HomeMy WebLinkAboutWTR2703198_9July 27, 2005
Vince Mazzaferro
VJM Construction Co., Inc.
12409 230'h Place NE
Redmond, WA 98053
SUBJECT: REVIEW OF SUBMITTALS FOR TALBOT HILL WATER MAIN
REPLACEMENT PROJECT, PHASE II
Mr. Mazzaferro:
We have received on July 25, 2005 your submittals dated July 14, 2005 for the materials to be
used on the City's stormwater and water main improvements portion of the above project. Our
review comments are:
DESCRIPTION
Specifications
STATUS
No.
1
Class 52, Tyton Joint
7-11.3(6) &
Approved
Ductile Iron Pipe
9-30.1
by US Pipe
2
Northtown Company
7-11.3(6) & 9-
Approved
Polywrap
30.1
3
Tyler/Union DI Fittings
7-11.3(6)
Approved with conditions
(Mechanical Joint and Flanged
All DI pipes and fittings shall be
Fittings only)
polywrapped with 8 mil. Polyethylene
plastic per AWWA C105
4
ROMAC tapping sleeve FTS 420
9-30.3(8)
Approved with conditions
with fusion epoxy coating 8-12
Tapping sleeve must have fusion epoxy -
mil
coat inside and outside.
Wet -tap must be done by City -approved
Wet -tap contractors.
5
M & H Style 929 Fire Hydrant
9-30.5
Approved with conditions
Install per Renton Standard Details
shown on Standard Detail BR41. 5"
Storz adaptors are required.
6
Kennedy Kenseal II Gate Valves-
9.30.3(1)
Approved with conditions
Resilient Seated (4", 6", 8")
Use MJ x MJ, MJxFL, FLxFL valves
M & H Gate Valves Resilient
only
Seated (4" — 8")
Install per Renton Standard Details
shown on Standard Detail BR46.
7
HD Fowler #940 Seattle
9.30.3(1)
Approved with conditions
Valve Box (B)
Install per Renton Standard Detail
BR46.
H:\File Sys\WTR - Drinking Water Utility\WTR-27 - Water Project Files\WTR-27-3198-TALBOT HILL PHASE Montractor
Correspondance\Submittal_Review.doc\r
September 7, 2005
Page 2
8
Carsonite Utility Marker
9.30.3(5)
Approved with conditions
Valve Marker Posts
Install per Renton Standard Detail
BR46
9
Harrington Permanent Hydrant
7-14.3,
Approved with conditions
Storz Adapter
9.30.5
Install per Renton Standard Detail
BR24
10
4"-ROMAC Coupling Style 501
Approved with conditions
Only use for connection between pipe
with dissimilar materials or different
Outside Diameters (OD's) - Use DI
(MJ) long body solid sleeves for all
other connections between similar pipe
materials and OD's.
11
Cerro Copper Water Tube,
7-15.3,
Approved with conditions
Type K
9.30.6
Install per Renton Standard Detail
BR41
12
Ford 70 Series 5/8"x3/4" Service
7-15.3,
Approved with conditions
Brass Fittings and Water Meter
9-30.6
Install per Renton Standard Detail
Setter (VBH72- 15W)
BR41.
Grip Joint Coupling, C44-xx-G
End connection types must conform to
Style, 3/a"
Renton Standard Details for water
Corp. Stop (F1000-x-G-Style)
service installation, and for meter setter
ends.
13
Mid -States Plastics, Inc.
7-11.3(6),
Approved with conditions
Meter Box (MSBCF1527-18)
9-30.3(7)
Install per Renton Standard Detail
BR50
14
Mid -States Plastics, Inc. MSP
7-15.3
Approved with conditions
Ductile Iron Covers
install per Renton Standard Detail BR41
(MSCBC-1527-R) )15
Hancor Sure -Lock Drainage Pie
Approved
We have not received submittals on sources for materials for select backfill, rocks for base and
top course, including State approved pit number.
Sincerely,
Rick Moreno, Project Manager Abdoul Gafour
Water Utility Water Utility Engineering Supervisor
rmoreno@ci.renton.wa.us azafour@ci.renton.wa.us
Phone: 425-430-7208 Phone: 425-430-7210
RECEIVED
City of Renton DEC 10 2004
Human Resources & Risk Management CITY OF RENTON
Memorandum UTILITY SYSTEMS
DATE: December 10, 2004
TO: Rick Moreno, Utility Systems
FROM: Michael R. Webby, HR&RM Administrator ^�
SUBJECT: Insurance Renewal Review/ Bush, Roed & Etchings, Inc.
