HomeMy WebLinkAboutSWP2702959G Gray & Osborne, Inc. CONSULTING ENGINEERS June 5, 2003 Mr. Allen Quynn, P.E. City of Renton 1055 South Grady Way 6" Floor Renton, Washington 98055 SUBJECT: SW 7TH STREET PHASE 1, 95% SUBMITTAL CITY OF RENTON, KING COUNTY, WASHINGTON G&O #02640 Dear Mr. Quynn: Attached is our 95% submittal of the plans, and cost estimate for Phase 1 of the SW 7`h Street Storm Drainage Improvement Project. Specifications were submitted via e-mail on June 2, 2003. Included with this submittal are the following: • One full-size plan set and one half-size plan set (11 x 17) • One cost estimate We look forward to discussing this submittal with City staff and proceeding to a final submittal of these documents. Please contact me if you have any questions or require further information to accommodate your review. Very truly yours, GRAY & OSBORNE, INC. Michael J. auhola, P.E. MJJ/sn Encl. 701 Dexter Avenue N., Suite 200 Seattle, Washington 98109 (206) 284-0860 Fax (206) 283-3206 l Aylen Quynn - Slide Rail Trench Shoring P g From: Matt Winkelman <mwinkelman@g-o.com> To: Allen Quynn <aquynn@ci.renton.wa.us> Date: 10/7/03 11:55AM Subject: Slide Rail Trench Shoring Allen, I just spoke with Brian at United Rentals Trench Safety regarding slide rail trench shoring installation. According to the specifications for installation, the panels are installed before the rails. The order of work for installation is: 1. Excavation of the trench section to a depth of about 2 feet to guide the panels when installed. 2. Excavation within the trench section concurrent with pushing of the panels deeper into the trench. Driving the panels into place is not recommended. Pushing of the panels can be accomplished using the bucket of a construction vehicle. 3. Once the panels are at the correct depth (invert of the pipe), the rails and cross -braces are pushed into place. One complete section of panels and rails creates a bay. 4. Installation requires two pieces of construction equipment for our application: A 300+ series machine to assemble the system, pushing the panels and rails into place and a smaller back -hoe to guide the panels in place during installation. 5. Three or four bays would be constructed at a time. Bays range in length from 10' to 20'. By installing multiple bays at one time, the contractor can excavate, install pipe, and backfill at the same time. Once the trench work is completed within a bay, the panels and rails are removed and re -installed for construction of the next segment of pipe. Construction of the slide rail system should not be louder than the other equipment in use at the construction site. However, Brian said that a contractor might try to bend the rules by driving the rails into place instead of pushing them, thus creating additional noise. The construction inspector should keep watch of installation of the bays. Please call me if you would like to discuss this construction sequence. I will be receiving more information and photographs of installation of this type of trench shoring system at other job sites later this week. Thank you, Matt Winkelman Design Engineer Gray & Osborne Client: Renton G-O # 02640 Electronic File Transfer - Note that these electronic files are provided as a courtesy only. Gray & Osborne, Inc. in no way guarantees the accuracy or completeness of the digital data contained within these files. Further more, Gray & Osborne, Inc. assumes no liability for any errors or omissions in the digital data herein. Anyone A,Ion Quynn Slide Rail Trench Shoring Page 2 using the information contained herein should consult the approved or certified hard copy drawings or reports for the most current information available. CC: Stacy Clear <sclear@g-o.com>, Mike Jauhola <mjauhola@g-o.com>, Ken Enns <kenns@g-o.com> 06!01�!200 07:58 FAX 206 283 3206 GRAY.OSBORNE Z001 lsmmyl $z Osborne, Inc. CONSULTING ENGINEERS FAX COVER SHEET DATE: June 7, 2004 TO: Organization: City of Renton - SW Utility CC: Gray & Osborne, Inc. FROM: Matt Winkelman Attention: Fax Number: Mr. Allen Quynn, P.E.