HomeMy WebLinkAboutWTR2703142_808/29/05 16:10 FAX 425 489 1533 BUNO CONSTRUCT.
Affidavit of Wages Paid
- Y '
Affidavit of Wages Paid
Received:
08/29/2005
Affidavit Id.-
75894
COMPANY
Company
BUNO CONSTRUCTION LLC
Information:
BUNOCL•981BN
602 173 756
License History
802,107-05
20219 99TH AVE SE
Industrial Insurance
SNOHOMISH, WA 98296
Premium status
(425) 486-1280
Payment Type:
Electronic
Company
Electronic
Signature:
PROJECT
Public Agency: RENTON, CITY OF
1055 S GRADY WAY
RENTON, WA 98055
County:
KING Multiple Counties? No
City:
Renton
Project Name:
Talbot Hill Water Main Replacement - Phase 1
Contract Number.,
Date Intent Filed:
05/11/2004
Bid Due Date:
04/20/2004
Award Date:
04/26/2004
Date Work
10126/2004
Completed:
Prime Contractor.
BUNO CONSTRUCTION LLC
BUNOCL'981 BN
(425) 486-1280
Did Your Company
Hire
Subcontractors To
Perform All Work?
No
Did Your Company
Hire Any
Subcontractors?
No
$ Amount:
$500,855.36
Number of
0
Owners:
Filed by:
Renee Bollinger
EMPLOYEES' WAGES
ln.rrnav I oval Trarfa-rJ 7ccunafions
Io 002/003
rage I of z
Prevailing Wage Section
Department of Labor &
Industries
PO Box 44540
Olympia, WA 98504-4540
Status:
Approved on 08/29/2005
County
Trade
Occupation
Wage
Fringe
Wo
Ho
KING
FLAGGERS
JOURNEY LEVEL
$27.18
$0.00
2
567
LABORERS - UNDERGROUND
https://wws2.wa.gov/lni/pwiapub/AffidavitPrint.asp?ID=75894 8/29/2005
08/29/05 16:11 FAX 425 489 1533 BUNO CONSTRUCT.
Affidavit of Wages Paid
I4 003/003
Page 2 of 2
KING
ISEWER & WATER
GENERAL LABORER
$31.86
$0.00
11
15
POWER EQUIPMENT
BACKHOE, EXCAVATOR,
$38.73
$0.00
2
1982
KING
OPERATORS
SHOVEL (3 YD & UNDER)
KING
TRUCK DRIVERS
DUMP TRUCK
$35.91
$0.00
21702.
Apprentice Trades/Occupations
-ITY OF RENTor,
https://wws2.wa.gov/lni/pwiapub/AffidavitPrint.asp?ID=75894 8/19/2005
TO: FINANCE DIRECTOR
FROM: PUBLIC WORKS ADMINISTRATOR
CONTRACTOR: Buno Construction, LLC.
CONTRACT NO. CAG 04-037 ESTIMATE NO. 4 (Final)
PROJECT: Talbot Hill Water Main Replacement, Phase 1
1.
CONTRACTOR EARNINGS THIS ESTIMATE
$45,426.62
2.
SALES TAX @ 8.80%
$3,997.54
3.
TOTAL CONTRACT AMOUNT THIS ESTIMATE
$49,424.16
4.
EARNINGS PREVIOUSLY PAID CONTRACTOR
$407,143.95
5
EARNINGS DUE CONTRACTOR THIS ESTIMATE
$45,426.62
6.
SUBTOTAL - CONTRACTOR PAYMENTS
$452,570.57
7
SALES TAX PREVIOUSLY PAID
$35,828.67
8
SALES TAX DUE THIS ESTIMATE
$3,997.54
9
SUBTOTAL - SALES TAX
$39,826.21
GRAND TOTAL:
$492,396.78
FINANCE DEPARTMENT ACTION:
PAYMENT TO CONTRACTOR (Lines 5 and 8):
ACCOUNT # 421/500/18.5960.34.65/55170/55574/5354 $49,424.16 # 4 (Final)
$49,424.16
TOTAL THIS ESTIMATE: $49,424.16
CHARTER 116, LAWS OF 1965
CITY OF RENTON CERTIFICATION
I, THE UNDERSIGNED DO HEREBY CERTIFY UNDER PENALTY OF
PERJURY, THAT THE MATERIALS HAVE BEEN FURNISHED, THE
SERVICES RENDERED OR THE LABOR PERFORMED AS DESCRIBED
HEREIN, AND THAT THE CLAIM IS A JUST, DUE AND UNPAID
OBLIGATION AGAINST THE CITY OF RENTON, AND THAT I AM
AUTHORIZED TO AUTHENTICATE AND CERTIFY TO SAID CLAIM
Signed:
Note: The contractor has a retainage bond; therefore the City is not withholding retainage.