Talbot Hill Water Main
Replacement — Phase 2
I have reviewed the Certificate of Insurance for the above -mentioned contract. The insurance
coverage, provided for this contract, meets the City's risk management requirements.
DEC-9-2004 13:43 FROM:FOX INS/TYRISCO 4257125006
70:14254307665 P:1/2
ACORDN CERTIFICATE OF LIABILITY INSURANCE
DATE(MM/DO/YYYY)
12/08104
PRODUCER
THIS CERTIFICATE 13 ISSUED AS A MATTER OF INFORMATION
TYRISCO, Inc.
6912 220th St. S.W., Suito 200
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
Mountlake Terrace WA 98043
Phone: (425) 712.5007 Fax: (425) 712-5006
INSURERS AFFORDING COVERAGE
NAIL A
INSURED Bush, Road a Hltchings, Inc.
INSURER A. Fldoll and Guaranty Ins Undrwtr, Inc
25879 A XV
2009 Minor Ave E
11991 A+ XV
INsufpF.�; National Casual Company
-----
Seattle WA 98102
I(vsuRFR c Fidelity and Guaranty Insurance Company
35386 A XV
INSURER O.
INSURER E.
COVERAGES
THE POI.ICIFS OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED
NOTWITHSTANDING
ANY REOUIRCMGNT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DrcSCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES AOOREc3A7E LIMITS SHOWN MAY HAVE BEEN R[OUCF_0 SY PAID CLAMS,
INSR' DD'l1 y Rn TYPE OF IN4118 POLICY NUMBER POLICAT,Y CrrCC IVC POL C
R TIONln)LIMITS
GENERAL LIAAILITY
EACH OCCURRENCE
S 1 OOQ000
A X _ RAL LIABILITY
COMMCLERRCAL O NE BK02014399 12/05/04 12/05/05
DAMAGE TO RENTED 11000,000
RbMI6Ea(Ea.000urooco)..... ?._,,
I X OCCUREXP
fAnY
10,000
X Separation of Insureds
one pernon
PERSONAL a A V i sI JU Y
1 ODO DOD
_.
cpnlESa gcpRFGA __
---
s 2,000,000
GFN'L AGGREOATE LIMIT APPLIES PER;
P O
I
PRORUC?S_COMP/Or A00
S 2 000,000
PO J ! X F Unc
AUTOMODILC UAGILITY
COM91NF.0 SINGLE LIMIT
91,000,000
C
X. ANYAUTO
BA01960117
12105/04
12/05105
(FnAcddern)
ALL OWNFO AUTOS
RODILY INJURY
SCHEDULED AUTOS
(Dry per�an)
S
HIRED AUTOS
DODILY IN•IURV
$
NON -OWNED AUT06
(Par Aocoent)
PROPERTY DAMAGE
4
(Pnr noclrlant)
GARAGE LIABILITY
7
AUTO ONLY • EAACCID6t,ILiJ__,
- ANY AUTO
FA ACC
;t
OTHER THAN
AUTO ONLY AGO
I 'S
A
EXCES9rUMORCLLA LIABILITY
XI
8K02014399
CAcH OCCURRENCE
$ 4,000,000
OCCUR CI.AIMS MADE
12/05/04
12/05/05
AGGREGATE
4,000,00
� $
POFOUCTIPLF.
RFTFNTION NIA
WORKCR3 COMPENAATION AND
WC STATU• X OTH•
� � c
A
EMPLOYEE'S' LIAOILITY
ANY PROPRIFTORiPARTNERrC"XFCUTIVF
BK02014399
12JOS104
12/05/05
El"ACH ACCIpFNT
$ 1,000,000
OFFICER/MFMBER EXCLUDED?
- EA EMPLOYE
$ 1 OOO OOO
If yyae. 0e9crloa under
G1j JAL PROVISIONS hnlq�
OTHER
_
I
_E,l,.,.,PIFEARF
E.L. DISEASE • POLICY INIT
Rotontion
_
$ 1,000,000
$30,000
B
Professional Liability
ARO 0001059
12105/04
12J05105
Each Claim
$2,000,000
re ate
$2,000 000
DESCRIPTION OF OPERATIONS / LOCATIONS i VEHICLES / EXCLUSIONS ADDED BY ENDORSCMENT /SPECIAL PROVISIONS
The City of Renton, and its officers, officials, agents, employees and volunteers are named as additional insured with rospocts to
operations of the named insured.