-425-430-7241 Mr. Ron Berger - - - Telephone No: 206-284-0860 Fax No: 206-283-3206 We are transmitting ! pages, including this cover sheet. If you do not receive all of the pages, please call us as soon as possible. Also sent original document this date: ❑ Client: City of Renton G&O No: 02640 Project: SW 7th Street Storm Drainage Project, Phase 2 MESSAGES/COMMENTS: Allen, Attached are the revisions for Vault No. 1. The vault was moved 12 feet east to Centerline Station 1+62 due to the location of a concrete fiber optics duct bank within SW 7"' Street. Movement of the vault by 12 feet was also chosen in order to utilize pipe that was already produced and fit into the pipe layout provided by Hanson Pipe. It is our understanding that the 1- 1/2" water service line shown at Station 1+61 is abandoned and should be removed, as necessary, during installation of the vault. As noted on the revised drawings, the invert elevations for the vault should remain the same. Please call me if you have any questions or need further information. Thank you, 1 Matt Wi ' elman The information contained in this facsimile is intended for the use of the addressee only. If you have received this facsimile in error, please notify the sender by telephone; this communication should not be copied or distributed and the original should be destroyed. Thank you. 701 Dexter Avenue N., Suite 200 Seattle, Washington 98109 (206) 284-0860 Fax: (206) 283-3206 Fsx Vault 1 Rev 06/07/2004 07:58 FAX 206 283 3206 X;! S T. SSW-H 53--9—,4 RW 23.49 57 S 8" IE 19.�9 1c, V A ;14 t%` Mollo =4:1 Pan O .� GRAY.OSBORNE -fEXIST. CE3 16, C18-8 1E,)6 DIA.) RIM 27).14 E 54" o N C I E 13.44 W 60" CONC I--- 13.44 NE 6" CCN�,r. 1c, 17.69 NW 6- CONC I^ 18.84 NW 8" CONC !E 18-84 S 21 " C C "--C I E 13,44 CHERRY 12" Z002 SIGN E S. W. 7TH I - =Gts /2 McVE: VhULT i Z�`0 CA5 (5iA. l f5-0 AFL 0 FO -,- M H —.— 2 "G —� CB NO. 31 2+00 LT -TN 0. 1 CB N.O. 2 SEE DETAIL 25 SHEET 26,1' 12" C1 W i K y T' NO. 1 SSE CITY DET, IL MAPLE .,QjDl 2, TYP MAPLE X I ST, . A'R E V. 22.8 3 z IN W' 6 C 0 N \01 !E 21 .56 �357 A,.,,; -S EXIST AREA ;NLE Z SEE CROSS ECMN r*N� R;Ni 22.87 1\ �3` W, 6 " CONE I E 2 0 -97 MAPLE 8 PARKUNG STALLS z . .. ........ 17 ............... ................... ....................................... ................... ......... ........... ............. d'-% ..... ;Ln .................. Ij......... ...... ................... ................ ................. ........................... ... ........... .. ............. ................ 06i07!2004 07:59 FAX 206 283 3206 GRAI.OSBORNE I: L Z003 / T/ 7 • - N • • • • d�4.Tt4� JJ'" L'riivY@C�fef��n.�a • ' . ���. +� w y a ` ry �.';'«., �' Ain , `.A,w. "�K<.. � ' <Ip f A '1;1..p .' .1 'U o�.A �rhl++'r1 � w {��.•• ` w .1jr"-Yi ^w <, �.� `•0i f +wY Y ' ,tr !r}.-i.F nv I .�F f.�•Y'� +..aw•,/< N .f .: i. < i 1 M. ` � rk AliM Mi1N ♦ fW.w'�+.n.M t ,<. \4h AN I�' 1. 3fy {we.�s'°.: 11"I+W' �. • ,-.,-:+�.............•.,.raves•sa.^�.,�.:,�.a.�...w.�"RtwR':wi+_f: tdn.; _ . �+. IitY 1 �i�, ...... GONG SD : :.:.:,:,:.:.:.:.: :.:.:.:.;.:.:.;.: :.:.;.;,:...... :....S..�..0.0007............. ...:.......... ...... ......... .... 111I01 Ei QI c 3� ZZZw .. ZZUUUZ _ ppZZZO � I--i�000U�U c e R 7NLD�om(D + to I d• m d- -.It d- I W rjrMr�c6cd6 Ln o�yxj#�vL�WWIJWW I 2+00 w J NI 4 O Li 2c: w Vw W `nw U CU as d C� C)M ZZ WO Z 00 n-Y OO V) xZ -H0C) UUO Z JO gR c R Za ZN 0-4- NY NOS N � -erica (.n r, — ONa 04 �w WUW _jd`d No �Z d W �� e— T H a �c� N W L-i W 06i07i2004 07:59 FAX 206 283 3206 GRAY.O5BORNE Z004 .................. 15 ::::� n.SD:IE,1.� :.: ' '.........: ..........:.:.:.. :..:.:............ ........ :.:,: ......:.:.�,.,.:. :.:.:.:,:,:.:.:.: ....:,; Z. �.� • cv M h Z W . . . . , 17 CROS ECTION STA.1 + ::2 ........: ......:...'.:.:.: ........... ....: ,., .::':':':': .'