Printed On: 10/12/2004 City of Renton Public Works Department Page 1
Printed On: 10/12/2004
Project: Talbot Hill Water Main Replacement, Phase 1
Contractor: Buno Construction, LLC.
Item Description
No.
City of Renton Public Works Department
Contract Number: CAG 04-037
Pay Estimate 4 (Final) Closing Date: 10/12/2004
Unit Est. Unit Previous Previous This
Quantity Price Quantity Amount Quantity
Page 1
This Total Total
Amount Quantitv Amount
ITEM
DESCRIPT
UNITS
ESTOTY UPRICE
POTY
PAMOUNT
THISOTY
TAMT
TOTOTY
TOTAMT
001.
Mobilization & Demobilization
Lump Sum
1
$45,000.00
1.00
$45,000.00
0.00
$0.00
1.00
$45,000.00
002.
Trench Excavation Safety Systems
Lump Sum
1
$5,000.00
1.00
$5,000.00
0.00
$0.00
0.00
$5,000.00
003.
Construction Surveying Staking and As-Builts
Lump Sum
1
$6,900.00
0.50
$3,450.00
0.50
$3,450.00
1.00
$6,900.00
004.
Traffic Control
Lump Sum
1
$5,000.00
0.90
$4,500.00
0.10
$500.00
1.00
$5,000.00
005.
Temporary Erosion/ Sedimentation Controls
Lump Sum
1
$1,500.00
1.00
$1,500.00
0.00
$0.00
1.00
$1,500.00
4-inch Ductile Iron Pipe, Class 52 and Fittings
006.
(Polywrapped)
Linear Foot
115
$26.00
88.00
$2,288.00
0.00
$0.00
88.00
$2,288.00
6-Inch Ductile Iron Pipe, Class 52 and Fittings
007.
(Polywrapped)
Linear Foot
110
$27.00
23.00
$621.00
0.00
$0.00
23.00
$621.00
8-Inch Ductile Iron Pipe, Class 52 and Fittings
008.
(Polywrapped)
Linear Foot
5220
$31.00
5208.00
$161,448.00
0.00
$0.00
5208.00
$161,448.00
009.
6-Inch Gate Valve Assembly
Each
1
$500.00
3.00
$1,500.00
0.00
$0.00
3.00
$1,500.00
010.
8-Inch Gate Valve Assembly
Each
35
$600.00
31.00
$18,600.00
0.00
$0.00
31.00
$18,600.00
011.
Fire Hydrant Assembly
Each
15
$2,800.00
15.00
$42,000.00
0.00
$0.00
15.00
$42,000.00
012.
3/4" Water Service Connection
Each
73
$700.00
72.00
$50,400.00
0.00
$0.00
72.00
$50,400.00
013.
3/4" Water Service Connection with no meter
Each
4
$600.00
5.00
$3,000.00
0.00
$0.00
5.00
$3,000.00
014.
1-Inch Air -Release Valve
Each
1
$1,800.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
015.
Connection to Existing Water Main
Each
12
$2,000.00
13.00
$26,000.00
0.00
$0.00
13.00
$26,000.00
016.
Wet Tap Connection to Existing Water Main
Each
1
$2,500.00
1.00
$2,500.00
0.00
$0.00
1.00
$2,500.DO
017.
Concrete Thrust Blocking & Dead -man Anchor Blocks
Cubic Yard
52
$70.00
54.00
$3,780.00
0.00
$0.00
54.00
$3,780.00
Removal of Existing Fire Hydrants, Valve Boxes & other
018.
appurtenances
Lump Sum
1
$500.00
1.00
$500.00
0.00
$0.00
1.00
$500.00
Removal and replacement of Unsuitable Foundation
019.
Material
Ton
25
$10.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
020.
Select Import Trench Backfill (Gravel Borrow)
Ton
1325
$8.00
300.12
$2,400.96
0.00
$0.00
300.12
$2,400.96
021.
Crushed Surfacing Top Course & Crushed Rock Backfill
Ton
500
$14.00
620.16
$8,682.24
0.00
$0.00
620.16
$8,682.24
022.
Asphalt Patch Class B, Including Temp. Asphalt Pavement
Ton
610
$75.00
219.65
$16,473.75
345.86
$25,939.50
565.51
$42,413.25
023,
Remove & Replace Sidewalk & Driveway
Square Yard
200
$25.00
0.00
$0,00
0.00
$0.00
0.00
$0.00
024.
Remove & Replace Curb & Gutter
Linear Foot
75
$15.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
025.
