway.
Otherwise, the drainage report and design plans look fine.
CC: Straka, Ronald
- -
Ronald Straka - Mylar Signatures
From: Jessica Briere
To: Abdoul Gafour; Corey W Thomas; David Christensen; Ronald Straka
Date: 10/4/02 10:33AM
Subject: Mylar Signatures
Please come to Carrie's desk area to sign/approve the mylars for "Honey Crest Plat". For
questions/comments see the project manager Arneta H.
Thank you.
CC: Arneta Henninger; Carrie Olson -Davis
Honey Crest
Technical Information Report
iY OF RENTON
'"'WED
700/-
wovwr 9 SERVICE
Submitted to:
City of Renton
1055 South Grady Way
Renton, WA 98055
wPrepared by:
g� a C�
s�l�?� Haozous Engineering, P.S.
9957 171St Avenue SE
Cne — (A- Renton, WA 98059
U r Tel. (425) 235-2707
�0 � 28576 � ��v Fax (425) 254-0579
�s �ISTER� G~
�-� a SI ANAL
September 30, 2001
EXPIRES: 2/19/ 03 Revised July 8, 2002
TABLE OF CONTENTS
1.
Project Overview..............................................................................................................1-1
2.
Conditions and Requirements Summary ...........................................................................
2-1
3.
Offsite Analysis.................................................................................................................
3-1
4.
Flow Control and Water Quality Facility Analysis and Design ........................................
4-1
5.
Conveyance System Analysis and Design........................................................................
5-1
6.
Special Reports and Studies..............................................................................................
6-1
7.
Other Permits....................................................................................................................
7-1
8. ESC Analysis and Design......................:.......................................................................... 8-1
9. Bond Quantities and Facility Summaries.......................................................................... 9-1
10. Operations and Maintenance Manual........................................................................... 10-1
11. References.....................................................................................................................11-1
LIST OF TABLES
Table 1. Description of Downstream Conveyance System ................................................... 3-4
Table 2. Existing and Developed Site Basin Conditions...................................................... 4-2
Table 3. Summary of Performance Standards....................................................................... 4-3
Table 4. Wet Pond Sizing Calculations................................................................................ 4-8
Table 5. Summary of Special Reports and Studies............................................................... 6-1
Table 6. Summary of Other Permits Required...................................................................... 7-1
Table 7. Summary of Maintenance Requirements for Stormwater Facilities .....................10-1
H
LIST OF FIGURES
Figure1. TIR Worksheet......................................................................................................1-2
Figure2. Vicinity Map..........................................................................................................1-5
Figure 3: Drainage Basins.....................................................................................................1-6
Figure4. Soils Map...............................................................................................................1-7
Figure 5. Downstream Conveyance System......................................................................... 3-3
Figure 6. Stormwater System Design.................................................................................... 4-5
Figure 7. Flow Duration Curves for R/D.............................................................................. 4-6
Figure 8. Erosion and Sedimentation Control Plan .............................................................. 8-2
Figure 9. Site Improvement Fee Calculation Worksheet...................................................... 9-2
Figure 10. Flow Control and Water Quality Facility Summary ............................................ 9-3
APPENDICES
Appendix A. Downstream System
Appendix B. Stormwater R/D System Design
Appendix C. Conveyance Calculations
Appendix D. Hydrologic Model Documentation
Appendix E. Proposed Site Plan
U
Project Description
A summary of the Honey Crest project is provided in the TIR Worksheet (Figure 1). This
preliminary technical information report (TIR) addresses the design of stormwater facilities and
the offsite drainage analysis for the Honey Crest project. The Honey Crest project is a proposed
residential development located within the City of Renton in King County (Figure 2). The
proposal for development includes building 18 single-family dwellings and maintaining one
existing dwelling on 3.1 acres. An existing single-family dwelling will be preserved and
included in the plat design. The proposed site plan is provided in Appendix E.
Site Description
The site is located within the Cedar River watershed (King County Department of Natural
Resources, 1997). The project address is 4210 NE 9th Place. The project is located east of Union
Avenue and south of NE 9 h Court. The site is relatively flat. The elevation of the site ranges
from 417 feet in the northwest corner to 411 feet in the southwest corner. The only distinct flow
path from the site is near a pipe leaving the southwest corner of the property (Figure 3).
Cover types on the site include those associated with four single-family residences, second
growth forest, and areas of dense briars (Photo 1 in Appendix A.1). Based on King County Soil
Survey (U.S. Department of Agriculture, 1973) the site consists of Alderwood soils (Figure 4).
Drainage from an approximately 1.1-acre tributary subbasin to the west sheet flows towards the
site and church property. The downstream drainage course passes through the church property to
the south, then through the Honey Dew Elementary School property, and eventually discharges to
a tributary of the Cedar River (King County Department of Parks, Planning, and Resources,
1990). A detailed assessment of the downstream conveyance system is provided in Section 3.
Stormwater Design
Under developed conditions, stormwater from the site will be collected and treated to basic water
quality standards in a combined wetpond/detention pond. Level 2 R/D standards are required by
the City of Renton and recommended by Lower Cedar River Basin and Nonpoint Action Plan.
The natural discharge location from the site will be maintained at the outlet of the proposed
stormwater pond. An agreement with the Renton Church of the Nazarene allows the stormwater
pond to be constructed on the church property. The pond has been designed to provide Level 2
detention for runoff from future improvements on the church property that include up to 0.82
acres of new impervious area. The wetpond volume in the pond is sized to treat runoff from the
proposed Honey Crest development, the offsite tributary area, and the entire area of the church
property that drains to the pond, including future improvements. Runoff from these areas is
currently untreated.
1-1
Honey Crest TM —July 2002
Figure 1. TIR Worksheet
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 1 PROJECT OWNER AND
PROJECT ENGINEER
Project Owner:
Honey Crest LLC.
Address:
C/o: John Petersen
Honey Crest LLC.
4720 200 Street SW
Lynwood, WA 98046
Phone:
(206) 423-6986
Project Engineer:
Ed McCarthy, P.E.
Company:
Haozous Engineering, P.S.
Address/Phone:
9957 171s' Avenue SE
Renton, WA 98059
(425) 235-2707
Part 3 TYPE OF PERMIT APPLICATION
Residential
❑X Grading
Part 2 PROJECT LOCATION AND
DESCRIPTION
Project Name:
Honey Crest
Location:
The project address is 4210 NE 91h Place.
The project is located east of Union Avenue
and south of NE 91h Court.
Township: 23N
Range: 5E
Section: 10
Description:
The proposal for development includes building
18 single-family dwellings and preserving one
dwelling on 3.10 acres.
Part4 OTHER REVIEWS AND PERMITS
❑ DFW HPA
❑ Wetlands
❑ National Pollutant Discharge Elimination
System (NPDES) Stormwater Permit
❑ Forest Practices Class IV General
Part5 SITE COMMUNITY AND DRAINAGE BASIN
Community: City of Renton
Drainage Basin: Maplewood Creek of the Lower Cedar River Watershed
Part 6 SITE CHARACTERISTICS
❑
River: N/A
❑
Steep Slopes: N/A
❑
Stream: N/A
❑
Floodplain: N/A
❑
Critical Stream Reach: N/A
0
Wetlands: Church property wetland
❑
Depressions/Swales: N/A
❑
Seeps/Springs: N/A
❑
Lake: N/A
❑
High Groundwater Table: N/A
❑
Groundwater Recharqe: N/A
FAR
Part 7 SOILS
Soil Type Slopes
Alderwood Moderate
Part 9 ESC REQUIREMENTS
MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION
❑ Sedimentation Facilities
❑X Stabilized Construction Entrance
0 Perimeter Runoff Control
0 Cover Practices
0 Construction Sequence
Part10 SURFACE WATER SYSTEM
Erosion Potential Erosive Velocities
LIMITATION/SITE CONSTRAINT
Onsite treatment - basic standards
Level 2 RID standards
MINIMUM ESC REQUIREMENTS
AFTER CONSTRUCTION
❑X Stabilize Exposed Surface
0 Remove and Restore Temporary ESC Facilities
❑X Clean and Remove All Silt and Debris
0 Ensure Operation of Permanent Facilities
❑X Wetpond onsite Basic water quality treatment
❑X RID Pond Level 2 RID standards are proposed
Facility Related Site Design Considerations:
Reference Facility
Design Consideration
1-3
Part 11 STRUCTURAL ANALYSIS
❑ Rockery > 4' High: N/A
❑ Berms > 6': N/A
Part 12 EASEMENTS/TRACTS
❑x Drainage Easement
❑ Access Easement
❑ Native Growth Protection Easement
❑ Sensitive areas
❑X Stormwater tracts
Part 13 SIGNATURE OF PROFESSIONAL ENGINEER
I or a civil engineer under my supervision have visited the site. Actual site conditions as observed
were incorporated into this worksheet and the attachments. To the best of my knowledge the
information provided here is accurate.
L 44 J 6--� --�'VP2
Sig d/Dat
I-4
N
O
V
N
C
00 w
It
� a
r
SITE
4
b
.i�� •6� :� .i�� ��� *% :rod' {.:=• (;
GIAVE#
L P!'{
v -
PYP'`od; r
AgC r..
I
ter. } �,,,. _ - k •
SCALE: 1:24 000
1" = 2,000'
TITLE
M� 5J� Q� M(� j� j�J�(� F.S.Figure 4. Soils Map
HAOOZOOW rIIUV�IIII�ERIIIIIVo FN PAGE DATE
1-7 9/26/01
�.... c .. a zt,��..a
A summary of conditions and requirements for the project are presented in this section. The
following is a summary of core and special requirements from the 1998 King County Surface
Water Design Manual:
Core Requirement 1: Discharge at the Natural Location
The natural discharge location from the site will be maintained at the outlet of the proposed
stormwater pond.
Core Requirement 2: Off -site Analysis
A Level 1 downstream drainage analysis is presented in Section 3.
Core Requirement 3: Runoff Control
Level 2 R/D standards are required for the site.
Core Requirement 4: Conveyance System
The onsite stormwater conveyance system and offsite improvements will be designed to
convey the 25-year storm.
Core Requirement 5: Erosion/Sedimentation Control Plan
Proposed erosion/sedimentation control procedures are described in Section 8.
Core Requirement 6: Maintenance and Operation
The proposed system for managing stormwater will be maintained and operated by a
homeowners association and/or the Renton Church of the Nazarene. Recommended
maintenance activities are provided in Section 10.
Core Requirement 7: Bonds and Liability
Bonds and liability requirements are presented in Section 9.
Core Requirement 8: Water Quality
As described in Section 5.E, basic water quality standards apply to the site. A basic wetpond
will provide water quality treatment for stormwater collected from the site and
2-1
Honey Crest TM —July 2002
offsite improvements. The wetpond has been sized to provide treatment from the entire
church property that drains to the pond.
Special Requirement 1: Other Adopted Area -Specific Requirements
The site is within the Cedar River Basin. Basin -wide requirements recommended by the
Lower Cedar River Basin and Nonpoint Action Plan apply to the site. Based on City of
Renton maps, the site is surrounded by parcels within a Zone 2 Aquifer Protection Area, but
is not identified as being within such a zone (Figure A.2.1 in Appendix A.2).
Special Requirement 2: Delineation of 100-Year Floodplain
The site is not within a 100-year floodplain.
Special Requirement 3: Flood Protection Facilities
The project does not contain nor is it adjacent to a flood protection facility.
Special Requirement 4: Source Controls
Source controls are not proposed for the development.
Special Requirement 5: Oil Control
The proposed development does not meet the definition of a high -use site requiring oil
control.
2-2
Honey Crest 77R —July 2002
3: Offsite A ijjyS s
A downstream drainage analysis for the site is presented in this section. The drainage course
from the site was assessed on 8/14/01 and 8/27/01. Rainfall occurred on the day prior to the
8/27/01 site visit. The downstream conveyance system is described below and illustrated in
Figure 5. Further descriptions of downstream structures are summarized in Table 1.
A wet weather follow-up investigation of the Honey Crest site was conducted on April 9, 2002.
Rainfall occurred shortly prior to the site visit. Puddles had formed along the gravel road that
enters the site. Neither ponded nor flowing water were observed within the pervious portions of
or along its boundaries.
Upstream Drainage
The topography of the site and surrounding area is flat (Photo 1 in Appendix A.1). Based on the
site's topographic map, it appears that drainage from residential lots adjacent to the site's west
boundary sheet flows towards the site (Location 1 in Figure 5). Runoff from areas north of the
site is intercepted by NE 9`h Court (Location 2). Mission Hills subdivision is located east of the
site (Location 3) and has its own stormwater collection system. Runoff from the southern
portion of the site appears to sheet flow towards the property to the south, owned by the Renton
Church of the Nazarene (Location 4). However, the primary discharge location from the site is
from the southwest corner of the site (Location 5). Runoff from this low area of the site flows to
a ditch along the south boundary of the site and subsequently to a pipe system on the church
property to the south as described below.
Downstream Drainage Course
From the southwest corner of the site, runoff flows to an open channel/ditch along the south
boundary of the site (Location 6). The ditch is somewhat constricted by yard debris as is flows
west a short distance and then into an 8-inch diameter CMP (Location 7). The 8-inch diameter
CMP flows to the southeast and connects to the stormwater system on the Renton Church of the
Nazarene property. The conveyance system is 12-inch diameter CMP along the church parking
lot (Locations 8 and 9). A 48-inch diameter Type 2 catch basin contains a 12-inch diameter CMP
riser that apparently acts as an oil/water separator for the parking lot. From this catch basin, a
12-inch diameter CMP (Location 10) conveys drainage to an outfall to the east on the church
property (Location 11). The storm system outfall is in the buffer of a Class 3 wetland (Photo 2 in
Appendix A.1). At the outlet of the wetland, the area of the site comprises approximately 15
percent of the tributary basin. From the wetland, runoff flows to the south and is conveyed under
the Honey Dew Elementary play fields through an 18-inch diameter pipe (Locations 12-14; Photo
3 in Appendix A.1). This section of the conveyance system was upgraded when the Mission
Hills plat was constructed (Harmsen & Associates, Inc., 1992). From the play fields, the pipe
system connects to a catch basin on the south side of NE 8 h Street (Location 15) and then crosses
between two lots within the Orchards plat to a catch basin on the north side of NE 7a' Place
(Location 16). This catch basin has approximately 6 inches of sediment. The pipe system then
3-1
Honey Crest 77R—July 2002
connects to a catch basin on the south side of NE 7th Place (Location 17). From this catch basin,
a 20-inch diameter pipe conveys drainage to the south (Location 18) and then turns west
(Location 19). The 20-inch diameter pipe outfalls in an open channel/wetland (Location 20;
Photo 4 in Appendix A.1). The open channel flows through an on-line stormwater facility that
was constructed as part of the Orchards plat (Location 21).
Downstream Drainage Complaints
Previous downstream drainage analyses for Mission Hills (Harmsen & Associates, Inc., 1992)
and the Orchards were reviewed. Conveyance constrictions were described by Harmsen &
Associates, Inc. at the Honey Dew Elementary School. The pipe system that crosses the athletic
fields of the schoolyard used to be 12-inch diameter and poorly maintained. This pipe system has
since been upsized to 18-inch diameter and appeared to be in good condition.
3-2
Homey Crest 77R—July 2002
4-
j4V
LEGEND
Location ID
Culvert
Ditch
Catch Basin
Sheet Flow
SCALE: I" = 250'
TITLE
Figure S. Downstream Conveyance
HAOZOW EMUMEERM. F.S. System
it PAGE DATE
3-3 1 9/26/01
Table 1. Description of Downstream Conveyance System
Site Visits on 8/14/01
and 9/26/01
Basin: Maplewood Creek Tributary of the Cedar River Weather: Sunny
Location
Drainage
Drainage
Slope
Distance from
Existing
Potential
Observations of Field
ID
Component Type,
Component
Site Discharge
Problems
Problems
Inspector, Resource
Name, and Size
Description
Reviewer, or
Resident
See Fig. 5
Type: sheet flow, swale,
drainage basin,
1/4 mile=1,320 ft
constrictions, under capacity, ponding,
tributary area, likelihood of
stream, channel, pipe.
vegetation, cover, depth,
(%)
(FT)
overtopping, scouring, bank sloughing,
problem, overflow
Size: diameter, width
type of sensitive area
sedimentation, incision, other erosion
pathways, potential impacts
I
Sheet flow onto site
Residential lots
1-3
West boundary of
located to the west of
site
the site
2
Sheet flow from
Road stormwater
1-3
North boundary
subbasin north of site
collection system
of site
collected by road storm
along NE 9a' Ct
system
3
Mission Hills
Existing stormwater
1-3
East boundary of
Runoff collected and
subdivision
system
site
conveyed to Mission
Hills stormwater system
4
Sheet flow from site
Sheet flow likely
1-3
South boundary
Sheet flow onto church
occurs across portion
of site
property is collected by
of south boundary of
storm collection pipe in
site
church parking lot
5
SheWshallow flow
Main discharge
1
Southeast corner
Most of the sheet flow
from site
location from site
of site
from interior of property
Rely flows to this low
spot on the site
6
Ditch
Ditch along south
1
0-20
No signs of
Yard waste and debris in
Width: 2-6'
boundary conveys
erosion or
ditch reducing the ditch
Depth: 1-2'
drainage to 8-inch
overtopping
capacity
Side slope. 3:1
diameter CMP pipe
7
8-inch diameter CMP
Conveys drainage to
1
20-50
pipe
church stormwater
system
Table I (continued)
Basin: Maplewood Creek Tributary of the Cedar River
Location
Drainage
Drainage
Slope
Distance from
Existing
Potential
Observations of Field
ID
Component Type,
Component
Site Discharge
Problems
Problems
Inspector, Resource
Name, and Size
Description
Reviewer, or
Resident
See Fig. 5
Type: sheet flow, swale,
drainage basin,
1/4 mile=1,320 ft
constrictions, under capacity, ponding,
tributary area, likelihood of
stream, channel, pipe.
vegetation, cover, depth,
(%)
(FT)
overtopping, scouring, bank sloughing,
problem, overflow
Size: diameter, width
type of sensitive area
sedimentation, incision, other erosion
pathways, potential impacts
8
12-inch diameter CMP
Church stormwater
1
50-400
Connects to CB in
system
eastern portion of
parking lot
9
12-inch diameter CMP
Church stormwater
1
400-530
Connects to 48-inch
system
diameter manhole with
12-inch riser for
oil/water separator
10
12-inch diameter CMP
Church stormwater
2
530-700
Discharges to Class 3
system
wetland/buffer in dense
briars; outfall not located
11
Wetland
Class 3 wetland
1
700-800
Buffer along west
Wetland discharges to
boundary of
pipe system at north
wetland has been
boundary of Honey Dew
disturbed
Elementary School
12
18-inch diameter N 12
Inlet to pipe
l
800-820
Connects to manhole at
pipe
conveyance system
north edge of athletic
field
13
18-inch diameter N12
Honey Dew
1
820-1,030
Connects to manhole in
pipe
Elementary School
middle of athletic field;
pipe conveyance
manhole lid covered
system
with soil/turf
14
18-inch diameter N12
Honey Dew
1
1,030-1,230
Connects to manhole at
pipe
Elementary School
south edge of athletic
pipe conveyance
field
system
Table 1 (continued)
Basin: Maplewood Creek Tributary of the Cedar River
Location
Drainage
Drainage
Slope
Distance from
Existing
Potential
Observations of Field
ID
Component Type,
Component
Site Discharge
Problems
Problems
Inspector, Resource
Name, and Size
Description
Reviewer, or
Resident
See Pig. 5
Type: sheet flow, swale,
drainage basin,
1/4 mile=1,320 ft
constrictions, under capacity, ponding,
tributary area, likelihood of
stream, channel, pipe.
vegetation, cover, depth,
(%)
(FT)
overtopping, scouring, bank sloughing,
problem, overflow
Size: diameter, width
type of sensitive area
sedimentation, incision, other erosion
pathways. potential impacts
15
18-inch diameter N 12
Connects to CB on
1-2
1,230-1,300
pipe
south side of NE 81h St
16
18-inch diameter N12
Connects to CB on
1-2
1,300-1,450
Outlet pipe from
pipe
north side of NE 7`h PI
CB is 1/3 full with
sediment
17
18-inch diameter N12
Connects to CB on
1-2
1,450-1,480
pipe
south side of NE 7'h Pl
18
20-inch diameter N 12
Connects to CB
1-2
1,480-1,600
pipe
between NE 7`h PI and
NE 7`r' St
19
20-inch diameter N 12
Outfalls to
1-2
1,600-1,900
pipe
wetland/channel
20
Outfall of 20-inch
1-2
1,900
No signs of
diameter N12 pipe
erosions; potential
overtopping onto
adjacent lawn
with backwater
conditions
21
Wetland/channel
1-2
1,900-1,950
22
R/D pond in the
1-2
1,950-2,250
western portion of the
Orchards
Part A: Existing Hydrology
Cover types on the northern portion of the site include lawn areas, roofs, driveways, and a gravel
access road associated with single-family residences. The southern portion of the site is forested.