.':'. V �� HWA GEOSCIENCES INC. _. SUgg'z oa'o.Qti- Geonvironmenta `ere ;ic,es' Inspection CV0 siit.3' December 30, 2003 HWA Project No. 2003-007-21 Gray & Osborne, Inc. 701 Dexter Avenue North, Suite 200 Seattle, Washington 98109 Attention: Matt Winkelman Subject: EXCAVATION DEWATERING ESTIMATES SW 71h Street Storm Drain Replacement Renton, Washington Dear Mr. Winkelman: This report summarizes HWA GeoSciences Inc. (HWA's) construction dewatering evaluation for the City of Renton SW 71h Street Storm Drain Replacement project, based on HWA's prior field investigations and laboratory testing. SITE LOCATION & DESCRIPTION The City of Renton plans to replace the existing, undersized storm drain along SW 7th Street between Lind Avenue east to Morris Avenue, with a new 60 inch storm drain. We understand that trenching options include steel sheet piling driven to at least twice the excavation depth below the trench bottom along the full length of the alignment. Planned trench excavation depth will vary from approximately 10 to 14 feet below grade. SCOPE The objective of this evaluation is to estimate the range of dewatering volumes for trenching operations along the alignment. HWA performed the following tasks: • Reviewed available existing data 19730 - 64 h Avenue W. Suite 200 Lynnwood, WA 98036-5957 Tel: 425-774-0106 December 30, 2003 HWA Project No. 2003-007 • Estimated permeability based on grain size distributions performed during geotechnical study • Estimated the range of expected dewatering volumes. Refer to our geotechnical report dated March 14, 2003 for boring logs and laboratory test results. DEWATERING ANALYSES Our analyses consisted of selecting several analytical approaches and determining the major hydrogeologic parameters that influence the inflow volumes into a shored trench excavation and dewatering volumes required for open cut trenching. ANALYTICAL APPROACH HWA utilized the Universal Well Formula, a derivative of Darcy's Law to estimate the amount of flow from wells dewatering a length of excavated trench (Powers, 1992), where: and �K H2 -hz +2 xK H2 - h 2 Q In R. 2L rs Q = Rate of discharge to lower water table to target elevation (W/min) K = Hydraulic conductivity ($/min) H = Height of static potentiometric surface above base of aquifer (aquifer thickness) h = Height of controlled potentiometric surface above base of aquifer &= Radius of influence (cylindrical area) L = Radius of influence (linear area) or distance to line source rs = Radius of trench x = Length of trench segment dewatered The above -listed principal dewatering parameters serve as the basis for estimating dewatering flows. Extreme variability (spatially and temporally) throughout the site of these dewatering parameters requires simplifying assumptions based on the available data in order to develop estimates of dewatering volumes. This method assumes flow to wells along the trench. The planned use of sheet piling prior to excavation will reduce flows within the sheet piles. SW 7th Dewater rpt.doc 2 HWA GEOSCIENCES INC. December 30, 2003 HWA Project No. 2003-007 An alternate analysis estimates inflow at the base of the sheet -piled trench, using Darcy's Law, Q = KiA where i = hydraulic gradient A = unit area This method also entails simplifying assumptions, particularly regarding the hydraulic gradient, which is estimated conservatively. Hydraulic Conductivity (K) We estimated hydraulic conductivity (K) using grain size distribution data for selected soil samples, using three interpretive methods: • An empirical method derived from blending various soil grain sizes and hydraulic conductivity testing (Massmann, 2003). • A graphical method in which the uniformity coefficient (D60/D10) is plotted against the D50 to yield an estimate of K (Powers, 1992). • Hazen formula, K (cm/sec) = D102 (mm) (Powers, 1992). These methods are limited to coarse grained soils only. We estimated hydraulic conductivity for the finer grained soils (silts) and coarser gravel and sand samples encountered in