Remove, Restore Lawn, Landscaping Restoration
Lump Sum
1
$10,000.00
0.75
$7,500.00
0.25
$2,500.00
1.00
$10,000.00
026.
Change Order N1 Extra work, time and materials
Lump Sum
1
$13,037.11
0.00
$0.00
1.00
$13,037.12
1.00
$13,037.12
Subtotal
$407,143.95
$45,426.62
0.00
$452,570.57
8.8 % Sales Tax
$35,828.67
$3,997.54
$39,826.21
TT
Total
$442,972.62
$49,424.16
$492,396.78
TO:
FINANCE DIRECTOR
FROM
PUBLIC WORKS ADMINISTRATOR
CONTRACTOR: Buno Construction, LLC.
CONTRACT NO. CAG 04-037
ESTIMATE NO. 4 (Final)
PROJECT: Talbot Hill Water Main Replacement, Phase 1
1. CONTRACTOR EARNINGS THIS ESTIMATE $45,426.62
2. SALES TAX @ 8.80% $3,997.54
3. TOTAL CONTRACT AMOUNT THIS ESTIMATE $49,424.16
4. EARNINGS PREVIOUSLY PAID CONTRACTOR $407,143.95
5 EARNINGS DUE CONTRACTOR THIS ESTIMATE $45,426.62
6. SUBTOTAL - CONTRACTOR PAYMENTS
7 SALES TAX PREVIOUSLY PAID
8 SALES TAX DUE THIS ESTIMATE
9 SUBTOTAL - SALES TAX
FINANCE DEPARTMENT ACTION:
PAYMENT TO CONTRACTOR (Lines 5 and 8):
ACCOUNT # 421/500/18.5960.34.65/55170/55574/5354
CHARTER 116, LAWS OF 1965
CITY OF RENTON CERTIFICATION
I, THE UNDERSIGNED DO HEREBY CERTIFY UNDER PENALTY OF
PERJURY, THAT THE MATERIALS HAVE BEEN FURNISHED, THE
SERVICES RENDERED OR THE LABOR PERFORMED AS DESCRIBED
HEREIN, AND THAT THE CLAIM IS A JUST, DUE AND UNPAID
OBLIGATION AGAINST THE CITY OF RENTON, AND THAT I AM
AUTHORIZED TO AUTHENTICATE AND CERTIFY TO SAID CLAIM
Signed:
$35,828.67
$3,997.54
GRAND TOTAL
$49,424.16 # 4 (Final)
TOTAL THIS ESTIMATE
Note: The contractor has a retainage bond; therefore the City is not withholding retainage.
$452,570.57
$39,826.21
$492,396.78
$49,424.16
$49,424.16
Printed On: 10/11/2004 City of Renton Public Works Department Page 1
. Printed On: 10/11/2004 City of Renton Public Works Department Page 1
Project: Talbot Hill Water Main Replacement, Phase i
Contractor: Buno Construction, LLC.
Item Description
No.
001. Mobilization & Demobilization
002. Trench Excavation Safety Systems
003. Construction Surveying Staking and As-Builts
004. Traffic Control
005. Temporary Erosion/ Sedimentation Controls
4-inch Ductile Iron Pipe, Class 52 and Fittings
006. (Polywrapped)
6-Inch Ductile Iron Pipe, Class 52 and Fittings
007. (Polywrapped)
8-Inch Ductile Iron Pipe, Class 52 and Fittings
008. (Polywrapped)
009. 6-Inch Gate Valve Assembly
010. 8-Inch Gate Valve Assembly
011. Fire Hydrant Assembly
012. 314" Water Service Connection
013. 314" Water Service Connection with no meter
014. 1-Inch Air -Release Valve
015. Connection to Existing Water Main
016. Wet Tap Connection to Existing Water Main
017. Concrete Thrust Blocking & Dead -man Anchor Blocks
Removal of Existing Fire Hydrants, Valve Boxes & other
018. appurtenances
Removal and replacement of Unsuitable Foundation
019. Material
020. Select Import Trench Backfill (Gravel Borrow)
021. Crushed Surfacing Top Course & Crushed Rock Backfill
022. Asphalt Patch Class B, Including Temp. Asphalt Pavement
023, Remove & Replace Sidewalk & Driveway
024. Remove & Replace Curb & Gutter
025. Remove, Restore Lawn, Landscaping Restoration
026. Change Order #1 Extra work, time and materials
Subtotal
Pay Estimate
Unit Est.