Cover types and areas used in the stormwater design for existing onsite conditions are
summarized in Table 2.
The site is relatively flat (Figure 3). The only distinct flow path from the site is near a pipe
leaving the southwest corner of the property. Sheet flow across the southern boundary of the site
also likely occurs under heavy rainfall. Drainage from the site (subbasin "siteex") is collected in
a pipe system on the church property to the south. Drainage from residential lots adjacent to the
southern portion of the west boundary of sheet flows towards the site and the neighboring church
drainage system.
Part B: Developed Site Hydrology
The proposal for development includes building 18 single-family dwellings and maintaining one
existing dwelling. The proposed site plan is provided in Appendix E. Under developed
conditions, the Honey Crest site will consist of 1.43 acres of grass and 1.67 acres of impervious
area. Cover type areas for developed onsite conditions are summarized in Table 2. The pond is
also designed to manage runoff from 0.82 acre of incremental impervious area on the church
property.
Under developed conditions, stormwater from the Honey Crest site (subbasin "sitede") will be
collected and treated to basic water quality standards in a combined wetpond/detention pond
located on the church property to the south. The natural discharge location of upstream tributary
areas and the site will be maintained under developed conditions. Runoff from offsite upstream
areas that currently flows to the western portion of the site will be collected in the site's
stormwater system.
Level 2 R/D standards are required by the King County Flow Application Maps and
recommended by the Lower Cedar River Basin and Nonpoint Action Plan. Stormwater from the
site will be collected and conveyed to the Level 2 stormwater facility. The pond has also been
designed to provide Level 2 detention for runoff from future improvements on the church
property. These improvements include adding up to 0.82 acre of impervious area. It is assumed
that up to 0.42 acre that is currently gravel will be either paved or used for a building footprint
sometime in the future. Stormwater from the pond will be discharged from its control structure
to the wetland buffer on the church property, southeast of the site.
4-1
Honey Crest M—July 2002
Table 2. Existing and Developed Site Basin Conditions
Existing Conditions
Subbasins
KCRTS
Till forest
Gravel Wetland
7111--grass
Impery
Total
Basin
(AC)
(AC) (AC)
(A0
(A0
(AC)
Site
siteex
1.78
0.22
-
0.92
0.18
3.10
Offsite Tributary Area
trib
0.13
0.14
-
0.78
0.08
1.13
Church
churchex
-
0.42
-
2.48
1.29
4.18
Total
1.91
0.78
-
4.18
1.55
8.41
Note: Gravel areas were modeled in KCRTS as 50% till grass and 50% impervious.
Developed Conditions
Subbasins KCRTS Till forest Gravel Wetland 77111-grass Impery Total
Basin (AC) (AC) 00 (AC) (AC) (AC)
Onsite Lots/Road sitede
-
-
-
1.43
1.67
3.10
Offsite Tributary Area trib
0.13
0.14
-
0.78
0.08
1.13
Church churchde
-
-
-
1.97
1.71
3.68
R/D Pond churchde
-
I -
I -
1 0.30
1 0.20
1 0.50
Total
0.13
1 0.14
1 -
1 4.48
1 3.66
1 8.41
Note: Gravel areas were modeled in KCRTS as 50% till grass and 50% impervious.
G-�-
'.L5 GL Alr../ I fOVIftt
4-2
Part C: Performance Standards
A summary of flow control, conveyance, and water quality treatment performance standards for
the project is presented in Table 3, below.
Table 3. Summary of Performance Standards
Category
Performance Standard
Source
Flow Control
Level 2 PUD
■ City of Renton
Conveyance System
Capacity
Provide conveyance for
developed 25-year storm
■ Surface Water Design
Manual Section 1.2.4.1
Water Quality
Treatment Menu
Basic water quality treatment; a
wetpond is proposed
■ City of Renton
Source Control
None proposed
■ Not applicable
Oil Control
The site does not meet the
definition of a high -use site
■ Surface Water Design
Manual Section 1.3.5
4-3
Honey Crest TM—J*2002
Part D: Flow Control System
KCRTS was used to design the proposed stormwater facility. Procedures and design criteria
specified in the 1998 King County Surface Water Design Manual were followed for hydrologic
modeling. Descriptions of the stormwater system and details of the design analysis are provided
below. A plan view of the stormwater system for the site is provided in Figure 6.
For stormwater facility designs, the reduced KCRTS time series data set was used for the Sea-
Tac rainfall region with a correction factor of 1.0. Documentation of the KCRTS input and
output including descriptions of executable files, reservoirs, and times series is listed in
Appendix D.
Stormwater from the development will be managed with a combined wetpond/detention facility.
Level 2 R/D standards are proposed for the single discharge location on the site. The facility
shown in Figure 6 meets Level 2 R/D criteria and basic water quality requirements. The facility
has been designed to accommodate up to 0.82 acre of new impervious area at the Renton Church
of the Nazarene. Flow duration curves at the outlet of the pond are provided in Figure 7. Peak
flow rates for the discharge location, for existing and developed site conditions, follow Figure 7.
The duration curves and peak flow rates, shown for existing and developed conditions, indicate
that Level 2 R/D criteria are met at the outlet of the R/D facility. The stormwater facility requires
approximately 25,889 cubic feet of live storage, excluding a factor of safety, to meet Level 2 R/D
standards. A factor of safety of approximately 10 percent has been added for a total required
volume of 28,478 cubic feet.
Part E: Water Quality System
Basic water quality standards apply to the site. A wetpond will provide treatment for the Honey
Crest site, offsite tributary areas to the site, and for all areas of the Renton Church of the
Nazarene property that drain to the pond, including future improvements. Runoff from the
church property is currently untreated. The required wetpond volume was determined using
equations provided in Chapter 6 of the 1998 Surface Water Design Manual. Basin areas, annual
runoff volumes, Vb/Vr ratios, and required volume for the wetpond are given in Table 4.
4-4
Honey Crest TIR-July 2002
` ASAIaLTD
UP. /
ofa 4.
E411. ij
4 I ,�7. / 60.00 I \I ( LOT 17
IL
i 0 '� I.E. ar IIIiW-406.n
li 11 1 ,
+++
via
IN
aoaEcxa 6 .1. / I co 11 j C0 --- -- ?:.�1:� ucn
•, ,; ...,.; SAGA
rert.aaMcwe
y ' 7DPr 41dalS
w .+,-�; l LOT 16
•'rA• 4N'A •L".,, •3'•' �s. 4; 4;{� / ' ' 47! /J 41Ica
•44. \ NOOSE
409.44 _ — 1N6 sAR. SEwaKN
RNIDIA EIFV.=414.11
I.E.%U
IE_ 409.QB _ l� QB 4 a /
- / 1 11�P� �} i;C PLAT OF
TH P 40Bra1 - WSSIONHIMS
/ 12 I 4 _ 40X91 -/ / VOLUME 167 PAGE 39
lE- 44MQ
* / / / 1 � .Do 1
/
LOT IS LOT 14 LOT 13 LOT 12 LOT 11
CB a / \ 1 I
Will- It
w / IE- 401L /
/ 1� TEat, � - �E/ _ - _ -_ -- -_ --
rRAE4pMDR� N 8.24'51'N 41-- -- -- -- -- _
Pam
J /
N0115E 1 \ op- 41 1 413Bd
\ \ \ NOR1N LINE N,/2, S -5 AE- 40XL ' IE- 407.Qe 12 \ ♦ $R1/4, NRI/4, 1023.5
�6 \ / -- - - iE- 40X48 IE_ 183 I -
/ \
ExsrwiGCB
/ 414 \ I.E.I.I?" P RBT= 409.16 EMSTNIi O
\/ I E. 12" CMP REA= .16
w �� _ _ EASTIN6 C6 LE.ir04►EAS1-406.99 I.E. 12"P 407.16
'FA491G01 ` \ RIM =411.52 �'. ! LE. B"OMP SAUSN=40N.66 I.E. 12'CMP-407.16
RIM 713A2
6'jMPR6t=40?'9 \ I.E. 6'CMP NORM�MA.99 ..
P N.N.=405.75 \ \ �SS R^ 45a63 /
LE. 12" EAST 409.54 J.ZI /Carry/ f
\ \ \ /� 6' QRl/SHED SIARFAIXIVG IPfWb QET Yql- Zq,47d CF � , , I I� \
/BOTWM CVARSE PROM QET VtX- 2JL;IW CF - .!L 1'D
\ RWID NET Vt'X- 24761 CF I
FR" NET WX- 24900 CF - d db
/ \ \ DEG W/ENN SUFES 2:1 I
\ \ c \ NET NVIEWOR SCOPES &I I I I
( ( \ \ WET PO11D CELL QIYIDEiP BERAa 2:1 I /
\ ( ENIEWW BEW SLOPES- 1-1
I Ir
( G BM �
col
L.
♦I
co
W
N
O
n
1.2
1
0.4
0.2
no
n .l .4
1.00E-05 1.00E-04 1.00E-03 1.00E-02 1.00E-01 1.00E+00
Probability of Exceedence
Figure 7. Flow Duration Curves for R/D. Duration curves are shown at pond outlet.
The pond is designed to meet Level 2 R/D standards.
4-6
1.2
1
W.
in
LL
U
0.6
3
0
LL
0.4
0.2
Le]
`c
V
1.00E-05 1.00E-04 1.00E-03 1.00E-02 1.00E-01 1.00E+00
Probability of Exceedence
Figure 7. Flow Duration Curves for RID. Duration curves are shown at pond outlet.
The pond is designed to meet Level 2 RID standards.
4-6
Predeveloped Peak Flow Rates
Flow Frequency Analysis
Time Series File:totex.tsf
Project Location:Sea-Tac
---Annual
Peak
Flow Rates ---
Flow Rate
Rank
Time of
Peak
(CFS)
0.954
4
2/09/01
2:00
0.654
7
1/05/02
16:00
1.16
2
2/27/03
7:00
0.570
8
8/26/04
2:00
0.710
6
10/28/04
16:00
1.01
3
1/18/06
16:00
0.931
5
11/24/06
3:00
2.02
1
1/09/08
6:00
Computed Peaks
Developed Peak Flow Rates
Flow Frequency Analysis
Time Series File:rdout.tsf
Project Location:Sea-Tac
---Annual
Peak
Flow Rates ---
Flow Rate
Rank
Time of
Peak
(CFS)
0.987
3
2/09/01
16:00
0.302
7
1/05/02
18:00
0.582
5
3/06/03
20:00
0.275
8
8/23/04
23:00
0.480
6
1/05/05
10:00
0.926
4
1/18/06
21:00
1.13
2
11/24/06
5:00
2.31
1
1/09/08
9:00
Computed Peaks
Horsey Crest 77R -July 2002
-----Flow
Frequency Analysis-------
- - Peaks
- - Rank
Return
Prob
(CFS)
Period
2.02
1
100.00
0.990
1.16
2
25.00
0.960
1.01
3
10.00
0.900
0.954
4
5.00
0.800
0.931
5
3.00
0.667
0.710
6
2.00
0.500
0.654
7
1.30
0.231
0.570
8
1.10
0.091
1.73
50.00
0.980
-Flow Frequency Analysis------
- - Peaks
- -
Rank
Return
Prob
(CFS)
(ft)
Period
2.31
3.09
1
100.00
0.990
1.13
2.79
2
25.00
0.960
0.987
2.74
3
10.00
0.900
0.926
2.71
4
5.00
0.800
0.582
2.42
5
3.00
0.667
0.480
1.87
6
2.00
0.500
0.302
1.20
7
1.30
0.231
0.275
1.00
8
1.10
0.091
1.92
3.03
50.00
0.980
4-7
Table B.1.1. Stormwater Pond Overflow Design
Date: 8/29/02
R/D Facility: Honey Crest
KCRTS Filename: lev2.rdf
Contributing Time Series: totdev15.tsf
Overflow protection structure: outlet control structure riser (Rl)
Emergency overflow structure: emergency spillway
Qd.igr, (CFS):
6.85
(KCRTS 15-minute peak rate)
Top of Control Structure Riser
(FT)
408.00
Min. Top of Berm (FT)
409.00
Structure
Capacity
Elevation
WSE
Structure
Size
Units
Head (FT)
(CFS)
(Fr)
(FT)
Design Operation
Riser R1
24
inches
0.10
408.00
408.10
Primary Overflow
Riser RI
24
inches
0.50
6.89
408.00
408.50
Secondary Inlet
Jailhouse window
98
inches
0.40
6.88
408.10
408.50
Emergency Overflow
Spillway'
23
feet
0.20
6.85
408.50
408.70
Head
(FI')
Design Head above
Required Freeboard:
Riser
0.10
Primary Overflow or
Secondary Inlet Head
0.40
Spillway Head
0.20
Spillway Freeboard
0.30
Total Required
Freeboard
1.00
'Spillway Design:
Spillway design is based on Equation 5-3 of the KCSWDM:
L= [Q./(3.21 *H112), -2.4H
Where:
Qloo = 6.85 cfs
H = 0.20 feet
Therefore:
L = 23 feet
Appendix B.2 KCRTS Pond Design
Retention/Detention Facility
Type
of Facility:
Detention
Pond
Side Slope:
2.00
H:1V
Pond Bottom
Length:
170.88
ft
Pond Bottom
Width:
42.72
ft
Pond
Bottom Area:
7300.
sq. ft
Top Area
at 1 ft. FB:
10974.
sq. ft
0.252
acres
Effective Storage
Depth:
3.00
ft
Stage
0 Elevation:
405.00
ft
Storage
Volume:
25889.
cu. ft
0.594
ac-ft
Riser Head:
3.00
ft
Riser
Diameter:
24.00
inches
Number
of orifices:
2
Full Head
Pipe
Orifice #
Height
Diameter
Discharge
Diameter
(ft)
(in)
(CFS)
(in)
1
0.00
3.19
0.478
2
1.40
2.35
0.189
6.0
Top
Notch Weir:
Rectangular
Length:
12.00
in
Weir Height:
2.50
ft
Outflow Rating
Curve:
None
Stage
Elevation
Storage
Discharge
Percolation
Surf Area
(ft)
(ft) (cu.
ft) (ac-ft)
(cfs)
(cfs)
(sq. ft)
0.00
405.00
0.
0.000
0.000
0.00
7300.
0.03
405.03
219.
0.005
0.050
0.00
7326.
0.07
405.07
513.
0.012
0.071
0.00
7360.
0.10
405.10
734.
0.017
0.087
0.00
7386.
0.13
405.13
956.
0.022
0.101
0.00
7411.
0.17
405.17
1253.
0.029
0.113
0.00
7446.
0.20
405.20
1477.
0.034
0.123
0.00
7472.
0.23
405.23
1702.
0.039
0.133
0.00
7497.
0.27
405.27
2002.
0.046
0.142
0.00
7532.
0.37
405.37
2760.
0.063
0.167
0.00
7618.
0.47
405.47
3526.
0.081
0.188
0.00
7705.
0.57
405.57
4301.
0.099
0.208
0.00
7792.
0.67
405.67
5084.
0.117
0.225
0.00
7880.
0.77
405.77
5877.
0.135
0.242
0.00
7967.
0.87
405.87
6678.
0.153
0.257
0.00
8055.
0.97
405.97
7488.
0.172
0.271
0.00
8144.
1.07
406.07
8307.
0.191
0.285
0.00
8233.
1.17
406.17
9134.
0.210
0.298
0.00
8322.
1.27
406.27
9971.
0.229
0.311
0.00
8411.
1.37
406.37
10817.
0.248
0.323
0.00
8501.
1.40
406.40
11072.
0.254
0.327
0.00
8528.
1.42
406.42
11243.
0.258
0.331
0.00
8546.
1.45
406.45
11499.
0.264
0.338
0.00
8573.
1.47
406.47
11671.
0.268
0.348
0.00
8591.
Honey Crest TIR-July 2002
R
1.50
406.50
11929.
0.274
0.360
0.00
8618.
1.52
406.52
12102.
0.278
0.375
0.00
8636.
1.55
406.55
12361.
0.284
0.392
0.00
8663.
1.57
406.57
12535.
0.288
0.408
0.00
8681.
1.60
406.60
12795.
0.294
0.415
0.00
8708.
1.62
406.62
12970.
0.298
0.422
0.00
8726.
1.72
406.72
13847.
0.318
0.447
0.00
8817.
1.82
406.82
14733.
0.338
0.470
0.00
8908.
1.92
406.92
15629.
0.359
0.491
0.00
8999.
2.02
407.02
16533.
0.380
0.510
0.00
9091.
2.12
407.12
17447.
0.401
0.529
0.00
9183.
2.22
407.22
18370.
0.422
0.547
0.00
9276.
2.32
407.32
19302.
0.443
0.564
0.00
9368.
2.42
407.42
20243.
0.465
0.581
0.00
9461.
2.50
407.50
21003.
0.482
0.594
0.00
9536.
2.56
407.56
21577.
0.495
0.654
0.00
9592.
2.63
407.63
22251.
0.511
0.755
0.00
9658.
2.69
407.69
22832.
0.524
0.880
0.00
9714.
2.75
407.75
23417.
0.538
1.020
0.00
9771.
2.81
407.81
24005.
0.551
1.180
0.00
9827.
2.88
407.88
24695.
0.567
1.360
0.00
9893.
2.94
407.94
25290.
0.581
1.540
0.00
9950.
3.00
408.00
25889.
