Loading...
HomeMy WebLinkAboutWTR2703198_8TO: FINANCE DIRECTOR FROM: PUBLIC WORKS ADMINISTRATOR CONTRACTOR: VJM Construction, Inc. CONTRACT NO. CAG 05-085 ESTIMATE NO. 6 & Final PROJECT: Talbot Hill Water Main Replacement, Phase 2 1. CONTRACTOR EARNINGS THIS ESTIMATE $5,751.00 2. SALES TAX @ 8.80% $506.09 3. TOTAL CONTRACT AMOUNT THIS ESTIMATE $6,257.09 4. EARNINGS PREVIOUSLY PAID CONTRACTOR $581,783.50 5 EARNINGS DUE CONTRACTOR THIS ESTIMATE $5,463.45 6. SUBTOTAL - CONTRACTOR PAYMENTS 7 RETAINAGE ON PREVIOUS PAY ESTIMATE $30,620.17 8 RETAINAGE ON THIS ESTIMATE $287.55 9 SUBTOTAL - RETAINAGE 10 SALES TAX PREVIOUSLY PAID $53,891.53 11 SALES TAX DUE THIS ESTIMATE $506.09 12 SUBTOTAL - SALES TAX FINANCE DEPARTMENT ACTION: PAYMENT TO CONTRACTOR (Lines 5 and 11): ACCOUNT # 425/500/18.5960.34.65/55170/55574/5354 RETAINED AMOUNT (Line 8): ACCOUNT # 425/500/18.5960.34.65/55170/55574/5354 GRAND TOTAL: $5,969.54 # 6 & Final $287.55 # 6 & Final TOTAL THIS ESTIMATE: CHARTER 116, LAWS OF 1965 CITY OF RENTON CERTIFICATION I, THE UNDERSIGNED DO HEREBY CERTIFY UNDER PENALTY OF PERJURY, THAT THE MATERIALS HAVE BEEN FURNISHED, THE SERVICES RENDERED OR THE LABOR PERFORMED AS DESCRIBED HEREIN, AND THAT THE CLAIM IS A JUST, DUE AND UNPAID OBLIGATION AGAINST THE CITY OF RENTON, AND THAT I AM AUTHORIZED TO AUTHENTICAT AND CERTIFY TO SAID CLAIM / Signed: l mow-, C�M`tY 3 /2 gl0 6 $587,246.95 $30,907.72 $54,397.62 $672,552.29 $5,969.54 $287.55 $6,257.09 -j' z't 1�59^ 13 n -06 Printed On: 03/28/2006 City of Renton Public Works Department Page 1 9 Printed On: 03/28/2006 City of Renton Public Works Department Page 1 Project: Talbot Hill Water Main Replacement, Phase 2 Contractor: VJM Construction, Inc. Item Description No. Pay Estimate Unit Est. Ouant Contract Number: 6 & Final Closing Date: Unit Previous Previous Price Quantity Amount UPRICE POTY PAMOUN CAG 05-085 03/30/2006 This This Ouantitv Amount Total Total Amount 001. Mobilization & Demobilization Lump Sum 1 $60,000.00 1.00 $60,000.00 0.00 $0.00 1.00 $60,000.00 002. Trench Excavation Safety Systems Lump Sum 1 $1,000.00 1.00 $1,000.00 0.00 $0.00 1.00 $1,000.00 003. Construction Surveying Staking and As-Builts Lump Sum 1 $10.000.00 1.00 $10,000.00 0.00 $0.00 1.00 $10,000.00 004. Temporary Erosion/ Sedimentation Controls Lump Sum 1 $3,000.00 1.00 $3.000.00 0.00 $0.00 1.00 $3,000.00 005. Traffic Control Lump Sum 1 $20,000.00 1.00 $20,000.00 0.00 $0.00 1.00 $20,000.00 006. 314' Water Service Connection Each 87 $950.00 84.00 $79,800.00 0.00 $0.00 84.00 $79,800.00 007. 3/4' Water Service Connection with no meter Each 4 $900.00 2.00 $1,800.00 0.00 $0.00 2.00 $1,800.00 8-Inch Ductile Iron Pipe, Class 52 and Fittings 008. (Polywrapped) Linear Foot 5103 $46.00 5035.00 $231,610.00 0.00 $0.00 5035.00 $231,610.00 009. 6-inch DIP, CI 52 and Fittings (Polywrapped) Linear Foot 10 $40.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 010. 4-Inch DIP, Cl 52 and Fittings (Polywrapped) Linear Foot 78 $30.00 41.00 $1,230.00 0.00 $0.00 41.00 $1,230.00 011. 8-Inch Gate Valve Assembly Each 20 $695.00 20.00 $13,900.00 1.00 $695.00 21.00 $14,595.00 012. 4-Inch Gate Valve Assembly Each 4 $500.00 5.00 $2,500.00 0.00 $0.00 5.00 $2,500.00 013. Fire Hydrant Assembly Each 14 $3,500.00 15.00 $52,500.00 0.00 $0.00 15.00 $52,500.00 014. Connection to Existing Water Main Each 10 $3,800.00 12.00 $45,600.00 0.00 $0.00 12.00 $45,600.00 015. Concrete Thrust Blocking & Dead -man Anchor Blocks Cubic Yard 37 $100.00 17.00 $1,700.00 0.00 $0.00 17.00 $1,700.00 Removal and Replacement of Unsuitable Foundation 016. Material Ton 20 $1.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 017. Select Import Trench Backfill (Gravel Borrow) Ton 500 $12.00 455.43 $5,465.16 0.00 $0.00 455.43 $5,465.16 018. Crushed Surfacing Top Course & Crushed Rock Backfill Ton 700 $15.00 815.24 $12,228.60 0.00 $0.00 815.24 $12,228.60 019. Asphalt Patch Class B Ton 480 $98.00 507.54 $49,738.92 0.00 $0.00 507.54 $49,738.92 020. Remove & Replace Concrete Sidewalk & Driveway Sq. Yard 200 $10.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 021. Remove, Restore Lawn, Landscaping Restoration Lump Sum 1 $15.000.00 1.00 $15,000.00 0.00 $0.00 1.00 $15,000.00 022. Removal of Existing Fire Hyrants, Valve Boxes Lump Sum 1 $2,500.00 1.00 $2,500.00 0.00 $0.00 1.00 $2,500.00 023. 8-Inch Dia. CPEP Storm Pipe Linear Foot 155 $20.00 15.00 $300.00 0.00 $0.00 15.00 $300.00 024. Type 1, Catch Basin Each 4 $600.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 Change Order No. 1 Fire Hydrant Relocation/Stuctures & 025, Obstructions 1 $2,531.00 1.00 $2,531.00 0.00 $0.00 1.00 $2,531.00 Change Order No. 2 Repair (7) unmarked side sewers, unmarked SD services, and asplaft paving beyond trench 026. limitations 1 $5,056.00 0.00 $0.00 1.00 $5,056.00 1.00 $5,056.00 s2,6 9� 3.2% 06 Printed On: 03/28/2006 City of Renton Public Works Department Page 2 Project: Talbot Hill Water Main Replacement, Phase 2 Contractor: VJM Construction, Inc. Item Description No. Subtotal 8.8 % Sales Tax TT Total Contract Number: CAG 05-085 Pay Estimate 6 & Final Closing Date: 03/30/2006 Unit Est. Unit Previous Previous This Quantity Price Quantity Amount Quantity $612,403.68 $53,891.52 $666,295.20 This Total Total Amount Quantity Amour $5,751.00 $618,154.68 $506.09 $54,397.61 $6,257.09 $672,552.29 3.2s 9M 3•zg.o6 CITY OF RENTON Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: CAG 05-085 TALBOT HILL WATER MAIN REPLACEMENT PHASE 2 C.O.