HomeMy WebLinkAboutWTR2703142_4CITY OF RENTON COUNCIL AGENDA BILL
Submitting Data:
Dept/Div/Board.. City Clerk
Staff Contact...... Bonnie Walton
Subject:
Bid opening on 4/20/2004 - CAG-04-037
Talbot Hill Water Main Replacement Project Phase 1
Exhibits:
Staff Recommendation
Bid Tabulation Sheet (eight bids)
Al #:
For Agenda of:
April 26, 2004
Agenda Status
Consent ..............
Public Hearing..
Correspondence..
Ordinance .............
Resolution........... .
Old Business........
New Business.......
Study Sessions......
Information........ .
Recommended Action: Approvals:
Council concur Legal Dept.........
Finance Dept......
Other ...............
/:1
Fiscal Impact:
Expenditure Required $500,855.36 (2004) Transfer/Amendment N/A
Amount Budgeted $542,000.00 (2004) Revenue Generated N/A
Total Project Budget $542,000.00 (2004) City Share Total Project $542,000
Account No.
421.000500.018.5960.0034.65.055170
SUMMARY OF ACTION:
Project construction cost estimate: $ 500,855.36
STAFF RECOMMENDATION:
In accordance with Council procedure, bids submitted at the subject bid opening met the
following three criteria: There was more than one bid, the low bid was within the project
budget, and there were no irregularities. Therefore, staff recommends acceptance of the low
bid submitted by Buno Construction, LLC, in the total amount of $500,855.36.
H:\File Sys\WTR - Drinking Water Utility�WTR-27 - Water Project Files\WTR-27-3142 Talbot Hill Phase ]\Agenda-Bill-award-of-contract.doc\AGtp
BII B
age 5
Project Title:
BID DATE: 4/20/04
Item
No.
2:30 PDT
Description
Talbot Hill
Wtr. Main Repl., Phase 1
Unit Est,
Quanl
DDJ Construction Co., Inc.
Unit Bid
Price Amount
001
Mobilization & Demobilization
Lump Sum
1
$
25,000.00
100.00
10,000.00
5,000.00
1,000.00
20.00
110.00
44.50
575.00
875.00
2,875.00
1,000.00
900.00
1,850.00
3,500.00
3,800.00
280.00
8,000.00
10.00
15.00
18.00
88.00
48.00
40.00
Subtotal
Tax
Total
$25,000.00
$100.00
$10,000.00
$5,000.00
$1,000.00
$2,300.00
$12,100.00
$232,290.00
$575.00
$30,625.00
$43,125.00
$73,000.00
$3,600.00
$1,850.00
$42,000.00
$3,800.00
$14,560.00
$8,000.00
$250.00
$19,875.00
$9,000.00
$53,680.00
$9,600.00
$3,000.00
$15,000.00
$619,330.00
$54,501.04
$673,831.04
04/21 /2004
BID TAB
Page 4
Project Title:
BID DATE: 4/20/04
Item
No.
2:30 PDT
Description
Talbot Hill
Wtr. Main Repl., Phase 1
Unit Est. Unit
Quantity Price
Americon, Inc. Mosbrucker Excavating, Inc.
Bid Unit Bid
Amount Price Amount
001
Mobilization & Demobilization
Lump Sum
1
$
48,133.61
$48,133.61
$
31,275.00
$31,275.00
002
Trench Excavation Safety Systems
Lump Sum
1
$
609.01
$609.01
$
3,544.00
$3,544.00
003
Construction Surveying, Staking, & As-Builts
Lump Sum
1
$
10,406.41
$10,406.41
$
9,680.00
$9,680.00
004
Traffic Control
Lump Sum
1
$
460.57
$460.57
$
19,755.00
$19,755.00
005
Temporary Erosion/Sedimentation Controls
Lump Sum
1
$
576.91
$576.91
$
11,850.00
$11,850.00
006
4-Inch DIP, Cl. 52 & Fittings (Polywrapped)
Linear Foot
115
$
18.67
$2,147.05
$
24.70
$2,840.50
007
6-Inch DIP, Cl. 52 & Fittings (Polywrapped)
Linear Foot
110
$
19.44
$2,138.40
$
25.10
$2,761.00
008
8-Inch DIP, Cl. 52 & Fittings (Pollywrapped)
Linear Foot
5,220
$
28.35
$147,987.00
$
43.10