0.594
1.730
0.00
10007.
3.10
408.10
26894.
0.617
2.360
0.00
10102.
3.20
408.20
27909.
0.641
3.500
0.00
10198.
3.30
408.30
28934.
0.664
4.970
0.00
10294.
3.40
408.40
29968.
0.688
6.710
0.00
10390.
3.50
408.50
31012.
0.712
8.690
0.00
10486.
3.60
408.60
32065.
0.736
10.860
0.00
10583.
3.70
408.70
33129.
0.761
13.230
0.00
10680.
3.80
408.80
34201.
0.785
15.370
0.00
10778.
3.90
408.90
35284.
0.810
16.200
0.00
10876.
4.00
409.00
36377.
0.835
16.990
0.00
10974.
4.10
409.10
37479.
0.860
17.740
0.00
11072.
4.20
409.20
38591.
0.886
18.450
0.00
11171.
4.30
409.30
39713.
0.912
19.140
0.00
11270.
4.40
409.40
40845.
0.938
19.800
0.00
11369.
4.50
409.50
41987.
0.964
20.440
0.00
11469.
4.60
409.60
43139.
0.990
21.060
0.00
11569.
4.70
409.70
44301.
1.017
21.660
0.00
11669.
4.80
409.80
45472.
1.044
22.240
0.00
11770.
4.90
409.90
46655.
1.071
22.810
0.00
11871.
5.00
410.00
47847.
1.098
23.360
0.00
11972.
Hyd
Inflow
Outflow
Peak
Storage
Target
Calc Stage
Elev
(Cu-Ft)
(Ac-Ft)
1
2.74
*******
2.32 3.09
408.09
26825.
0.616
2
1.31
*******
1.13 2.79
407.79
23808.
0.547
3
1.32
*******
0.99 2.74
407.74
23279.
0.534
4
1.39
*******
0.93 2.71
407.71
23023.
0.529
5
1.60
*******
0.58 2.43
407.43
20295.
0.466
6
0.81
*******
0.48 1.87
406.87
15149.
0.348
7
1.01
*******
0.30 1.20
406.20
9425.
0.216
8
1.01
*******
0.27 1.00
406.00
7705.
0.177
----------------------------------
Route Time Series through Facility
Inflow Time Series File:totdev.tsf
Homey Crest TIR -July 2002
Outflow Time Series File:rdout
Inflow/Outflow Analysis
Peak Inflow Discharge:
2.74
CFS
at
Peak Outflow Discharge:
2.32
CFS
at
Peak Reservoir Stage:
3.09
Ft
Peak Reservoir Elev:
408.09
Ft
Peak Reservoir Storage:
26825.
Cu-Ft
0.616
Ac-Ft
Flow Frequency Analysis
Time Series File:rdout.tsf
Project Location:Sea-Tac
6:00 on Jan 9 in Year 8
9:00 on Jan 9 in Year 8
---Annual
Peak
Flow Rates---
-----Flow
Frequency Analysis-------
FlowRate
Rank
Time of
Peak
- - Peaks
- - Rank
Return Prob
(CFS)
(CFS)
(ft)
Period
0.987
3
2/09/01
16:00
2.31
3.09 1
100.00 0.990
0.302
7
1/05/02
18:00
1.13
2.79 2
25.00 0.960
0.582
5
3/06/03
20:00
0.987
2.74 3
10.00 0.900
0.275
8
8/23/04
23:00
0.926
2.71 4
5.00 0.800
0.480
6
1/05/05
10:00
0.582
2.42 5
3.00 0.667
0.926
4
1/18/06
21:00
0.480
1.87 6
2.00 0.500
1.13
2
11/24/06
5:00
0.302
1.20 7
1.30 0.231
2.31
1
1/09/08
9:00
0.275
1.00 8
1.10 0.091
Computed Peaks
1.92
3.03
50.00 0.980
Flow Duration
from Time
Series File:rdout.tsf
Cutoff
Count
Frequency CDF
Exceedence_Probability
CFS
%
$
%
0.016
47465
77.405
77.405
22.595
0.226E+00
0.047
5236
8.539
85.944
14.056
0.141E+00
0.079
2871
4.682
90.626
9.374
0.937E-01
0.110
1802
2.939
93.565
6.435
0.644E-01
0.142
1347
2.197
95.762
4.238
0.424E-01
0.173
902
1.471
97.233
2.767
0.277E-01
0.205
522
0.851
98.084
1.916
0.192E-01
0.236
410
0.669
98.752
1.248
0.125E-01
0.267
277
0.452
99.204
0.796
0.796E-02
0.299
139
0.227
99.431
0.569
0.569E-02
0.330
105
0.171
99.602
0.398
0.398E-02
0.362
38
0.062
99.664
0.336
0.336E-02
0.393
18
0.029
99.693
0.307
0.307E-02
0.425
33
0.054
99.747
0.253
0.253E-02
0.456
39
0.064
99.811
0.189
0.189E-02
0.488
18
0.029
99.840
0.160
0.160E-02
0.519
26
0.042
99.883
0.117
0.117E-02
0.550
16
0.026
99.909
0.091
0.913E-03
0.582
21
0.034
99.943
0.057
0.571E-03
0.613
6
0.010
99.953
0.047
0.473E-03
0.645
0
0.000
99.953
0.047
0.473E-03
0.676
4
0.007
99.959
0.041
0.408E-03
0.708
2
0.003
99.962
0.038
0.375E-03
0.739
3
0.005
99.967
0.033
0.326E-03
0.771
2
0.003
99.971
0.029
0.294E-03
0.802
3
0.005
99.976
0.024
0.245E-03
0.833
0
0.000
99.976
0.024
0.245E-03
0.865
3
0.005
99.980
0.020
0.196E-03
Honey Crest TIR -July 2002
0.896
5
0.008 99.989
0.928
2
0.003 99.992
0.959
1
0.002 99.993
0.991
2
0.003 99.997
1.02
0
0.000 99.997
1.05
1
0.002 99.998
1.08
0
0.000 99.998
1.12
0
0.000 99.998
Duration
Comparison
Anaylsis
Base
File: totex.tsf
New
File: rdout.tsf
Cutoff Units: Discharge
in CFS
-----Fraction
of Time-----
CutoffBase
New %Change
0.360
I 0.34E-02
0.34E-02 0.0
0.422
I 0.24E-02
0.26E-02 9.0
0.483
I 0.17E-02
0.16E-02 -7.5
0.544
I 0.13E-02
0.95E-03 -25.6
0.606
i 0.96E-03
0.47E-03 -50.8
0.667
I 0.60E-03
0.42E-03 -29.7
0.728
I 0.41E-03
0.34E-03 -16.0
0.789
I 0.29E-03
0.24E-03 -16.7
0.851
I 0.20E-03
0.20E-03 0.0
0.912
I 0.11E-03
0.11E-03 0.0
0.973
I 0.65E-04
0.65E-04 0.0
1.03
I 0.33E-04
0.33E-04 0.0
1.10
I 0.16E-04
0.16E-04 0.0
0.011
0.114E-03
0.008
0.815E-04
0.007
0.652E-04
0.003
0.326E-04
0.003
0.326E-04
0.002
0.163E-04
0.002
0.163E-04
0.002
0.163E-04
---------Check of
Tolerance-------
ProbabilityBase
New
%Change
0.34E-02
0.360
0.360
0.0
0.24E-02
0.422
0.431
2.3
0.17E-02
0.483
0.470
-2.6
0.13E-02
0.544
0.512
-6.0
0.96E-03
0.606
0.539
-10.9
0.60E-03
0.667
0.581
-12.9
0.41E-03
0.728
0.676
-7.1
0.29E-03
0.789
0.772
-2.2
0.20E-03
0.851
0.866
1.8
0.11E-03
0.912
0.912
0.0
0.65E-04
0.973
0.979
0.6
0.33E-04
1.03
1.04
0.2
0.16E-04
1.10
1.12
2.6
Maximum positive excursion = 0.075 cfs ( 7.1%)
occurring at 1.05 cfs on the Base Data:totex.tsf
and at 1.12 cfs on the New Data:rdout.tsf
Maximum negative excursion = 0.115 cfs (-16.3$)
occurring at 0.705 cfs on the Base Data:totex.tsf
and at 0.590 cfs on the New Data:rdout.tsf
Honey Crr&TIR-July 2002
Flow Frequency Analysis
Time Series File:totdev.tsf
Project Location:Sea-Tac
---Annual
Peak
Flow Rates---
-----Flow
Frequency Analysis-------
FlowRate
Rank
Time of
Peak
- - Peaks
- -
Rank
Return
Prob
(CFS)
(CFS)
Period
1.32
5
2/09/01
2:00
2.74
1
100.00
0.990
1.01
8
1/05/02
16:00
1.60
2
25.00
0.960
1.60
2
2/27/03
7:00
1.47
3
10.00
0.900
1.01
7
8/26/04
2:00
1.39
4
5.00
0.800
1.24
6
10/28/04
16:00
1.32
5
3.00
0.667
1.39
4
1/18/06
16:00
1.24
6
2.00
0.500
1.47
3
10/26/06
0:00
1.01
7
1.30
0.231
2.74
1
1/09/08
6:00
1.01
8
1.10
0.091
Computed Peaks
2.36
50.00
0.980
Flow Frequency
Analysis
Time Series File:rdout.tsf
Project Location:Sea-Tac
---Annual
Peak
Flow Rates---
-----Flow
Frequency
Analysis-------
FlowRate
Rank
Time of
Peak
- - Peaks
- -
Rank
Return
Prob
(CFS)
(CFS)
(ft)
Period
0.987
3
2/09/01
16:00
2.31
3.09
1
100.00
0.990
0.302
7
1/05/02
18:00
1.13
2.79
2
25.00
0.960
0.582
5
3/06/03
20:00
0.987
2.74
3
10.00
0.900
0.275
8
8/23/04
23:00
0.926
2.71
4
5.00
0.800
0.480
6
1/05/05
10:00
0.582
2.42
5
3.00
0.667
0.926
4
1/18/06
21:00
0.480
1.87
6
2.00
0.500
1.13
2
11/24/06
5:00
0.302
1.20
7
1.30
0.231
2.31
1
1/09/08
9:00
0.275
1.00
8
1.10
0.091
Computed Peaks
1.92
3.03
50.00
0.980
Flow Frequency
Analysis
Time Series File:sitede15.tsf
Project Location:Sea-Tac
---Annual
Peak
Flow Rates---
-----Flow
Frequency
Analysis-------
FlowRate
Rank
Time of
Peak
- - Peaks
- -
Rank
Return
Prob
(CFS)
(CFS)
Period
0.796
6
8/27/01
18:00
2.69
1
100.00
0.990
0.589
8
1/05/02
15:00
1.82
2
25.00
0.960
1.82
2
12/08/02
17:15
1.13
3
10.00
0.900
0.641
7
8/23/04
14:30
1.13
4
5.00
0.800
1.13
3
11/17/04
5:00
0.983
5
3.00
0.667
0.983
5
10/27/05
10:45
0.796
6
2.00
0.500
1.13
4
10/25/06
22:45
0.641
7
1.30
0.231
2.69
1
1/09/08
6:30
0.589
8
1.10
0.091
Computed Peaks
2.40
50.00
0.980
M
Honey Crest TTR-July 2002
Predeveloped Peak Flow Rates
Flow Frequency Analysis
Time Series File:totex.tsf
Project Location:Sea-Tac
---Annual
Peak
Flow Rates ---
Flow Rate
Rank
Time of
Peak
(CFS)
0.954
4
2/09/01
2:00
0.654
7
1/05/02
16:00
1.16
2
2/27/03
7:00
0.570
8
8/26/04
2:00
0.710
6
10/28/04
16:00
1.01
3
1/18/06
16:00
0.931
5
11/24/06
3:00
2.02
1
1/09/08
6:00
Computed Peaks
Developed Peak Flow Rates
Flow Frequency Analysis
Time Series File:rdout.tsf
Project Location:Sea-Tac
---Annual
Peak
Flow Rates ---
Flow Rate
Rank
Time of
Peak
(CFS)
0.988
3
2/09/01
16:00
0.297
7
1/05/02
18:00
0.577
5
3/06/03
20:00
0.271
8
8/23/04
23:00
0.475
6
1/05/05
10:00
0.927
4
1/18/06
21:00
1.14
2
11/24/06
5:00
2.32
1
1/09/08
9:00
Computed Peaks
----Flow Frequency Analysis-------
- - Peaks -
- Rank
Return
Prob
(CFS)
Period
2.02
1
100.00
0.990
1.16
2
25.00
0.960
1.01
3
10.00
0.900
0.954
4
5.00
0.800
0.931
5
3.00
0.667
0.710
6
2.00
0.500
0.654
7
1.30
0.231
0.570
8
1.10
0.091
1.73
50.00
0.980
-----Flow Frequency Analysis-------
- - Peaks
- -
Rank
Return
Prob
(CFS)
(ft)
Period
2.32
3.09
1
100.00
0.990
1.14
2.80
2
25.00
0.960
0.988
2.74
3
10.00
0.900
0.927
2.71
4
5.00
0.800
0.577
2.46
5
3.00
0.667
0.475
1.89
6
2.00
0.500
0.297
1.22
7
1.30
0.231
0.271
1.01
8
1.10
0.091
1.92
3.03
50.00
0.980
4-7
Honey Crest TOR -July 2002
Table 4. Wet Pond Sizing Calculations
Runoff Wetpond
Wet Pond Till Forest Till Grass Impervious Total Area Volume VbNr Volume
;Facility (AC) (AC) (AC) (AC) (C'F) (CF)
Onite Stormwater Pond
Residential
Lots/Onite Road 0.00 1.43 1.67 3.10 3,174 3.0 9,523
Offsite Tributary
Area 0.13 0.85 0.15 1.13 / 619 3.0 1,858
Church 0.00 2.08 2.11 4.19 -, 4,127 3.0 12,381
Total 0.13 4.36 3.93 8.42 7,920 23,761
Mean annual storm
= 0.47
Note: Impervious area of Honey Crest lots is assumed to be 54 percent with a density of 6.5
dwelling units/acre.
4-8
5. Conveyance System Analysis and Design A �y�' £R
Stormwater RID System Conveyance
The onsite stormwater system will be designed to convey the 25-year peak flow rate for onsite
conveyance systems upstream of the stormwater facility. A conceptual design of the conveyance
system is shown in Figure 6 of Section 4. Conveyance calculations for the system from the
Honey Crest site to the proposed stormwater pond on the church site are provided in Appendix
C.1. Figure C.1.1 presents backwater calculations for the trunk line and branches of the storm
conveyance system. Figure C.1.2 illustrates the subbasins contributing to the individual catch
basins on the site. Tables C.1.1 and C.1.2 document flow rate calculations using the Rational
Method.
5-1
HoneyCrr& M—J*2002
6. Special Reports and Studies
A summary of special reports and studies conducted for Honey Crest is presented below.
Table 5. Summary of Special Reports and Studies
Study/Report Date Conducted
Geotechnical/soils
Report of Geotechnical Investigation, Proposed Honeycrest April 2001
Development, Renton, Washington (S&EE)
Wetlands
Wetland Delineation and Report (J.S. Jones and Associates, Inc.) February 2001
Floodplains
Groundwater N/A
Anadromous fisheries impacts N/A
f,
6-1
Honey Crest 77—July2M
July 2002
N/A
N/A
7. Other Permits
A summary of permits required for the Honey Crest project is listed in the table below.
Table 6. Summary of Other Permits Required
Permit Required Regulating AgencyY
Onsite Sewage Disposal No Seattle/King County Department of Health
Onsite Well
Developer/Local Agency No
Agreement
Seattle/King County Department of Health
Washington State Department of
Transportation
Hydraulic Project Approval No -- Washington State Department of Fish and
v Wildlife
NPDES Stormwater No Washington State Department of Ecology
Forest Practices Yes Washington State Department of Natural
Resources
Section 10, 401, 404 No United States Army Corps of Engineers
7-1
Haney Crest M—July 2002
Construction activities required to develop the site will include the following:
■ clearing and grading,
■ demolition of existing structures,
■ earthwork (excavation, filling, hauling), and
■ paving.
An erosion and sedimentation control plan for the project is provided in Figure 8. Construction
best management practices (BMPs) have been selected for each of the particular types of
anticipated construction activities. Implementing proven BMPs at construction locations, such as
minimizing exposed soil surfaces, and controlling erosion and sedimentation will reduce
potential impacts on surface water. BMPs for the proposed types of construction activities are
outlined below.
Clearing Limits
To prevent disturbance of project areas not designated for construction, a construction clearing
limits fence or silt fence will be installed by the Contractor. These fences will be installed prior
to clearing and grading activities where appropriate.
Cover Measures
Temporary and permanent cover measures will be provided by the Contractor to protect disturbed
areas. Mulching will be used to provide immediate temporary protection from erosion and to
enhance plant growth. Plastic covering may be used in order to protect cut and fill slopes and
stockpiles and/or to encourage grass growth in newly seeded areas.
Perimeter Protection
In order to reduce the transport of sediment off -site, the Contractor will install filter fences as
indicated on the drawings prior to grading activities.
Equipment Parking and Storage of Materials
Parking areas for vehicles and equipment on the construction site should be covered with gravel
to prevent erosion and tracking of the underlying soil. Machinery and vehicles should be well
maintained. In the event of a spill or leak of toxic materials, the incident should be reported to
the Construction Site Supervisor and actions should immediately be taken to contain and cleanup
the materials.
&1
Honey Crest 7M—July 2002
\ -k_Mg Qf1VA 14
I
I
4
r
I
I I
II
I
I
i
1 1
I 1
I I
I I
I I
I I
I �
II
1 1
1
I 1
1
1
gat
Z
SCALE: 1" = 80'
TITLE
Figure 8. Erosion and Sedimentation Control Plan
' CJ����r\uJ �_PAGE DATE
8.2 7/24/02
Traffic Area Stabilization
Stabilized pads of quarry spalls will be installed by the Contractor at all egress points from the
project site to reduce the amount of sediment transported onto paved roads or other off -site areas
by motor vehicles.
Sediment Retention
Sediment retention will be provided by silt fencing at the locations and dimensions shown on the
drawings and shall be maintained by the Contractor. The permanent stormwater pond will be
constructed prior to clearing and grading the Honey Crest site such that it can be used as a
sediment pond.
Wet Season Construction
If soils are exposed during the period of October 1 to March 31, the Contractor will mulch and
seed as much disturbed area as possible by the first week of October in order to provide grass
cover for the wet season. The Contractor will also conform to the following wet season special
provisions:
■ Apply cover measures to disturbed areas that are to remain unworked for more than two
days.
■ Provide on -site stockpiles of cover materials sufficient to cover all disturbed areas.
■ Seed all areas that are to be unworked during the wet season by the end of the first week
of October.
■ Apply mulch to all seeded areas for protection.
■ Provide construction road and parking lot stabilization areas for all sites.
Maintenance
The Contractor will maintain and review all TESC measures on a regular basis.
Final Stabilization
Prior to obtaining final construction approval, the site shall be stabilized, the structural TESC
measures removed, and drainage facilities cleaned. Disturbed areas of the site should be
vegetated or otherwise permanently stabilized. At a minimum, disturbed areas should be seeded
and mulched to provide a high likelihood that sufficient cover will develop shortly after final
approval.
