HomeMy WebLinkAboutWTR2703638_5T0: FINANCE DIRECTOR
FROM: PUBLIC WORKS ADMINISTRATOR
CONTRACTOR: Rodarte Construction, Inc
CONTRACT NO. # CAG-13-044 PO#18/0001862 ESTIMATE NO. 2
PROJECT: President Park Water Main Replacement Project
1. CONTRACTOR EARNINGS THIS ESTIMATE $217,995.22
2 SALES TAX @ 9.50% $20,709.55
3. TOTAL CONTRACT AMOUNT THIS ESTIMATE $238.704.77
4.
EARNINGS PREVIOUSLY PAID CONTRACTOR
$72,665.48
5. *
EARNINGS DUE CONTRACTOR THIS ESTIMATE
$207,095.46
6.
SUBTOTAL - CONTRACTOR PAYMENTS
$279,760.94
7.
RETAINAGE ON PREVIOUS EARNINGS
$3,824.50
8. **
RETAINAGE ON EARNINGS THIS ESTIMATE
$10,899.76
9.
SUBTOTAL - RETAINAGE
$14,724.26
10.
SALES TAX PREVIOUSLY PAID
$7,266.55
11.
SALES TAX DUE THIS ESTIMATE
$20,709.55
12.
SUBTOTAL - SALES TAX
$27,976.09
*
(95% x LINE 1)
**
(RETAINAGE: 5%)
GRAND TOTAL:
$322,461.29
FINANCE DEPARTMENT ACTION:
PAYMENT TO CONTRACTOR (Lines 5 and 11):
ACCOUNT # 425.455170.018.594 34.63.000 # 2
RETAINED AMOUNT (Line 8):
*ACCOUNT # 6621292082 # 2
* Escrow Number, Wells Fargo Bank, N.A. - Tacoma Business Banking
TOTAL THIS ESTIMATE:
CHARTER 116, LAWS OF 1965
CITY OF RENTON CERTIFICATION
I, THE UNDERSIGNED DO HEREBY CERTIFY UNDER PENALTY OF
PERJURY, THAT THE MATERIALS HAVE BEEN FURNISHED, THE
SERVICES RENDERED OR THE LABOR PERFORMED AS DESCRIBED
HEREIN, AND THAT THE CLAIM IS A JUST, DUE AND UNPAID
OBLIGATION AGAINST THE CITY OF RENTON, AND THAT I AM
AUTHOR ZED TO AUTHENTTCAT AND CERTIFY TO SAID CLAIM
Signed: i 4
_ JJ (0 7,011,
$227,805.01
$10,899.76
$238,704.77
�M J„ly io/ 20i3
Printed On: O710912013 City of Renton Public Works Department Page 1
Printed On: 07/09/2013
Project President Park Water Main Replacement Project
Contractor: Rodarte Construction. Inc.
Item Description
No.
City of Renton Public Works Department
Contract Number. CAG-13-0"
Pay Estimate 2 Closing Dale: 07/09/2013
Unit Est. Unit Previous Previous This
Quantity Price Quantity Amount Quantity
Page 1
This Total Total
Amount Quantity Amount
001.
Mobilization, Demobilization, Site Preparation & Clean-up
Lump Sum
1
$34,000.00
50.00
0.75
$25,SD0.00
0.75
$25,500.00
002.
Traffic Control
Lump Sum
1
$25,000.00
$0.00
0.20
55,000.00
0.20
$5,000.00
003.
Trench Excavation Safety Systems
Lump Sum
1
$500.00
$0.00
1.00
$500.00
1.00
$500.00
0D4.
Construction Surveying and Staking
Lump Sum
1
$5,0D0.D0
$0.00
1.00
$5,000.00
1.00
$5.000.00
As -Built Surveying for Progress Payments and Final As-
005.
Buills
Lump Sum
1
$800.00
$0.00
$0.00
0.00
$0.00
006.
Temporary Erosion and Sedimentation Control
Lump Sum
1
$1.200.00
$0.00
$0.00
0.00
$0.00
007.
Site Specific Potholing
Each
20
$250.00
50.00
10.00
$2.500.00
10.00
$2,5D0.00
Furnish and Install 8' Cl 52 DI Water Pipe & Filings w/
008.
Polywrap
Lineal Foot
4210
$61.00
1253.93 $76,489.98
2255.07
$137,559.02
3509.00
$214,049.00
009.