# 2 CONTRACTOR: VJM Construction Co., Inc. SUMMARY OF PROPOSED CHANGE: Provide all labor, equipment, materials, subcontracting, B & O tax, 20% over head, bonding, and insurance for: Description Lump Sum Cost Repair (7) seven unmarked side sewers $1,440.00 Repair of unmarked service storm drains $300.00 Redig due to miss marked tie-in location at S. 141h at Morris Ave S. $556.00 Asphalt paving, preparation and removal beyond trench limitations @ $23.00/ SY x 100 SY $2,760.00 Sub Total $5,056.00 Sales Tax (8.8%) $444.93 Total Time Extension for 39 days for rain delay and asphalt scheduling. New Contract completion date is February 10, 2006 $5500.93 $0.00 ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT ESTIMATED NET CHANGE THIS ORDER ESTIMATED TOTAL AFTER CHANGE $666,822.14 $669,130.41 $5,500.93 $674,631.34 60 Working Days 90 Working Days 39 Working Day 129 Working Days Contractor: Project Engi Water Utility Approved B, Date: -� Date: 3 d le Date: Date: H:\File Sys\WTR - Drinking Water Utility\WTR-27 - Water Project Files\WTR-27-3198-TALBOT HILL PHASE 2\Pay Estimates\CO-2.doc/RLMtp CITY OF RENTON COUNCIL AGENDA BILL Al #: Submitting Data: Planning/Building/Public Works For Agenda of- Dept/Div/Board Utility Systems Aril 10, 2006 Staff Contact Rick Moreno, x7208 Agenda Status Consent X Subject: Public Hearing.. Final Pay Estimate for CAG-05-085 Correspondence.. Talbot Hill Water Main Replacement - Phase 2 Ordinance ............. Contractor: VJM Construction, Inc. Resolution ............ Old Business........ Exhibits: New Business....... Final Pay Estimate Study Sessions...... Notice of Completion of Public Works Contract Information......... Project Location Mai Recommended Action: Approvals: Council Concur Legal Dept......... Finance Dept...... X Other ............... Fiscal Impact: Expenditure Required $6,257.09 (final pay estimate) Transfer/Amendment N/A Amount Budgeted $6,500.00 (final pay estimate) Revenue Generated N/A Total Project Budget $800,000.00 City Share Total Project 100% 2005-2006 budget for design, construction & administration SUMMARY OF ACTION: The contractor, VJM Construction, Inc., started construction of the project on August 18, 2005, and completed the project on February 13, 2006. The original contract amount was $666,822.14 and the final contract amount is $672,552.29. The $5,730.15 (less than 1%), increase in cost is due to the need to replace more asphalt roadway pavement than estimated. There are sufficient funds in the Water Utility project budget to cover the final pay estimate. STAFF RECOMMENDATION: Accept the project, approve the final pay estimate in the amount of $6,257.09, and release the retained amount of $30,907.72 after 60 days, subject to the City's receipt of all required authorizations. H:\File Sys\WTR - Drinking Water Utility\WTR-27 - Water Project Files\WTR-27-3198-TALBOT HILL PHASE 2\ln-House\Agenda-bill-final-pay- estimate.doc\RLMtp TO: FINANCE DIRECTOR FROM: PUBLIC WORKS ADMINISTRATOR CONTRACTOR: VJM Construction, Inc. CONTRACT NO. CAG 05-085 PROJECT: Talbot Hill Water Main Replacement, Phase 2 ESTIMATE NO. 6 & Final 1. CONTRACTOR EARNINGS THIS ESTIMATE $5,751.00 2. SALES TAX Q 8.80% $506.09 3. TOTAL CONTRACT AMOUNT THIS ESTIMATE $6,257.09 4. EARNINGS PREVIOUSLY PAID CONTRACTOR $581,783.50 5 EARNINGS DUE CONTRACTOR THIS ESTIMATE $5,463.45 6• SUBTOTAL - CONTRACTOR PAYMENTS 7 RETAINAGE ON PREVIOUS PAY ESTIMATE $30,620.17 8 RETAINAGE ON THIS ESTIMATE $287.55 9 SUBTOTAL - RETAINAGE 10 SALES TAX PREVIOUSLY PAID $53,891.53 11 SALES TAX DUE THIS ESTIMATE $506.09 12 SUBTOTAL - SALES TAX FINANCE DEPARTMENT ACTION: PAYMENT TO CONTRACTOR (Lines 5 and 11): ACCOUNT # 425/500/18.5960.34.65/55170/55574/5354 RETAINED AMOUNT (Line 8): ACCOUNT # 425/500/18.5960.34.65/55170/55574/5354 $587,246.95 $30,907.72 $54,397.62 GRAND TOTAL: $672,552.29 $5,969.54 # 6 & Final $5,969.54 $287.55 # 6 & Final $287.55 TOTAL THIS ESTIMATE: $6,257.09 CHARTER 116, LAWS OF 1965 CITY OF RENTON CERTIFICATION I, THE UNDERSIGNED DO HEREBY CERTIFY UNDER PENALTY OF PERJURY, THAT THE MATERIALS HAVE BEEN FURNISHED, THE SERVICES RENDERED OR THE LABOR PERFORMED AS DESCRIBED HEREIN, AND THAT THE CLAIM IS A JUST, DUE AND UNPAID OBLIGATION AGAINST THE CITY OF RENTON, AND THAT I AM AUTHORIZED TO AUTHENTICAT AND CERTIFY TO SAID CLAIM Signed: C>ouk'- 4M 3 2 8l0 6 Printed On: 03/28/2006 City of Renton Public Works Department Page 1 Printed On: 03/28/2006 City of Renton Public Works Department Page 1 Project: Talbot Hill Water Main Replacement, Phase 2 Contractor. VJM Construction, Inc. Item Description No. 001. Mobilization & Demobilization 002. Trench Excavation Safety Systems 003. Construction Surveying Staking and As-Buihs 004. Temporary Erosion/ Sedimentation Controls 005. Traffic Control 006. 314' Water Service Connection 007. 3/4' Water Service Connection with no meter 8-Inch Ductile Iron Pipe, Class 52 and Fittings 008. (Polywrapped) 009. 6-inch DIP, Cl 52 and Fittings (Poywrapped) 010. 4-Inch DIP, Cl 52 and Fittings (Poywrapped) 011. 8-Inch Gate Valve Assembly 012. 4-Inch Gate Valve Assembly 013. Fire Hydrant Assembly 014. Connection to Existing Water Main 015. Concrete Thrust Blocking & Dead -man Anchor Blocks Removal and Replacement of Unsuitable Foundation 016. Material 017. Select Import Trench Badcfill (Gravel Borrow) 018. Crushed Surfacing Top Course & Crushed Rock Backtill 019. Asphalt Patch Class B 020. Remove & Replace Concrete Sidewalk & Driveway 021. Remove, Restore Lawn, Landscaping Restoration 022. Removal of Existing Fire Hyrants, Valve Boxes 023. 