$224,982.00
009
6-Inch Gate Valve Assembly
Each
1
$
494.32
$494.32
$
386.00
$386.00
010
8-Inch Gate Valve Assembly
Each
35
$
631.72
$22,110.20
$
580.00
$20,300.00
011
Fire Hydrant Assembly
Each
15
$
2,464.24
$36,963.60
$
2,900.00
$43,500.00
012
3/4" Water Service Connection
Each
73
$
1,772.09
$129,362.57
$
830.00
$60,590.00
013
3/4" Water Service Connection w/ no meter
Each
4
$
1,789.86
$7,159.44
$
834.00
$3,336.00
014
1-inch Air -Release Valve
Each
1
$
559.29
$559.29
$
2,080.00
$2,080.00
015
Connection to Existing Water Main
Each
12
$
2,751.94
$33,023.28
$
2,172.00
$26,064.00
016
Wet Tap Connection to Existing Water Main
Each
1
$
3,917.94
$3,917.94
$
2,276.00
$2,276.00
017
Concrete Thrust Blocks & Dead -man Blocks
Cubic yard
52
$
91.56
$4,761.12
$
10.00
$520.00
018
Removal of Existing Fire Hydrants, Valve Boxes & Appurtenances
Lump Sum
1
$
412.26
$412.26
$
1,954.00
$1,954.00
019
Removal & Replacement of Unsuitable Foundation Material
Ton
25
$
31.82
$795.50
$
21.20
$530.00
020
Select Imported Trench Backfill (Gravel Borrow)
Ton
1,325
$
22.79
$30,196.75
$
16.50
$21,862.50
021
Crushed Surfacing Top Course & Crushed Rock Backfill
Ton
500
$
22.80
$11,400.00
$
19.50
$9,750.00
022
Asphalt Patch Class B incl. Temp. Asphalt Pavement
Ton
610
$
71.07
$43,352.70
$
85.00
$51,850.00
023
Remove & Replace Sidewalk & Driveway
Sq. Yard
200
$
44.37
$8,874.00
$
33.00
$6,600.00
024
Remove & Replace Curb & Gutter
Linear Foot
75
$
32.06
$2,404.50
$
38.00
$2,850.00
025
Remove, Restore Lawn, Landscaping Restoration
Lump Sum
1
$
14,665.85
$14,665.85
$
10,000.00
$10,000.00
Subtotal
$562,912.28
Subtotal
$571,136.00
Tax
$49,536.28
Tax
$50,259.97
Total
$612,448.56
Total
$621,395.97
� 04/21 /
r BII B age 3
Project Title: Talbot Hill
BID DATE: 4/20/04 2:30 PDT Wtr. Main Repl., Phase 1
Item Description Unit Est.
No. Quantil
001 Mobilization & Demobilization
Lump Sum
1
002 Trench Excavation Safety Systems
Lump Sum
1
003 Construction Surveying, Staking, & As-Builts
Lump Sum
1
004 Traffic Control
Lump Sum
1
005 Temporary Erosion/Sedimentation Controls
Lump Sum
1
006 4-Inch DIP, Cl. 52 & Fittings (Polywrapped)
Linear Foot
115
007 6-Inch DIP, Cl. 52 & Fittings (Polywrapped)
Linear Foot
110
008 8-Inch DIP, Cl. 52 & Fittings (Pollywrapped)
Linear Foot
5,220
009 6-Inch Gate Valve Assembly
Each
1
010 8-Inch Gate Valve Assembly
Each
35
011 Fire Hydrant Assembly
Each
15
012 3/4" Water Service Connection
Each
73
013 3/4" Water Service Connection w/ no meter
Each
4
014 1-inch Air -Release Valve
Each
1
015 Connection to Existing Water Main
Each
12
016 Wet Tap Connection to Existing Water Main
Each
1
017 Concrete Thrust Blocks & Dead -man Blocks
Cubic yard
52
018 Removal of Existing Fire Hydrants, Valve Boxes & Appurtenances
Lump Sum
1
019 Removal & Replacement of Unsuitable Foundation Material
Ton
25
020 Select Imported Trench Backfill (Gravel Borrow)
Ton
1,325
021 Crushed Surfacing Top Course & Crushed Rock Backfill
Ton
500
022 Asphalt Patch Class B incl. Temp. Asphalt Pavement
Ton
610
023 Remove & Replace Sidewalk & Driveway
Sq. Yard
200
024 Remove & Replace Curb & Gutter
Linear Foot
75
025 Remove, Restore Lawn, Landscaping Restoration
Lump Sum
1
Kar-Vel Construction
Construct Co.