Furnish and Install 8' Gale Valve Assembly
Each
28
$1,000.00
$0.00
19.00
$19,000.00
19.00
$19,000.00
010.
Concrete for Thrust Blocking, Dead -Man Anchor Blocks
Cubic Yard
30
$300.00
$0.00
1.50
$450.00
1.50
$450.DD
011.
Furnish and Install Fire Hydrant Assembly
Each
5
$4,200.00
$0.00
2.00
$9,400.00
2.00
$8.400.00
012.
Furnish & Install 1' Water Service Connection
Each
69
$1.200.00
$0.00
4.00
$4,800.00
4.00
$4,800.00
013.
Furnish & Install 2' Water Service Connection
Each
1
$3,800.00
$0.00
$0.00
0.00
$0.00
014.
Connection to Existing Water Main
Each
8
$2,500.00
$0.00
$0.00
0.00
$0.00
015,
Cut, Cap, and Block Existing Water Main
Each
1
$1,000.00
SD.00
$0.00
0.00
$0.00
Removal and Replacement of Unsuitable Foundation
016,
Material
Ton
150
$32.00
$0.00
$0.00
0.00
$0.00
017.
Select Imported Trench Backfill
Ton
1100
$12.00
$0.00
$0.D0
0.00
$0.00
Crushed Surfacing Top Course, Crushed Rock Backfill,
018.
Crushed Rock for Shoulder Restoration
Ton
1150
$20.00
$0.00
88.06
$1.761.20
88.06
$1,761.20
019,
2' Temporary Cold Mix Asphalt Trench Patching
Ton
360
$100.00
$0.00
75,25
$7,525.00
75.25
$7,525.00
020.
H.M.A. Class h' PG 64-22 for Roadway Reconstruction
Ton
720
$115.00
$0.00
$0.00
0.00
$0.00
021.
Removal and Replacement of Concrete Curb and Gutler
Lineal Foot
250
$26.00
$0.00
$0 D0
0.00
$0.00
022.
Concrete Driveway and/or Sidewalk Restoration
Square -Yard
100
$42.00
$0.00
$0.00
0.00
50.00
023.
Property & Landscape Restoration
Lump Sum
1
$6,50020
$0.00
$0 00
0.00
$0.00
Subtotal
$76,489.98
$217,995.22
$294,485.20
9.5% Sales Tax
$7.266.55
$20,709.55
$27,976.09
TT
Total
$83,756.53
$238,704.77
$322,461.29
�M 3„iy /O, LG i3
70°�zan
TO: FINANCE DIRECTOR
FROM: PUBLIC WORKS ADMINISTRATOR
CONTRACTOR: Rodarte Construction, Inc.
CONTRACT NO. # CAG-13-044 PO#18/0001862 ESTIMATE NO. 3
PROJECT: President Park Water Main Replacement Project
1. CONTRACTOR EARNINGS THIS ESTIMATE $142,627.40
2. SALES TAX @ 9.50% $13,549.60
3. TOTAL CONTRACT AMOUNT THIS ESTIMATE $156,177.00
4. EARNINGS PREVIOUSLY PAID CONTRACTOR $279,760.94
5. * EARNINGS DUE CONTRACTOR THIS ESTIMATE $135,496.03
6. SUBTOTAL - CONTRACTOR PAYMENTS $415,256.97
7. RETAINAGE ON PREVIOUS EARNINGS $14,724.26
8. ** RETAINAGE ON EARNINGS THIS ESTIMATE $7,131.37
9. SUBTOTAL - RETAINAGE $21,855.63
10. SALES TAX PREVIOUSLY PAID $27,976.09
11. SALES TAX DUE THIS ESTIMATE $13,549.60
12. SUBTOTAL - SALES TAX $41,525.70
* (95% x LINE 1)
*' (RETAINAGE: 5%) GRAND TOTAL: $478,638.30
FINANCE DEPARTMENT ACTION:
PAYMENT TO CONTRACTOR (Lines 5 and 11):
ACCOUNT # 425.455170,018.594.34.63.000 # 3 $149,045.63
RETAINED AMOUNT (Line 8):
*ACCOUNT # 6621292082 # 3 $7,131.37
* Escrow Number, Wells Fargo Bank, N.A. - Tacoma Business Banking
TOTAL THIS ESTIMATE: $156,177.00
CHARTER 116, LAWS OF 1965
CITY OF RENTON CERTIFICATION
I, THE UNDERSIGNED DO HEREBY CERTIFY UNDER PENALTY OF Q Z
PERJURY, THAT THE MATERIALS HAVE BEEN FURNISHED, THE
SERVICES RENDERED OR THE LABOR PERFORMED AS DES CRIS
HEREIN, AND THAT THE CLAIM IS A JUST, DUE AND UNPAID /A/��
OBLIGATION AGAINST THE CITY OF RE�:TON, AND THAT l AM 7
AUTHORIZED TO AUTHENTICATE AND CERTIFY TO SAID CLAIM
Signed: /
Printed On: 08/09/2013
City of Renton Public Works Department
Page 1
Printed On: 08/09/2013
City of Renton Public Works Department
Page 1
Project President Park Water Main Replacement Project
Contractor. Rodarte Construction, Inc.