Quant
Lump Sum 1
Lump Sum 1
Lump Sum 1
Lump Sum 1
Lump Sum 1
Linear Foot 115
Linear Foot 110
Linear Foot 5220
Each 1
Each 35
Each 15
Each 73
Each 4
Each 1
Each 12
Each 1
Cubic Yard 52
Lump Sum 1
Ton 25
Ton 1325
Ton 500
Ton 610
Square Yard 200
Linear Foot 75
Lump Sum 1
Lump Sum 1
Contract Number:
4 (Final)
Closing Date:
Unit
Previous Previous
Price
Quantity Amount
ICE
PQTY PAMOUNT
$45,000.00
$5,000.00
$6,900.00
$5,000.00
$1,500.00
$26.00
$27.00
$31.00
$500.00
$600.00
$2,800.00
$700.00
$600.00
$1,800.00
$2,000.00
$2,500.00
$70.00
$500.00
$10.00
$8.00
$14.00
$75.00
$25.00
$15.00
$10,000.00
$13,037.11
CAG 04-037
9/31/2004
This This
Quantitv Amoui
THISQTY TAMT
Total Total
1.00
$45,000.00
0.00
$0.00
1.00
$45.000.00
1.00
$5,000.00
0.00
$0.00
0.00
$5,000.00
0.50
$3.450.00
0.50
$3,450.00
1.00
$6,900.00
0.90
$4,500.00
0.10
$500.00
1.00
$5,000.00
1.00
$1,500.00
0.00
$0.00
1.00
$1,500.00
88.00
$2,288.00
0.00
$0.00
88.00
$2,288.00
23.00
$621.00
0.00
$0.00
23.00
$621.00
5208.D0
$161,448.00
0.00
$0.00
5208.00
$161,448.00
3.00
$1,500.00
0.00
$0.00
3.00
$1,500.00
31.00
$10,600.00
0.00
$0.00
31.00
$18,600.00
15.00
$42,000.00
0.00
$0.00
15.00
$42,000.00
72.00
$50,400.00
0.00
$0.00
72.00
$50,400.00
5.00
$3,000.00
0.00
$0.00
5.00
$3,000.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
13.00
$26,000.00
0.00
$0.00
13.00
$26,000.00
1.00
$2,500.00
0.00
$0.00
1.00
$2,500.00
54.00
$3,780.00
0.00
$0.00
54.00
$3,780.00
1.00
$500.00
0.00
$0.00
1.00
$500.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
300.12
$2,400.96
0.00
$0.00
300.12
$2,400.96
620.16
$8,682.24
0.00
$0.00
620.16
$8,682.24
219.65
$16,473.75
345.86
$25,939.50
565.51
$42,413.25
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.75
$7,500.00
0.25
$2,500.00
1.00
$10,000.00
0.00
$0.00
1.00
$13,037.12
1.00
$13,037.12
$407,143.95
$45,426.62
0.00
$452,570,57
8.8 % Sales Tax $35,828.67 $3,997.54 $39,826.21
TT Total 11 $442,972.62 $49,424.16 $492,396.78
f TO: FINANCE DIRECTOR
FROM: PUBLIC WORKS ADMINISTRATOR
CONTRACTOR: Buno Construction, LLC.
CONTRACT NO. CAG 04-037 ESTIMATE NO. 3
PROJECT: Talbot Hill Water Main Replacement, Phase 1
1. CONTRACTOR EARNINGS THIS ESTIMATE $100,528.87
2. SALES TAX @ 8.80% $8,846.54
3. TOTAL CONTRACT AMOUNT THIS ESTIMATE $109,375.41
4. EARNINGS PREVIOUSLY PAID CONTRACTOR $306,615.08
5 EARNINGS DUE CONTRACTOR THIS ESTIMATE $100,528.87
6. SUBTOTAL - CONTRACTOR PAYMENTS
7 SALES TAX PREVIOUSLY PAID $26,982.13
8 SALES TAX DUE THIS ESTIMATE $8,846.54
9 SUBTOTAL - SALES TAX
GRAND TOTAL
FINANCE DEPARTMENT ACTION:
PAYMENT TO CONTRACTOR (Lines 5 and 8):
ACCOUNT # 421/500/18.5960.34.65/55170/55574/5354 $109,375.41 # 3
TOTAL THIS ESTIMATE:
CHARTER 116, LAWS OF 1965
CITY OF RENTON CERTIFICATION
I, THE UNDERSIGNED DO HEREBY CERTIFY UNDER PENALTY OF
PERJURY, THAT THE MATERIALS HAVE BEEN FURNISHED, THE
SERVICES RENDERED OR THE LABOR PERFORMED AS DESCRIBED
HEREIN, AND THAT THE CLAIM IS A JUST, DUE AND UNPAID
OBLIGATION AGAINST THE CITY OF RENTON, AND THAT I AM
LAIM
AUTHORIZED TO AUTHENTICATE ANDCERTIFY TO SAID CLAIM
Signed: l�h�y4A�
� +�ti 02, *Ot
Note: The contractor has a retainage bond; therefore the City is not withholding retainage.