Unit
Price
Bid
Amount
Unit
Price
Bid
Amount
$
53,000.00
$53,000.00
$
19,150.00
$19,150.00
$
300.00
$300.00
$
8,400.00
$8,400.00
$
14,000.00
$14,000.00
$
10,100.00
$10,100.00
$
600.00
$600.00
$
32,000.00
$32,000.00
$
900.00
$900.00
$
4,500.00
$4,500.00
$
31.50
$3,622.50
$
20.00
$2,300.00
$
34.00
$3,740.00
$
34.00
$3,740.00
$
41.30
$215,586.00
$
39.00
$203,580.00
$
400.00
$400.00
$
570.00
$570.00
$
590.00
$20,650.00
$
740.00
$25,900.00
$
2,700.00
$40,500.00
$
2,400.00
$36,000.00
$
800.00
$58,400.00
$
970.00
$70,810.00
$
800.00
$3,200.00
$
970.00
$3,880.00
$
1,900.00
$1,900.00
$
2,700.00
$2,700.00
$
1,900.00
$22,800.00
$
900.00
$10,800.00
$
2,900.00
$2,900.00
$
2,500.00
$2,500.00
$
2.00
$104.00
$
180.00
$9,360.00
$
1,800.00
$1,800.00
$
330.00
$330.00
$
12.00
$300.00
$
39.00
$975.00
$
11.00
$14,575.00
$
17.50
$23,187.50
$
14.00
$7,000.00
$
20.50
$10,250.00
$
80.00
$48,800.00
$
81.00
$49,410.00
$
15.00
$3,000.00
$
34.00
$6,800.00
$
30.00
$2,250.00
$
25.00
$1,875.00
$
15,000.00
$15,000.00
$
10,000.00
$10,000.00
Subtotal
$535,327.50
Subtotal
$549,117.50
Tax
$47,108.82
Tax
$48,322.34
Total
$582,436.32
Total
$597,439.84
04/21 /2004
BID TAB
Page 2
Project Title:
BID DATE: 4/20/04
Item
No.
2:30 PDT
Description
001 Mobilization & Demobilization
002 Trench Excavation Safety Systems
003 Construction Surveying, Staking, & As-Builts
004 Traffic Control
005 Temporary Erosion/Sedimentation Controls
006 4-Inch DIP, Cl. 52 & Fittings (Polywrapped)
007 6-Inch DIP, Cl. 52 & Fittings (Polywrapped)
008 8-Inch DIP, Cl. 52 & Fittings (Pollywrapped)
009 6-Inch Gate Valve Assembly
010 8-Inch Gate Valve Assembly
011 Fire Hydrant Assembly
012 3/4" Water Service Connection
013 3/4" Water Service Connection w/ no meter
014 1-inch Air -Release Valve
015 Connection to Existing Water Main
016 Wet Tap Connection to Existing Water Main
017 Concrete Thrust Blocks & Dead -man Blocks
018 Removal of Existing Fire Hydrants, Valve Boxes & Appurtenances
019 Removal & Replacement of Unsuitable Foundation Material
020 Select Imported Trench Backfill (Gravel Borrow)
021 Crushed Surfacing Top Course & Crushed Rock Backfill
022 Asphalt Patch Class B incl. Temp. Asphalt Pavement
023 Remove & Replace Sidewalk & Driveway
024 Remove & Replace Curb & Gutter
025 Remove, Restore Lawn, Landscaping Restoration
Talbot Hill
Wtr. Main Repl., Phase 1
Unit Est.
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Linear Foot
Linear Foot
Linear Foot
Each
Each
Each
Each
Each
Each
Each
Each
Cubic yard
Lump Sum
Ton
Ton
Ton
Ton
Sq. Yard
Linear Foot
Lump Sum
1
1
1
1
1
115
110
5,220
1
35
15
73
4
1
12
1
52
1
25
1,325
500
610
200
75
1
B & L Utility
Unit Bid
Price Amount
30,000.00
100.00
10,000.00
7,000.00
2,000.00
40.00
40.00
36.00
400.00
600.00
2,500.00
800.00
800.00
1,500.00
2,000.00
2,500.00
100.00
1,000.00
0.01
1.00
20.00
100.00
35.00
25.00
3,500.00
Subtotal
Tax
Total
$30,000.00
$100.00
$10,000.00
$7,000.00
$2,000.00
$4,600.00
$4,400.00
$187,920.00
$400.00
$21,000.00
$37,500.00
$58,400.00
$3,200.00
$1,500.00
$24,000.00
$2,500.00
$5,200.00
$1,000.00
$0.25
$1,325.00
$10,000.00
$61,000.00
$7,000.00
$1,875.00
$3,500.00
$485,420.25
$42,716.98
$528,137.23
VJM Construction Co., Inc.