Rem Description
No.
Pay Estimate 3
Unit Est link
Quantity _ Price
001.
Mobl6zabon, Demobilization, Site Preparation & Clean-up
Lump Sum
1
002
Traffic Control
Lump Sum
1
003.
Trench Excavation Safety Systems
Lump Sum
1
004.
Construction Surveying and Staking
Lump Sum
1
As -Built Surveying for Progress Payments and Final As-
005.
Builts
Lump Sum
1
006.
Temporary Erosion and Sedimentation Control
Lump Sum
1
007.
Site Specific Potholing
Each
20
Furnish and install 8' Cl 52 01 Water Pipe & Fittings vd
000.
Polywrap
Lineal Foot
4210
009,
Furnish and Install 8' Gate Valve Assembly
Each
28
010.
Concrete for Thrust Blocking, Dead -Man Anchor Blocks
Cubic Yard
30
011.
Fumish and Install Fire Hydrant Assembly
Each
5
012.
Furnish 8 Install 1" Water Service Connection
Each
69
013.
Furnish & Install 2' Water Service Connection
Each
1
014.
Connection to Existing Water Main
Each
8
015.
Cut, Cap, and Block Existing Water Main
Each
1
Removal and Replacement of Unsuitable Foundation
016.
Material
Ton
150
017.
Select Imported Trench Backfill
Ton
1100
Crushed Surfacing Top Course, Crushed Rock Backfill,
018.
Crushed Rock for Shoulder Restoration
Ton
1150
019.
2" Temporary Cold Mix Asphalt Trench Patching
Ton
360
020.
H.MA. Class %" PG 64-22 for Roadway Reconstruction
Ton
720
021.
Removal and Replacement of Concrete Curb and Gutler
Lineal Foot
250
022,
Concrete Driveway and/or Sidewalk Restorat on
Square -Yard
100
023.
Property 8 Landscape Restoration
Lump Sum
1
Subtotal
9.5% Sales Tax
TT Total
$34.000.00
$25,000.00
$500.00
55,000.00
$800.00
$1.200.00
$250.00
$61.00
$1,000.00
$300.00
$4,200.00
$1,200.00
$3,800.00
$2.500.00
$1,000.00
$32.00
$12.00 j
$20.00
$100.00
$115.00
$20.00
$42.00
i
$6.500.00
Contract Number,
CAG-13-044
Closing Date:
08/092013
Previous Previous
This
Quantity Amount
Quantity
0.75 $25,500.00
020 $5.000.00
1.00 $500.00
1.00 55,000.00
0.00 $0.00
0.00 $0.00
10.00 $2.500.00
3509.00 $214,049.00
19.00 $191000.00
1.50 $450.00
2.00 $8,400.00
4.00 $4,800.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
88.06 $1.76120
75.25 $7,525.00
0.00 $0.00
0.00 $0.00
0.00 50.00
0.00 30.00
$294.485.20
$27.976.09
$322,461.29
This Total Total
Amount Quantity Amour
0.00
$0.00
0,75
$25,500.00
0.07
$1,750.00
027
$6,750.D0
0.00
$0.00
1.00
5500.00
0.00
$0.00
1.00
$5,000.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
2.00
$500.00
12.00
$3,000.00
701.00
542,761.00
4210,00
$256,810.D0
2.00
$2.000.00
21.00
$21.000.00
2.50
$750.00
4.00
$1,200.00
1.25
$5.250.00
3.25
$13.650.00
65.00
$78,000.00
69.00
$82.800.00
1.00
$3,800.00
1.00
$3,800.00
1.00
$2.500.00
1.00
$2,500.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
81.00
$972.00
81.00
$972.00
60.67
$1,213,40
148.73
$2,974.60
31.31
$3,131.00
106.56
$10,556.00
0.00
$0 00
0.00
$0.00
coo
$0 00
0.00
50.00
0 0^
50 00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$142,627.40
$13,549.60
$156,177.00
$437.112.60
$41,525.70
$478,638.30
12t'A Au ) `t, 2.013
9191/3
TO: FINANCE DIRECTOR
FROM: PUBLIC WORKS ADMINISTRATOR
CONTRACTOR: Rodarte Construction, Inc.