8-Inch Dia. CPEP Storm Pipe 024. Type 1, Catch Basin Charge Order No. 1 Fire Hydrant Relocation/ tuctures & 025. Obstructions Charge Order No. 2 Repair (7) unmarked side sewers, unmarked SD services, and asplaR paving beyond trench 026. limitations Contract Number. CAG 05-085 Pay Estimate 6 & Final Closing Date: 03(30/2006 Unit Est. Unit Previous Previous This Ouantity Price Quantity Amount Quanlity UNITS Lump Sum 1 Lump Sum 1 Lump Sum 1 Lump Sum 1 Lump Sum 1 Each 87 Each 4 Linear Foot 5103 Linear Foot 10 Linear Foot 78 Each 20 Each 4 Each 14 Each 10 Cubic Yard 37 Ton 20 Ton 500 Ton 700 Ton 480 Sq. Yard 200 Lump Sum 1 Lump Sum 1 Linear Foot 155 Each 4 1 0 $60,000.0 $1,000.0 $10,000.0 $3,000.0( $20,000.0( $950.0C $900.00 $46.00 $40.00 $W.00 $695.00 $500.00 $3,500.00 $3,8W.00 $100.00 $1.00 $12.00 $15.00 $98.00 $10.00 $15,000.00 $2.500.00 $20.00 $600.00 $2,531.00 $5,056.00 1.00 $60,000.00 1 1.00 $1.000.00 1.00 $10,000.00 1.00 $3,000.00 1.00 $20,000.00 84.00 $79,800.00 2.00 $1.800.00 5035.00 $231.610.00 0.00 $0.00 41.00 $1,230.00 20.00 $13,900.00 5.00 $2.500.00 15.00 $52,5W.00 12.00 $45.600.00 17.00 $1.700.00 0.00 $0.00 455.43 $5,465A6 815.24 $12,228.60 507.54 $49,738.92 0.00 $0.00 1.00 $15,000.00 1.00 $2.500.00 15.00 $300.00 0.00 $0.00 1.00 $2.531.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 This Total Total Amount Quantity Amount MT TOTOTY TOTAMT $0.00 1.00 $60,000.00 $0.00 1.00 $1,000.00 $0.00 1.00 $10,000.00 $0.00 1.00 $3.000.00 $0.00 1.00 $20,000.00 $0.00 84.00 $79,800.00 $0.00 2.00 $1,800.00 $0.00 5035.00 $231,610.00 $0.00 0.00 $0.00 $0.00 41.00 $1,230.00 $695.00 21.00 $14.595.00 $0.00 5.00 $2,500.00 $0.00 15.00 $52.500.00 $0.00 12.00 $45,600.00 $0.00 17.00 $1,700.00 $0.00 0.00 $0.00 $0.00 455.43 $5,465.16 $0.00 815.24 $12,228.60 $0.00 507.54 $49,738.92 $0.00 0.00 $0.00 $0.00 1.00 $15,000.00 $0.00 1.00 $2,500.00 $0.00 15.00 $300.00 $0.00 0.00 $0.00 $0.00 1.00 $2.531.00 $5,056.00 1.00 $5.056.00 ZJ-Z8 Printed On: 03/28/2006 City of Renton Public Works Department Page 2 Project: Talbot Hill Water Main Replacement, Phase 2 Contractor: VJM Construction, Inc. Item Description No. Subtotal 8.8 % Sales Tax TT Total Pay Estimate Unit Est. Quant Contract Number: 6 8 Final Closing Date: Unit Previous Previous Price Quantity Amount $612 403.68 $53,891.52 $666,295.20 GAG 05-085 03/30/2006 This This Total Total Quantity Amount Quantity Amount $5,751.00 $618.154.68 $506.09 $54,397.61 $6,257.09 $672,552.29 3- u) ,9M 3•2g.06 STATA.O� State of Washington ��f, 04 g Department of Revenue i m Audit Procedures & Administration PO Box 47474 Olympia, Washington 98504-7474 Reg.No.: NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT From: DEPARTMENT USE ONLY City of Renton Assigned To 1055 South Grady Way Renton, WA 98055 Date Assigned Notice is hereby given relative to the completion of contract or project described below. Description of Contract CAG-05-085 - Talbot Hill Water Main Replacement Project, Phase 2 Water Project No. WTR-27-3198 Contractor's Name VJM Construction, Inc. Telephone No. 425 868-9066 Contractor's Address 12409 230"' P1. NE, Redmond, WA 98053 Date Work Commenced Date Work Completed Date Work Accepted August 18, 2005 February 13, 2006 April 10, 2006 Surety or Bonding Co. Developers Surety and Indemnity Company Agent's Address 225 1080' Ave NE, Bellevue, WA 98004 Agent: Patty Aker Nelson, Phone 425- 586-1012 Contract Amount: Additions Sales Tax: Total $612,888.00 $5,266.67 $54,397.62 $672,552.29 I0 Phone No: Amount Disbursed: $641,644.57 Amount Retained: $30,907.72 Total: $672,552.29 (Disbursing Officer) The Disbursing Officer must complete and mail THREE copies of this notice to the Department of Revenue, Olympia, Washington 98504-7474, immediately after acceptance of the work done under this contract. NO PAYMENTS SHALL BE MADE FROM RETAINED FUND until receipt of Department's certificate, and then only in accordance with said certificate. H:\File Sys\WTR - Drinking Water Utility\WTR-27 - Water Project Files\WTR-27-3198-TALBOT HILL PHASE 2\In- House\Notice_of completion.doc\RLM CAG-05-085 - NEW 8-INCH WATER MAIN REPLACEMENT 1 �1H sl • vi vi S. Q 0 > U w = Q Q � �� w S. 15TH ST. _ � > N r N N Q W W YQ J Ln Q 0 S. 19TH ST. S. 18TH ST. TALB 0 T HILL PATER MAIN REPLACEMENT PROJECT, PHASE II PROJECT VICINITY MAP CITY OF RENTON COUNCIL AGENDA BILL Submitting Data: Planning/Building/Public Works Dept/Div/Board Utility Systems Staff Contact Rick Moreno, x7208 Subject: Final Pay Estimate for CAG-05-085 Talbot Hill Water Main Replacement - Phase 2 Contractor: VJM Construction, Inc. Exhibits: Final Pay Estimate Notice of Completion of Public Works Contract Project Location Map Al #: For Agenda of: April 10, 2006 Agenda Status Consent Public Hearing. Correspondencf Ordinance......... Resolution........ Old Business.... New Business... Study Sessions. Information...... X DATE: Recommended Action: Approvals: Council Concur Legal Dept......... Finance Dept...... X Other............... Fiscal Impact: Recommended Action: Approvals: Council Concur Legal Dept......... Finance Dept...... X Other............... Fiscal Impact: Expenditure Required $6,257.09 (final pay estimate) Transfer/Amendment N/A Amount Budgeted $6,500.00 (final pay estimate) Revenue Generated N/A Total Project Budget $800,000.00 City Share Total Project 100% 2005-2006 budget for design, construction & administration SUMMARY OF ACTION: The contractor, VJM Construction, Inc., started construction of the project on August 18, 2005, and completed the project on February 13, 2006. The original contract amount was $666,822.14 and the final contract amount is $672,552.29. The $5,730.15 (less than 1%), increase in cost is due to the need to replace more asphalt roadway pavement than estimated. There are sufficient funds in the Water Utility project budget to cover the final pay estimate. STAFF RECOMMENDATION: Accept the project, approve the final pay estimate in the amount of $6,257.09, and release the retained amount of $30,907.72 after 60 days, subject to the City's receipt of all required authorizations. H:\File Sys\WTR - Drinking Water Utility\WTR-27 - Water Project Files\WTR-27-3198-TALBOT HILL PHASE 2\In-House\Agenda-bill-final-pay- estimate.doc\RLMtp CITY OF RENTON COUNCIL AGENDA BILL Al #: Recommended Action: Approvals: Council Concur Legal Dept......... Finance Dept...... X Other. Fiscal Impact: Expenditure Required $6,257.09 (final pay estimate) Transfer/Amendment N/A Amount Budgeted $6,500.00 (final pay estimate) Revenue Generated N/A Total Project Budget $800,000.00 City Share Total Project 100% 2005-2006 budget for design, construction & administration SUMMARY OF ACTION: The contractor, VJM Construction, Inc., started construction of the project on August 18, 2005, and completed the project on February 13, 2006. The original contract amount was $666,822.14 and the final contract amount is $672,552.29. The $5,730.15 (less than 1%), increase in cost is due to the need to replace more asphalt roadway pavement than estimated. There are sufficient funds in the Water Utility project budget to cover the final pay estimate. STAFF RECOMMENDATION: Accept the project, approve the final pay estimate in the amount of $6,257.09, and release the retained amount of $30,907.72 after 60 days, subject to the City's receipt of all required authorizations. H:\File Sys\WTR - Drinking Water Utility\WTR-27 - Water Project Files\WTR-27-3198-TALBOT HILL PHASE 2\In-House\Agenda-bill-final-pay- estimate.doc\RLMtp CAG-05-085 NEW 8—INCH WATER MAIN REPLACEMENT 141N S' . vi S , Q cn w Q w = Q y) U v) W S. 15TH ST. c=n : W Q H Lo 7 Q 0 S. 19TH ST vi w Q Y U Q Q 2 (n S. 18TH ST. TALBOT HILL WATER MAIN REPLACEMENT PROJECT, PHASE II PROJECT VICINITY MAP TO: FROM: FINANCE DIRECTOR PUBLIC WORKS ADMINISTRATOR CONTRACTOR: VJM Construction, Inc. CONTRACT NO. CAG 05-085 COPY ESTIMATE NO. 5 PROJECT: Talbot Hill Water Main Replacement, Phase 2 1. CONTRACTOR EARNINGS THIS ESTIMATE $94,097.47 2. SALES TAX @ 8.80% $8,280.58 3. TOTAL CONTRACT AMOUNT THIS ESTIMATE $102,378.05 4. EARNINGS PREVIOUSLY PAID CONTRACTOR $492,390.90 5 EARNINGS DUE CONTRACTOR THIS ESTIMATE $89,392.60 6. SUBTOTAL - CONTRACTOR PAYMENTS 7 RETAINAGE ON PREVIOUS PAY ESTIMATE $25,915.31 8 RETAINAGE ON THIS ESTIMATE $4,704.87 9 SUBTOTAL - RETAINAGE 10 SALES TAX PREVIOUSLY PAID $45,610.95 11 SALES TAX DUE THIS ESTIMATE $8,280.58 12 SUBTOTAL - SALES TAX FINANCE DEPARTMENT ACTION: PAYMENT TO CONTRACTOR (Lines 5 and 11): ACCOUNT # 425/500/18.5960.34.65/55170/55574/5354 RETAINED AMOUNT (Line 8): ACCOUNT # 425/500/18.5960.34.65/55170/55574/5354 CHARTER 116, LAWS OF 1965 CITY OF RENTON CERTIFICATION GRAND TOTAL $97,673.18 # 5 $581,783.50 $30,620.18 $53,891.53 $666,295.21 $97,673.18 $4,704.87 # 5 $4,704.87 TOTAL THIS ESTIMATE I, THE UNDERSIGNED DO HEREBY CERTIFY UNDER PENALTY OF PERJURY, THAT THE MATERIALS HAVE BEEN FURNISHED, THE SERVICES RENDERED OR THE LABOR PERFORMED AS DESCRIBED HEREIN, AND THAT THE CLAIM IS A JUST, DUE AND UNPAID OBLIGATION AGAINST THE CITY OF RENTON, AND THAT I AM AUTHORIZED TO AUTHENTICATE AND CERTIFY TO SAID CLAIM Signed: �S3G.i, G'-�`t .�✓ i 6; '1�F C $102,378.05 -�L 'z . 16 --D Co Printed On: 02/16/2006 City of Renton Public Works Department Page 1 Printed On: 02/15/2006 City of Renton Public Works Department Page 1 Project: Talbot Hill Water Main Replacement, Phase 2 Contractor: VJM Construction, Inc. Item Description No ITEM DESCRIPT 001. Mobilization & Demobilization 002, Trench Excavation Safety Systems 003. Construction Surveying Staking and As-Bwlts 004. Temporary Erosion/ Sedimentation Controls 005. Traffic Control 006. 3/4' Water Service Connection 007, 3/4' Water Service Connection with no meter 8-Inch Ductile Iron Pipe, Class 52 and Fittings 008. (Potywrapped) 009. 5-inch DIP, Cl 52 and Fittings (Polywrapped) 010. 4-Inch DIP, Cl 52 and Fittings (Polywrappedi 011. 8-Inch Gate Valve Assembly 012. 4-Inch Gate Valve Assembly 013. Fire Hydrant Assembly 014, Connection to Existing Water Main 015, Concrete Thrust Blocking & Dead -man Anchor Blocks Removal and Replacement of Unsuitable Foundation 016 Material 017. Select Import Trench Backfill (Gravel Borrow) 018. Crushed Surfacing Top Course & Crushed Roy_ k Backfill 019. Asphalt Patch Class 8 020, Remove & Replace Concrete Sidewalk & Driveway 021. Remove, Restore Lawn, Landscaping Restoration 022, Removal of Existing Fire Hyrams, Valve Boxe= 023. 