BH-1 and BH-2 (no grain size analysis was performed on these materials during the geotechnical evaluation) from published approximations and experience in our own laboratory testing. Vertical hydraulic conductivities in alluvial sediments may be five to ten times lower than horizontal hydraulic conductivities, due to stratification of sediments, therefore the estimates shown may be conservative. Refer to Table 1 for estimates of K. SW 7th Dewater rpt.doc 3 HWA GEOSCIENCES INC. December 30, 2003 HWA Project No. 2003-007 Table 1 HYDRAULIC CONDUCTIVITY (K) ESTIMATES Boring Depth Soil Class Massmann ft/min Powers ft/min Hazen ft/min HWA ft/min BH-1 6 -10 GP-SP NA NA NA 1.0 BH-1 17.5 -19 SP-SM 5.69E-02 3.94E-03 1.60E-02 BH-2 7.5 - 9 SM 1.74E-02 5.91 E-03 4.93E-03 13H-3 7.5 - 9 ML 4.50E-03 NA NA BH-4 7.5 - 9 ML 2.00E-3 NA NA 13H-5 5 - 6.5 ML 4.02E-03 NA NA BH-6 7.5 — 9 ML 3.50E-03 NA NA BH-7 7.5 — 9 SW-SM 1.58E-01 7.88E-02 1.97E-02 BH-7 10 - 11.5 SP-SM 1.59E-01 1.18E-01 1.44E-01 Aquifer thickness(IT) Existing well log data in the project area suggest that the total aquifer thickness exceeds 80 feet. The presence of intermittent fine grained layers and stratification will reduce the effective aquifer thickness, consequently, 60 feet was used for flow estimates. Height of controlled potentiometric surface above base of aquifer (h) This value was estimated based on ground water levels measured in February, and trench depths as provided by Gray & Osborne, with an added two feet of drawdown. Radius of influence (Ro) SW 7th Dewater rpt.doc 4 HWA GEOSCIENCES INC. December 30, 2003 HWA Project No. 2003-007 Radius of influence was estimated based on Suchart's formula, R, = 300(H — h),[K With Ro, H and h in feet and K in cm/sec. DEWATERING VOLUMES Using the above approach, parameter assumptions, and our understanding of the site hydrogeology, dewatering flows will vary significantly along the alignment as summarized in Table 2. TABLE 2 Dewatering Estimates (per 100 feet of trench*) Boring Depth Soil Class (feet) K (ft/min) Trench Water depth depth (feet) (feet) Q a (gpm) Q b (gpm) BH-1 6-10 GP-SP 1.00E+00 10 7 4444 4488 BH-1 17.5-19 SP-SM 5.69E-02 10 7 531` 255 BH-2 7.5-9 SM 1.74E-02 10 7 244' 78 BH-3 7.5-9 ML 4.50E-03 11 8 107 20 BH-4 7.5-9 ML 2.00E-03 10 6 68 9 BH-5 5-6.5 ML 4.02E-03 8 4.0 102 18 BH-6 7.5-9 ML 3.50E-03 8 4.5 93 15 BH-7 7.5-9 SW-SM 1.58E-01 6 4.0 1024 709 vjOrK- tfo �F- SW 7th Dewater rpt.doc HWA GEOSCIENCES INC. December 30, 2003 HWA Project No. 2003-007 13H-7 1 10-11.5 1 SP-SM I 1.59E-01 1 6 1 4.0 1 1029 1 714 * Flows to an excavation, as the Darcy modification formula indicates, are logarithmic in nature. Consequently, per foot of trench flow will typically be higher for shorter lengths of open trench than for longer lengths of open trench. a — Universal well formula, seasonal high ground water (assumes no sheet piles) b — Darcy's law, flow into sheet -piled trench bottom, seasonal high ground water c — Flows likely higher than indicated (coarsest layers not analyzed) CONCLUSIONS AND RECOMMENDATIONS Dewatering volumes will likely vary considerably along the trench alignment, due to the variability of geologic conditions, and depending on ground water levels at the time of construction. The above rates were calculated for water levels measured during February of 2003. Worst case estimates near BH-I anticipate up to 4,000 gpm per 100 feet of trench, although other areas may require little or no dewatering. Based on water levels measured by the City in September 2003 (three to eight feet lower), summer flows may be less (e.g., up to approximately 3,400 gpm/100 foot trench near BH-1, little or no flow possible near BH-3, BH-4 and BH-5). Due to the large observed seasonal ground water level variations, project scheduling may have a significant impact on dewatering flows. Hydraulic conductivity values for gravels encountered at BH-I were estimated conservatively based on visual soil classification; no