CONTRACT NO. # CAG-13-044 PO#18/0001862 ESTIMATE NO. 4
PROJECT: President Park Water Main Replacement Project
1. CONTRACTOR EARNINGS THIS ESTIMATE $226,411.80
2. SALES TAX @ 9.50% $21,509.12
3. TOTAL CONTRACT AMOUNT THIS ESTIMATE $247,920.92
4. EARNINGS PREVIOUSLY PAID CONTRACTOR $415,256.97
5. EARNINGS DUE CONTRACTOR THIS ESTIMATE $215,091.21
6. SUBTOTAL - CONTRACTOR PAYMENTS $630,348.18
7. RETAINAGE ON PREVIOUS EARNINGS $21,855.63
8. ** RETAINAGE ON EARNINGS THIS ESTIMATE $11,320.59
9. SUBTOTAL - RETAINAGE $33,176.22
10. SALES TAX PREVIOUSLY PAID $41,525.70
11. SALES TAX DUE THIS ESTIMATE $21,509.12
12. SUBTOTAL - SALES TAX $63,034.82
" (95% x LINE 1)
" (RETAINAGE: 5%) GRAND TOTAL: $726,559.22
FINANCE DEPARTMENT ACTION:
PAYMENT TO CONTRACTOR (Lines 5 and 11):
ACCOUNT # 425.455170.018.594.34.63.000 # 4 $236,600.33
RETAINED AMOUNT (Line 8):
*ACCOUNT # 6621292082 # 4 $11,320.59
Escrow Number, Wells Fargo Bank, N.A. - Tacoma Business Banking
TOTAL THIS ESTIMATE
CHARTER 116, LAWS OF 1965
CITY OF RENTON CERTIFICATION
I, THE UNDERSIGNED DO HEREBY CERTIFY UNDER PENALTY OF
PERJURY, THAT THE MATERIALS HAVE BEEN FURNISHED, THE
SERVICES RENDERED OR THE LABOR PERFORMED AS DESCRIBED
HEREIN, AND THAT THE CLAIM IS A JUST, DUE AND UNPAID
OBLIGATION AGAINST THE CITY OF RENTON, AND THAT I AM
AUTHORIZED TO AUTHENTICAT AND CERTIFY TO SAID CLAIM
�' /
Signed: Ci:t �'►ISYtil,t/ 5 /
$247, 920.92
r
Printed On: 09/09/2013 City of Renton Public Works Department Page 1
Printed On: 09/09/2013 City of Renton Public Works Department Page 1
Project President Park Water Main Replacement Project
Contractor. Rodarte Construction, Inc.
Item Description
Contract Number: CAG-13-044
Pay Estimate 4 Closing Date: 09/042013
Unit Est Unit Previous Previous This
Quantity Price Quantity Amount Quantity
001.
Mobilization, Demobilization, Site Preparation & Clean-up
Lump Sum
1
002.
Traffic Control
Lump Sum
1
003.
Trench Excavation Safety Systems
Lump Sum
1
004.
Construction Surveying and Staking
Lump Sum
1
As -Built Surveying for Progress Payments and Final As-
005.
Bulls
Lump Sum
1
006.
Temporary Erosion and Sedimentation Control
Lump Sum
1
007.
Site Specific Potholing
Each
20
Furnish and Install 8" Cl 52 DI Water Pipe & Fittings w/
008.
Polywrap
Lineal Foot
4210
009.
Furnish and Install 8" Gate Valve Assembly
Each
28
010.