8-Inch Dia. CPEP Storm Pipe 024. Type 1, Catch Basin Change Order No. 1 Fire Hydrant RelocatioNStuctures & 025, Obstructions 026 0 Subtotal Pay Estimate I Inir For UNITS Lump Sum 1 Lump Sum 1 Lump Sum 1 Lump Sum 1 Lump Sum 1 Each 87 Each 4 Linear Foot 5103 Linear Foot 10 Linear Foot 78 Each 20 Each 4 Each 14 Each 10 Cubic Yard 37 Ton 20 Ton 500 Ton 700 Ton 480 Sq. Yard 200 Lump Sum 1 Lump Sum 1 Linear Foot 155 Each 4 1 Contract Number: CAG 05-085 5 Closing Date: 02/16/2006 Unit Previous Previous This This Total Total Price Ouanttty Amount Ouantity Amount Ouanttty Amount �E POTY PAMOUNT THISOTY TAMT TOTOTY TOTAMT $60,000.00 $1,000.00 $10.000 00 $3,000.00 $20,000.00 $950.00 $900 00 $46,00 S40.00 $30.00 $695.00 $500.00 $3,500.00 $3,800.00 $100.00 $1,00 $12.00 $15.00 $98,00 $10.00 $15,000, 00 $2.500.00 $20 00 $600,00 $2.531,00 1.00 $60,000.00 0,00 $0.00 1.00 $60,000.00 0.94 $940,00 0.06 $60.00 1.00 $1,000.00 0.50 $5,000.00 0.50 $5.000.00 1,00 $10.000.00 0.94 $2,820.00 0.06 $180.00 1,00 $3.000.00 0.85 $17.000.00 0.15 $3,000,00 1.00 $20,000.00 64.00 $60.800.00 20.00 $19,000,00 84,00 $79,800.00 2,00 $1,800.00 0,00 $0.00 2,00 $1,800.00 4988.00 $229.448.00 47.00 $2,162.00 5035.00 $231,610.00 0,00 $0.00 0.00 $0.00 0.00 $0.00 41_0C $1,230.00 0.00 $0.00 41.00 $1,230.00 1900. $13,205.00 1.00 $695.00 20.00 $13,900.001�\rr �OJ 3.00 $1.500.00 2.00 $1,000.00 5.Ib $2,500.00 14.00 $49,000.00 1.00 $3,500.00 15.00 $52,500.00 11.00 $41,800.00 1,00 $3,800.00 12.00 $45,600.00 17.00 $1.700.00 0.00 $0.00 17,00 $1,700.00 000 $0.00 0,00 $0.00 0.00 $0.00 455.43 $5,465.16 0.00 $0.00 455.43 $5,465.16 644.47 $9,667.05 170,77 $2,561.55 815.24 $12.228.60 000 $0,00 507,54 $49,738.92 507.54 $49,738.92 0.00 $0.00 0.00 $0,00 0,00 $0.00 0.94 $14,100.00 0.06 $900,00 1.00 $15.000.00 000 $0.00 1.00 $2.500,00 1.00 $2,500.00 15.00 $300.00 0.00 $0,00 15.00 $300.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 1.00 $2,531.00 0.00 $0.00 1.00 $2,531.00 $0.00 0-00 $0.00 0.00 $0,00 $518.306.21 $94,097.47 0.00 $612.403.68 Printed On: 02/15/2006 City of Renton Public Works Department Page 2 Project: Talbot Hill Water Main Replacement, Phase 2 Contractor: VJM Construction, Inc. Item Description No. 8.8 % Sales Tax TT Total Pay Estimate Unit Est. Contract Number: 5 Closing Dale: Unit Previous Previous price Quantity Amount $45,610.95 $563,917.16 CAG 05-085 02/ 16/2006 This This Total Quantity Amount Quanti 58,280.58 $102,378.05 Total Amount $53,891.52 5666.295.20 • a 1 TO: FROM: FINANCE DIRECTOR PUBLIC WORKS ADMINISTRATOR CONTRACTOR: VJM Construction, Inc. CONTRACT NO. CAG 05-085 ESTIMATE NO. 4 PROJECT: Talbot Hill Water Main Replacement, Phase 2 1. CONTRACTOR EARNINGS THIS ESTIMATE $42,538.36 2. SALES TAX @ 8.80% $3,743.38 3. TOTAL CONTRACT AMOUNT THIS ESTIMATE $46,281.74 4. EARNINGS PREVIOUSLY PAID CONTRACTOR $451,979.46 5 EARNINGS DUE CONTRACTOR THIS ESTIMATE $40,411.44 6. SUBTOTAL - CONTRACTOR PAYMENTS 7 RETAINAGE ON PREVIOUS PAY ESTIMATE 8 RETAINAGE ON THIS ESTIMATE 9 SUBTOTAL - RETAINAGE 10 SALES TAX PREVIOUSLY PAID 11 SALES TAX DUE THIS ESTIMATE 12 SUBTOTAL - SALES TAX FINANCE DEPARTMENT ACTION: PAYMENT TO CONTRACTOR (Lines 5 and 11): ACCOUNT # 421/500/18.5960.34.65/55170/55574/5354 RETAINED AMOUNT (Line 8): ACCOUNT # 421/500/18.5960.34.65/55170/55574/5354 CHARTER 116, LAWS OF 1965 CITY OF RENTON CERTIFICATION I. THE UNDERSIGNED DO HEREBY CERTIFY UNDER PENALTY OF PERJURY, THAT THE MATERIALS HAVE BEEN FURNISHED, THE SERVICES RENDERED OR THE LABOR PERFORMED AS DESCRIBED HEREIN, AND THAT THE CLAIM IS A JUST, DUE AND UNPAID OBLIGATION AGAINST THE CITY OF RENTON, AND THAT I AM AUTHORIZED TO AUTHENTICATE AND CERTIFY TO SAI CLAIM Signed: �. l $23,788.39 $2,126.92 $41,867.57 $3,743.38 $492,390.90 $25,915.31 $45,610.95 GRAND TOTAL: $563,917.16 $44,154.83 # 4 $44,154.83 $2,126.91 # 4 $2,126.91 TOTAL THIS ESTIMATE 06t6mS6 - 23, -ko3 Printed On: 12/23/2005 City of Renton Public Works Department $46,281.74 12 - 2z- vs A41 Iz- u-05 Page 1 Is Printed On: 12/22/2005 Project: Talbot Hill Water Main Replacement, Phase 2 Contractor. VJM Construction, Inc. Item Description No. ITEM DESCRIPT 001. Mobilization & Demobilization 002. Trench Excavation Safety Systems 003. Construction Surveying Staking and As-Builts 004. Temporary Erosion/ Sedimentation Controls 005. Traffic Control 006. 314" Water Service Connection 007. 3/4' Water Service Connection with no meter 8-Inch Ductile Iron Pipe, Class 52 and Fittings 008. (Polywrapped) 009. 6-inch DIP, Cl 52 and Fittings (Polywrapped) 010. 4-Inch DIP, CI 52 and Fittings (Polywrapped) 011. 8-Inch Gate Valve Assembly 012. 4-Inch Gate Valve Assembly 013. Fire Hydrant Assembly 014. Connection to Existing Water Main 015. Concrete Thrust Blocking & Dead -man Anchor Blocks Removal and Replacement of Unsuitable Foundation 016. Material 017. Select Import Trench Baxcdill (Gravel Borrow) 018. Crushed Surfacing Top Course & Crushed Rock Backfill 019. Asphalt Patch Class B 020. Remove & Replace Concrete Sidewalk & Driveway 021. Remove, Restore Lawn, Landscaping Restoration 022. Removal of Existing Fire Hyrants, Valve Boxes 023. 8-Inch Dia. CPEP Storm Pipe 024. Type 1. Catch Basin Change Order No. 1 Fire Hydrant Relocation/Stuctures & 025. Obstructions 026. 