$407,143.95
$35,828.67
$442,972.62
$109,375.41
$109,375.41
Printed On: 09/02/2004 City of Renton Public Works Department Page 1
Printed On: 09/02/2004
Project: Talbot Hill Water Main Replacement, Phase 1
Contractor: Buno Construction, LLC.
Item Description
No.
City of Renton Public Works Department
Contract Number:
Pay Estimate 3 Closing Date:
Unit Est. Unit Previous Previous
Quantity Price Quantity Amount
001.
Mobilization & Demobilization
Lump Sum
1
002.
Trench Excavation Safety Systems
Lump Sum
1
003.
Construction Surveying Staking and As-Builts
Lump Sum
1
004.
Traffic Control
Lump Sum
1
005.
Temporary Erosion/ Sedimentation Controls
Lump Sum
1
4-inch Ductile Iron Pipe, Class 52 and Fittings
006.
(Polywrapped)
Linear Foot
115
6-Inch Ductile Iron Pipe, Class 52 and Fittings
007.
(Polywrapped)
Linear Foot
110
8-Inch Ductile Iron Pipe, Class 52 and Fittings
008.
(Polywrapped)
Linear Foot
5220
009.
6-Inch Gate Valve Assembly
Each
1
010.
8-Inch Gate Valve Assembly
Each
35
11a
Fire Hydrant Assembly
Each
15
11b
314" Water Service Connection
Each
73
11c
314" Water Service Connection with no meter
Each
4
012.
1-Inch Air -Release Valve
Each
1
013.
Connection to Existing Water Main
Each
12
014.
Wet Tap Connection to Existing Water Main
Each
1
015.
Concrete Thrust Blocking & Dead -man Anchor Blocks
Cubic Yard
52
Removal of Existing Fire Hydrants, Valve Boxes & other
016.
appurtenances
Lump Sum
1
Removal and replacement of Unsuitable Foundation
017.
Material
Ton
25
018.
Select Import Trench Backfill (Gravel Borrow)
Ton
1325
019.
Crushed Surfacing Top Course & Crushed Rock Backfill
Ton
500
020.
Asphalt Patch Class B, Including Temp. Asphalt Pavement
Ton
610
021.
Remove & Replace Sidewalk & Driveway
Square Yard
200
022.
Remove & Replace Curb & Gutter
Linear Foot
75
023.
Remove, Restore Lawn, Landscaping Restoration
Lump Sum
1
Subtotal
8.8% Sales Tax
TT Total
$45,000.00
$5,000.00
$6,900.00
$5,000.00
$1,500.00
$26.00
$27.00
$31.00
$500.00
$600.00
$2,800.00
$700.00
$600.00
$1,800.00
$2,000.00
$2,500.00
$70.00
$500.00
$10.00
$8.00
$14.00
$75.00
$25.00
$15.00
$10,000.00
Page 1
CAG 04-037
08/31/2004
This This Total Total
Quantitv Amount Quantity Amount
1.00
$45,000.00
0.00
$0.00
1.00
$45,000.00
1.00
$5,000.00
0.00
$0.00
0.00
$5,000.00
0.50
$3,450.00
0.00
$0.00
0.50
$3,450.00
0.75
$3,750.00
0.15
$750.00
0.90
$4,500.00
1.00
$1,500.00
0.00
$0.00
1.00
$1,500.00
18.00
$468.00
70.00
$1,820.00
88.00
$2,288.00
15.00
$405.00
8.00
$216.00
23.00
$621.00
4495.00
$139,345.00
713.00
$22,103.00
5208.00
$161,448.00
3.00
$1,500.00
0.00
$0.00
3.00
$1,500.00
28.00
$16,800.00
3.00
$1,800.00
31.00
$18,600.00
14.00
$39,200.00
1.00
$2,800.00
15.00
$42,000.00
41.00
$28,700.00
31.00
$21,700.00
72.00
$50,400.00
2.00
$1,200.00
3.00
$1,800.00
5.00
$3,000.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
2.00
$4,000.00
11.00
$22,000.00
13.00
$26,000.00
0.00
$0.00
1.00
$2,500.00
1.00
$2,500.00
36.00
$2,520.00
18.00
$1,260.00
54.00
$3,780.00
0.00
$0.00
1.00
$500.00
1.00
$500.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
237.50
$1,900.00
62.62
$500.96
300.12
$2,400.96
491.22
$6,877.08
128.94
$1,B05.16
620.16
$8,682.24
0.00
$0.00
219.65
$16,473.75
219.65
$16,473.75
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.50
$5,000.00
0.25
$2,500.00
0.75
$7,500.00
$306,615.08
$100,528.87
0.00
$407,143.95
$26,982.13 $8,846.54 $35,828.67
$333,597.21 $109,375.41 $442,972.62
qTow 9 -z -c,¢
TO: FINANCE DIRECTOR
FROM:
PUBLIC WORKS ADMINISTRATOR
CONTRACTOR: Buno Construction, LLC.