Concrete for Thrust Blocking, Dead -Man Anchor Blocks
Cubic Yard
30
011.
Furnish and Install Fire Hydrant Assembly
Each
5
012.
Furnish & Install 1" Water Service Connection
Each
69
013.
Furnish & Install 2" Water Service Connection
Each
1
014.
Connection to Existing Water Main
Each
8
015.
Cut, Cap, and Block Existing Water Main
Each
1
Removal and Replacement of Unsuitable Foundation
016.
Material
Ton
150
017.
Select Imported Trench Backfill
Ton
1100
Crushed Surfacing Top Course, Crushed Rock Backfill,
018.
Crushed Rock for Shoulder Restoration
Ton
1150
019.
2" Temporary Cold Mix Asphalt Trench Patching
Ton
360
020.
H.M.A. Class %" PG 64-22 for Roadway Reconstruction
Ton
720
021.
Removal and Replacement of Concrete Curb and Gutter
Lineal Fool
250
022.
Concrete Driveway and/or Sidewalk Restoration
Square -Yard
100
023.
Property & Landscape Restoration
Lump Sum
1
Subtotal
9.5 % Sales Tax
TT Total
$34,000.00
$25,000.00
$500.00
$5,000.00
$800.00
$1,200.00
$250.00
$61.00
$1,000.00
$300.00
$4,200.00
$1,200.00
$3,800.00
$2,500.00
$1,000.00
$32.00
$12.00
$20.00
$100.00
$115 00
$20.00
$42.00
$6,500.00
This Total
Total
Amount
0.75
$25.500.00
0.25
$8,500.00
1.00
$34,000.00
0.27
$6,750.00
0.73
$18,250.00
1.00
$25.000.00
1.00
$500.00
0.00
$0.00
1.00
$500.00
1.00
$5,000.00
0.00
$0.00
1.00
$5,000.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
1.00
$1,200.00
1.00
$1,200.00
12.00
$3,000.00
8.00
$2,000.00
20.00
$5,000.00
4210.00
$256,810.00
0.00
$0.00
4210.00
$256,810.00
21.00
$21,000.00
7.00
$7,000.00
28.00
$28,000.00
4.00
$1.200.00
26.00
$7,800.00
30.00
$9,000.00
3.25
$13,650.00
3.75
$15,750.00
7.00
$29,400.00
69.00
$82,800.00
1.00
$1,200.00
70.00
$84,000.00
1.00
$3,800.00
0.00
$0.00
1.00
$3,800.00
1.00
$2,500.00
7.00
$17,500.00
8.00
$20,000.00
0.00
$0.00
1,00
$1,000.00
1.00
$1,000.00
0.00
$0.00
81.00
$2,592.00
81.00
$2,592.00
81.00
$972.00
0.00
$0.00
81.00
$972.00
148.73
$2,974.60
965.75
$19,315.00
1114.48
$22,289.60
106.56
$10,656.00
32.82
$3,282.00
139.38
$13,938.00
0.00
$0.00
955.12
$109.838.80
955.12
$109.838.80
0.00
$0.00
188.00
$3,760.00
188.00
$3.760.00
0.00
$0.00
22.00
$924.00
22.00
$924 00
0.00
$0.00
1.00
$6,500.00
1.00
$6,500.00
$437,112.60 $226,411.80 $663,524.40
$41,525.70 $21,509.12 $63,034.82
$478,638.30 $247,920.92 $726,559.22
AGENDA BILL SCHED
AGENDA BILL TITLE
PREPARED BY: ICI Extension:
DEADLINE/DATE
ACTION
�S/
GREGG'S SIGNATURE
4 .3 P
l
TRANSMIT TO CLERK VIA Electronic Agenda Bill Process
COUNCIL MEETING DATE
Referred Committee
COMMITTEE MEETING DATE
COMMITTEE
Time: Place:
COUNCIL MEETING REPORTED OUT
USA\17\Misc Form s\AB-Sched u le\tp
14
CITY OF RENTON COUNCIL AGENDA BILL
Al #:
Submitting Data: Public Works
For Agenda of:
Dept/Div/Board.. Utility Systems/Water Utility
April 7, 2014
Agenda Status
Staff Contact....... Andrew Weygandt, x7208
Consent ................ X
Public Hearing......
Subject:
Final Pay Estimate — CAG-13-044 (WTR-27-3638)
Correspondence...