8-3
Honey Crest 7M —July 2002
d' lk sir ?h ! i r } at" ' r ♦'Elul
_ r -• 1- - P l�:-�'�: iT + c * i ��, C
. ��_.r+�' ,-r•K�_� �;� r� ..per-'� ,� ?�`.�� �� _:* >� ► >}+ �s.e � �`{ '`�
' - �-�14� � � ��, . {•�`.��_' ! �, {r'�_ l•° _r .�'T 1• .�_ ,. `t 'fir*
46
Vol
TO
Li
y� �!R Y��l� � �'I'j if r � :. J'4. F�r�LL �._ ,- i L'r ..�- K *. F. M1' Y .�•.� '•- . h� s ,
r
-14
1 {Y .r rl .F ti :t h it
f•4 F �5icle' ti- r-I:_
.lt
r-
►. f iSl �..T. �,i ; •rL�S aE4 � `\ riL��
� � t y. 'yam+ � 1. � �` i i I_ • �� �' r ,� �'• -"� �' �y
:- �L : _ 4 'S.. •.' ' ' • S +'' �'*aj': �, �'r�- .,� ,, �. • :i. �l �!ir�i��' ,Z t. ''� y(��'Xi. +
r�'. t ' 1� -¢ �, _ �i F ~ y - -}4�• �. ,` ram, �+
t �c
�.r�' � �4 :`�. �� S4"' a1 _ t '+� • r� ' �- s "� ti,� � r�'- r ' � ,re.•--,_ , r ��[� r ( ~
t �. � . �' � � �?• '-a �i` �-'. _ �.. �:� +�r, 't•t,r i i� 4.��i; i t`' i '}�!r'• �; �` ' •_ �
{' _ ¢'..��,,,`,.w ^~SF Q+,��� rt 11 4 �•r� ;'i+_V .'!JI, �. • `` -a
Lr
14
� ~��� � � •�1 "y w� � _ � ���� t', '�•5`r, .. �.... �r• ,..e. �'� Z •,r i'T�' y,• :+g ��a f :• 1
yC I•S. �L � �4 •� �_3 G ry .� r`. •}i - � � �.Ry�., � _,' f � � �i , '� .; •���:-Jjj��F�
�, rF� �• • t '�Y- "r5 � �' •;r t � a � � •' of
i^-'' Y d�Y'� ri�i�./"� t a .,•may .y � •fF f,�j 5 :e�s`i�`4rS� � r=, '•��. f'
9
9 Bond Quantities and Facility Summaries
A bond quantities worksheet for the project will be provided upon approval of the final
engineering plans. A summary of onsite conveyance and water quality facilities is given in
Figure 10. The facilities will be privately owned and maintained.
9-1
Honey Crest 77R—July 2002
Figure 9. Site Improvement Fee Calculation Worksheet (to be completed for construction
permit)
PUBLIC WORKS CONSTRUCTION
PERMIT INSPECTION/APPROVAL
FEE CALCULATION WORKSHEET
50% INSPECTION/APPROVAL FEES PER ORDINANCE NO.4345
PROJECT NAME: Honey Crest
1. Estimate the total cost of offsite and onsite improvements for water lines, sewer lines,
stormwater facilities, and roadway improvements for your project. Enter estimated costs
in items (A) through (D) below.
(A) Water $
(B) Sewer $
(C) Stormwater $
(Includes On -Site Pavement)
(D) Roadway $
(Street, sidewalks, street lighting, etc.)
(E) Total Improvements $
(A) + (B) + (C) + (D) = (E
2. Calculate 50% inspection/approval fee for total improvements, as follows:
(F) 2.5% of First $100,000 of (E) $
(G) 2% of over $100,000 but $
less than $200,000 of (E)
(H) 1.5% of over $200,000 of (E) $
(I) Total 50% Inspection/Approval $
Fee: (F) + (G) + (H) = (I)
3. Breakdown of 50% Inspection/Approval Fees is performed as follows:
(J) 50% Water Fee $
((A) \ (E)) x (I) _ (J)
(K) 50% Sewer Fee $
((B) \ (E)) x (1) _ (K)
(L) 50% Stormwater Fee $
((C) \ (E)) x (1) = (L)
(M) 50% Roadway Fee:
((D) \ (E)) x (I) = (M)
9-2
Honey Crest TIR—July 2002
401/343.90.00.02
401/343.90.00.01
401/343.90.00.03
$ 000/343.20.00.00
Figure 10. Flow Control and Water Quality Facility Summary
Development: Honey Crest Date: 7-8-02
Location: King County Township 23N, Range 5E, Section 10
ENGINEER
DEVELOPER
Name: Ed McCarthyName:
John Petersen
Firm: Haozous Engineering, P.S.
Firm: Honey Crest LLC.
Address:
9957 171" Avenue SE
Renton, WA 98059
Address:
4720 200 Street SW
Lynwood, WA 98046
Phone: 425 235-2707
Phone: 206) 423-6986
Developed Site: 3.10 Acres
Number of detention facilities on site:
1 Combined Wetpond/R/D
Number of lots: 18 new single-family residences
Number of infiltration facilities on site: 0
Downstream Drainage Basins
Immediate
Major Basin
Lower Cedar River
Maplewood Creek
Cedar River
Number & type of water quality facilities on site:
biofiltration swale (regular/wet/ or sand filter (basic or large?)
continuous inflow?) sand filter, linear (basic or large?)
1 combined detention/WQ ponds sand filter vault (basic or large?)
flow dispersion trenches wetvault
combined detention/wetvault energy dissipation structure
compost filter Basic pond (basic or large?)
filter strip
landscape management plan
oil/water separator (baffle or coalescing plate?)
catch basin inserts: Manufacturer
pre -settling pond
pre -settling structure: Manufacturer
flow-splitter catch basin
DESIGN INFORMATION
INDIVIDUAL BASIN
Maplewood Creek
Water Quality Design Volume (CF)
23,761
Onsite Area (AC)
Offsite Area AC)
3.10
5.31
Type of Storage Facility
Combined We nd/R/D
Figure 10 (continued)
DESIGN INFORMATION
INDIVIDUAL BASIN
Maplewood Creek
Required Live Storage Volume (CF)
Including 10% FOS
28,478
Predevelo ed Runoff Rates
25-year (CFS)**
1.16
Post-R/D Developed Runoff Rates
25-year (CFS)**
1.14
* * Based on KCRTS 1-hour peak rates for the proposed developed and offsite areas.
r
`e'MMitzt$ e- a'-
The conveyance and water quality facilities for Honey Crest will be privately maintained. The
facilities do not contain non-standard features. The table below specifies the maintenance
requirements for each component of the stormwater facility being constructed. Applicable
maintenance requirements, taken from the 1998 Surface Water Design Manual, are referenced to
the pages that follow.
Table 7. Summary of Maintenance Requirements for Stormwater Facilities
Maintenance Requirement
■ No. 1 — Detention Ponds
■ No. 4 — Control Structure Restrictor
■ No. 5 — Catch Basins
■ No. 6 — Debris Barriers
■ No. 10 — Conveyance Systems
■ No. 13 — Water Quality Facilities — Wetponds
10-1
Honey Crest TM —July 2002
10. 1 - DETENTION PONDS
Maintenance Defect Conditions When Maintenance
Component Is Needed
Results Expected When
Maintenance Is Performed
General Trash & Debris Any trash and debris which exceed 1 cubic foot
Trash and debris cleared from site.
per 1,000 square feet (this is about equal to the
amount of trash it would take to fill up one
standard size office garbage can). In general,
there should be no visual evidence of dumping.
Poisonous Vegetation Any poisonous or nuisance vegetation which
No danger of poisonous vegetation
may constitute a hazard to County personnel or
where County personnel or the
the public.
public might normally be.
(Coordination with Seattle -King
County Health Department)
Pollution
Oil, gasoline, or other contaminants of one
No contaminants present other than
gallon or more or any amount found that could:
a surface film. (Coordination with
1) cause damage to plant, animal, or marine life,
Seattle/King County Health
2) constitute a fire hazard: or 3) be flushed
Department)
downstream during rain storms.
Unmowed Grass/
If facility is located in private residential area.
When mowing is needed.
Ground Cover
mowing is needed when grass exceeds 18
grass/ground cover should be
inches in height. In other areas, the general
mowed to 2 inches in height.
policy is to make the pond site match adjacent
Mowing of selected higher use
ground cover and terrain as long as there is no
areas rather than the entire slope
interference with the function of the facility.
may be acceptable for some
situations.
Rodent Holes
Any evidence of rodent holes if facility is acting
Rodents destroyed and dam or
as a dam or berm, or any evidence of water
berm repaired. (Coordination with
piping through dam or berm via rodent holes.
Seattle/King County Health
Department)
Insects
When insects such as wasps and hornets
Insects destroyed or removed from
interfere with maintenance activities-
site.
Tree Growth
Tree growth does not allow maintenance access
Trees do not hinder maintenance
or interferes with maintenance activity (i.e.. slope
activities. Selectively cultivate trees
mowing, silt removal, vactoring, or equipment
such as alders for firewood.
movements). If trees are not interfering with
access, leave trees alone.
Side Slopes of Pond Erosion
Eroded damage over 2 inches deep where
Slopes should be stabilized by
cause of damage is still present or where there
using appropriate erosion control
is potential for continued erosion.
measure(s), e.g., rock
reinforcement, planting of grass,
compaction.
Storage Area Sediment
Accumulated sediment that exceeds 10% of the
Sediment cleaned out to designed
designed pond depth.
pond shape and depth, pond re-
seeded if necessary to control
erosion
Pond Dikes Settlements
Any part of dike which has settled 4 inches lower
Dike should be built back to the
than the design elevation.
design elevation.
Emergency Rock Missing
Only one layer of rock exists above native soil in
Replace rocks to design standards.
Overflow/Spillway
area five square feet or larger, or any exposure
of native soil at the top of out flow path of
spillway. Rip -rap on inside slopes need not be
replaced.
10-2
NO.4 - CONTROL STRUCTURE/FLOW RESTRICTOR
aintenance Defect
component
Condition When Maintenance is
Needed
Results Expected When
Maintenance is
Performed
General Trash and Debris
Distance between debris build-up and bottom of
All trash and debris removed.
(Includes Sediment)
orifice plate is less than 1-1/2 feet.
Structural Damage
Structure is not securely attached to manhole wall
Structure securely attached to
and outlet pipe structure should support at least
wall and outlet pipe.
1,000 lbs. of up or down pressure
Structure is not in upright position (allow up to
Structure in correct position.
10% from plumb).
Connections to outlet pipe are not watertight and
Connections to outlet pipe are
show signs of rust.
water tight, structure repaired or
replaced and works as
designed.
Any holes --other than designed holes --in the
Structure has no holes other
structure.
than designed holes.
Cleanout Gate Damaged or Missing
Cleanout gate is not watertight or is missing.
Gate is watertight and works as
designed.
Gate cannot be moved up and down by one
Gate moves up and down easily
maintenance person.
and is watertight
Chain leading to gate is missing or damaged.
Chain is in place and works as
designed.
Gate is rusted over 50% of its surface area.
Gate is repaired or replaced to
meet design standards..
Orifice Plate Damaged or Missing
Control device is not working properly due to
Plate is in place and works as
missing, out of place, or bent orifice plate.
designed.
Obstructions
Any trash. debris. sediment, or vegetation
Plate is free of all obstructions
blocking the plate.
and works as designed.
Overflow Pipe Obstructions
Any trash or debris blocking (or having the
Pipe is free of all obstructions
potential of blocking) the overflow pipe.
and works as designed.
Manhole
See "Closed Detention Systems" Standards No. 3
See "Closed Detention Systems'
Standards No. 3
Catch Basin
See "Catch Basins" Standards No. 5
See 'Catch Basins" Standards
No. 5
10-3
NO.5 - CATCH BASINS
laintenance Defect
%.omponent
General
0
Conditions When Maintenance is
Needed
Results Expected When
Maintenance is
performed
Trash & Debris Trash or debris of more than 1/2 cubic foot which is No Trash or debris located
(Includes Sediment) located immediately in front of the catch basin immediately in front of catch
opening or is blocking capacity of the basin by basin opening.
more than 10%
Trash or debris (in the basin) that exceeds 1/3 the No trash or debris in the catch
depth from the bottom of basin to invert the lowest basin.
pipe into or out of the basin.
Trash or debris in any inlet or outlet pipe blocking
more than 1/3 of its height.
Dead animals or vegetation that could generate
odors that could cause complaints or dangerous
gases (e.g., methane).
Deposits of garbage exceeding 1 cubic foot in
volume
Structure Damage to Corner of frame extends more than 3/4 inch past
Frame and/or Top Slab curb face into the street (If applicable).
Top slab has holes larger than 2 square inches or
cracks wider than 1/4 inch (intent is to make sure
all material is running into basin).
Frame not sitting flush on top slab, i.e., separation
of more than 3/4 inch of the frame from the top
slab.
Inlet and outlet pipes free of
trash or debris.
No dead animals or vegetation
present within the catch basin.
No condition present which
would attract or support the
breeding of insects or rodents.
Frame is even with curb.
Top slab is free of holes and
cracks.
Frame is sitting flush on top
slab.
Cracks in Basin Walls/ Cracks wider than 1/2 inch and longer than 3 feet, Basin replaced or repaired to
Bottom any evidence of soil particles entering catch basin design standards.
through cracks, or maintenance person judges that
structure is unsound.
Cracks wider than 1/2 inch and longer than 1 foot No cracks more than 1/4 inch
at the joint of any inlet/ outlet pipe or any evidence wide at the joint of inlet/outlet
of soil particles entering catch basin through pipe.
cracks.
Sediment/ Basin has settled more than 1 inch or has rotated Basin replaced or repaired to
Misalignment more than 2 inches out of alignment. design standards.
10-d
NO.5 - CATCH BASINS (CONTINUED)
aintenance Defect Conditions When Maintenance is
Results Expected When
—amponent Needed
Maintenance is
performed
Fire Hazard Presence of chemicals such as natural gas, oil and
No flammable chemicals
gasoline.
present.
Vegetation Vegetation growing across and blocking more than
No vegetation blocking opening
10% of the basin opening.
to basin.
Vegetation growing in inlet/outlet pipe joints that is
No vegetation or root growth
more than six inches tall and less than six inches
present.
apart.
Pollution
Nonflammable chemicals of more than 1/2 cubic foot
No pollution present other than
per three feet of basin length.
surface film.
Catch Basin Cover
Cover Not in Place
Cover is missing or only partially in place. Any open
Catch basin cover is closed
catch basin requires maintenance.
Locking Mechanism
Mechanism cannot be opened by on maintenance
Mechanism opens with proper
Not Working
person with proper tools. Bolts into frame have less
tools.
than 1/2 inch of thread.
Cover Difficult to
One maintenance person cannot remove lid after
Cover can be removed by one
Remove
applying 80 lbs. of lift, intent is keep cover from
maintenance person.
sealing off access to maintenance.
Ladder
Ladder Rungs
Ladder is unsafe due to missing rungs, misalignment,
Ladder meets design standards
Unsafe
rust, cracks, or sharp edges.
and allows maintenance person
safe access.
etal Grates
Grate with opening wider than 7/8 inch.
Grate opening meets design
Applicable)
standards.
Trash and Debris
Trash and debris that is blocking more than 20% of
Grate free of trash and debris.
grate surface.
Damaged or
Grate missing or broken member(s) of the grate.
Grate is in place and meets
Missing.
design standards.
NO. 6 DEBRIS BARRIERS (E.G., TRASH RACKS)
Maintenance
Components
Defect
Condition When Maintenance is
Needed
Results Expected When
Maintenance is
Performed.
General
Trash and Debris
Trash or debris that is plugging more than 20% of
Barrier clear to receive capacity
the openings in the barrier.
flow.
Metal
Damaged/ Missing
Bars are bent out of shape more than 3 inches.
Bars in place with no bends more
Bars.
than 3/4 inch.
Bars are missing or entire barrier missing.
Bars in place according to
design.
Bars are loose and rust is causing 50% deterioration
Repair or replace barrier to
to any part of barrier.
design standards.
I0-5
NO. 10 - CONVEYANCE SYSTEMS (PIPES & DITCHES)
Paintenance
Defect
Conditions When Maintenance is
Results Expected When
Component
Needed
Maintenance is
Performed
Pipes
Sediment & Debris
Accumulated sediment that exceeds 20% of the
Pipe cleaned of all sediment
diameter of the pipe.
and debris.
Vegetation
Vegetation that reduces free movement of water
All vegetation removed so water
through pipes.
flows freely through pipes.
Damaged
Protective coating is damaged, rust is causing
Pipe repaired or replaced
more than 50% deterioration to any part of pipe.
Any dent that decreases the cross section area of
Pipe repaired or replaced.
pipe by more than 20%.
Open Ditches
Trash & Debris
Trash and debris exceeds 1 cubic foot per 1.000
Trash and debris cleared from
square feet of ditch and slopes
ditches.
Sediment
Accumulated sediment that exceeds 20 % of the
Ditch cleaned/ flushed of all
design depth.
sediment and debris so that it
matches design.
Vegetation
Vegetation that reduces free movement of water
Water flows freely through
through ditches.
ditches.
Erosion Damage to
See "Ponds" Standard No. 1
See "Ponds" Standard No. 1
Slopes
Rock Lining Out of
Maintenance person can see native soil beneath
Replace rocks to design
Place or Missing (if
the rock lining.
standards.
Applicable).
Atch Basins
See "Catch Basins: Standard No. 5
See "Catch Basins" Standard
No. 5
Debris Barriers
See "Debris Barriers" Standard No.6
See "Debris Barriers" Standard
(e.g., Trash Rack)
No. 6
10-6
NO.13- WATER QUALITY FACILITIES
Vetponds
Jlaintenance Defect Condition When Maintenance is
Component Needed
Wetpond Vegetation
Trash and Debris
Inlet/ Outlet Pipe
Sediment
Accumulation in Pond
Bottom
Oil Sheen on Water
Erosion
Settlement of Pond
Dike/ Berm
Rock Window
Overflow Spillway
Vegetation such as grass and weeds need to be
mowed when it starts to impede aesthetics of pond
Mowing is generally required when height exceeds
18-inches. Mowed vegetation should be removed
from areas where it could enter the pond. either
when the pond level rises, or by rainfall runoff.
Accumulation that exceeds 1 CIF per 1000-SF of
pond area.
Inlet/ Outlet pipe clogged with sediment and/ or
debris material.
Sediment accumulations in pond bottom that
exceeds the depth of sediment zone plus 6-inches,
usually the first cell.
Prevalent and visible oil sheen.
Results Expected When
Maintenance is
Performed
Vegetation should be mowed to
4 to 5 inches in height. Trees
and bushes should be removed
where they are interfering with
pond maintenance activities
Trash and debris removed from
pond.
No clogging or blockage in the
inlet and outlet piping.
Removal of sediment from pond
bottom.
Removal of sediment from pond
bottom.