CONTRACT NO. CAG 04-037 ESTIMATE NO. 2
PROJECT: Talbot Hill Water Main Replacement, Phase 1
1. CONTRACTOR EARNINGS THIS ESTIMATE $73,136.24
2. SALES TAX @ 8.80% $6,435.99
3. TOTAL CONTRACT AMOUNT THIS ESTIMATE $79,572.23
4. EARNINGS PREVIOUSLY PAID CONTRACTOR $233,478.84
5 EARNINGS DUE CONTRACTOR THIS ESTIMATE $73,136.24
6. SUBTOTAL - CONTRACTOR PAYMENTS
7 SALES TAX PREVIOUSLY PAID $20,546.14
8 SALES TAX DUE THIS ESTIMATE $6,435.99
9 SUBTOTAL - SALES TAX
FINANCE DEPARTMENT ACTION:
PAYMENT TO CONTRACTOR (Lines 5 and 8):
ACCOUNT # 421/500/18.5960.34.65/55170/55574/5354
CHARTER 116, LAWS OF 1965
CITY OF RENTON CERTIFICATION
GRAND TOTAL:
$79,572.23 # 2
$306,615.08
$26,982.13
$333,597.21
$79,572.23
TOTAL THIS ESTIMATE: $79,572.23
I, THE UNDERSIGNED DO HEREBY CERTIFY UNDER PENALTY OF
PERJURY, THAT THE MATERIALS HAVE BEEN FURNISHED, THE
SERVICES RENDERED OR THE LABOR PERFORMED AS DESCRIBED
HEREIN, AND THAT THE CLAIM IS A JUST, DUE AND UNPAID
OBLIGATION AGAINST THE CITY OF RENTON, AND THAT I AM
AUTHORIZED TO AUTHENTICATE AND CERTIFY TO SAID CLAIM
Signed: ��OU4/ �It`Fb4� AyGusf 2f `% of
Note: The contractor has a retainage bond; therefore the City is not withholding retainage.
`6 ���L4
Printed On: 08/02/2004
City of Renton Public Works Department
Page 1
Printed On: 08/02/2004 City of Renton Public Works Department Page 1
Project:
Talbot Hill Water Main Replacement, Phase 1
Contract Number.
CAG 04.037
Contractor: Buno Construction, LLC.
Pay Estimate
Closing Date:
07/30/2004
Item
Description
Unit
Est.
Unit
Previous
Previous
This
This
Total
Total
No.
Ouantity
Price
Ouantity
Amount
Ouantity
Amount
Ouanlity
Amount
ITEM
DESCRIPT
UNITS
ESTOTY UPRICE
POTY
PAMOUNT
THISOTY
TAMT
TOTOTY
TOTAMT
001,
Mobilization & Demobilization
Lump Sum
1
$45.000.00
1.00
S45,000.00
0.00
$0.00
1.00
S45,000.00
002.
Trench Excavation Safety Systems
Lump Sum
1
$5,000.00
0.74
$3,700.00
0.26
$1.300.00
1.00
$5,000.00
003,
Construction Surveying Staking and As-Buills
Lump Sum
1
S6,900.00
0.50
$3,450.00
0.00
$0.00
0.50
$3,450.00
004.
Traffic Control
Lump Sum
1
$5,000.00
0.50
$2,500.00
0.25
$1.250.00
0.75
$3,750.00
005.
Temporary Erosion/ Sedimentation Controls
Lump Sum
1
$1.500.00
0.74
$1,110.00
0.26
S390.00
1.00
$1,500.00
4-inch Ductile Iron Pipe, Class 52 and Fittings
006.
(Poywrapped)
Linear Foot
115
$26.00
0.00
$0.00
18.00
$468.00
18.00
$468.00
6-Inch Ductile Iron Pipe, Class 52 and Fittings
007.
(Poywrapped)
Linear Foot
110
$27.00
0.00
$0.00
15.00
S405.00
15.00
$405.00
8-Inch Ductile Iron Pipe, Class 52 and Fittings
008.
(Poywrapped)
Linear Foot
5220
S31.00
3890.00
$120.590.00
605.00
$18,755.00
4495.00
$139,345.00
009.
6-Inch Gale Valve Assembly
Each
1
$500.00
0.00
$0.00
3,00
$1,500.00
3.00
$1.500.00
010.