0 Subtotal City of Renton Public Works Department Contract Number: CAG 05-085 Pay Estimate 4 Closing Date: 12/23/2005 Unit Est. Unit Previous Previous This Quantity Price Quantity Amount Ouantity Lump Sum 1 Lump Sum 1 Lump Sum 1 Lump Sum i Lump Sum 1 Each 87 Each 4 Linear Foot 5103 Linear Foot 10 Linear Foot 78 Each 20 Each 4 Each 14 Each 10 Cubic Yard 37 Ton 20 Ton 500 Ton 700 Ton 480 Sq. Yard 200 Lump Sum 1 Lump Sum 1 Linear Foot 155 Each 4 1 $60,000.00 $1,000.00 $10,000.00 $3,000.00 $20,000.00 $950.00 $900.00 $46.00 $40.00 $30.00 $695.00 $500.00 $3,500.00 $3,800.00 $100.00 $1.00 $12.00 $15.00 $98.00 $10.00 $15,000.00 $2,500,00 $20.00 S600.00 $2,531.00 Page 1 This Total Total 1.00 $60,000.00 0.00 $0.00 1.00 $60,000.00 0.94 $940.00 0.00 $0.00 0.94 $940.00 0.50 $5,000.00 0.00 $0.00 0.50 $5,000.00 0.94 $2,820.00 0.00 $0.00 0.94 $2,820.00 0.85 $17,000.00 0.00 $0.00 0.85 $17,000.00 34.00 $32,300.00 30.00 $28,500.00 64.00 $60,800.00 2.00 $1,800.00 0.00 $0.00 2.00 $1,800.00 4957.00 $228,022.00 31.00 $1,426.00 4988.00 $229,448.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 41.00 $1230.00 0.00 $0.00 41.00 $1,230.00 19.00 $13,205.00 0.00 $0.00 19.00 $13,205.00 3.00 $1,500.00 0.00 $0.00 3.00 $1,500.00 14.00 $49,000.00 0.00 $0.00 14.00 $49,000.00 8.00 $30,400.00 3.00 $11,400.00 11.00 $41,800.00 17.00 $1,700.00 0.00 $0.00 17.00 $1,700.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 354.40 $4,252.80 101.03 $1,212.36 455.43 $5,465.16 644.47 $9,667.05 0.00 $0.00 644.47 $9,667.05 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.94 $14,100.00 0.00 $0.00 0.94 $14,100.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 15.00 $300.00 0.00 $0.00 15.00 $300.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 1.00 $2,531.00 0.00 $0.00 1.00 $2,531.00 $0.00 0.00 $0.00 0.00 $0.00 $475,767.85 $42,538.36 0.00 $518,306.21 Printed On: 12/22/2005 City of Renton Public Works Department Page 2 Project: Talbot Hill Water Main Replacement, Phase 2 Contractor. VJM Construction, Inc. Item Description No. 8.8 % Sales Tax TT Total Contract Number: CAG 05-085 Pay Estimate 4 Closing Date. 12/2312005 Unit Est. Unit Previous Previous This Quantity Price Quantity Amount Quantity $41,867.57 $517.635.42 This Total Total Amount Quantity Amount $3,743.38 $45,610.95 $46,281.74 $563,917.16 14Atz---2 iki62-s TO: FINANCE DIRECTOR FROM: PUBLIC WORKS ADMINISTRATOR CONTRACTOR: VJM Construction, Inc. CONTRACT NO. CAG 05-085 � COPY ESTIMATE NO. 3 PROJECT: Talbot Hill Water Main Replacement, Phase 2 1. CONTRACTOR EARNINGS THIS ESTIMATE $46,926.09 2. SALES TAX @ 8.80% $4,129.50 3. TOTAL CONTRACT AMOUNT THIS ESTIMATE $51,055.59 4. EARNINGS PREVIOUSLY PAID CONTRACTOR $407,399.67 5 EARNINGS DUE CONTRACTOR THIS ESTIMATE $44,579.79 6. SUBTOTAL - CONTRACTOR PAYMENTS 7 RETAINAGE ON PREVIOUS PAY ESTIMATE 8 RETAINAGE ON THIS ESTIMATE 9 SUBTOTAL - RETAINAGE 10 SALES TAX PREVIOUSLY PAID 11 SALES TAX DUE THIS ESTIMATE 12 SUBTOTAL - SALES TAX FINANCE DEPARTMENT ACTION: PAYMENT TO CONTRACTOR (Lines 5 and 11): ACCOUNT # 421/500/18.5960.34.65/55170/55574/5354 RETAINED AMOUNT (Line 8): ACCOUNT # 421/500/18.5960.34.65/55170/55574/5354 CHARTER 116, LAWS OF 1965 CITY OF RENTON CERTIFICATION $451,979.46 $21,442.09 $2,346.30 $23,788.39 $37,738.07 $4,129.50 $41,867.57 GRAND TOTAL: $517,635.42 $48,709.29 # 3 $48,709.29 $2,346.30 # 3 $2,346.29 TOTAL THIS ESTIMATE: I, THE UNDERSIGNED DO HEREBY CERTIFY UNDER PENALTY OF PERJURY, THAT THE MATERIALS HAVE BEEN FURNISHED, THE SERVICES RENDERED OR THE LABOR PERFORMED AS DESCRIBED HEREIN, AND THAT THE CLAIM IS A JUST, DUE AND UNPAID OBLIGATION AGAINST THE CITY OF RENTON, AND THAT I AM AUTHORIZED TO AUTHENTIC TEANID CERTIFY TO SAID CLAIM Signed: UL/ uvV 'ZOOS $51,055.59 6AA1t?,I: Printed On: 12/01/2005 City of Renton Public Works Department Page 1 Printed On: 12/01/2005 City of Renton Public Works Department Page 1 Project: Talbot Hill Water Main Replacement, Phase 2 Contractor: VJM Construction, Inc. Item Description No. ITEM DESCRIPT 001. Mobilization & Demobilization 002. Trench Excavation Safety Systems 003. Construction Surveying Staking and As-Builts 004. Temporary Erosion/ Sedimentation Controls 005. Traffic Control 006. 3/4" Water Service Connection 007. 314" Water Service Connection with no meter 8-Inch Ductile Iron Pipe, Class 52 and Fittings 008. (Polywrapped) 009. 6-inch DIP, CI 52 and Fittings (Polywrapped) 010. 4-Inch DIP, CI 52 and Fittings (Polywrapped) 011. 8-Inch Gate Valve Assembly 012. 4-Inch Gate Valve Assembly 013. Fire Hydrant Assembly 014. Connection to Existing Water Main 015. Concrete Thrust Blocking & Dead -man Anchor Blocks Removal and Replacement of Unsuitable Foundation 016. Material 017. Select Import Trench Backfill (Gravel Borrow) 018. Crushed Surfacing Top Course & Crushed Rock Backfill 019. Asphalt Patch Class B 020. Remove & Replace Concrete Sidewalk & Driveway 021. Remove, Restore Lawn, Landscaping Restoration 022. Removal of Existing Fire Hyrants, Valve Boxes 023. 8-Inch Dia. CPEP Storm Pipe 024. Type 1, Catch Basin Change Order No. 1 Fire Hydrant Relocation/Stuctures & 025. Obstructions 026. 0 Subtotal Contract Number. CAG 05-085 Pay Estimate 3 Closing Date: 11/30/2005 Unit Est. Unit Previous Previous This Quantitv Price Quantity Amount Ouantitv Lump Sum 1 Lump Sum 1 Lump Sum 1 Lump Sum 1 Lump Sum 1 Each 87 Each 4 Linear Foot 5103 Linear Foot 10 Linear Foot 78 Each 20 Each 4 Each 14 Each 10 Cubic Yard 37 Ton 20 Ton 500 Ton 700 Ton 480 Sq. Yard 200 Lump Sum 1 Lump Sum 1 Linear Foot 155 Each 4 1 $60,000.00 $1,000.00 $10.000.00 $3,000.00 $20,000.00 $950.00 $900.00 $46.00 $40.00 $30.00 $695.00 $500.00 $3.500.00 $3,800.00 $100.00 $1.00 $12.00 $15.00 $98.00 $10.00 $15,000.00 $2,500.00 $20.00 $600.00 $2.531.00 This Total Total Amount Quantity Amount TAMT TOTOTY TOTAMT 1.00 $60,000.00 0.00 $0.00 1.00 $60,000.00 0.94 $940.00 0.00 $0.00 0.94 $940.00 0.50 $5,000.00 0.00 $0.00 0.50 $5,000.00 0.94 $2,820.00 0.00 $0.00 0.94 $2,820.00 0.75 $15,000.00 0.10 $2,000.00 0.85 $17,000.00 9.00 $8,550.00 25.00 $23,750.00 34.00 $32,300.00 0.00 $0.00 2.00 $1,800.00 2.00 $1,800.00 4930.00 $226,780.00 27.00 $1,242.00 4957.00 $228,022.