Erosion of the pond's side slopes and/ or scouring of Slopes should be stabilized by
the pond bottom, that exceeds 6-inches, or where using proper erosion control
continued erosion is prevalent measures. and repair methods
Any part of these components that has settled 4- Dike/ berm is repaired to
inches or lower than the design elevation. or specifications.
inspector determines dike/ berm is unsound
Rock window is clogged with sediment. Window is free of sediment and
Rock is missing and soil is exposed at top of
spillway or outside slope.
debris.
Replace rocks to specifications.
f
11. References
Harmsen & Associates, Inc., 1992. Mission Hills Subdivision, Renton, Washington, Conceptual
Drainage Plan. Monroe, Wash.
J.S. Jones and Associates, Inc. February 2001. Wetland Investigation, Proposed Honeycrest
Development, Renton, Washington.
King County Department of Natural Resources, 1998. King County Surface Water Design
Manual. Seattle.
King County Department of Natural Resources, 1997. Lower Cedar River Basin and Nonpoint
Pollution Action Plan. Seattle.
Soil & Environmental Engineers, Inc., April 3, 2001. Report of Geotechnical Investigation,
Proposed Honeycrest Development, Renton, Washington. Redmond, Wash.
U.S. Department of Agriculture, Soil Conservation Service, 1973. Soil Survey of King County
Area, Washington. Seattle.
Honey Crest TM —July 2002
Appendix A. Downstream System
Appendix A.1 Photographs of the Downstream System
Appendix A.2 Aquifer Protection Areas
Appendix A.3 Lower Cedar River Subbasin Map
Honey crest TM-J*2002
♦ Photo Number 1
Date of Photo:
8/23/01
Location:
Northeast portion of site looking west.
Description:
G ravel access road into existing homes.
�j
♦ Photo Number 2
Date of Photo: 8/16/01
Location: Location 10 in Figure 5, looking east.
Description: Edge of Class 3 wetland buffer on church
Droverty southeast of site.
M , .�n�1J'+Gil�r PI 41 ikrt�f�q+�
I • ,, � r fr, r ,. ,'u N„, ,y,. tar ''� ., v� rr.., r".S� + y�N�WI. �i� " ` �
`. �4,
Honey Crest - Offsite Drainage System
♦ Photo Number 3
Date of Photo:
8/27/01
Location:
Location 14 in Figure 5, looking north.
Description:
An 18-inch diameter storm pipe leaves the
wetland on the church property and crosses
the athletic field of the Honeydew Elementary
School.
♦ Photo Number 4
Date of Photo:
8/27/01
Location:
Location 21 in Figure 5, looking at channel
substrate.
Description:
A 20-inch diameter pipe discharges to a
wetland channel at this location, upstream of
the westerly R/D pond of the Orchards.
rid i'�Y +r• � � 1• I,j 's.
VIVA' '. �"��� Y} t���� its A. �+N d►�
,.fir"r ' �-•'�`.•. � eti ,"�"�' -:
e
Honey Crest - Offsite Drainage System
Appendix A.l Photographs of the Downstream System R� zf'
Honey Crest 77R —July 2002
AppendixA.2 Aquifer Protection Areal MIZ
e e
Homey Crest 77R — July 2002
c O m m S f'y Ct S21�
� ��I�oStUuNE 20th �fF 5 E21st
Ij e� LS
St z I
L
_ NE 187H z o pSt
n E 17th _ a
E V 1�th cr F7
ay C0 R _ >
j= '.6'r St. v. C E 'th- S
G C C
NE 14th St
St,
Z Z
N' 12th St
� z
F¢ R 5 I a+• P R z
O x s
a NE Z
�' NE 1Gth w. 1 g
NE 10th
PI. $ Ct. b E 0,il PI x
NE lothSt,:
N 901 F�0 ��--�
lh C,
NE g\b PI i s `.\1
m � E 8th PI, SE 116th
4X � + E � � + T St
3 g gn t
NE 8th St, o
o s NE ath A NE 7th St. _
NE 1N 5\.7a Zc. SE 121st St
NE 7th
pp x x NE 6th z m>
q� a f6fh Q 6 S �� a 4'E <' E 6717d�
6,�, S•
a
m
r o NE Slh Ctzo,
.
171.
v
z
�__--
NE 3td �
� a
NE 2nd'St 5
SE 1 nd
ti� r
SE, St Pr I a
a � I
�J
Source: City of Renton
FA
TITLE
Figure A.2.1. Aquifer Protection Areas
Appendix A.3 Lower cedar River Subbasin
Honey Crest 77R — July 2002
14—
Location
♦ jl I ;
• ' I • Map
��
o • 7;1 - - ♦ _
._
I `.
---=-- --- 1 MW3
_ 1 �
` I
W2 0. •
SITE 150
e 0.2 s
• —�- 3120.3 NE 4,h s'—I
..
: .-�_....
---�� ■ \ o / ISO! • ;
.r
♦, URBAN GROW
IFJ,
'.3120.2 0 -
- \ �1312• �
d --I ♦
�
1
lk
•
J2
#4 2-
3122.1
03
10
•
0.6 11
3122.2
•�• `, 06
— -----------�♦ • ♦
L23—�•
••••..� ••••••..••,
...... .
��- j
i
3.2
.. 0299 , ♦ o.
•
3.. 9 ^1
.-
\
`---•,' ^/ ,A ��'E R 101
URBAN
42
9.6
SA �.
_ ^1R a0 r �,
A- - d s.e 07
38 \ Dfl
Oo od
6.0
f
s r_—_—_—_—. '• ��
GROWTH AREA .
Source: Lower Cedar River Basin and
Nonpoint Pollution Action Plan, King
County DNR, 1997
TITLE
AQOZOW EMWEEG{ M V3.
Figure A.3.1. Maplewood & Orting Hills Subbasins
Appendix B. Stormwater R/D System Design°{
Appendix B.1 Stormwater Facility Control and Overflow Design
Appendix B.2 KCRTS Pond Design
Honey Crest M-.hdy2002
Appendix B.1 Stormwater Facility Control and Overflow Design
Honey crest 77R—July 2002
a
O
O
SOLID LOCKING LID, SEE STD DINGS
INFORMATION PLATE, SEE DETAIL
BR29. BOLT FRAME TO
TOP SLAB, SEE NOTE 1
RIM ELEV - 410.0
C -
OSHA CONFINED SPACE NOTICE
VERTICAL BAR GRATE FOR SECONDARY
INLET, SEE NOTES 7 R 8
100 YR W.S.
OVERFLOW ELEV - 408.0
ELEV - 408.1
NOTCH ELEV - 407.5
rt
ELEV - 406.4
18' LCPE INLET
-n
24'0 RISER
SECONDARY INLET
INFORMATION PLATE,
(�
CURVE TO MATCH
C
ORIFICE DLA - 2.35'
WALL
1 .5'
CD
SHEAR GATE WITH CONTROL ROD
MIN
CONTROL. POINT, SEE
FOR CLEiWOUT/DRAIN (ROD BENT
DRAINAGE STRUCTURE
AS RE0'D FOR VERTICAL ALIGNMENT
TABLE
WITH COVER). SEE STD DWG
BR05, ELEV - 405A
18' LCPE OUTLET
98'
Q
18"0 LCPE OUTLET
HANDHOLDS, STEPS OR UDDER, 404.0 ----
PIPE, IE - 405.0
a
SEE STD LING B--01 Z
PIPE SUPPORT, TYP
/
Q
403.0
SEE NOTE 4
C
CB TYPE SEE
OF PIPE
4D
. B-OI
STD. DWG. B-01F k BROS
ATTACHED BY
o
24'0 RISER
'+
AND 2 4-0
/ALLOW
0
401 0
SS.SI.D
BOLTS TO
ELBOW RFSTRICTOR
0
REMOVAL
W/ ORIFICE
RESTRO PATE
L/V� •�
PLANVIEW
n
SECTION VIEW
ORIFICEDIA
ORIFICE oA - 3.15'
9
c
0
c
CD
Table B.1.1. Stormwater Pond Overflow Design
Date: 7/18/02
R/D Facility:
Honey Crest
KCRTS Filename:
lev2.rdf
Contributing Time Series:
totdevl5.tsf
Overflow protection structure:
outlet control structure riser (R1)
Emergency overflow structure:
emergency spillway
Qde,ig, (CFS):
6.85
(KCRTS 15-minute peak rate)
Top of Control Structure Riser
(FT)
408.00
Min. Top of Berm (FT)
409.00
Structure
Capacity Elevation WSE
Structure
Size
Units Head (FT) (CFS) (FT) (FT)
Design Operation
Riser RI
24
inches 0.10 408.00 408.10
Primary Overflow
Riser RI
24
inches 0.50 6.89 408.00 408.50
Secondary Inlet
Jailhouse window
98
inches 0.40 6.88 408.10 408.50
Emergency Overflow
Spillway
23
feet 0.20 6.85 408.50 408.70
Head
Design Head above
(FT)
Required Freeboard.-
Riser
0.10
Primary Overflow or
Secondary Inlet Head
0.40
Spillway Head
0.20
Spillway Freeboard
0.30
Total Required
Freeboard
1.00
Table B.1.2. Wetpond Outlet Pipe Design
Date: 7/8/02
Wetpond Facility
Permanent WSE (FT)
Qwq (CFS)
Outlet Pipe Dia. (IN)
Check for Inlet Control:
HW/D from Fig. 4.3.1.13
of Design Manual MIN
HW (FT) 0.75
Inlet Control WSE (FT) 405.75
Check for Outlet Control.
dc/D from Fig. 4.3.1.F of '`"_ '`.
Design Manual,
dc (FT) 0.38
T (FT) 1.30
A (SQ FT) 0.36
V (FT/S) 2.98
Vh (FT) 0.14
Outlet Control WSE (FT) 405.51
Overflow WSE (FT) 405.75
Primary Overflow Structure
Elev. (FT) 408.00
Overflow WSE < Overflow
Structure Elev. ? OK
Note: Calculations above follow the design procedure outlined on p. 6-70
of the KCSWM 1998 Surface Water Design Manual.
Shaded areas denote
spreadsheet inputs
APPendiz B.� KRTSPoies►
Retention/Detention Facility
Retention/Detention Facility
Type of Facility:
Detention
Pond
Side Slope:
2.00
H:1V
Pond Bottom
Length:
170.88
ft
Pond
Bottom Width:
42.72.
ft
Pond
Bottom Area:
7300.
sq. ft
Top Area
at 1 ft. FB:
10974.
sq. ft
0.252
acres
Effective Storage
Depth:
3.00
ft
Stage
0 Elevation:
405.00
ft
Storage
Volume:
25889.
cu. ft
0.594
ac-ft
Riser Head:
3.00
ft
Riser
Diameter:
24.00
inches
Number
of orifices:
2
Full Head Pipe
Orifice
# Height
Diameter
Discharge Diameter
(ft)
(in)
(CFS)
(in)
1
2; 0.00
3.15
0.450
2
\ 1.40
2.35
0.177 6.0
Top
Notch Weir:
Rectangular
Length:
12.00
in
Weir Height:
ft
Outflow
Rating Curve:
None
Stage
Elevation
Storage
Discharge
Percolation
Surf Area
(ft)
(ft) (cu. ft) (ac-ft)
(cfs)
(cfs)
(sq. ft)
0.00
405.00
0.
0.000
0.000
0.00
7300.
0.03
405.03
219.
0.005
0.049
0.00
7326.
0.07
405.07
513.
0.012
0.069
0.00
7360.
0.10
405.10
734.
0.017
0.084
0.00
7386.
0.13
405.13
956.
0.022
0.098
0.00
7411.
0.16
405.16
1179.
0.027
0.109
0.00
7437.
0.20
405.20
1477.
0.034
0.119
0.00
7472.
0.23
405.23
1702.
0.039
0.129
0.00
7497.
0.26
405.26
1927.
0.044
0.138
0.00
7523.
0.36
405.36
2684.
0.062
0.162
0.00
7610.
0.46
405.46
3449.
0.079
0.183
0.00
7696.
0.56
405.56
4223.
0.097
0.202
0.00
7783.
0.66
405.66
5006.
0.115
0.219
0.00
7871.
0.76
405.76
5797.
0.133
0.235
0.00
7959.
0.86
405.86
6597.
0.151
0.250
0.00
8047.
0.96
405.96
7406.
0.170
0.264
0.00
8135.
1.06
406.06
8224.
0.189
0.277
0.00
8224.
1.16
406.16
9051.
0.208
0.290
0.00
8313.
1.26
406.26
9887.
0.227
0.302
0.00
8402.
1.36
406.36
10732.
0.246
0.314
0.00
8492.
1.40
406.40
11072.
0.254
0.318
0.00
8528.
Honey Crest MZR July 2002
1.42
406.42
11243.
0.258
0.323
0.00
8546.
1.45
406.45
11499.
0.264
0.330
0.00
8573.
1.47
406.47
11671.
0.268
0.339
0.00
8591.
1.50
406.50
11929.
0.274
0.352
0.00
8618.
1.52
406.52
12102.
0.278
0.367
0.00
8636.
1.55
406.55
12361.
0.284
0.384
0.00
8663.
1.57
406.57
12535.
0.288
0.399
0.00
8681.
1.60
406.60
12795.
0.294
0.406
0.00
8708.
1.62
406.62
12970.
0.298
0.413
0.00
8726.
1.72
406.72
13847.
0.318
0.438
0.00
8817.
1.82
406.82
14733.
0.338
0.460
0.00
8908.
1.92
406.92
15629.
0.359
0.481
0.00
8999.
2.02
407.02
16533.
0.380
0.501
0.00
9091.
2.12
407.12
17447.
0.401
0.519
0.00
9183.
2.22
407.22
18370.
0.422
0.537
0.00
9276.
2.32
407.32
19302.
0.443
0.554
0.00
9368.
2.42
407.42
20243.
0.465
0.570
0.00
9461.
2.50
407.50
21003.
0.482
0.583
0.00
9536.
2.56
407.56
21577.
0.495
0.643
0.00
9592.
2.63
407.63
22251.
0.511
0.744
0.00
9658.
2.69
407.69
22832.
0.524
0.869
0.00
9714.
2.75
407.75
23417.
0.538
1.010
0.00
9771.
2.81
407.81
24005.
0.551
1.170
0.00
9827.
2.88
407.88
24695.
0.567
1.350
0.00
9893.
2.94
407.94
25290.
0.581
1.530
0.00
9950.
3.00
408.00
25889.
0.594
1.720
0.00
10007.
3.10
408.10
26894.
0.617
2.350
0.00
10102.
3.20
408.20
27909.
0.641
3.490
0.00
10198.
3.30
408.30
28934.
0.664
4.960
0.00
10294.
3.40
408.40
29968.
0.688
6.700
0.00
10390.
3.50
408.50
31012.
0.712
8.670
0.00
10486.
3.60
408.60
32065.
0.736
10.850
0.00
10583.
3.70
408.70
33128.
0.761
13.220
0.00
10680.
3.80
408.80
34201.
0.785
15.350
0.00
10778.
3.90
408.90
35284.
0.810
16.190
0.00
10876.
4.00
409.00
36377.
0.835
16.970
0.00
10974.
4•.10
409.10
37479.
0.860
17.720
0.00
11072.
4.20
409.20
38591.
0.886
18.440
0.00
11171.
4.30
409.30
39713.
0.912
19.130
0.00
11270.
4.40
409.40
40845.
0.938
19.790
0.00
11369.
4.50
409.50
41987.
0.964
20.430
0.00
11469.
4.60
409.60
43139.
0.990
21.050
0.00
11569.
4.70
409.70
44301.
1.017
21.650
0.00
11669.
4.80
409.80
45472.
1.044
22.230
0.00
11770.
4.90
409.90
46654.
1.071
22.790
0.00
11871.
5.00
410.00
47847.
1.098
23.350
0.00
11972.
Hyd
Inflow Outflow
Peak
Storage
Target
Calc
Stage
Elev
(Cu-Ft)
(Ac-Ft)
1
2.74
*******
2.32
3.09
408.09
26844.
0.616
2
1.31
*******
1.14
2.80
407.80�
23881.
0.548
3
1.32
*******
0.99
2.74
407.74
23327.
0.536
4
1.39
*******
0.93
2.71
407.71
23072.
0.530
5
1.60
*******
0.58
2.46
407.46
20635.
0.474
6
0.81
*******
0.48
1.89
406.89
15384.
0.353
7
1.01
*******
0.30
1.22
406.22
9530.
0.219
8
1.01
*******
0.27
1.01
406.01
7831.
0.180
Honey Crva TIR - July 2002
Route Time Series through Facility
Inflow Time Series File:totdev.tsf
Outflow Time Series File:rdout
Inflow/Outflow Analysis
Peak Inflow Discharge:
2.74
CFS at
6:00 on Jan
9 in Year 8
Peak Outflow
Discharge:
2.32
CFS at
9:00 on Jan
9 in Year 8
Peak
Reservoir
Stage:
3.09
Ft
Peak
Reservoir
Elev:
408.09
Ft
Peak Reservoir
Storage:
26844.
Cu-Ft
0.616
Ac-Ft
Flow Frequency
Analysis
Time Series
File:rdout.tsf
J
Project
Location:Sea-Tac
---Annual
Peak
Flow Rates---
-----Flow
Frequency Analysis-------
FlowRate
Rank
Time of
Peak
- - Peaks
- - Rank
Return Prob
(CFS)
(CFS)
(ft)
Period
0.988
3
2/09/01
16:00
2.32
3.09 1
100.00 0.990
0.297
7
1/05/02
18:00
1.14
2.80 2
25.00 0.960
0.577
5
3/06/03
20:00
0.988
2.74 3
10.00 0.900
0.271
8
8/23/04
23:00
0.927
2.71 4
5.00 0.800
0.475
6
1/05/05
10:00
0.577
2.46 5
3.00 0.667
0.927
4
1/18/06
21:00
0.475
1.89 6
2.00 0.500
1.14
2
11/24/06
5:00
0.297
1.22 7
1.30 0.231
2.32
1
1/09/08
9:00
0.271
1.01 8
1.10 0.091
Computed
Peaks
1.92
3.03
50.00 0.980
Flow Duration
from
Time
Series File:rdout.tsf
Cutoff
Count
Frequency
CDF
Exceedence_Probability
CFS
%
%
%
0.016
47652
77.710
77.710
22.290
0.223E+00
0.048
4922
8.027
85.737
14.263
0.143E+00
0.080
3038
4.954
90.691
9.309
0.931E-01
0.111
1786
2.913
93.604
6.396
0.640E-01
0.143
1356
2.211
95.815
4.185
0.418E-01
0.175
919
1.499
97.314
2.686
0.269E-01
0.206
517
0.843
98.157
1.843
0.184E-01
0.238
417
0.680
98.837
1.163
0.116E-01
0.270
246
0.401
99.238
0.762
0.762E-02
0.301
150
0.245
99.483
0.517
0.517E-02
0.333
84
0.137
99.620
0.380
0.380E-02
0.365
22
0.036
99.656
0.344
0.344E-02
0.397
19*
0.031
99.687
0.313
0.313E-02
0.428
45
0.073
99.760
0.240
0.240E-02
0.460
36
0.059
99.819
0.181
0.181E-02
0.492
20
0.033
99.852
0.148
0.148E-02
0.523
27
0.044
99.896
0.104
0.104E-02
0.555
17
0.028
99.923
0.077
0.766E-03
0.587
18
0.029
99.953
0.047
0.473E-03
0.619
0
0.000
99.953
0.047
0.473E-03
0.650
1
0.002
99.954
0.046
0.457E-03
0.682
3
0.005
99.959
0.041
0.408E-03
0.714
2
0.003
99.962
0.038
0.375E-03
0.745
3
0.005
99.967
0.033
0.326E-03
0.777
4
0.007
99.974
0.026
0.261E-03
0.809
1
0.002
99.976
0.024
0.245E-03
0.841
2
0.003
99.979
0.021
0.212E-03
Honey Crest TIR-J* 2002
0.872
3
0.005
99.984
0.016
0.163E-03
0.904
3
0.005
99.989
0.011
0.114E-03
0.936
2
0.003
99.992
0.008
0.815E-04
0.967
1
0.002
99.993
0.007
0.652E-04
0.999
2
0.003
99.997
0.003
0.326E-04
1.03
0
0.000
99.997
0.003
0.326E-04
1.06
1
0.002
99.998
0.002
0.163E-04
1.09
0
0.000
99.998
0.002
0.163E-04
1.13
0
0.000
99.998
0.002
0.163E-04
Inflow/Outflow Analysis
Peak Inflow Discharge:
2.74
CFS at
6:00 on Jan
9 in Year 8
Peak Outflow
Discharge:
2.32
CFS at
9:00 on Jan
9 in Year 8
Peak
Reservoir
Stage:
3.09
Ft
Peak
Reservoir
Elev:
408.09
Ft
Peak Reservoir
Storage:
26844.