Unit Bid
Price Amount
30,000.00
100.00
12,000.00
8,000.00
4,000.00
43.00
45.00
39.00
450.00
630.00
3,200.00
700.00
700.00
1,800.00
3,000.00
3,000.00
150.00
500.00
5.00
10.00
15.00
70.00
50.00
30.00
15,000.00
Subtotal
Tax
Total
$30,000.00
$100.00
$12,000.00
$8,000.00
$4,000.00
$4,945.00
$4,950.00
$203,580.00
$450.00
$22,050.00
$48,000.00
$51,100.00
$2, 800.00
$1, 800.00
$36,000.00
$3,000.00
$7, 800.00
$500.00
$125.00
$13,250.00
$7,500.00
$42,700.00
$10,000.00
$2,250.00
$15,000.00
$531,900.00
$46,807.20
$578,707.20
04/21 /,'
BI[ 3 ige 1
Project Title:
BID DATE: 4/20/04
Item
No.
2:30 PDT
Description
Talbot Hill
Wtr. Main Repl., Phase 1
Unit
City of Renton
Engineers Estimate
Est. Unit
jantity Price
001 Mobilization & Demobilization
Lump Sum
1
002 Trench Excavation Safety Systems
Lump Sum
1
003 Construction Surveying, Staking, & As-Builts
Lump Sum
1
004 Traffic Control
Lump Sum
1
005 Temporary Erosion/Sedimentation Controls
Lump Sum
1
006 4-Inch DIP, Cl. 52 & Fittings (Polywrapped)
Linear Foot
115
007 6-Inch DIP, Cl. 52 & Fittings (Polywrapped)
Linear Foot
110
008 8-Inch DIP, Cl. 52 & Fittings (Pollywrapped)
Linear Foot
5,220
009 6-Inch Gate Valve Assembly
Each
1
010 8-Inch Gate Valve Assembly
Each
35
011 Fire Hydrant Assembly
Each
15
012 3/4" Water Service Connection
Each
73
013 3/4" Water Service Connection w/ no meter
Each
4
014 1-inch Air -Release Valve
Each
1
015 Connection to Existing Water Main
Each
12
016 Wet Tap Connection to Existing Water Main
Each
1
017 Concrete Thrust Blocks & Dead -man Blocks
Cubic yard
52
018 Removal of Existing Fire Hydrants, Valve Boxes & Appurtenances
Lump Sum
1
019 Removal & Replacement of Unsuitable Foundation Material
Ton
25
020 Select Imported Trench Backfill (Gravel Borrow)
Ton
1,325
021 Crushed Surfacing Top Course & Crushed Rock Backfill
Ton
500
022 Asphalt Patch Class B incl. Temp. Asphalt Pavement
Ton
610
023 Remove & Replace Sidewalk & Driveway
Sq. Yard
200
024 Remove & Replace Curb & Gutter
Linear Foot
75
025 Remove, Restore Lawn, Landscaping Restoration
Lump Sum
1
$32,000.00
$1,500.00
$5,000.00
$5,000.00
$1,000.00
$36.00
$42.00
$47.00
$450.00
$700.00
$2,000.00
$800.00
$700.00
$2,000.00
$2,500.00
$1,500.00
$100.00
$2,000.00
$15.00
$14.00
$16.00
$100.00
$20.00
$25.00
$5,000.00
Subtotal
Tax
Total
Buno Construction LLC
Low Bid
Bid Unit Bid
Amount Price Amount
$32,000.00
$1,500.00
$5,000.00
$5,000.00
$1,000.00
$4,140.00
$4,620.00
$245,340.00
$450.00
$24,500.00
$30,000.00
$58,400.00
$2, 800.00
$2,000.00
$30,000.00
$1,500.00
$5,200.00
$2,000.00
$375.00
$18,550.00
$8,000.00
$61,000.00
$4,000.00
$1,875.00
$5,000.00
$554,250.00
$48,774.00
$603,024.00
45,000.00
5,000.00
6,900.00
5,000.00
1,500.00
26.00
27.00
31.00
500.00
600.00
2,800.00
700.00
600.00
1,800.00
2,000.00
2,500.00
70.00
500.00
10.00
8.00
14.00
75.00
25.00
15.00
10,000.00
Subtotal
Tax
Total
$45,000.00
$5,000.00
$6,900.00
$5,000.00
$1,500.00
$2,990.00
$2, 970.00
$161,820,00
$500.00
$21,000.00
$42,000.00
$51,100.00
$2,400.00
$1,800.00
$24,000.00
$2,500,00
$3,640.00
$500.00
$250.00
$10,600.00
$7,000.00
$45,750.00
$5,000.00
$1,125.00
$10,000.00
$460,345.00
Qan yin aF
$500,855.36
04/21 /2004
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
MEMORANDUM
DATE: April 21, 2004
TO: Bonnie Walton, City Clerk
FROM: Abdoul Gafour, x7210 41PO/
SUBJECT: Award of Construction Contract for Talbot Hill
Water Main Replacement Project Phase 1
On April 20, 2004, bids were opened and publicly read for the Talbot Hill Water Main
Replacement Project Phase 1. The City received eight bids.