8-Inch Gale Valve Assembly
Each
35
$600.00
24.00
$14,400.00
4.00
$2,400.00
28.00
$16,800.00
tta
Fire Hydrant Assembly
Each
15
$2,800.00
11.00
S30,800.00
3.00
$8,400.00
14.00
$39,200.00
11b
3/4' Water Service Connection
Each
73
$700.00
0.00
$0.00
41.00
$28,700.00
41.00
$28.700.00
ttc
3/4' Water Service Connection with no meter
Each
4
$600.00
0.00
50.00
2.00
$1,200.00
2.00
$1,200.00
012.
1-Inch Air -Release Valve
Each
1
$1,800.00
0.00
$0.00
0.00
$0.00
0.00
S0.00
013.
Connection to Existing Water Main
Each
12
$2.000.00
0.00
$0.00
2.00
$4,000.00
2.00
$4,000.00
014.
Wet Tap Connection to Existing Water Main
Each
1
$2,500.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
015.
Concrete Thrust Blocking & Dead -man Anchor Blocks
Cubic Yard
52
$70.00
23.00
$1,610.00
13.00
$910.00
36.00
$2,520.00
Removal of Existing Fire Hydrants, Valve Boxes & other
.
016.
appurtenances
Lump Sum
1
S500.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
Removal and replacement of Unsuitable Foundation
017.
Material
Ton
25
$10.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
018.
Select Import Trench Backfill (Gravel Borrow)
Ton
1325
$8.00
144.26
$1,154.08
93.24
$745.92
237.50
$1,900.00
019.
Crushed Surfacing Top Course & Crushed Rock Backfill
Ton
500
$14.00
390.34
$5,464.76
100.88
$1,412.32
491.22
$6.877.08
020.
Asphalt Patch Class B, Including Temp. Asphalt Pavement
Ton
610
$75.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
021.
Remove & Replace Sidewalk & Driveway
Square Yard
200
$25.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
022.
Remove & Replace Curb & Gutter
Linear Foot
75
$15.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
023.
Remove, Restore Lawn, Landscaping Restoration
Lump Sum
1
$10,000.00
0.37
$3,700.00
0.13
$1,300.00
0.50
S5,000.00
Subtotal
$233,478.84
$73.136.24
0.00
$306.615.00
8.8% Sales Tax
$20,546.14
$6. 35.99
$26,982.13
Printed On: 08/02/2004
City of Renton Public Works Department
Page 2
Project: Talbot Hill Water Main Replacement, Phase 1
Contractor: Buno Construction, LLC.
Item Description
No.
TT Total
Contract Number: CAG 04-037
Pay Estimate 2 Closing Date: 07/30/2004
Unit Est. Unit Previous Previous This
Quantity Price Quantity Amount Quantity
$254,024.98
This Total Total
Amount Ouantity Amount
$79,572.23 $333,597.21
/M `; ._ 2_ tI -t
plow
It
Tlx:
FINANCE DIRECTOR
' j-' -4 � [�;I-1't
FROM
PUBLIC WORKS ADMINISTRATOR
CONTRACTOR: Buno Construction, LLC.
CONTRACT NO. CAG 04-037
ESTIMATE NO. 1
PROJECT: Talbot Hill Water Main Replacement, Phase 1
1. CONTRACTOR EARNINGS THIS ESTIMATE $233,478.84
2. SALES TAX @ 8.80% $20,546.14
3. TOTAL CONTRACT AMOUNT THIS ESTIMATE $254,024.98
4. EARNINGS PREVIOUSLY PAID CONTRACTOR $0.00
5 EARNINGS DUE CONTRACTOR THIS ESTIMATE $233,478.84
6. SUBTOTAL - CONTRACTOR PAYMENTS
7 SALES TAX PREVIOUSLY PAID $0.00
8 SALES TAX DUE THIS ESTIMATE $20,546.14
9 SUBTOTAL - SALES TAX
GRAND TOTAL:
FINANCE DEPARTMENT ACTION:
PAYMENT TO CONTRACTOR (Lines 5 and 8):
ACCOUNT # 421/500/18.5960.34.65/55170/55574/5354 $254,024.98 # 1
TOTAL THIS ESTIMATE
CHARTER 116, LAWS OF 1965
CITY OF RENTON CERTIFICATION
I, THE UNDERSIGNED DO HEREBY CERTIFY UNDER PENALTY OF
PERJURY, THAT THE MATERIALS HAVE BEEN FURNISHED, THE
SERVICES RENDERED OR THE LABOR PERFORMED AS DESCRIBED
HEREIN, AND THAT THE CLAIM IS A JUST, DUE AND UNPAID
OBLIGATION AGAINST THE CITY OF RENTON, AND THAT I AM
AUTHORIZED TO AUTHENTICATE AND CERTIFY TO SAID
CLAIM
Signed:�%SLV 6K* StA L�lj 2, 2e,09'
Note: The contractor has a retainage bond; therefore the City is not withholding retainage.