Cu-Ft
0.616 Ac-Ft
Flow Frequency
Analysis
Time Series
File:rdout.tsf
Project
Location:Sea-Tac
---Annual
Peak
Flow Rates---
-----Flow
Frequency Analysis-------
FlowRate
Rank
Time of
Peak
- - Peaks
- - Rank
Return Prob
(CFS)
(CFS)
(ft)
Period
0.988
3
2/09/01
16:00
2.32
3.09 1
100.00 0.990
0.297
7
1/05/02
18:00
1.14
2.80 2
25.00 0.960
0.577
5
3/06/03
20:00
0.988
2.74 3
10.00 0.900
0.271
8
8/23/04
23:00
0.927
2.71 4
5.00 0.800
0.475
6
1/05/05
10:00
0.577
2.46 5
3.00 0.667
0.927
4
1/18/06
21:00
0.475
1.89 6
2.00 0.500
1.14
2
11/24/06
5:00
0.297
1.22 7
1.30 0.231
2.32
1
1/09/08
9:00
0.271
1.01 8
1.10 0.091
Computed
Peaks
1.92
3.03
50.00 0.980
Flow Duration
from Time
Series File:rdout.tsf
Cutoff
Count
Frequency
CDF
Exceedence_Probability
CFS
%
%
%
0.016
47652
77.710
77.710
22.290
0.223E+00
0.048
4922
8.027
85.737
14.263
0.143E+00
0.080
3038
4.954
90.691
9.309
0.931E-01
0.111
1786
2.913
93.604
6.396
0.640E-01
0.143
1356
2.211
95.815
4.185
0.418E-01
0.175
919
1.499
97.314
2.686
0.269E-01
0.206
517
0.843
98.157
1.843
0.184E-01
0.238
417
0.680
98.837
1.163
0.116E-01
0.270
246
0.401
99.238
0.762
0.762E-02
0.301
150
0.245
99.483
0.517
0.517E-02
0.333
84
0.137
99.620
0.380
0.380E-02
0.365
22
0.036
99.656
0.344
0.344E-02
0.397
19
0.031
99.687
0.313
0.313E-02
0.428
45
0.073
99.760
0.240
0.240E-02
0.460
36
0.059
99.819
0.181
0.181E-02
0.492
20
0.033
99.852
0.148
0.148E-02
0.523
27
0.044
99.896
0.104
0.104E-02
0.555
17
0.028
99.923
0.077
0.766E-03
0.587
18
0.029
99.953
0.047
0.473E-03
0.619
0
0.000
99.953
0.047
0.473E-03
Haney Crest TIR - July 2002
0.650
1
0.002
0.682
3
0.005
0.714
2
0.003
0.745
3
0.005
0.777
4
0.007
0.809
1
0.002
0.841
2
0.003
0.872
3
0.005
0.904
3
0.005
0.936
2
0.003
0.967
1
0.002
0.999
2
0.003
1.03
0
0.000
1.06
1
0.002
1.09
0
0.000
1.13
0
0.000
Duration
Comparison
Anaylsis
Base
File: totex.tsf
New
File: rdout.tsf
99.954
99.959
99.962
99.967
99.974
99.976
99.979
99.984
99.989
99.992
99.993
99.997
99.997
99.998
99.998
99.998
Cutoff Units: Discharge in CFS
Cutoff
0.360
0.422
0.483
0.544
0.606
0.667
0.728
0.789
0.851
0.912
0.973
1.03
1.10
-----Fraction of Time-----
BaseNew %Change
0.34E-02 0.35E-02 3.8
0.24E-02 0.26E-02 8.3
0.17E-02 0.16E-02 -8.4
0.13E-02 0.93E-03 -26.9
0.96E-03 0.47E-03 -50.8
0.60E-03 0.44E-03 -27.0
0.41E-03 0.36E-03 -12.0
0.29E-03 0.26E-03 -11.1
0.20E-03 0.20E-03 0.0
0.11E-03 0.11E-03 0.0
0.65E-04 0.65E-04 0.0
0.33E-04 0.33E-04 0.0
0.16E-04 0.16E-04 0.0
0.046
0.457E-03
0.041
0.408E-03
0.038
0.375E-03
0.033
0.326E-03
0.026
0.261E-03
0.024
0.245E-03
0.021
0.212E-03
0.016
0.163E-03
0.011
0.114E-03
0.008
0.815E-04
0.007
0.652E-04
0.003
0.326E-04
0.003
0.326E-04
0.002
0.163E-04
0.002
0.163E-04
0.002
0.163E-04
---------Check of
Probability Base
0.34E-02 0.360
0.24E-02 0.422
0.17E-02 0.483
0.13E-02 0.544
0.96E-03 0.606
0.60E-03 0.667
0.41E-03 0.728
0.29E-03 0.789
0.20E-03 0.851
0.11E-03 0.912
0.65E-04 0.973
0.33E-04 1.03
0.16E-04 1.10
Maximum positive excursion = 0.084 cfs ( 8.0%)
occurring at 1.05 cfs on the Base Data:totex.tsf
and at 1.13 cfs on the New Data:rdout.tsf
Maximum negative excursion = 0.121 cfs (-17.1%)
occurring at 0.705 cfs on the Base Data:totex.tsf
and at 0.584 cfs on the New Data:rdout.tsf
Honey Crest TIR-July 2002
Tolerance-------
New%Change
0.369 !2.�-'
0.429 7
0.466 -3.6
0.507 -6.9
0.537 -11.4
0.575 -13.8
0.690 -5.3
0.772 -2.2
0.868 2.0
0.924 1.3
0.985 1.2
1.06 2.6
1.13 3.5
Appendix C. Co� Calculations
Appendix C.1 Stormwater System Conveyance
Appendix C.2 KCRTS Time Series Calculations
Appendix C.3 KCRTS Peak Flow Rates
Honey Crest TM —July 2W2
Appendix CA Stormwater System Conveyance
Honey Cres177R - July 2002
v1.2
Project: Honey Crest
Figure C.I.I. Backwater Analysis for Conveyance System
Date: 07/24/02 Revised 9/4/02
Onsite Conveyance Improvements: R/D Pond to CB8
I n c c 7 O n 1 r)
1O2 1d 1r,
1R 17
1R
iCs�1111
Pipe
Barrel
Barrel
Barrel
Friction
Entrance
Entrance
Entrance
Exit,
Exit
OutletInlet;
Inlet
Approach
<_
i
Bend
Junctions
HW
1'op
Added Q'
KI
HL
ft
Pipe Segment
Q
(cfs)
Length
(ft)
Size
(m)
"n"
Value
Outlet Elev
(ft)
Inlet Elev
(ft)
Area
sf
Velocity
f s
Vel Head
ft
TW Elev
ft
Loss
ft
HGL Elev
ft)
HL
Coef
HL
ft
HL.
Coef
HL
ft
Cntrl. Elev
ft
Control
HW/D
Cntrl. Elev
ft
Vel. Head
ft
Defi.
ML
HL
ft
Elev.
(ft)
Upstream
Struct
CB to CB
Pond
CB1
9.64
208
18
0.012
402.50
401.80
1.767
5.45
0.46
407.80
1.48
409.28
0.50
0.23
1.00
0.46
409.97
1:45
409.97
0.22
90
1.32
0.29
5.29
0.36
0.08
410.12
413.68
..............................................................................................................................................................................................................................................................................................................................................................
C61
C62
4.63
57
15
0.012
407.08
408.00
1.227
3.77
0.22
410.12
0.25
410.37
0.50
0.11
1.00
0.22
410.70
0.8 �
409.06
0.22
90
1.32
0.29
0:00
0.00
410.77
414.82
C62
.....................
C63
.................
4.63
.
92
15
0.012
.................................................................................................................................................................................................................................................6..
408.00
408.46
1.227
3.7
0.22
410.77
0.40
411.17
0.50
0.11
1.00
0.22
411.5
.
0.85
409.53
0.22
90
1.32
0.29
0:00
0.00
411.57
413.42
...................................................................................................................................................................................................................................................................................................................................................................
CB3
CB4
4.63
90
15
0.012
408.46
408.91
1.227
3.77
0.22
411.57
0.39
411.96
0.50
0.11
1.00
0.22
412.30 .
.
0.85
409.98
0.09
0
0.02
0.00
3.23
0:43
0.04
412.25
413.69
...........4....................................................................................................
CB4
CB5
1.88
105
12
0.012
.........................................................................................................................................................................................................................................
408.91
409.44
0.785
2.40
0.09
412.25
0.25
412.49
0.50
0.04
1.00
0.09
412.63
0:70_
410:14
0.02
0
0.02
0:00
1.15
0:39
0.01
412.61
413.05
CB5
CB6
0.95
124
12
0.012
409.44
410.06
0.785
1.21
0.02
412.61
0.07
412.69
0.50
0.01
1.00
0:02
412.72
.
0.51
........................................................................................................................................................................................
410.57
0.02
90
1.32
0.02
0.14
0.12
0.00
412.73
414.90
..................................................................................................................................................................................................................................................................................................................................
CB6
C67
0.84
79
12
0.012
410.06
410.45
0.785
1.07
0.02
412.73
0.04
412.77
0.50
0.01
1.00
0.02
412.80
0.48
410.93
0.00
0
002
0.00
0.50
0.38
0.00
412.79
413.83
.........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
CB7
C68
0.38
150
12
0.012
410.45
411.20
0.785
0.49
0.00
412.79
0.01
412.81
0.50
0.00
1.00
0.00
412.81
0.34 .....
411.54
0.06
0
0.02
0.00
0.38
0.55
0.03
412.79
414.48
.......................................................................................................................................................................................................................
0.000
2.00
0.06
NOTES: 1. All pipe material is assumed to be LCPE
2. Flow rates (Q) are based on KCRTS Rational Method.
3. Entrance loss coefficients are from Table 4.3.1.E for LCPE pipe, headwall with square edge entrance.
4. Exit loss coefficients are based on Figure 4.2.1.1, Column (14) and ASCE Manual "Design and
Construction of Sanitary and Storm Sewers". 1970, page 107.
Onsite Conveyance Improvements: C64 to CB10
n o n C a 7 A 1 r)
1R 17
19 20
Pipe
Barrel
Barrel
Barrel
Friction
Entrance
:i11,''
Entrance
;')
Exit
Outlet
Inlet
Approach
'Bend
Bend
Bend
Junctions
HW
Top
Added Q
Q3
KI
HL
ft
Pipe Segment
Q
(cfs)
Length
(ft)
Size
in
"n"
Value
Outlet Elev
(ft)
Inlet Elev
ft
Area
sf
Velocity
f s
Vel Head
ft
TW Elev
ft
Loss
ft
HGL Elev
ft
j
Cie ..,
HL
ft
1 L.
Coef
HL
ft
Cntrl. Elev
ft
Control
HW/D' -
Cntrl. Elev
ft
Vel. Head
ft
Defl.
de
HL
ef,
HL
ft
Elev.
ft
Upstream
Structure
CB to CB
CB4
�,b4/A
zuu
118
15
u u i)
4,_O.zu
409.50
1.227
2.12
0.07
0.16
412.41
0.50
0.03
1 00
0.07
412.51
0.62
410.28
0.01
0
0 02
0.00
1 87
0 44
0.01
412.50
413 11
...............................................................................................................................................................................................................................................A
CB4B
0.73
32
12
0.012
409.50
409.66
0.785
0.93
0.01
12.50
0.01
412.52
0.50
0.01
1.00
0.01
412.54
0.45
410.11
0.01
90
1,32
0.01
0.73
0.55
0.00
412.54
413.07
...............................................
.0
.
2
0012
409.50
40...0.01
L412.25
12.54
0.01
412.55
0.50
.................
0.00
1.00
........
0.01
......
412.56
...................
... 0.38
410.04
.................
0.06
....................
90
...........
1.32
........
0.08
.........
0.73
..............--
0.70
......
0.04
......
12.62...........................................................................................................................................................................................................................................................
.................
..................
0.000
2.00
0.06
Onsite Conveyance Improvements: CB5 to CB 11
1 n G CZ 7 n a 1n
11 1d 1.9;
IF; 17
18
19 20
Pipe
Barrel
Barrel
Barrel
Friction
Entrance
_Mtzzk
Entrance
Exit
Outlet
Inlet
Inlet
Approach
Bend'
Bend
Bend
Junctions
HW
3,
Pipe Segment
Q
Length
Size
"n"
Outlet Elev
Inlet Elev
Area
Velocity
Vel Head
TW Elev
Loss
HGL Elev
f
HL
HL
Cntrl. Elev
Control
Cntrl. Elev
Vel. Head-.
Defl.
HL
HL
Added Q
KI
HL
Elev
(12
S� J
ft�
ft
ft
HW/D '
ft
ft
de
Coef'
ft
Q3
ft
ft
P,
CB to CB
r B 1
OC42
32
0.012
409 44
409.60
0.785
0.53
0 00
412 61
0 00
412.62
0
0.00
1.00
0.00
412.62
0.36
409.96
0.06
0
0 0 �.........................
0.00
0..4.2
.
0 55
0.03
412.60
413 05
.........
.................................................................................................................................................................................................................................................................................................................................................................
0.000
2.00
0.06
9/8/2002
Honey Crest HGL v1.xls Page 1 4:55 PM
- lect: Honey Crest
;ure C.1.1. Backwater Analysis for Conveyance System
Date: 07/24/02
Onsite Conveyance Improvements: R/D Pond to CB8
1 2 3 4 5 6 7 8 9 10 11 12
13 14 15
iG"�r]
18
19 20
Pipe
Barrel
Barrel
Barrel
Friction
Entrance
_ = "'
Entrance
Exit
Outlet
Inlet
Approach
.Bend
Ben'" ;
Bend
Junctions
HW
Pipe Segment
Q
cfs
Length
ft
Size
in
"W'
Value
Outlet Elev
ft
Inlet Elev
ft
Area
sf
Velocity
(fps)
Vel Head
ft
TW Elev
ft
Loss
ft
HGL Elev
ft
HL
ft
HL
ft
Cntrl. Elev
ft
✓
Cntrl. Elev
ft
Vel. Head
ft
" ,Defl.
` d
HL
Coef�
HL
ft
KI
HL
ft
Elev.
ft
CB to CB
Pond
CB1
9.43
208
18
0.012
402.50
407.80
1.767
5.34
0.44
407.80
1.42
409.22
0.50
0.22
1.00
0.44
409.88
1.41
409.92
0.21
90
1.32
0.27
5.01
0.35
0.07
..
410.06
. .....................
413.68 .
.
....................................................................................
C81
C62
4.46
...
57
.
15
.. .
.......................................................
0.012
407.08
........................................
408.00
.
1.227
3.63
.............................................................................
0.21
410.06
0.23
410.29
.
........................................................................
0.50
.
0.10
.
1.00
.
0.21
........................................................
.
410.59
0.83
409.04
. .
. ..
.....................
0.21
. ...........
.
90
..............................................................
9.32
.
0.28
.
0.00
0.00
410.66
. .
414.82
..................................................................
CB2
CB3
4.54
.............................................................................
92
15
.
0.012
. . ...
408.00
.. .. .
408.46 ............................................
1.227
..
3.70
.................. .
0.21
.. .........................................................
410.66
0.38
.
411.05
........ ...............
... ..
0.50
........
.. ....
.
0.11
. ...
1.00
......................................................................
. ..
0.21
411.36
0.84 .
409.51
. ......................
.. . ..
0.22
. . ................
90
1.32
. .........................
0.29
............................
0.00
0.00
411.44
.
413.42
..................
CB3
CB4
4.63
90 ..
15
..... ...
0.012
....
408.46
408.91 ..................................................
1.227
3.77
0.22
411.44
0.39
411.83
0.50
0.11
1.00
0.22
412.16
0.85
409.98
0.09
0
0.02
0.00
2.75
0.38
0.03
412.10 ..
413.69
...........................................................................
CB4
CB5
1.88
105
.........
12
.............................................
0.012
408.91
409.44
0.785
....................
2.39
.............................................................................................................................................................................................................................................................................................................................
. 0.09
412.10
0.25
412.35
0.50
0.04
1.00
0.09
412.48
.
0.70
410.14
0.02
0
0.02
0.00
0.93
0.33
0.01
412.47
......................
413.05
.. ........
...........................................................
CB5
CB6
0.95
124
12
0.012
.... .....
409.44
...........
410.06
0.785
1.21
0.02
...........................................
412.47
0.07
...
412.54
. ...........
0.50
.
0.01
..
1.00
. .
0 02
. .
412.58
. .
0.51
.
....................
410.57
... . ..
.........................
0.02
.
90
........................
.
1.32
.
0.02
0.11
0.09
. .
0.00
.
412.58
414.90
.............................................
C66
C67
.....................................................................................................
0.84
79
12
0.012
410.06
410.45
.........................................
0.785
...............................
1.07
.........................................................................................................................................................................................................
0.02
412.58
0.04
412.62
0.50
0.01
1.00
0.02
412.65
0.48
410.93
.........................................................................................................................
0.00
0
0.02
0.00
0.46
0.36
0.00
.....
412.65 .
.... ...............
413.83
.
...................................................
CB7
C68
.......................................................................................................
0.38
150
12
0.012
410.45
411.20
0.785
0.48
...............................................................................................................................................................................................................................................................................................................................................
0.00
412.65
0.01
412.66
0.50
0.00
1.00
0.00
412.67
0.34
411.54
0.06
0
0.02
0.00
0.38
0.55
0.03
412.64
.............
414.48
.........................................................................................._.................................................._................................................................................................
0.000
2.00
0.06
... ....
.................
.....
............... ......
....... ....
...... ....
.................. ....
................... ....
.................. ....
................... ....
........... .....