Buno Construction, LLC, of Snohomish, Washington, submitted the lowest bid in the amount of
$500,855.36 for the construction of the improvements. We checked the low bid and found no
irregularities in it. The engineer's estimate for this project is $603,024.00.
The Water Utility recommends that the contract be awarded to Buno Construction, LLC, in the
total amount of $500,855.36.
The Water Utility budget for this project is $542,000, which includes funds for construction,
inspection, staff time and contingencies. The Water Utility has sufficient funds in our 2004
Capital Improvements Project budget account no. 421.000500.018.5960.0034.65.055170 to cover
all work that will be done on this project.
Attached is a draft agenda bill with the budget information completed. Please use this
information to prepare your agenda bill for City Council with our recommendation to award the
contract to the low bidder Buno Construction, LLC, for the Council Meeting on April 26, 2004.
If you have any questions, please call me at x7210. Thank you for your assistance on this
contract.
Attachments: Bid Tabulation
Draft Agenda Bill
cc: Gregg Zimmerman
Lys Hornsby
Nenita Ching
Rick Moreno
H:\File Sys\WTR - Drinking Water Utility\WTR-27 - Water Project Files\WTR-27-3142 Talbot Hill Phase 1\award-memo-to-clerk-
01.docWGtp
Talbot Hill Water Main Replacement Project Phase 1
Estimated Project Expenditures (2004)
Account No. 421.000500.018.5960.0034.65.055170
Description
Amount
Construction contract
(from low bidder: Buno Construction, LLC)
$
500,855.36
City staff for Contract Administration (estimated)
$
20,000.00
Contingencies (estimated)
$
$21,144.64
Total estimated project costs
$
542,000.00
HAFile Sys\WTR - Drinking Water Utilit3AWTR-27 - Water Project Files\WTR-27-3142 Talbot Hill Phase Aaward-memo-to-clerk-
Ol .doc\AGtp
-� �2,►�- Uo nWt se ry Its S re. A � �K►� :
'�L Fao'C'htot� �?35 LF J
D tit
2-7 xl�s'/cp = joat�377,,<
se=-ro
73.r4 4�,277 L 3) (, 4tp)
153to -7 29. 145 = ( 5 S-%� `7 to-7 c+ b = -7 75 rW
�*o k 5-.3C. a 2/57�/ Sy
(,7.cj/Z,-7X3J531-Z =
gT71 zs
x l i10 -1yc�
.141 J/ S'3G1. 1 = I& ar`S(o .
IWO
21d9
7
X 0 �/6
8
Sq
1
S.Hc -Z�)
s1.); -41)
5w r A)
,A07 x 2. 93 Y. 5 - 2jK!j or it «5 - 4t?,,1d5/9-w
o = ?vL. TT
5Z52<2,273xis 3t*L-01.`tsxlgs . �5321 t3.�51�.�0� - 2(su .are
ZCot. %ajs
lotn.3Sxos = 4ro-) SIAS.
$ sa :cP
sr--t AC,D 45.5'xlg5 - 45�,09?.51vvo 228 a -
22 8 T or1S
\S`I.o5X1q5= tQ_3to&Z.�hr1 _ 1.63
Sd 2 tyNA
sNc -1) t5X? x 2.�2,593 905,x 1 AS = 506-1-15 z00o = 2 s3.39
25 4 -r,>Ns
5Mr 16 1267L 33 16 - Sa39 lot )1 Lt5 .:73ol& 9��2000 3taf5 .IV
5H7 I q J!T is 1.31X 3 : 911_ S. S 9 145 0 gS2707.5 /Zola- �: 2 2`1. 35'
SH% 1a 313X 2.'33x3 s 2►87.9'7 u 145 . -60 24I, �S8.1"
1511 -(a�S
Gf- , <&A,l o -�r l4 t LU AS P'O<' �SYJ
'A-r Z Ao-1 K t. Z442 .11lt� = 2'71.3o = 272-sy
sHT 37 co-2S x = 31 S o sf' X. �� t 9C, SY 35v Sy
51-ri * ...
-7 o?