CERTIFICATE HOLDER rANrFI I ATInKI
City of Renton
Attn: Rick Moreno F0. 425-430-7241
1055 S Grady Way
Renton, WA 98055
SHOULD ANY Or THE ABOVE DF.SCRISFD rOLICIES BE CANCELLED RF.FORF THE EXPIRATION
DATE THERDOr, THE ISSUING INSURER WILL MAIL 45 DAYS WRITTEN
NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT,
ACORD 25 (2001/09)
AUTHORIZED REPRESENTATNL
0
TION 1988
Policy Number:
Person or Organization Required by Written Contract
ADDITIONAL INSURED ENDORSEMENT
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
This endorsement modifies insurance provided under the following:
LIABILITY COVERAGE PART.
1. The following is added to SECTION II. WHO IS AN
INSURED, 2.:
Person or Organizaiiorr Required by
Written Contract
Any person or organization that you agree to
add as an insured under this Liability
Coverage Part in a written contract or
agreement that is made before, and in effect
when, the "bodily injury" or "property
damage" occurs or the offense that causes
the "personal injury" or "advertising injury" is
first committed, but only with respect to that
person's or organization's liability arising out
of "your work" for that person or
organization.
However, such person or organization is not
an insured with respect to any:
(1) "Bodily injury", "property damage",
"personal injury" or "advertising injury'
that does not arise out of your
negligence;
(2) "Bodily injury," "property damage,"
"personal injury" or "advertising injury"
for which such person or organization
has assumed liability in a contract or
agreement, except for liability for
damages that such person or
organization would have in the absence
of the contract or agreement;
(3) "Property damage" to:
(a) Property owned, used or occupied by
or loaned or rented to such person or
organization;
(b) Property over which such person or
organization is for any purpose
exercising physical control; or
(c) "Your work" performed for the
insured; or
(4) "Bodily injury," "property damage,"
"personal injury" or "advertising injury"
arising out of an architect's, engineer's
or surveyor's rendering of, or failure to
render, any "professional service" when
such person or organization is an
architect, engineer or surveyor.
2. The following is added to SECTION IV.
CONDITIONS, 5. "Other Insurance", a. Primary
Insurance, (2►:
In addition, this insurance will be
considered primary to, and non-
contributory with, "other insurance"
issued directly to a person or
organization added as an additional
insured under the Person or Organization
Required By Written Contract Additional
Insured endorsement, if you specifically
agree, in that written contract or
agreement, that this insurance must be
primary to, and non-contributory with,
such "other insurance". This insurance
will then be applied as primary insurance
for damages for "bodily injury", "property
damage", "personal injury" or
"advertising injury" that are covered by
the Person or Organization Required By
Written Contract Additional Insured
endorsement and that are incurred by
such person or organization, and we will
not share those damages with such
"other insurance".
All other terms of your policy remain the same.
CL/eF 22 66 1102 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Page 1 of 1
Copyright, Insurance Services Office. Inc., 1994
CITY OF RENTON
TRANSPORTATION SYSTEMS - TRAFFIC OPERATIONS
TRAFFIC CONTROL PLAN
CONSTRUCTION COMPANY: VS M ►isT
ADDRESS: I ay Da aW PL dJ 9-
n
CONSTRUCTION SUPERINTENDENT: 'V i nI[1' 't rrCI.
PROJECT NAME: TA L,&T H iLL U) hTc,- MAInJ
APPL. DATE:
PERMIT#:
PHONE#: 91S 868' 4 DG Co
MOB./CELL:# 4 2S q q l 30 31
FAX#: (W dS-� 8 6q 70 qq
PROJECT LOCATION: S I S"�t J im 11 ku^S N/E/S/W/OF:
WORK TIME: �'k(7p AN1 To y�3O �N� APPROVED BY: JUN C a�SQ�=' V�1✓
WORK DATE: 5TATT qv�l% Zoos APPROVAL DATE:
NOTES: 1. WORK ZONE TRAFFIC CONTROL SHALL BE IN ACCORDANCE WITH MANUAL ON
UNIFORM TRAFFIC CONTROL DEVICES (MUTCD).
2. CALL 911 (USING A LOCAL PHONE) OR 253-252-2121 (USING A CELL PHONE), FIRE AND
POLICE DEPARTMENTS BEFORE ANY CLOSURE WITHIN PUBLIC RIGHT OF WAY.