....... ......
........ .....
................ ....
...... ....
..... ..
............. . .
.................
NOTES: 1. All pipe material is assumed to be LCPE.
2. Flow rates (Q) are based on Rational Method.
3. Entrance loss coefficients are from Table 4.3.1.E for LCPE pipe, headwall with square edge entrance.
4. Exit loss coefficients are based on Figure 4.2.1.1, Column (14) and ASCE Manual "Design and
Construction of Sanitary and Storm Sewers". 1970, page 107.
site Conveyance Improvements: CB4 to C1310
1 2 4 6 7 8 9 10 11 12
13 14 15
16 17
18
19 20
Pipe Segment
Q
cfs
Length
ft
Pipe
Size
in
"n"
Value
Outlet Elev
(ft)
Inlet Elev
(ft
Barrel
Area
sf
Barrel
Velocity
(fps)
Barrel
Vel Head
ft
TW Elev
ft
Friction
Loss
ft
Entrance
HGL Elev
ft
Entrance
HL
Coef
Entrance
HL-
(ft)
: -' `=
Exit
HL
(ft
I Outlet
Cntrl. Elev
ft
Inlet
Control
HW/D
Inlet
Cntrl. Elev
(ft)
Approach
Vel. Head
(ft
Benc
Defl.
de L
Bend
HL
Coef
Bend
HL
ft
Junctions
HW
Elev.
ft
Top
Upstream
'Structure
`.
,��,, •
KI
HL
ft
CB . #o . ;,CB
CB4
........................................................................................................................................................................................................
CB9
.............................................
....................
CB9
CB10
..........................
2.59
0.73
......................._.........................................................................................................
.............
118
32
................
12
12
0.012
0.012
I ..............
408.29
409.50
i
409.50
409.66
.....................
0.785
0.785
t....000
0...
3.30
0.93
2.00
0.17
0.01
0.061
412.10
......
412.89
........................
.............. . ...
0.53
..............................................................................................................................................................
0 01 ......
..................
412.63
412.90
.................
I ......................
. 0.50
0.50
................
....................
0.08 .
0.01
...............
F...
1.00
1.00
.......
0.17
0.01
......
412.88
412.92
..................
i
0.84
.. ..
0.45 _
..................
.......................
410.34
410.11
.. ....
..................
....................
0.01
... ..
...............................
0.06 ....
...................
.......................
..90
............
90 .....
...........
...............
1.32
............................................................................
.
1.32
....... .....
I .............
0.02
0.08
........ .....
I .............
1.87
0.73
...............
......................
r
0.44
0.55
.....
.... .....
.........
0.01
..... .
0.03 ..........
412.89
........................
412.98
. .................
.. .............
413.11
413.07
.................
......................
Onsite Conveyance Improvements: CB5 to CB 11
1 2 3 4 . 6 7 8 9 10 it 12
13 14 15
16 17
18
19 20
Pipe Segment
Q
cfs
Length
ft
Pipe
Size
in
"n"
Value
Outlet Elev
ft
Inlet Elev
ft
Barrel
Area
sf
Barrel
Velocity
(fps)
Barrel
Vel Head
ft
TW Elev
ft
Friction
Loss
ft
Entrance
HGL Elev
ft
Entrance
, HL
Coef
Entrance
HL
(ft)
Exit
j HL
(ft
Outlet
Cntrl. Elev
ft
Inlet
Control
HW/D
Inlet
Cntrl. Elev
(ft)
Approach
Vel. Head
(ft
Bend:
Defl.
d)
Bend
HL
Coef
Bend
HL
ft
Junctions
HW
Elev.
ft
Top
Upstream
Structure
Added Q
%" Q3
I KI
HL
ft
,CB to CB
CB5
.....................................................................................................................................................................................................................................................................
CB11
0.42
32
12
0.012
409.44
409.60
0.785
0.000
0.53
2.00
0.00
0.06
412.47
0.00
412.47
0.50
.....
0.00
................
1.00
.......
0.00
......
412.48
..................
0.36
..................
409.96
..................
0.06
...................
0
...........
0.02
.......
0.00
........
0.42
................
0.55
......
0.03
.....
412.45
.............
413.05
.................
7/24/2002
Honey Crest HGL v1.xls Page 1 6:04 PM
A71-
U)
c
�0 W
cc
00
LL
L
z
un
an
z
v
z
I
OO
N
Table C.1.1. Flow Rate Calculations Using the Rational Method
Design Storm = 25 Year
24 Hr Precip = 3.4 in
Sub
Upstrm Downstrm
SubArea
Forest
Lawn
Impervious
Total
Cumul.
Tc
it
I
Q
Pipe
Pipe
Upstrm
Downstrm
Slope
n
Veloc
Travel
Basin
Node
Node
Subtotal
C=0.10
C=0.25
C=0.90
Area
C
C*A
C*A
Unit Peak
Diam.
Length
Invert El
Invert El
Time
(SF)
(AC)
(AC)
(AC)
(AC)
(MIN)
(IN/HR)
(CFS)
in
ft
%
fps
min
F
CB8
CB7
11,146
0.00
0.14
0.12
0.26
0.55
0.140
0.140
6.3
0.80
2.73
0.38
12
150
411.20
410.45
0.50%
0.012
2.37
1.1
E
C137
CB6
15,950
0.00
0.20
0.17
0.37
0.55
0.201
0.341
7.4
0.73
2.47
0.84
12
79
410.45
410.06
0.49%
0.012
3.09
0.4
D
C86
C135
4,653
0.00
0.06
0.05
0.11
0.55
0.059
0.400
7.8
0.70
2.38
0.95
12
124
4%06
409.44
0.50%
0.012
3.24
0.6
C*
CB11
C135
11,132
0.00
0.12
0.14
0.26
0.61
0.155
0.155
6.3
0.80
2.73
0.42
12
32
409.60
409.44
0.50%
0.012
2.44
0.2
B
CB5
CB4
19,801
0.00
0.20
0.25
0.45
0.61
0.276
0.832
8.4
0.67
2.26
1.88
12
105
409.44
408.29
1.10%
0.012
5.20
0.3
H*
CB10
C139
19,242
0.00
0.20
0.24
0.44
0.61
0.268
0.268
6.3
0.80
2.73
0.73
12
32
409.66
409.5
0.50%
0.012
2.95
0.2
G*
C139
CB4
57,249
0.00
0.75
0.57
1.31
0.53
0.696
0.965
6.5
0.79
2.68
2.59
12
118
409.50
408.29
1.03%
0.012
5.31
0.4
A
C84
CB3
23,861
0.00
0.30
0.25
0.55
0.55
0.301
2.097
8.8
0.65
2.21
4.63
12
90
408.91
408.46
0.50%
0.012
5.89
0.3
CB3
C132
2.097
9.0
0.64
2.17
4.54
12
92
408.46
408.00
0.50%
0.012
5.79
0.3
C132
C131
2.097
9.3
0.63
2.13
4.46
12
57
408.00
407.08
1.61 %
0.012
7.04
0.1
CB1
Pond
2.097
9.4
0.62
2.11
4.42
18
92
407.08
402.50
4.98%
0.012
10.43
0.1
Note: *
denotes branch in storm system.
Church
Property
K
CBEX3
CBEX2
21,344
0.13
0.36
0.00
0.49
0.21
0.103
0.103
6.3
0.80
2.73
0.28
12
264
409.54
409.18
0.14%
0.024
0.88
5.0
J
CBEX3
CBEX2
54,796
0.00
0.19
1.07
1.26
0.80
1.009
1.112
6.3
0.80
2.73
3.04
12
264
409.64
409.18
0.14%
0.024
3.87
1.1
I
CBEX2
CBEX1
50,330
0.00
0.17
0.98
1.16
0.80
0.927
2.040
7.4
0.72
2.45
5.01
12
96
408.59
407.16
1.49%
0.024
6.37
0.3
Table C.1.2. Time of Concentration Calculations
Lawn
Grassed Waterway
Pavement
Basin
Kr
7.0
15.0
20.0
Segment 1 Segment 2
Length Height Slope Kr Tc Length Height Slope Kr Tc
F F (FT/FT) (M I N) FT F (FT/FT) (M I N)
F 60 0.005 7.0 2.0 60
G 300 0.020 7.0 5.1 110
K 241 0.020 7.0 4.1 70
Note: All onsite Time of Concentrations were calculated to be < 6.3 minutes.
0.010
20.0
0.5
0.010
20.0
0.9
0.010
20.0
0.6
TOTAL
Tc
(MIN)
2.5
6.0
4.6
Appendix C.2 KCRTS Time Series Calculations
1-Hour Times Series:
KCRTS Command
-------------
CREATE a new Time Series
------------------------
Production of Runoff Time Series
Project Location Sea-Tac
Computing Series siteex.tsf
Regional Scale Factor 1.00
Data Type Reduced
Creating Hourly Time Series File
Loading Time Series File:C:\KC_SWDM\KC_DATA\STTF60R.rnf
Till Forest 1.78 acres
Loading Time Series File:C:\KC_SWDM\KC_DATA\STTG60R.rnf
Till Grass 1.03 acres
Loading Time Series File:C:\KC_SWDM\KC_DATA\STEI60R.rnf
Impervious 0.29 acres
--------------
Total Area 3.10 acres
Peak Discharge: 0.482 CFS at 6:00 on Jan 9 in Year 8
Storing Time Series File:siteex.tsf
Time Series Computed
KCRTS Command
-------------
Enter the Analysis TOOLS Module
-------------------------------
Analysis Tools Command
----------------------
Compute PEAKS and Flow Frequencies
----------------------------------
Loading Stage/Discharge curve:siteex.tsf
Flow Frequency Analysis
--------------------------------------------------------
Time Series File:siteex.tsf
Project Location:Sea-Tac
Frequencies & Peaks saved to File:siteex.pks
Analysis Tools Command
----------------------
Compute Flow DURATION and Exceedence
------------------------------------
Loading Time Series File:siteex.tsf
Computing Interval Locations
Computing Flow Durations
Durations & Exceedence Probabilities to File:siteex.dur
Analysis Tools Command
----------------------
RETURN to Previous Menu
-----------------------
KCRTS Command
-------------
Haney Crest TLR -July 2002
CREATE a new Time Series
------------------------
Production of Runoff Time Series
Project Location Sea-Tac
Computing Series sitede.tsf
Regional Scale Factor 1.00
Data Type Reduced
Creating Hourly Time Series File
Loading Time Series File:C:\KC_SWDM\KC_DATA\STTG60R.rnf
Till Grass 1.43 acres
Loading Time Series File:C:\KC_SWDM\KC_DATA\STEI60R.rnf
Impervious 1.67 acres
--------------
Total Area 3.10 acres
Peak Discharge: 1.09 CFS at 6:00 on Jan 9 in Year 8
Storing Time Series File:sitede.tsf
Time Series Computed
KCRTS Command
-------------
Enter the Analysis TOOLS Module
-------------------------------
Analysis Tools Command
----------------------
Compute PEAKS and Flow Frequencies
----------------------------------
Loading Stage/Discharge curve:sitede.tsf
Flow Frequency Analysis
--------------------------------------------------------
Time Series File:sitede.tsf
Project Location:Sea-Tac
Frequencies & Peaks saved to File:sitede.pks
Analysis Tools Command
----------------------
Compute Flow DURATION and Exceedence
------------------------------------
Loading Time Series File:sitede.tsf
Computing Interval Locations
Computing Flow Durations
Durations & Exceedence Probabilities to File:sitede.dur
Analysis Tools Command
----------------------
RETURN to Previous Menu
-----------------------
KCRTS Command
-------------
CREATE a new Time Series
------------------------
Production of Runoff Time Series
Project Location Sea-Tac
Computing Series trib.tsf
Regional Scale Factor 1.00
Data Type Reduced
Creating Hourly Time Series File
Loading Time Series File:C:\KC_SWDM\KC_DATA\STTF60R.rnf
Honey Crest TIR-July 2002
Till Forest 0.13 acres
Loading Time Series File:C:\KC_SWDM\KC_DATA\STTG60R.rnf
Till Grass 0.85 acres
Loading Time Series File:C:\KC_SWDM\KC_DATA\STEI60R.rnf
Impervious 0.15 acres
--------------
Total Area 1.13 acres
Peak Discharge: 0.260 CFS at 6:00 on Jan 9 in Year 8
Storing Time Series File:trib.tsf
Time Series Computed
KCRTS Command
-------------
Enter the Analysis TOOLS Module
-------------------------------
Analysis Tools Command
----------------------
Compute PEAKS and Flow Frequencies
----------------------------------
Loading Stage/Discharge curve:trib.tsf
Flow Frequency Analysis
--------------------------------------------------------
Time Series File:trib.tsf
Project Location:Sea-Tac
Frequencies & Peaks saved to File:trib.pks
Analysis Tools Command
----------------------
Compute Flow DURATION and Exceedence
------------------------------------
Loading Time Series File:trib.tsf
Computing Interval Locations
Computing Flow Durations
Durations & Exceedence Probabilities to File:trib.dur
Analysis Tools Command
----------------------
RETURN to Previous Menu
-----------------------
KCRTS Command
-------------
CREATE a new Time Series
------------------------
Production of Runoff Time Series
Project Location Sea-Tac
Computing Series churchex.tsf
Regional Scale Factor 1.00
Data Type Reduced
Creating Hourly Time Series File
Loading Time Series File:C:\KC_SWDM\KC_DATA\STTG60R.rnf
Till Grass 2.69 acres
Loading Time Series File:C:\KC_SWDM\KC_DATA\STEI60R.rnf
Impervious 1.50 acres
--------------
Total Area 4.19 acres
Peak Discharge: 1.28 CFS at 6:00 on Jan 9 in Year 8
Storing Time Series File:churchex.tsf
Honey C,esr 777? —July 2002
Time Series Computed
KCRTS Command
-------------
Enter the Analysis TOOLS Module
-------------------------------
Analysis Tools Command
----------------------
Compute PEAKS and Flow Frequencies
----------------------------------
Loading Stage/Discharge curve:churchex.tsf
Flow Frequency Analysis
--------------------------------------------------------
Time Series File:churchex.tsf
Project Location:Sea-Tac
Frequencies & Peaks saved to File:churchex.pks
Analysis Tools Command
----------------------
Compute Flow DURATION and Exceedence
------------------------------------
Loading Time Series File:churchex.tsf
Computing Interval Locations
Computing Flow Durations
Durations & Exceedence Probabilities to File:churchex.dur
Analysis Tools Command
----------------------
RETURN to Previous Menu
-----------------------
KCRTS Command
-------------
CREATE a new Time Series
------------------------
Production of Runoff Time Series
Project Location Sea-Tac
Computing Series churchde.tsf
Regional Scale Factor 1.00
Data Type Reduced
Creating Hourly Time Series File
Loading Time Series File:C:\KC_SWDM\KC_DATA\STTG60R.rnf
Till Grass 2.28 acres
Loading Time Series File:C:\KC_SWDM\KC_DATA\STEI60R.rnf
Impervious 1.91 acres
--------------
Total Area 4.19 acres
Peak Discharge: 1.38 CFS at 6:00 on Jan 9 in Year 8
Storing Time Series File:churchde.tsf
Time Series Computed
KCRTS Command
-------------
Enter the Analysis TOOLS Module
-------------------------------
Analysis Tools Command
----------------------
Haley Crest TOR -July 2002
Compute PEAKS and Flow Frequencies
Loading Stage/Discharge curve:churchde.tsf
Flow Frequency Analysis
--------------------------------------------------------
Time Series File:churchde.tsf
Project Location:Sea-Tac
Frequencies & Peaks saved to File:churchde.pks
Analysis Tools Command
----------------------
Compute Flow DURATION and Exceedence
------------------------------------
Loading Time Series File:churchde.tsf
Computing Interval Locations
Computing Flow Durations
Durations & Exceedence Probabilities to File:churchde.dur
Analysis Tools Command
----------------------
RETURN to Previous Menu
-----------------------
KCRTS Command
-------------
ADD Time Series
---------------
Adding Time Series
Computing Series:totex.tsf
Loading Time Series File:siteex.tsf
Peak Flow Rate: 0.482 CFS at 6:00 on Jan 9 in Year 8
Lag= 0.00 Factor: 1.00
Loading Time Series File:trib.tsf
Peak Flow Rate: 0.260 CFS at 6:00 on Jan 9 in Year 8
Lag= 0.00 Factor: 1.00
Loading Time Series File:churchex.tsf
Peak Flow Rate: 1.28 CFS at 6:00 on Jan 9 in Year 8
Lag= 0.00 Factor: 1.00
Peak Flow Rate: 2.02 CFS at 6:00 on Jan 9 in Year 8
Storing Time Series File:totex.tsf
Time Series addition complete
KCRTS Command
-------------
Enter the Analysis TOOLS Module
-------------------------------
Analysis Tools Command
----------------------
Compute PEAKS and Flow Frequencies
----------------------------------
Loading Stage/Discharge curve:totex.tsf
Flow Frequency Analysis
--------------------------------------------------------
Time Series File:totex.tsf
Project Location:Sea-Tac
Frequencies & Peaks saved to File:totex.pks
Analysis Tools Command
Honey Crest TIR-.hdy 2002
----------------------
Compute Flow DURATION and Exceedence
Loading Time Series File:totex.tsf
Computing Interval Locations
Computing Flow Durations
Durations & Exceedence Probabilities to File:totex.dur
Analysis Tools Command
----------------------
RETURN to Previous Menu
-----------------------
KCRTS Command
-------------
ADD Time Series
---------------
Adding Time Series
Computing Series:totdev.tsf
Loading Time Series File:sitede.tsf
Peak Flow Rate: 1.09 CFS at 6:00 on Jan 9 in Year 8
Lag= 0.00 Factor: 1.00
Loading Time Series File:trib.tsf
Peak Flow Rate: 0.260 CFS at 6:00 on Jan 9 in Year 8
Lag= 0.00 Factor: 1.00
Loading Time Series File:churchde.tsf
Peak Flow Rate: 1.38 CFS at 6:00 on Jan 9 in Year 8
Lag= 0.00 Factor: 1.00
Peak Flow Rate: 2.74 CFS at 6:00 on Jan 9 in Year 8
Storing Time Series File:totdev.tsf