A � ;
SST
�Sb
K �,
z-too
,stay 6'
5t5
it s
3s�o •(.tttl�
500
Sit g
�a J
K �
43zt�� Itll)
St't T
4-715-
31-2 �
k�e
sN.T!> --
A--7 1. g1
; = .si
Z`ig,°t`1
300 Sy
r
3gq LR.
s,!
31to. 1,3=317
s�
Z ID $. LILL =
Zo 9 sir
, aL,u iuEs 5�1an.r
Sy
r
F•�'s 1� X 3 x tA>' 1e� 4 SY
313Z��3 f 31��e.Y
s-, —1'A N) ll� -S Atli �,- 10v ki GPAvl:-�I, 0 6 c�)
V ,��� 40-7 X 2•&-7'X 3
x 1 FAO �/b ,t000 0
S.14 = l �� �`�t-46-7 = "11Ss x L,*0 goo) 646_9 = 5�z
Zo 0 0
0
1'Uf.Sz.
,�5 x 2, cad X 3 = 4Zo 5, 2 S 6F'
l4D x 42a 5.2'S = 5 �8, '7 35, 7 3L
. 5625i CC—XC 5 5 = . �121.1� x L = t�l
�o
108 -?93919t.?o,__
ti{ a l �'S d? o�Zaoo
-1o 8 = Ia,50—,S'O x
Sd x 2. Col X 3 = 3 too 4, s 6r x t Ad = 5 a 4110 ?,%gyp Z , t71
SI,ZS� X 4'SC) _ -1614.V x IAD = 1111'7,-7 5�iad0 = 55-1,4
= 1 9 tP•to7
X."10- 1 6ra(vS
5115 x 2.19'7 }c 3 4.17(,� .`iS n �40 = �(�-1, 2- /2-0ao
3.05d.a102/Zodo = '?S. Si�
Z.4o. 06 x.7O= 182.dy
SO -, 2, L.? k 3 =
4 00 S u 140
= 51,d ?60/20dc)
= Z$0.35
3.14C,51e7,15) 4,00_
`d- 3.1z lad :
IZ3,LVSI-1040()=
(pt.8Z
St 6. 53 3 ,10 = I Z 2lmq
-7ZI x Z-L7Y, 5-225,Z,I qax 140 = �507r529.40171MO = 404,SLp
S.14 L. L5 2,5 x -7 Z I = I S 7 3.4Co x 14.0 = i 7 25, 21s5. 27/7ACOO - sGi ,14
3t5, 1 Z k 70 = yZt7. Sg
ZZt 'foNS
4l15 3Fro4.�5Xli0� S32J6tslu o = Zt,�.�,3
.5toZs) 4'15 ,.11, x ly0 = 1 I-71 q S5. V'3/ivdo = 5 .-13
Za7.1.e0 x -W = 145', 32 fob
1 4 [, -To N s
K S. L, 7?c 3 = ZSo-�, t3 XtL4o 350 qq 8,2v12-000 = 1"I5-, 4,9
-2 4, �.5702�3�3 = 55Z.�`{ x ��� =�� 3�-1 . Ot Z06O = 38•&a
S ,'1 S'
,:�\lo 10o-s
BUNO
5d3 �So oi�8
OWNER
PROJECT
Soos Creek Wtr & Swr District Panther Lake NE
14616 SE 192nd Street Trunk Sewer
Renton WA 98059
CONSTRUCTION, LLC.
COMPLETED PROJECTS
CONTACT AMOUNT
Roth Hill Engineering $200,000.00
Att: Katherine Maxwell
(425) 869-9448
DESCRIPTION
1,610 LF Of 8" PVC Sewer Main
Adjacent to sensitive Wetland and
Through Wetland Buffer Areas
Northshore Utility District Inglemoor Tank Farm Northshore Utility Dist. $900,000.00 Replace 24" Inlet -Outlet Piping @ (3)
6830 NE 185th Street Site Piping Att: Steve Dennehey Tanks W/ The Demolition Of Site Piping
Kenmore WA 98028 Alterations (425) 398-4400 & Replacement W/ 30" & 24" DI Pipe.