laboratory or hydrogeologic testing was performed. Additional studies including installation of driven piezometers, pumping tests, and measuring ground water levels are recommended in order to more accurately estimate flows along the alignment. Some areas of anticipated low ground water flow (e.g., near BH-4, BH-5, or BH-6) may be subject to soft conditions or flowing soils, if confined conditions exist in the more permeable sandy layers underlying the silts, during periods of high ground water. This can be prevented by lowering the water table prior to excavation. If subsidence to structures adjacent to the excavation is a concern, foundation surveys of structures along the trench alignment should be preformed prior to dewatering. REFERENCES Powers, J. Patrick, Construction Dewatering, New Methods and Applications, John Wiley and Sons, Inc., New York, 1992. SW 7th Dewater rpt.doc 6 HWA GEOSCIENCES INC. December 30, 2003 HWA Project No. 2003-007 Massmann, Joel, course notes: Stormwater Infiltration Fundamentals, Design, and Site Assessment, a Short Course, October 28, 2003. 1111611 KI 1111MI The conclusions expressed by HWA are based solely on material referenced in this report. Observations were made under the conditions stated. Within the limitations of scope, schedule and budget, HWA attempted to execute these services in accordance with generally accepted professional principles and practices in the area at the time the report was prepared. No warranty, express or implied, is made. Experience has shown that subsurface soil and groundwater conditions can vary significantly over small distances. Inconsistent conditions can occur between explorations and not be detected by a geotechnical study. If, during future site operations, subsurface conditions are encountered which vary significantly from those described herein, HWA should be notified for review of the recommendations of this report, and revision of such if necessary. The findings and recommendations of this report were prepared in accordance with generally accepted professional principles and practices in the fields of geotechnical engineering and engineering geology. No warranty, expressed or implied, is made. We do not warrant the accuracy of information supplied by others, nor the use of segregated portions of this report. HWA does not practice or consult in the field of safety engineering. We do not direct the contractor's operations, and cannot be responsible for the safety of personnel other than our own on the site. We appreciate the opportunity to provide our services. Should you have any questions regarding this report, or require additional services, please contact us at your convenience. Sincerely, HWA GEOSCIENCES INC. SW 7th Dewater rpt.doc 7 HWA GEOSCIENCES INC. December 30, 2003 HWA Project No. 2003-007 Greg W. Emens, P.G. Arnie Sugar, P.G. Hydrogeologist Senior Environmental Geologist GWE:AS:gwe SW 7th Dewater rpt.doc 8 HWA GEOSCIENCES INC. PROJECT REQUEST FORM PLANNINGBUILDING/P'UBLIC "WORKS SOME SECT IONS APPLY l Q C1P AND SOME APPLY TO DEVELOPER PROJECTS DATE: %2 a s OLS CONTACT:_ M t vt WO# (1. - 9 s o FILE STATUS ( EXISTING_` OR NEW FILE CODE (PRl-xi xxxx): LOCATION My Work Space: SyGt -luJr File Bay Shelf #: _ ther: PROJECT 'NAME: , z 1 �c %� (label line one) tgNO hvT< UJ• =ice "Muir,, nvc (10 ch racters rriaic) s, Allowable Folder Title"(CIP ONLY):. ' SEE ATTATCHED"ALLOWABLE FOLDER CHECKLIST pg.