3. CALL METRO TRANSIT CONTROL CENTER AT 206-684-2732 AT LEAST TWENTY-FOUR (24)
HOURS BEFORE ANY STREET OR LANE CLOSER AND 30 MINUTES BEFORE THE ACTUAL
CLOSURE.
4. THIS PLAN MUST BE SUBMITTED AT LEAST THREE (3) WORKING DAYS PRIOR TO WORK.
5. APROVED TRAFFIC CONTROL PLAN MUST BE AT THE WORK SITE DURING WORK HOURS.
6. ANY VEHICLE AND/OR EUQIPMENT TO BE USED FOR WORK WITHIN THE CITY RIGHT OF
WAY MUST DISPLAY A COMPANY LOGO (ANY LEGALLY ACCEPTABLE SIGN SHOWING A
COMPANY NAME, ADDRESS, AND TELEPHONE NUMBER) AT A CONSPITCUOUS PLACE ON
THE VEHICLE OR EQUIPMENT.
COMMENTS: _ ,� S W b-L 6 fy A i L1 L it Afr,' Co NTFrOt For S t 4 `1sT
1,Akc-
nue - S 1 S �S� -fS1� ATTRc�c R✓� S, �.c�h�TTwor-{, . Mor/
i'S -f'
5 M mk e r S AAF S- SKETCH S i5lE AT-rAcAe-14
N
o�
Ac_4SD-2,
Gtt§
1c -3
lu
�
7
s I s sT
❑ Q
o v —
--
l� FL-IScr cr 7oSY SigN's
I have been informed of my responsibilities for traffic control and
agree to comply with all traffic regulations of the City of Renton.
SIGNATURE: LDATE:
OFFICE COPY
T- & 19
CONTRACTOR
V C-0v Co
INSPECTOR
K.KITTRICK/
POLICE
FIRE
JIM GRAY/STA. # 11
Cu
I, VJ nJL.eW1_ S representing V S M colys y CO -Tilt-
agree to comply with all traffic regulations of the City of Renton. I shall prepare a traffic control plan and
obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the
plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. I shall notify
emergency services twenty-four (24) hours before any street or lane closures. I understand any lane or
street closures not in conformance with the approved traffic control plan and/or without notification of
emergency services may result in my receiving a citation for violation of R.C.W. 47.36.200 through
47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
I certify I am responsible for the project and the responsible party to be cited for violation of R.C.W.
47.36.200 through 47.36.220 or 9A.36.050 Reckless Endangerment, and other applicable State and City
codes.
NAME:_ Vl N C,P_.Al-7— 1- MAZZApe-/-p
HOME ADDRESS:—/ O 9 a 3O Pt A16
I&J "'J , wa 9Fo s 3
WORK ADDRESS: /ago9 l X PKI A16
WORK PHONEY) 9FS 'QO(o(0 HOME PHONE: &S) p0 ` [ og
COLOR EYES: 6w4 WEIGHT: o;W HEIGHT: 5'/0 COLOR HAIR: &Lk
WASHINGTON STATE DRIVERS LICENSE NUMBER: M Az-Z R V T 516 a u a
datacenter/p w/tra fco ntro Vb h
END
ROAD WORK ■
o'
C20- 20 �° \
,Ko
y0
e
,�t o
x0 y
CHANNELIZING
ICE SPACING (FT)
ToperTangent
i
40
60
30
60
20
40
LEGEND
ace Channeli2ing Devices
r Flogger
o'
h
a 0 a
NOTES
1- floodlights shall be provided to mark flogger stations at night.
2. If entire work area is vlsible from one station, one f1agger may
be used, otherwise two floggers and signing will be required each
direction.
3. Sign sequence Is the some for both directions of travel.
4. See Buffer Data Table, Use of buffer vehicle is recommended.
it may be a work vehicle. If buffer vehicle is used, minimum
from end of toper to work area shoil be total of "R" (roll ahead
• distance) plus length of vehicle, plus "8" (Duffer spoce), if buffer
vehicle is not used, minimum distance shall be "B".
5. Steady burning worm n? lights (Type C. MUTCD) should be used to
mark channelliing devices Of night as needed.
6. Either reverse cone toper or sign G20-2o may be used to show end
Of work area.
N20-To
�, eE
PREPARED
TO
STOP
M20-801
(optional)
ONE LANE
y ROAD
/ AHEAD
�✓\ ) N20-4
SIGN SPACING TABLE
Roadway Type
Speed
x
reswa s and
xpres ways
$5/65 MPH
(oper
Rural Roods
45/55 MPH
500'3
Urban Arterials
35/40 MPH
3501:
Urban Streets
Residentol
and Business
25/30 MPH
200'!