King County Water District # 85
2002 Water Main
Penhallegon Associates $1,378,500.00
17,700 LF Of 8"
2108 SW 146th Street
Replacement Project
Bob Stanton
DI Water Main W/
Seahurst WA 98062
Phase 1 & 2
(425) 827-2014
Appurtenances
Woodinville Water District AC Water Main CHS Engineers $270,000.00 2,700 LF Of 8"
17238 Woodinville - Duvall Rd Replacement Att: Mary Dahl DI Water Main W/
Woodinville WA 98072 Schedule 9 (425) 637-3693 Appurtenances
Cross Valley Water District Clearview Local Facilities Penhallegon Associates $780,000.00 6,700 LF Of 24 & 18"
8802180th St. SE Transmission Main Dave Hutley DI Water Main W/
Snohomish Wa 98296 (425) 827-2014 Appurtenances
Northshore Utility District Totem Lake Fire Flow Northshore Utility Dist. $250,000.00 11-- 1,200 LF Of 16",12 & 8"
6830 NE 185th Street Improvements Att: Steve Dennehey 3 i 'old-aEs %^" Water Main W/
Kenmore WA 98028 (425) 398-4400 S. Appurtenances
City Of Bothell Water Main Replacement City Of Bothell
9654 NE 182nd Street Phase II - Sammamish Steve Morikowa
$285,000.00 Installation of 670 LF of 12" & 8"
DI Pipe. & 430 LF of 14" HDPE under
Bothell WA River Crossing (425) 486-2768 the Sammamish river by Directional Drill
Lake Stevens Sewer District Lundeen/Vernon Road Gray & Osborne $1,346,000.00 Installation of 4,000 LF of
9327 4th Street NE Suite #8 Bypass - Phase 2 Att: Warren Perkins 22" HDPE, 200 LF of 10"
Everett WA (206) 284-0860 HDPE Force Main & 2,400
LF Of 24"& 8" PVC Gravity
Northshore Utility District 187/63 Northshore Utility Dist. $189,000.00 3,500 LF Of 8",6" & 4"
6830 NE 185th Street Water Main Att: Steve Dennehey Water Main W/
Kenmore WA 98028 Replacement (425) 398-4400 Appurtenances
City Of Poulsbo
Front Street NE
City Of Poulsbo
$1,500,000.00 +/- 4,500 LF of Street
19050 Jensen Way/PO Box 98
Improvements
Att: Andrzej Kasiniak
Reconstruction Inc. Water,
Poulsbo WA 98370
Project
(360) 779-5111
Sewer,Storm,Conc.ACP
King County Water District # 90 May Valley Road Roth Hill Engineering $526,499.00 7,500 LF Of 12" DI
15606 SE 128th Street Water Main Att: Kevin Goss Water Main W/
Renton WA 98059 Replacement (425) 869-9448 Appurtenances
1� ►ss� a� G . o .�
King County Water District # 20 S. 120th Street KCWD # 20 ' $142,200.00 2,000 LF Of 8" DI
126061st Ave South Water Main Att: Ron Malaspino 1�0 1�u.�► �'� Water Main W/:,�
Seattle WA 98168 Replacement (206) 243-3990 V•+ry �tok. �v.��/(fit' Appurtenances
City Of Milton
1000 Laurel Street
1999 Water System City Of Milton
Improvements Att: Glen Baker
$230,000.00 4,500 LF Of 8" DI
Water Main W/
Milton WA 98354 Project (253) 922-8738 Appurtenances
City Of Sultan
Public Works Dept.
7031st Street
Sultan WA 98294
Commercial/Industrial City Of Sultan
Sewer LID 97-1 Att: Gary Keeley
Schedule A (360) 793-1262
$510,000.00 5,000 LF Of 8"& 6"
PVC & DI Gravity Sewer
W/ Street Improvements
PUD#10f Snohomish County
2320 California Street
Everett WA 98206
Northshore Utility District
6830 NE 185th Street
Kenmore WA 98028
City Of Toppenish
21 West First Avenue
Toppenish Wa 98948
Lake Stevens
C.I.P. Pipelines
Schedules 1 thru 5
130/64 Sewer
Public Works
Project
Wastewater Collection
System Schedules
A,B,C,D,E & F
t --�'77 7113-000
PUD #1 Of Snoh. Cnty
Att: Brant Wood ,
(425)258-8211
Northshore Utility Distr
Att: Dick Todd Or
Jack Stillwell
(425)398-4400
Gray & Osborne Inc.