Time Series addition complete
KCRTS Command
-------------
Enter the Analysis TOOLS Module
-------------------------------
Analysis Tools Command
----------------------
Compute PEAKS and Flow Frequencies
----------------------------------
Loading Stage/Discharge curve:totdev.tsf
Flow Frequency Analysis
--------------------------------------------------------
Time Series File:totdev.tsf
Project Location:Sea-Tac
Frequencies & Peaks saved to File:totdev.pks
Analysis Tools Command
----------------------
Compute Flow DURATION and Exceedence
------------------------------------
Loading Time Series File:totdev.tsf
Computing Interval Locations
Computing Flow Durations
Durations & Exceedence Probabilities to File:totdev.dur
Analysis Tools Command
----------------------
Honey Crest TIR-J*2002
RETURN to Previous Menu
-----------------------
KCRTS Command
-------------
eXit KCRTS Program
------------------
Ha+ey Cmm 7YR - July 2002
15-Minute Times Series:
KCRTS Command
-------------
CREATE a new Time Series
------------------------
Production of Runoff Time Series
Project Location Sea-Tac
Computing Series sitedel5.tsf
Regional Scale Factor 1.00
Data Type Reduced
Creating 15-minute Time Series File
Loading Time Series File:C:\KC_SWDM\KC_DATA\STTG15R.rnf
Till Grass 1.43 acres
Loading Time Series File:C:\KC_SWDM\KC_DATA\STEI15R.rnf
Impervious 1.67 acres
--------------
Total Area 3.10 acres
Peak Discharge: 2.69 CFS at 6:30 on Jan 9 in Year 8
Storing Time Series File:sitedel5.tsf
Time Series Computed
KCRTS Command
-------------
Enter the Analysis TOOLS Module
-------------------------------
Analysis Tools Command
----------------------
Compute PEAKS and Flow Frequencies
----------------------------------
Loading Stage/Discharge curve:sitedel5.tsf
Flow Frequency Analysis
--------------------------------------------------------
Time Series File:sitedel5.tsf
Project Location:Sea-Tac
Frequencies & Peaks saved to File:sitedel5.pks
Analysis Tools Command
----------------------
RETURN to Previous Menu
-----------------------
KCRTS Command
-------------
CREATE a new Time Series
------------------------
Production of Runoff Time Series
Project Location Sea-Tac
Computing Series tribl5.tsf
Regional Scale Factor 1.00
Data Type Reduced
Creating 15-minute Time Series File
Loading Time Series File:C:\KC_SWDM\KC_DATA\STTF15R.rnf
Till Forest 0.13 acres
Loading Time Series File:C:\KC_SWDM\KC_DATA\STTG15R.rnf
Till Grass 0.85 acres
Loading Time Series File:C:\KC_SWDM\KC_DATA\STEI15R.rnf
HarleyCmV TIR-July2002
Impervious 0.15 acres
--------------
Total Area 1.13 acres
Peak Discharge: 0.616 CFS at 6:30 on Jan 9 in Year 8
Storing Time Series File:tribl5.tsf
Time Series Computed
KCRTS Command
-------------
Enter the Analysis TOOLS Module
-------------------------------
Analysis Tools Command
----------------------
Compute PEAKS and Flow Frequencies
----------------------------------
Loading Stage/Discharge curve:tribl5.tsf
Flow Frequency Analysis
--------------------------------------------------------
Time Series File:tribl5.tsf
Project Location:Sea-Tac
Frequencies & Peaks saved to File:tribl5.pks
Analysis Tools Command
----------------------
RETURN to Previous Menu
-----------------------
KCRTS Command
-------------
CREATE a new Time Series
------------------------
Production of Runoff Time Series
Project Location Sea-Tac
Computing Series chdel5.tsf
Regional Scale Factor 1.00
Data Type Reduced
Creating 15-minute Time Series File
Loading Time Series File:C:\KC_SWDM\KC_DATA\STTG15R.rnf
Till Grass 2.08 acres
Loading Time Series File:C:\KC_SWDM\KC_DATA\STEI15R.rnf
Impervious 2.11 acres
--------------
Total Area 4.19 acres
Peak Discharge: 3.54 CFS at 6:30 on Jan 9 in Year 8
Storing Time Series File:chdel5.tsf
Time Series Computed ,
KCRTS Command
-------------
Enter the Analysis TOOLS Module
-------------------------------
Analysis Tools Command
----------------------
Compute PEAKS and Flow Frequencies
----------------------------------
Loading Stage/Discharge curve:chdel5.tsf
Flow Frequency Analysis
Honey Crest 77R—J*2002
--------------------------------------------------------
Time Series File:chdel5.tsf
Project Location:Sea-Tac
Frequencies & Peaks saved to File:chdel5.pks
Analysis Tools Command
----------------------
RETURN to Previous Menu
-----------------------
KCRTS Command
-------------
ADD Time Series
---------------
Adding Time Series
Computing Series:totdevl5.tsf
Loading Time Series File:sitedel5.tsf
Peak Flow Rate: 2.69 CFS at 6:30 on Jan 9 in Year 8
Lag= 0.00 Factor: 1.00
Loading Time Series File:tribl5.tsf
Peak Flow Rate: 0.616 CFS at 6:30 on Jan 9 in Year 8
Lag= 0.00 Factor: 1.00
Loading Time Series File:chdel5.tsf
Peak Flow Rate: 3.54 CFS at 6:30 on Jan 9 in Year 8
Lag= 0.00 Factor: 1.00
Peak Flow Rate: 6.85 CFS at 6:30 on Jan 9 in Year 8
Storing Time Series File:totdevl5.tsf
Time Series addition complete
KCRTS Command
-------------
Enter the Analysis TOOLS Module
-------------------------------
Analysis Tools Command
----------------------
Compute PEAKS and Flow Frequencies
----------------------------------
Loading Stage/Discharge curve:totdevl5.tsf
Flow Frequency Analysis
--------------------------------------------------------
Time Series File:totdevl5.tsf
Project Location:Sea-Tac
Frequencies & Peaks saved to File:totdevl5.pks
Analysis Tools Command
----------------------
RETURN to Previous Menu
-----------------------
KCRTS Command
-------------
eXit KCRTS Program
------------------
Honey Cmst TIR—A*2002
Flow Frequency Analysis
Time Series File:siteex.tsf
Project Location:Sea-Tac
---Annual
Peak
Flow Rates---
-----Flow
Frequency Analysis-------
FlowRate
Rank
Time of
Peak
- - Peaks
- - Rank
Return
Prob
(CFS)
(CFS)
Period
0.249
3
2/09/01
15:00
0.482
1
100.00
0.990
0.138
7
1/05/02
16:00
0.273
2
25.00
0.960
0.273
2
2/27/03
7:00
0.249
3
10.00
0.900
0.092
8
8/26/04
2:00
0.249
4
5.00
0.800
0.146
6
1/05/05
8:00
0.224
5
3.00
0.667
0.249
4
1/18/06
16:00
0.146
6
2.00
0.500
0.224
5
11/24/06
3:00
0.138
7
1.30
0.231
0.482
1
1/09/08
6:00
0.092
8
1.10
0.091
Computed Peaks
0.412
50.00
0.980
Flow Frequency
Analysis
Time Series File:trib.tsf
Project Location:Sea-Tac
---Annual
Peak
Flow Rates---
-----Flow
Frequency Analysis-------
FlowRate
Rank
Time of
Peak
- - Peaks
- - Rank
Return
Prob
(CFS)
(CFS)
Period
0.117
4
2/09/01
2:00
0.260
1
100.00
0.990
0.073
6
1/05/02
16:00
0.145
2
25.00
0.960
0.145
2
2/27/03
7:00
0.123
3
10.00
0.900
0.053
8
8/26/04
2:00
0.117
4
5.00
0.800
0.069
7
10/28/04
16:00
0.112
5
3.00
0.667
0.123
3
1/18/06
16:00
0.073
6
2.00
0.500
0.112
5
11/24/06
3:00
0.069
7
1.30
0.231
0.260
1
1/09/08
6:00
0.053
8
1.10
0.091
Computed Peaks
0.222
50.00
0.980
Flow Frequency
Analysis
Time Series File:churchex.tsf
Project Location:Sea-Tac
---Annual
Peak
Flow Rates---
-----Flow
Frequency Analysis-------
FlowRate
Rank
Time of
Peak
- - Peaks
- - Rank
Return
Prob
(CFS)
(CFS)
Period
0.604
5
2/09/01
2:00
1.28
1
100.00
0.990
0.443
7
1/05/02
16:00
0.737
2
25.00
0.960
0.737
2
2/27/03
7:00
0.636
3
10.00
0.900
0.424
8
8/26/04
2:00
0.614
4
5.00
0.800
0.524
6
10/28/04
16:00
0.604
5
3.00
0.667
0.636
3
1/18/06
16:00
0.524
6
2.00
0.500
0.614
4
10/26/06
0:00
0.443
7
1.30
0.231
1.28
1
1/09/08
6:00
0.424
8
1.10
0.091
Computed Peaks
1.10
50.00
0.980
Honey Crest TIR-J* 2002
Flow Frequency Analysis
Time Series File:totex.tsf
Project Location:Sea-Tac
---Annual Peak
Flow Rates---
-----Flow
Frequency Analysis-------
FlowRate Rank
Time of
Peak
- - Peaks
- - Rank
Return
Prob
(CFS)
(CFS)
Period
0.954 4
2/09/01
2:00
2.02
1
100.00
0.990
0.654 7
1/05/02
16:00
1.16
2
25.00
0.960
1.16 2
2/27/03
7:00
1.01
3
10.00
0.900
0.570 8
8/26/04
2:00
0.954
4
5.00
0.800
0.710 6
10/28/04
16:00
0.931
5
3.00
0.667
1.01 3
1/18/06
16:00
0.710
6
2.00
0.500
0.931 5
11/24/06
3:00
0.654
7
1.30
0.231
2.02 1
1/09/08
6:00
0.570
8
1.10
0.091
Computed Peaks
1.73
50.00
0.980
Flow Frequency
Analysis
Time Series File:sitede.tsf
Project Location:Sea-Tac
---Annual Peak
Flow Rates---
-----Flow
Frequency Analysis-------
FlowRate Rank
Time of
Peak
- - Peaks
- - Rank
Return
Prob
(CFS)
(CFS)
Period
0.533 6
2/09/01
2:00
1.09
1
100.00
0.990
0.422 8
1/05/02
16:00
0.644
2
25.00
0.960
0.643 3
2/27/03
7:00
0.643
3
10.00
0.900
0.443 7
8/26/04
2:00
0.564
4
5.00
0.800
0.536 5
10/28/04
16:00
0.536
5
3.00
0.667
0.564 4
1/18/06
16:00
0.533
6
2.00
0.500
0.644 2
10/26/06
0:00
0.443
7
1.30
0.231
1.09 1
1/09/08
6:00
0.422
8
1.10
0.091
Computed Peaks
0.943
50.00
0.980
Flow Frequency
Analysis
Time Series File:churchde.tsf
Project Location:Sea-Tac
---Annual Peak
Flow Rates---
-----Flow
Frequency Analysis-------
FlowRate Rank
Time of
Peak
- - Peaks
- - Rank
Return
Prob
(CFS)
(CFS)
Period
0.667 5
2/09/01
2:00
1.38
1
100.00
0.990
0.512 8
1/05/02
16:00
0.809
2
25.00
0.960
0.809 2
2/27/03
7:00
0.752
3
10.00
0.900
0.518 7
8/26/04
2:00
0.704
4
5.00
0.800
0.633 6
10/28/04
16:00
0.667
5
3.00
0.667
0.704 4
1/18/06
16:00
0.633
6
2.00
0.500
0.752 3
10/26/06
0:00
0.518
7
1.30
0.231
1.38 1
1/09/08
6:00
0.512
8
1.10
0.091
Computed Peaks
1.19
50.00
0.980
Haney Crest TIR - July 2002
Flow Frequency Analysis
Time Series
File:totdev.tsf
Project
Location:Sea-Tac
---Annual
Peak
Flow Rates---
-----Flow
Frequency
Analysis-------
FlowRate
Rank
Time of
Peak
- - Peaks
- -
Rank
Return
Prob
(CFS)
(CFS)
Period
1.32
5
2/09/01
2:00
2.74
1
100.00
0.990
1.01
8
1/05/02
16:00
1.60
2
25.00
0.960
1.60
2
2/27/03
7:00
1.47
3
10.00
0.900
1.01
7
8/26/04
2:00
1.39
4
5.00
0.800
1.24
6
10/28/04
16:00
1.32
5
3.00
0.667
1.39
4
1/18/06
16:00
1.24
6
2.00
0.500
1.47
3
10/26/06
0:00
1.01
7
1.30
0.231
2.74
1
1/09/08
6:00
1.01
8
1.10
0.091
Computed
Peaks
2.36
50.00
0.980
Flow Frequency
Analysis
Time Series
File:rdout.tsf
Project
Location:Sea-Tac
---Annual
Peak
Flow Rates---
-----Flow
Frequency
Analysis-------
FlowRate
Rank
Time of
Peak
- - Peaks
- -
Rank
Return
Prob
(CFS)
(CFS)
(ft)
Period
0.988
3
2/09/01
16:00
2.32
3.09
1
100.00
0.990
0.297
7
1/05/02
18:00
1.14
2.80
2
25.00
0.960
0.577
5
3/06/03
20:00
0.988
2.74
3
10.00
0.900
0.271
8
8/23/04
23:00
0.927
2.71
4
5.00
0.800
0.475
6
1/05/05
10:00
0.577
2.46
5
3.00
0.667
0.927
4
1/18/06
21:00
0.475
1.89
6
2.00
0.500
1.14
2
11/24/06
5:00
0.297
1.22
7
1.30
0.231
2.32
1
1/09/08
9:00
0.271
1.01
8
1.10
0.091
Computed
Peaks
1.92
3.03
50.00
0.980
Flow Frequency Analysis
Time Series File:sitede15.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates ---
Flow Rate Rank Time of Peak
(CFS)
0.796
6
0.589
8
1.82
2
0.641
7
1.13
3
0.983
5
1.13
4
2.69
1
Computed
Peaks
Honey Cho& T!R-Ady 2002
8/27/01 18:00
1/05/02 15:00
12/08/02 17:15
8/23/04 14:30
11/17/04 5:00
10/27/05 10:45
10/25/06 22:45
1/09/08 6:30
-----Flow Frequency Analysis-------
- - Peaks -
- Rank
Return
Prob
(CFS)
Period
2.69
1
100.00
0.990
1.82
2
25.00
0.960
1.13
3
10.00
0.900
1.13
4
5.00
0.800
0.983
5
3.00
0.667
0.796
6
2.00
0.500
0.641
7
1.30
0.231
0.589
8
1.10
0.091
2.40
50.00
0.980
Flow Frequency Analysis
Time Series File:tribl5.tsf
Project Location:Sea-Tac
---Annual
Peak
Flow Rates---
-----Flow
Frequency Analysis-------
FlowRate
Rank
Time of
Peak
- - Peaks
- - Rank
Return
Prob
(CFS)
(CFS)
Period
0.151
4
2/09/01
12:45
0.616
1
100.00
0.990
0.094
7
1/06/02
1:00
0.328
2
25.00
0.960
0.326
3
12/08/02
17:15
0.326
3
10.00
0.900
0.070
8
8/26/04
1:00
0.151
4
5.00
0.800
0.328
2
11/17/04
5:00
0.137
5
3.00
0.667
0.136
6
10/27/05
10:45
0.136
6
2.00
0.500
0.137
5
11/24/06
1:00
0.094
7
1.30
0.231
0.616
1
1/09/08
6:30
0.070
8
1.10
0.091
Computed Peaks
0.520
50.00
0.980
Flow Frequency
Analysis
Time Series File:chdel5.tsf
Project Location:Sea-Tac
---Annual
Peak
Flow Rates---
-----Flow
Frequency Analysis-------
FlowRate
Rank
Time of
Peak
- - Peaks
- - Rank
Return
Prob
(CFS)
(CFS)
Period
1.00
6
8/27/01
18:00
3.54
1
100.00
0.990
0.757
8
1/05/02
15:00
2.36
2
25.00
0.960
2.36
2
12/08/02
17:15
1.51
3
10.00
0.900
0.809
7
8/23/04
14:30
1.43
4
5.00
0.800
1.51
3
11/17/04
5:00
1.26
5
3.00
0.667
1.26
5
10/27/05
10:45
1.00
6
2.00
0.500
1.43
4
10/25/06
22:45
0.809
7
1.30
0.231
3.54
1
1/09/08
6:30
0.757
8
1.10
0.091
Computed Peaks
3.15
50.00
0.980
Flow Frequency
Analysis
Time Series File:totdevl5.tsf
Project Location:Sea-Tac
---Annual
Peak
Flow Rates---
-----Flow
Frequency Analysis-------
FlowRate
Rank
Time of
Peak
- - Peaks
- - Rank
Return
Prob
(CFS)
(CFS)
Period
1.87
6
8/27/01
18:00
6.85
1
100.00
0.990
1.44
8
1/05/02
15:00
4.50
2
25.00
0.960
4.50
2
12/08/02
17:15
2.97
3
10.00
0.900
1.51
7
8/23/04
14:30
2.68
4
5.00
0.800
2.97
3
11/17/04
5:00
2.38
5
3.00
0.667
2.38
5
10/27/05
10:45
1.87
6
2.00
0.500
2.68
4
10/25/06
22:45
1.51
7
1.30
0.231
6.85
1
1/09/08
6:30
1.44
8
1.10
0.091
Computed Peaks
6.07
50.00
0.980
Honey Crv& TIR - July 2002
The following is a description of KCRTS input and output files used
in designing the R/D facilities and conducting the downstream drainage
analysis for Honey Crest.
EXECUTABLE FILES
basins.exc:
This executable file creates time series for all contributing areas to
the downstream system for both existing and developed conditions.
Based on 1-hour peak flow rates.
Basinsl5.exc:
This executable file creates time series for all contributing areas to
the downstream system for developed conditions. Based on 15-minute
peak flow rates.
tar.exc:
This executable creates target duration files for R/D design.
TIME SERIES FILES
R/D Design
siteex.tsf:
The Honey Crest site under existing conditions.
trib.tsf:
Offsite tributary basin draining to the Honey Crest site and the
church property.
churchex.tsf:
The neighboring church property under existing conditions.
sitede.tsf:
The Honey Crest site under proposed developed conditions.
churchde.tsf:
The neighboring church under future potential developed conditions.
This includes the church property with up to 0.82 acre of new
impervious area.
rdout.tsf:
Time series out of proposed R/D system for site (lev2.rdf).
totex.tsf:
Total project area draining to the proposed pond under existing
conditions. This time series was used to develop the target duration
curve for the proposed R/D system design. Based on the following
Hbney Crest TIR —July 2002
times series: siteex.tsf + trib.tsf + churchex.tsf.
tar.tsf:
Target duration curve for the proposed R/D system design. Based on
the following times series: siteex.tsf + trib.tsf + churchex.tsf.
totdev.tsf:
Total project area draining to the proposed pond under proposed
developed conditions. Based on the following times series:
sitede.tsf + trib.tsf + churchde.tsf.
15-minute time series:
The following 15-minute time series were calculated for pond overflow
design: sitedel5.tsf + tribl5.tsf + chdel5.tsf = totdevl5.tsf
RESERVOIRS
Lev2.rdf:
Honey Crest R/D facility managing stormwater from the entire developed
site as well as from 0.82 acre of new impervious on the church
property.
GENERAL NOTES
1. Seatac regional rainfall runoff files with a scale factor of 1.0
were used in the hydrologic simulations.
2. R/D facilities were designed with the 8-year data set. 1-hour peak
flow rates were used for detention calculations.
3. 15-minute peak flow rates were used for conveyance calculations.
4. Gravel areas were modeled in KCRTS by assuming that 50 percent of
the area is impervious and the remaining 50 percent are the same
cover type as that surrounding the gravel area.
Honey Crest TM —.Tiny 2002
Appendix E. Proposed Site Plan
Honey Crest 77R—July 2002
SCALE: 1" = 50'
Figure E.I. Honey Crest Plat
Haozous Engineering, P.S. PAGE DATE