$233,478.84
$20,546.14
$254,024.98
$254,024.98
$254,024. 8
G
`7 -1- e q
1h. d 7-4--v41
Printed On: 07/02/2004 City of Renton Public Works Department Page 1
Printed On: 07/01/2004
Project: Talbot Hill Water Main Replacement, Phase 1
Contractor: Buno Construction, LLC.
Item Description
No.
City of Renton Public Works Department
Contract Number:
Pay Estimate 1 Closing Date:
Unit Est. Unit Previous Previous
Quantity Price Quantity Amount
CAG 04-037
O6/30/2004
This This
Quantitv Amount
r "
Page 1
Total Total
001.
Mobilization & Demobilization
Lump Sum
1
$45,000.00
0.00
$0.00
1.00
$45,000.00
1.00
$45,000.00
002.
Trench Excavation Safety Systems
Lump Sum
1
$5,000.00
0.00
$0.00
0.74
$3,700.00
0.74
$3,700.00
003.
Construction Surveying Staking and As-Builts
Lump Sum
1
$6,900.00
0.00
$0.00
0.50
$3.450.00
0.50
$3,450.00
004.
Traffic Control
Lump Sum
1
$5,000.00
0.00
$0.00
0.50
$2,500.00
0.50
$2,500.00
005.
Temporary Erosion/ Sedimentation Controls
Lump Sum
1
$1,500.00
0.00
$0.00
0.74
$1,110.00
0.74
$1,110.00
4-inch Ductile Iron Pipe, Class 52 and Fittings
006.
(Polywrapped)
Linear Foot
115
$26.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
6-Inch Ductile Iron Pipe, Class 52 and Fittings
007.
(Polywrapped)
Linear Foot
110
$27.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
8-Inch Ductile Iron Pipe, Class 52 and Fittings
008,
(Polywrapped)
Linear Foot
5220
$31.00
0.00
$0.00
3890.00
$120,590.00
3890.00
$120,590.00
009.
6-Inch Gate Valve Assembly
Each
1
$500.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
010.
8-Inch Gate Valve Assembly
Each
35
$600.00
0.00
$0.00
24.00
$14,400.00
24.00
$14,400.00
11 a
Fire Hydrant Assembly
Each
15
$2.800.00
0.00
$0.00
11.00
$30,800.00
11.00
$30,800.00
11 b
3/4" Water Service Connection
Each
73
$700.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
11c
3/4` Water Service Connection with no meter
Each
4
$600.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
012.
1-Inch Air -Release Valve
Each
1
$1,800.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
013.
Connection to Existing Water Main
Each
12
$2,000.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
014.
Wet Tap Connection to Existing Water Main
Each
1
$2,500.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
015.
Concrete Thrust Blocking & Dead -man Anchor Blocks
Cubic Yard
52
$70.00
0.00
$0.00
23.00
$1,610.00
23.00
$1,610.00
Removal of Existing Fire Hydrants, Valve Boxes & other
016.
appurtenances
Lump Sum
1
$500.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
Removal and replacement of Unsuitable Foundation
017.
Material
Ton
25
$10.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
018.
Select Import Trench Backfill (Gravel Borrow)
Ton
1325
$8.00
0.00
$0.00
144.26
$1,154.08
144.26
$1,154.08
019.
Crushed Surfacing Top Course & Crushed Rock Backfill
Ton
500
$14.00
0.00
$0.00
390.34
$5,464.76
390.34
$5,464.76
020.
Asphalt Patch Class B, Including Temp. Asphalt Pavement
Ton
610
$75.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
021.
Remove & Replace Sidewalk & Driveway
Square Yard
200
$25.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
022.
Remove & Replace Curb & Gutter
Linear Fool
75
$15.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
023.
Remove, Restore Lawn, Landscaping Restoration
Lump Sum
1
$10,000.00
0.00
$0.00
0.37
$3,700.00
0.37
$3,700.00
Subtotal
$0.00
$233,478.84
0.00
$233,478.84
8.8 % Sales Tax
$0.00
$20,546.14
$20,546.14
Printed On: 07/01/2004
City of Renton Public Works Department
Page 2
Project: Talbot Hill Water Main Replacement, Phase 1
Contractor: Buno Construction, LLC.
Item Description
No.
TT Total
Contract Number: CAG 04-037
Pay Estimate t Closing Date: 06/30/2004
Unit Est. Unit Previous Previous This
Quantity Price Quantity Amount Quantity
$0.00
This Total Total
$254,024.98 $254,024.98 ��