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 24.00 $720.00 17.00 $510.00 41.00 $1,230.00 19.00 $13,205.00 0.00 $0.00 19.00 $13,205.00 3.00 $1,500.00 0.00 $0.00 3.00 $1,500.00 14.00 $49,000.00 0.00 $0.00 14.00 $49,000.00 4.00 $15,200.00 4.00 $15,200.00 8.00 $30,400.00 16.25 $1,625.00 0.75 $75.00 17.00 $1,700.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 315.48 $3.785.76 38.92 $467.04 354.40 $4,252.80 519.00 $7,785.00 125.47 $1,882.05 644.47 $9,667.05 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.94 $14,100.00 0.00 $0.00 0.94 $14,100.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 15.00 $300.00 0.00 $0.00 15.00 $300.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 1.00 $2,531.00 0.00 $0.00 1.00 $2,531.00 $0.00 0.00 $0.00 0.00 $0.00 $428,841.76 $46,926.09 0.00 $475,767.85 • f Printed On: 12/01/2005 City of Renton Public Works Department Page 2 Project: Talbot Hill Water Main Replacement, Phase 2 Contract Number: CAG 05-085 Contractor: VJM Construction, Inc. Pay Estimate 3 Closing Date: 11/30/2005 Item Description Unit Est. Unit Previous Previous This This Total Total No. Quantity Price Quantity Amount Quantity Amount Quantity Amount 8.8%Sales Tax $37,738.07 $4,129.50 $41,867.57 TT Total $466,579.83 $51,055.59 $517,635.42 l� -0 ' 1 TO: FROM: FINANCE DIRECTOR PUBLIC WORKS ADMINISTRATOR CONTRACTOR: VJM Construction, Inc. CONTRACT NO. CAG 05-085 ESTIMATE NO. 2 PROJECT: Talbot Hill Water Main Replacement, Phase 2 1. CONTRACTOR EARNINGS THIS ESTIMATE $290,036.05 2. SALES TAX @ 8.80% $25,523.17 3. TOTAL CONTRACT AMOUNT THIS ESTIMATE $315,559.22 4. EARNINGS PREVIOUSLY PAID CONTRACTOR $131,865.42 5 EARNINGS DUE CONTRACTOR THIS ESTIMATE $275,534.25 6. SUBTOTAL - CONTRACTOR PAYMENTS 7 RETAINAGE ON PREVIOUS PAY ESTIMATE 8 RETAINAGE ON THIS ESTIMATE 9 SUBTOTAL - RETAINAGE $407,399.67 $6,940.29 $14,501.80 $21,442.09 10 SALES TAX PREVIOUSLY PAID $12,214.90 11 SALES TAX DUE THIS ESTIMATE $25,523.17 12 SUBTOTAL - SALES TAX $37,738.07 GRAND TOTAL: $466,579.83 FINANCE DEPARTMENT ACTION: PAYMENT TO CONTRACTOR (Lines 5 and 11): ACCOUNT # 421/500/18.5960.34.65/55170/55574/5354 RETAINED AMOUNT (Line 8): ACCOUNT # 421/500/18.5960.34.65/55170/55574/5354 CHARTER 116, LAWS OF 1965 CITY OF RENTON CERTIFICATION $301,057.42 # 2 $301,057.42 $14,501.80 # 2 $14,501.80 TOTAL THIS ESTIMATE: $315,559.22 I, THE UNDERSIGNED DO HEREBY CERTIFY UNDER PENALTY OF PERJURY, THAT THE MATERIALS HAVE BEEN FURNISHED, THE SERVICES RENDERED OR THE LABOR PERFORMED AS DESCRIBED HEREIN, AND THAT THE CLAIM IS A JUST, DUE AND UNPAID OBLIGATION AGAINST THE CITY OF RENTON, AND THAT I AM AUTHORIZED TO AUTHENTICATE AND CERTIFY TO SAID CLAIM Signed: 6voxi, 6WD NChI. 2-, ZOo� Note: The contractor has a retainage bond; therefore the City is not withholding retainage. Printed On: 11/01/2005 City of Renton Public Works Department Page 1 Printed On: 11/01/2005 City of Renton Public Works Department F Page 1 Project: Talbot Hill Water Main Replacement, Phase 2 Contractor: VJM Construction, Inc. Item Description No. 001. Mobilization & Demobilization 002. Trench Excavation Safety Systems 003. Construction Surveying Staking and As-Buifts 004. Temporary Erosion/ Sedimentation Controls 005. Traffic Control 006. 3/4" Water Service Connection 007. 314" Water Service Connection with no meter 8-Inch Ductile Iron Pipe, Class 52 and Fittings 008. (Polywrapped) 009. 6-inch DIP, CI 52 and Fittings (Polywrapped) 010. 4-Inch DIP, Cl 52 and Fittings (Polywrapped) Ott. 8-Inch Gate Valve Assembly 012. 4-Inch Gate Valve Assembly 013. Fire Hydrant Assembly 014. Connection to Existing Water Main 015. Concrete Thrust Blocking & Dead -man Anchor Blocks Removal and Replacement of Unsuitable Foundation 016. Material 017. Select Import Trench Backfill (Gravel Borrow) 018. Crushed Surfacing Top Course & Crushed Rock Backfill 019. Asphalt Patch Class B 020. Remove & Replace Concrete Sidewalk & Driveway 021. Remove, Restore Lawn, Landscaping Restoration 022. Removal of Existing Fire Hyrants, Valve Boxes 023. 8-Inch Dia. CPEP Storm Pipe 024. Type 1, Catch Basin Change Order No. 1 Fire Hydrant Relocation/Stuctures & 025. Obstructions 026. 0 Subtotal Pay Estimate Unit Est. Lump Sum 1 Lump Sum 1 Lump Sum 1 Lump Sum 1 Lump Sum i Each 87 Each 4 Linear Foot 5103 Linear Foot 10 Linear Foot 78 Each 20 Each 4 Each 14 Each 10 Cubic Yard 37 Ton 20 Ton 500 Ton 700 Ton 480 Sq. Yard 200 Lump Sum 1 Lump Sum 1 Linear Foot 155 Each 4 1 Contract Number: 2 Closing Date: Unit Previous Previous price Quantity Amount :E PQTY PAMOUN $60,000.00 $1,000.00 $10,000.00 $3,000.00 $20,000.00 $950.00 $9W.00 $46.00 $40.00 $30.00 $695.00 $500.00 $3.500.00 $3,800.00 $100.00 $1.00 $12.00 $15.00 $98.00 $10.00 $15,000.00 $2,500.00 $20.00 $600.00 $2,531.00 CAG 05-085 10/31 /2005 This This Quantitv Amount Total Total Amount 1.00 $60,000.00 0.00 $0.00 1.00 $60,000.00 0.21 $210.00 0.73 $730.00 0.94 $940.00 0.21 $2,100.00 0.29 $2,900.00 0.50 $5,000.00 0.21 $630.00 0.73 $2,190.00 0.94 $2,820.00 0.21 $4,200.00 0.54 $10,800.00 0.75 $15,000.00 0.00 $0.00 9.00 $8,550.00 9.00 $8,550.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 1084.00 $49,864.00 3846.00 $176,916.00 4930.00 $226,780.