Dlstricts
kII
Typical 00pllcotl0n of traffic control devices on
0 tw0•IOne hlghwoy where one lane is closed and
flogging is provided.
7A*-1
9>-
W2o-I
w
FOR LOCAL
WQEG9CCl USE
TRAFFIC CONTROL PLAN
WASHINGTON STATE DEPARTMENT Of TRANSPORTATION
OLYMPIA. WASHINGTON
Ineorporeted ehonyes to Chapter 4 of NUTCD one resigned fu0 APPROVED MONTH DAY, YEAR
DATE REVISION I By IAPPR D STANDARD PLAN K-2
M4-8 DETOUR
i I
M3-4 NEST
512
M1-601 I
M6- 3
NOTE:
Signs
one d
LEGEND
as Type I11 Barricade
typicol opplicotion - Roodwoy closed beyond detour point
NOTES
1. Regulatory. traffic control devices to be modified
as needed for the duration of the detour.
_ _ aosAED 2. flashing warning lights (Type A, MUTCD) shall
R11-2 be used to mark barricades at night as needed.
x
3. Detour trot lblazers shall be instol led as necessary
ROAD throughout detour route.
CLOSED
AHEAD
W20- 3 ROAD CLOSED
xx MILES
LOCAL TRAffIC ONLY
� R11-3o
` « DETOUR M4-10L
SIGN SPACING TABLE
Roadway Type Speed x
DETOUR ffreewayYs one r500''
M4-8 Expressways 55/65 MPH (or as per
M T )
x KEST M3-4 Rural Roads 45/55 MPH 500''
N
Urban Arterlols 35/40 MPH 350't
A,.- 512 Urban Streets
M1-601 Residental 25/30 MPH 200'±
x \ and Business
Districts
M4-8
M3-4
M1-601
15-1(L)
FORLOCAL
AQEMMCMUZ E
TRAFFIC CONTROL PLAN
WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
OLYMPIA, WASHINGTON
tnoorpoeettd chaNtt to Chopttr t of MUTCD and r*%IV*d SdD APPRovfO MONTH DAY, YEAR
oATE REVISION APPR•O STANDARD PLAN K-3
Conftruction,inc.
IL 12409 230th PI. NE • Redmond, WA 98053 • Phone (425) 868-9066 • Fax (425) 868-9074
A
z
E
bob 0o G� ArvA)eL�z' pCv icc5'
Q 3 ry a
a
�
3
� �
Q�
�9q�-
yr �usi s�gNS
�r of 11/1 rt-i C Co �Tro L,
0 LA,O .
For G;-Vy OF LOT")
g
urbAO 51 ¢
ept;&,�—1 i nL a s/3� mph
aw r llF
6:�F�lC $ i
DATE:
VAME fiAu�- p E
July 7, 2005
Vincent Mazzaferro
VJM Construction Co., Inc. - a
12409 2301h Place NE �
Redmond, WA 98053
SUBJECT: TALBOT HILL WATER MAIN REPLACEMENT PHASE 2:
CAG-05-085 CONTRACT DOCUMENTS
Dear Mr. Mazzaferro:
The Renton City Council is scheduled to award the subject construction contract to your firm on
July 11, 2005, in the total amount of $666,822.14.
In order to prepare the contract documents, please provide the following documents to me as soon as
possible.
1. A list of names, addresses, phone numbers, and emergency phone numbers for: Responsible
Officer, Job Foreman, and Bonding Agent.
2. Corporation Letter or Resolution giving names of those authorized to sign the contract and
samples of their signatures.
3. A photocopy of your current State Contractor's License (not Master License).
4. A photocopy of your current City of Renton Business License or a copy of the receipt
showing that one has been obtained.
5. Two (2) signed contract bonds on City of Renton forms, UNDATED.
The date will be filled in when signed by the Mayor.
6. Two (2) signed contracts also UNDATED. The blank forms of the contract are enclosed.
Two Certificate of Insurance for 2005, naming the City of Renton as additional insured.
Language on this certificate must require 45 days written notice to the City prior to
cancellation and not include language relieving the insurance company, its agents or
representatives of obligations or liability to meet the 45-day requirement. If the correct
language is not available, the inappropriate wording may be lined out and
acknowledged by the insurance company. See enclosed sample.