President Park Water Main Replacement Project
Ordinance............
Resolution............
Old Business.........
New Business.......
Exhibits:
Pay Estimate #5 (Final)
Study Sessions......
Notice of Completion of Public Works Contract
Information..........
Recommended Action: Approvals:
Council Concur Legal Dept..........
Finance Dept...... X
Fiscal Impact:
Expenditure Required... $8,139.35 (final pay est. only) Transfer/Amendment.......
Amount Budgeted........ $8,200.00 (final pay est. only) Revenue Generated.........
Total Project Budget..... $1,000,000 (Acct.425/455170) City Share Total Project.... 100%
SUMMARY OF ACTION:
On April 15, 2013, Council awarded the construction contract to Rodarte Construction, Inc.
Construction started on May 28, 2013, and the project was completed on September 30, 2013.
The original contract amount was $733,003.95 and the final contract amount is $734,698.57.
The increase in contract amount of $1,694.62 was due to additional pavement restoration
beyond the amount shown on the original engineering drawings. The project was completed on
schedule and within the amount budgeted. The final pay estimate and project closeout was
delayed until the contractor submitted as -built drawings.
STAFF RECOMMENDATION:
Accept the project, approve the final pay estimate in the amount of $8,139.35, and release the
retainage bond after 60 days, subject to the receipt of all required authorizations.
H:\File Sys\WTR - Drinking Water Utility\WTR-27 - Water Project Files\W7R-27-3638 President Park Main Replacement\Construction
Contract\WTR-27-3638_agenda-bill-final-payment.doc\AWtp
TO: FINANCE DIRECTOR
FROM: PUBLIC WORKS ADMINISTRATOR
CONTRACTOR: Rodarte Construction, Inc.
CONTRACT NO. # CAG-13-044 PO#18/0001862 ESTIMATE NO. 5 (Final)
PROJECT: President Park Water Main Replacement Project
1.
2.
3.
CONTRACTOR EARNINGS THIS ESTIMATE
SALES TAX @ 9.50%
TOTAL CONTRACT AMOUNT THIS ESTIMATE
$7,433.20
$706.15
$8,139.35
4.
EARNINGS PREVIOUSLY PAID CONTRACTOR
$630,348.18
5.
EARNINGS DUE CONTRACTOR THIS ESTIMATE
$7,061.54
6.
SUBTOTAL - CONTRACTOR PAYMENTS
$637,409.72
7.
RETAINAGE ON PREVIOUS EARNINGS
$33,176.22
8. *` RETAINAGE ON EARNINGS THIS ESTIMATE
$371.66
9.
SUBTOTAL - RETAINAGE
$33,547.88
10.
SALES TAX PREVIOUSLY PAID
$63,034.82
11.
SALES TAX DUE THIS ESTIMATE
$706.15
12.
SUBTOTAL - SALES TAX
$63,740.97
(95% x LINE 1)
`* (RETAINAGE: 5%) GRAND TOTAL:
$734,698.57
FINANCE DEPARTMENT ACTION:
PAYMENT TO CONTRACTOR (Lines 5 and 11):
ACCOUNT # 425.455170.018.594.34.63.000
# 5
$7,767.69
RETAINED AMOUNT (Line 8):
*ACCOUNT # 6621292082 # 5 $371.66
* Escrow Number, Wells Fargo Bank, N.A. - Tacoma Business Banking
TOTAL THIS ESTIMATE: $8,139.35
CHARTER 116, LAWS OF 1965
CITY OF RENTON CERTIFICATION
I, THE UNDERSIGNED DO HEREBY CERTIFY UNDER PENALTY OF
PERJURY, THAT THE MATERIALS HAVE BEEN FURNISHED, THE
SERVICES RENDERED OR THE LABOR PERFORMED AS DESCRIBED
HEREIN, AND THAT THE CLAIM IS A JUST, DUE AND UNPAID
OBLIGATION AGAINST THE CITY OF RENTON, AND THAT I AM
AUTHORIZED TO AUTHENTICATEA�CERT�TO SA/%ID���C,,L_,,AIIM /
Signed: �9�6 41J v4ham 75
, 1 y'
IIA Ck ( JA .2 0
Printed On: 03/20/2014 City of Renton Public Works Department Page 1
Printed On: 03/20/2014
City of Renton Public Works Department
Page 1
Project: President Park Water Main Replacement Project
Contractor: Rodarte Construction, Inc.