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 24.00 $720.00 24.00 $720.00 3.00 $2,085.00 16.00 $11,120.00 19.00 $13,205.00 0.00 $0.00 3.00 $1,500.00 3.00 $1,500.00 4.00 $14,000.00 10.00 $35,000.00 14.00 $49,000.00 0.00 $0.00 4.00 $15,200.00 4.00 $15,200.00 3.75 $375.00 12.50 $1,250.00 16.25 $1,625.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 59.58 $714.96 255.90 $3,070.80 315.48 $3,785.76 98,45 $1,476.75 420.55 $6,308.25 519.00 $7,785.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.21 $3,150.00 0.73 $10,950.00 0.94 $14,100.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 15.00 $300.00 15.00 $300.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 1.00 $2,531.00 1.00 $2,531.00 $0.00 0.00 $0.00 0.00 $0.00 $138,805.71 $290,036.05 0.00 $428,841.76 Printed On: 11/01/2005 Project: Talbot Hill Water Main Replacement, Phase 2 Contractor: VJM Construction, Inc. Item Description No. 8-8°o Sales Tax TT Total City of Renton Public Works Department Contract Number: CAG 05-085 Pay Estimate 2 Closing Date: 10/31/2005 Unit Est. Unit Previous Previous This $12,214.90 $151,020.61 Page 2 This Total Total Amount Quantity Amount $25.523.17 $37.738,07 $315,559.22 $466,579.83 CITY OF RENTON Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: CAG 05-085 TALBOT HILL WATER MAIN REPLACEMENT PHASE 2 C.O.# 1 CONTRACTOR: VJM Construction Co., Inc. SUMMARY OF PROPOSED CHANGE: Provide all labor, equipment, materials, subcontracting, B & O tax, bonding, and insurance for: Description Lump Sum Cost Removal and relocation of new fire hydrant assembly (15'h/Morris Ave S) $2,200.00 Sta. 30+15 Structures and obstruction (ex. dead -man block) $331.00 Sub Total $2,531.00 Sales Tax (8.8%) $222.73 Total $2,308.27 Time Extension for 30 days, New Contract completion date is December 15, 2005 $0.00 ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT ESTIMATED NET CHANGE THIS ORDER ESTIMATED TOTAL AFTER CHANGE $666,822.14 $666,822.14 $2,308.27 $669,130.41 60 Working Days 60 Working Days 30 Working Days 90 Working Days SIGNATUr't Contractor: Project Engi Water Utility Approved B,. Date: ic: - Date: 4 - 3' Date: I 1p /0 f Date: __'U Nao�� H:\File Sys\WTR - Drinking Water Uti1ity\WTR-27 - Water Project Files\WTR-27-3198-TALBOT HILL PHASE 2\Pay Estimates\CO-I.doc/RLMtp Construction. Inc. 12409 230th PI. NE • Redmond, WA 98053 • Phone (425) 868-9066 • Fax (425) 868-9074 October 18, 2005 City of Renton 1055 South Grady Way Renton, Washington 98055 Attn: Rick Moreno SUBJECT: TALBOT HILL WATER MAIN REPLACEMENT PHASE 2 CAG-05-085 CONTRACT DOCUMENTS RE: Sta. 30t15 jack hammer dead man that was in the way of new pipe being Install. Cost as follows: 3 hrs. labor $42.00 hr. $126.00 Compressor $50.00 hr. $150.00 Sub Total $276.00 20% P/O $ 55.00 TOTAL $331.00 Signature Vincent Mazzaferro, Presi VJM Construction Co., Inc. Approved By:i�pµ/ C4+N (I�Zip� Constructionjnc. 12409 230th PI. NE - Redmond, WA 98053 - Phone (425) 868-9066 - Fax (425) 868-9074 October 18, 2005 City of Renton 1055 South Grady Way Renton, Washington 98055 Attn: Rick Moreno SUBJECT: TALBOT HILL WATER MAIN REPLACEMENT PHASE 2 CAG-05-085 CONTRACT DOCUMENTS RE: Removal of newly installed Hyd. At So. 151h St. & Morris Blind flange 8x6 inch tee. Cost as follows: Lump Sum $2,200.00 Contractor: VJM Construction Co., Inc. Signature _� I I " 2P4.1D Vincent Mazzaferr reside VJM Construction o., Inc. Approved By: 600cx'U�� 2/ o� lk/ Construction, Inc. 12409 230th Pi. NE • Redmond, WA 98053 • Phone (425) 868-9066 • Fax (425) 868-9074 October 22, 2005 City of Renton 1055 South Grady Way Renton, Washington 98055 Attn: Rick Moreno Re: TIME EXTENSION FOR TALBOT HILL WATER MAIN REPLACEMENT Phase 2 CAG-05-085 Due to unforeseen circumstances, our firm is requesting an additional 30 working days to complete the above contract. Thank you, jl ;s Vincent Mazzaferro, President VJM Construction Co., Inc. Construction, Inc. NE - Redmond, WA 98053 - Phone (425) 868-9066 - Fax (425) 868-9074 October 18, 2005 City of Renton 1055 South Grady Way Renton, Washington 98055 Attn: Rick Moreno SUBJECT: TALBOT HILL WATER MAIN REPLACEMENT PHASE 2 CAG-05-085 CONTRACT DOCUMENTS RE: Removal of newly installed Hyd. At So. 151h St. & Morris Blind flange 8x6 inch tee. Cost as follows: Lump Sum $2,200.00 Contractor: VJM Construction Co., Inc. Signature —�2i I /M 07.-4� Vincent Mazzaferr reside ro.,VJM Construction Inc. Approved By: Construction. Inc. 12409 230th PI. NE • Redmond, WA 98053 • Phone (425) 868-9066 • Fax (425) 868-9074 October 18, 2005 City of Renton 1055 South Grady Way Renton, Washington 98055 Attn: Rick Moreno SUBJECT: TALBOT HILL WATER MAIN REPLACEMENT PHASE 2 CAG-05-085 CONTRACT DOCUMENTS RE: Sta. 3005 jack hammer dead man that was in the way of new pipe being Install. Cost as follows: 3 hrs. labor $42.00 hr. $126.00 Compressor $50.00 hr. $150.00 Sub Total $276.00 20% P/O $ 55.00 TOTAL $331.00 Signature IMr?Z6L Vincent Mazzaferro, Presi VJM Construction Co., Inc. Approved By: Construction, Inc. 12409 230th PI. NE • Redmond, WA 98053 • Phone (425) 868-9066 • Fax (425) 868-9074 October 22, 2005 City of Renton 1055 South Grady Way Renton, Washington 98055 Attn: Rick Moreno Re: TIME EXTENSION FOR TALBOT HILL WATER MAIN REPLACEMENT Phase 2 CAG-05-085 Due to unforeseen circumstances, our firm is requesting an additional 30 working days to complete the above contract. Thank you, f Vincent Mazzaferro, President VJM Construction Co., Inc.