8. One City Insurance Information form (enclosed).
9. One City Endorsement form (enclosed).
10. One executed copy of the City's Fair Practice Affidavit of Compliance for the Prime and
subcontractor (4 blanks enclosed).
Please return all of the above documents and the signed and undated contracts to rne. Once the City
executes the contract, an original will be returned to you.
VJM Construction
July 7, 2005
Page 2 of 2
A pre -construction conference will be scheduled as soon as the contract is executed. Please submit
the following information before the pre -construction conference.
• Contractor's detailed plan of operation and progress schedule, using a critical path method.
0 Order dates, statement of origin, compensation, name of principal suppliers and manufacturer
of materials to be used.
• Preliminary list of shop drawings and schedule of submittals.
• Traffic Control Plan.
• The insurance policy declaration pages of all required insurance policies obtained from the
insurance carrier.
Please call me at 425-430-7208, if you have any questions or need additional information on this
contract.
Sincerely,
Rick Moreno, Project Manager
Water Utility
Enclosures
cc: Abdoul Gafour, Water Utility Engineering Supervisor
Ron McPhee, Field Engineering Specialist
H:\File Sys\WTR - Drinking Water Utility\WTR-27 - Water Project Files\WTR-27-3 I 98-TALBOT HILL PHASE 2\Contractor
Correspondance\Contract-Award 1 a.doc\RLMtp
►` iR..0
Kathy Keolker-Wheeler, Mayor
July 7, 2005
Vincent Mazzaferro
VJM Construction Co., Inc.
12409 230th Place NE
Redmond, WA 98053
CITY OF RENTON
Planning/Building/PublicWorks Department
Gregg Zimmerman P.E., Administrator
SUBJECT: TALBOT HILL WATER MAIN REPLACEMENT PHASE 2:
CAG-05-085 CONTRACT DOCUMENTS
Dear Mr. Mazzaferro:
The Renton City Council is scheduled to award the subject construction contract to your firm on
July 11, 2005, in the total amount of $666,822.14.
In order to prepare the contract documents, please provide the following documents to me as soon as
possible.
1. A list of names, addresses, phone numbers, and emergency phone numbers for: Responsible
Officer, Job Foreman, and Bonding Agent.
2. Corporation Letter or Resolution giving names of those authorized to sign the contract and
samples of their signatures.
3. A photocopy of your current State Contractor's License (not Master License).
4. A photocopy of your current City of Renton Business License or a copy of the receipt
showing that one has been obtained.
5. Two (2) signed contract bonds on City of Renton forms, UNDATED.
The date will be filled in when signed by the Mayor.
6. Two (2) signed contracts also UNDATED. The blank forms of the contract are enclosed.
7. Two Certificate of Insurance for 2005, naming the City of Renton as additional insured.
Language on this certificate must require 45 days written notice to the City prior to
cancellation and not include language relieving the insurance company, its agents or
representatives of obligations or liability to meet the 45-day requirement. If the correct
language is not available, the inappropriate wording may be lined out and
acknowledged by the insurance company. See enclosed sample.
8. One City Insurance Information form (enclosed).
9. One City Endorsement form (enclosed).
10. One executed copy of the City's Fair Practice Affidavit of Compliance for the Prime and
subcontractor (4 blanks enclosed).
Please return all of the above documents and the signed and undated contracts to me. Once the City
executes the contract, an original will be returned to you.
1055 South Grady Way - Renton, Washington 98055 R E N T O N
9 This paper contains 50 % recycled material, 30 % post consumer AHEAD OF THE CURVE
VJM Construction
July 7, 2005
Page 2 of 2
A pre -construction conference will be scheduled as soon as the contract is executed. Please submit
the following information before the pre -construction conference.
• Contractor's detailed plan of operation and progress schedule, using a critical path method.
• Order dates, statement of origin, compensation, name of principal suppliers and manufacturer
of materials to be used.
• Preliminary list of shop drawings and schedule of submittals.
• Traffic Control Plan.
• The insurance policy declaration pages of all required insurance policies obtained from the
insurance carrier.
Please call me at 425-430-7208, if you have any questions or need additional information on this
contract.
Sincerely,
Rick Moreno, Project Manager
Water Utility
Enclosures
cc: Abdoul Gafour, Water Utility Engineering Supervisor
Ron McPhee, Field Engineering Specialist
H:\File Sys\WTR - Drinking Water Utility\WTR-27 - Water Project Files\WTR-27-3198-TALBOT HILL PHASE 2\Contractor
Corzespondance\Contract-Award I a.doc\RLMtp