Yakima WA
Att: Michael Rohrich
(509) 453-4833
$540,000.00
8" & 12" DI
Water Main
$410,000.00 8" PVC and DI
Gravity Sewer System
$985,000.00 8" thru 15" PVC
Gravity Sewer System
City Of Mountlake Project 95-1 City of Mountlake Terr. $469,000.00 10,000 LF of 8" DI
Terrace Water Main Engineering Department Water Main
23204 58th Ave W Replacement Att: Kjell Johnson
Mountlake Terrace WA (206) 776-1161
98043
Alderwood Water District Swamp Creek Trunk KCM Inc. $2,370,390.00 30",24",12",& 8" DI, PVC
3626156th Street SW Sewer Phase 3 Att: Doug Genzlinger & Concrete Gravity
Lynnwood WA 98037 (206) 443-5354 Sewer System
Highline Water District Water Main Penhallogen Associates $725,000.00 12" DI Transmission
23828 30th Ave S Replacement Att: Zenon Zazula and Distribution Main
Kent WA 98032 Phase II (206) 827-2014
Hillcrest Village Water 1994 Water Main HCW-L Associates $1,250,000.00 300,000 Gal. Reservoir,
Company Replacement 4010 Stone Way N Hydropnumatic and
Oak Harbor WA Seattle WA 98103 Chlorination Facilities, &
Att: Erik Davido Distribution Pipelines
(206) 632-2664
Alderwood Water Distr. Swamp Creek Trunk KCM Inc. $914,000.00 12",16",& 24" DI, PVC
- 1 a
3626156th Street SW Sewer Phase 1 Att: Doug Genzlinger & Concrete Gravity
Lynnwood WA 98037 Schedule 1-B (206) 443-5354 Sewer System
Silver Lake Water Distr. 4.2 Million Gallon Silver Lake Water Distr. $900,400.00 4.2 Million Gal. Reservoir
2210132nd Street SE Reservoir And Att: Bruce Nelson w/Pump Station(VFD)
Everett WA 98204 Pump Station & associated Piping
City Of Lynnwood Sanitary Sewer Gray & Osborne $1,060,000.00 24" DI Sewer Force Main
19100 44th Ave West Improvements Att: Tim Osborne
Lynnwood WA 98036 (206) 284-0860
City Of Sedro Woolley Treatment Plant City Of Sedro Woolley $453,000.00 16" DI Outfall
720 Murdock Street Outfall Att: Dale Velasquez Gravity Sewer
Sedro Woolley Wa 98284 (360) 855-1661
City Of Roslyn
Schedule A Sewer
Gray & Osborne
$1,240,000.00 Sewage Lagoons,
13 South 1st Street
Rehabilitation And
Att: Tom Zerkel
Treatment Facilities &
Roslyn WA 98941
Treatment Plant
(206) 284-0860
Sewer Collection System
Lake Stevens Sewer Distr ULID # 7 Lake Stevens Sewer Distr $533,000.00 12",18",& 24" PVC and
9327 4th Street NE Sanitary Sewer Att: Darwin Smith Concrete Sewer Main
Everett WA 98205 (206) 334-8588
Rosehill Water District 1989 Water main Repl. S.T. Engineering $1,259,000.00 6",8",12",& 16" DI
13013 NE 65th Street 1990 Water main Repl. Att: Owen Bond $1,751,000.00 Transmission And
Kirkland WA 98033 (206) 483-9389 Distribution Pipelines
Northshore Utility Distr. ULID # 73 Northshore Utility Distr. $490,000.00 7,000 LF of DI & PVC
6830 NE 185th Street Sanitary Sewer Att: Dick Todd Sanitary Sewer Main
Kenmore WA 98028 (425) 398-4400
Richard Moreno - Background check for Buno Construction Page 1
From: Richard Moreno
To: Gafour, Abdoul
Subject: Background check for Buno Construction
Buno Construction supplied with its bid a 4 page resume listing 29 projects ranging in cost and scope from
$149K - $2.3 Million. From the contacts I called (most closely related projects) Buno Construction was
constistanly receiving high praise in the following areas:
Quality control
Low Change Orders
Foreman and crew (2 foremen were listed with high praise- Dan, and Brad)
Restoration
Very concienscience with the public
I have no issues recommending Buno Construction for the Talbot Hill Water Main Replacement Project,
Phase 1.
Richard Moreno - Re: Background check for Buno Construction
Page 1
From: Abdoul Gafour
To: Moreno, Richard
Date: 04/21/2004 1:14:05 PM
Subject: Re: Background check for Buno Construction
Thank you for checking reference on Buno.
Please prepare letter notifying them of Council's award of contract on April 26 and ask them to submit
standard paperwork for contract execution. Forward draft letter to Teresa for review and mail out final
letter on April 27, after confirmation that Council awards the contract on Monday night 4/26.
Abdul
4/21 /04- 1:15 pm
>>> Richard Moreno 04/21/2004 9:30:41 AM >>>
Buno Construction supplied with its bid a 4 page resume listing 29 projects ranging in cost and scope from
$149K - $2.3 Million. From the contacts I called (most closely related projects) Buno Construction was
constistanly receiving high praise in the following areas:
Quality control
Low Change Orders
Foreman and crew (2 foremen were listed with high praise- Dan, and Brad)
Restoration
Very concienscience with the public
I have no issues recommending Buno Construction for the Talbot Hill Water Main Replacement Project,
Phase 1.