-2 (label line two) i/ DESCRIPTION OF PROJECT: 1d o,c-e 'S: (lit! LE �C Siff iyv\ Owe, nr wi It, Ct) a 's < ADDRESS/STREET NAME(S): /2- S -S - DEV/CNTR/OWN/CNSLT: OTHER ALIASES: Circle Size of Waterlline: 8" 10" 12" Circle One: New / Replace / Extension Circle Size of Sewerline: 8" 10" 12" Circle One: New / Replace / Extension Circle Size of Stormline: 12" 18" 24" Circle One New / Replace / Extension CHECKEACH DISCIPLINE INVOLVED IN PROJECTLtr . Drwg # of sheets TED (roadway/drainage) (off site improvements) (include TESC) TRO (Signalization, Channelization, Lighting) WWP (wastewater) (sanitary sewer main) WTR (water) (Mains, Valves, Hydrants) (inc. composite & HorizontalCtrl) SWP (surface water imp.) %bus, j (CIP onlyxinclude basin name) PLR (plan review) (Neccessary for developer files) T. Oetteronly) PLFrASE CiEECYTID15'CIPLINES WTICH IVE�Ii Td' SIGIJYLYLARS , .WATER'. WASTEWATER . SURFACE:WTER TRANSP.OtTATION FIRE. FOR FH,E MAWTAINANCF INF. ONLY File Codes: Date Entered and Labels Made: RgtfonnN E W YROJ.doc CIP PROJECT FILE PICKLIST UTILITIES FILE TITLE FOLDER SIZE* QUANTITY CORRESPONDENCE................................................................. General............................................................................. Consultant......................................................................... City.................................................................................... OtherAgencies.................................................................. Contractor......................................................................... Grants/Loans..................................................................... DESIGN/PLANNING................................................................... Design............................................................................... Consultant Selection.......................................................... Contracts........................................................................... Reports/Studies/Calculations (Geotech, Surveying, etc).... Consultant Payments......................................................... AGREEMENTS (Interlocal, Cost Sharing, MOA's, etc) ................ SEPA.......................................................................................... PERMITS/PLAN REVIEW........................................................... EASEMENTS/DEEDS ................................................................. CONSTRUCTION....................................................................... Bid Info (Bid Tab, Agenda Bill, Committee Reports).......... Insurance & Legal Review ................................................. Contract Document (inc. Specs, Contract & Bid does)....... Submittals......................................................................... Materials Shop Drawings Schedules Traffic Control Plan PayEstimates................................................................... Prevailing Wages ChangeOrders.................................................................. Inspection/Progress Reports .............................................. Photos, Site Condition Reports Construction Management Services (Consultant) .............. Contract Invoices Operations & Maintainance................................................ General Information Manual As-built/Survey Notes LITIGATION................................................................................ LID.............................................................................................. Public Notification.............................................................. Public Meetings................................................................. Final Assessment Roll ....................................................... Miscellaneous.................................................................... SAD............................................................................................ Public Notification....................................................... I...... PublicMeetings................................................................. Final Assessment Roll ....................................................... Miscellaneous.................................................................... / o / u / C o C) / 'FOLDER SIZE CHOICES: - 1", 2", or 4" side tab for shelf storage (IS, 2S, or 4S). 1" top & side tab for files kept at desks/file cabinets prior to shelves (ITS). RgtformUTLT.doc