Item Description
No.
Contract Number: CAG-13-044
Pay Estimate 5 (Final) Closing Date: 03/25/2014
Unit Est. Unit Previous Previous This
Quantity Price Quantity_ Amount Quantity
001.
Mobilization, Demobilization, Site Preparation & Clean-up
Lump Sum
1
$34,000.00
002.
Traffic Control
Lump Sum
1 -
$25,000.00
003.
Trench Excavation Safety Systems
Lump Sum
1
$500.00
004.
Construction Surveying and Staking
Lump Sum
1
$5,000.00
As -Built Surveying for Progress Payments and Final As-
005.
Builts
Lump Sum
1
$800.00
006.
Temporary Erosion and Sedimentation Control
Lump Sum
1
$1,200.00
007.
Site Specific Potholing
Each
20
$250.00
Furnish and Install 8" Cl 52 DI Water Pipe & Fittings w/
008.
Polywrap
Lineal Foot
4210
$61.00
009.
Furnish and Install 8" Gate Valve Assembly
Each
28
$1,000.00
010*
Concrete for Thrust Blocking, Dead -Man Anchor Blocks
Cubic Yard
30
$300.00
011.
Furnish and Install Fire Hydrant Assembly
Each
5
$4,200.00
012.
Furnish & Install 1" Water Service Connection
Each
69
$1,200.00
013.
Furnish & Install2" Water Service Connection
Each
1
$3,800.00
014.
Connection to Existing Water Main
Each
8
$2,500.00
015.
Cut, Cap, and Block Existing Water Main
Each
1
$1,000.00
Removal and Replacement of Unsuitable Foundation
016,
Material
Ton
150
$32.00
017.
Select Imported Trench Backfill
Ton
1100
$12.00
Crushed Surfacing Top Course, Crushed Rock Backfill,
018.
Crushed Rock for Shoulder Restoration
Ton
1150
$20.00
019.
2" Temporary Cold Mix Asphalt Trench Patching
Ton
360
$100.00
020.
H.M.A. Class Yi" PG 64-22 for Roadway Reconstruction
Ton
720
$115.00
021.
Removal and Replacement of Concrete Curb and Gutter
Lineal Foot
250
$20.00
022.
Concrete Driveway and/or Sidewalk Restoration
Square -Yard
100
$42.00
023.
Property & Landscape Restoration
Lump Sum
1
$6,500.00
Subtotal
9.5 % Sales Tax
TT Total
This Total Total
1.00
$34.000.00
0.00
$0.00
1.00
$34,000.00
1.00
$25.000.00
0.00
$0,00
1.00
$25,000.00
1.00
$500.00
0.00
$0.00
1.00
$500.00
1.00
$5,000.00
0.00
$0.00
1.00
$5,000.00
0.00
$0.00
1,00
$800.00
1.00
$800.00
1.00
$1,200.00
0.00
$0.00
1.00
$1,200.00
20.00
$5,000.00
0.00
$0.00
2000.
$5,000.00
4210.00
$256,810.00
0.00
$0.00
4210.00
$256,810.00
28.00
$28,000.00
0.00
$0.00
28.00
$28,000.00
30.00
$9,000.00
0.00
$0.00
30.00
$9.000.00
7.00
$29,400.00
000
$0.00
7.00
$29,400.00
70,00
$84.000.00
0.00
$0.00
70.00
$84,000.00
1.00
$3.800,00
0.00
$0.00
1.00
$3.800.00
8.00
$20,000.00
0,00
$0.00
8.00
$20,000.00
1.00
$1,000.00
0,00
$0.00
1.00
$1,000.00
81.00
$2,592.00
0.00
$0.00
81,00
$2,592.00
81.00
$972.00
0.00
$0.00
81.00
$972.00
1114.48
$22,289.60
0.00
$0.00
1114.48
$22,289.60
139.38
$13,938.00
0.00
$0.00
139.38
$13,938.00
955.12
$109,838.80
57.68
$6,633.20
1012.80
$116,472.00
188.00
$3,760.00
0,00
$0.00
188.00
$3,760.00
22.00
$924.00
0.00
$0.00
22.00
$924,00
1.00
$6,500.00
0.00
$0.00
1.00
$6,500.00
$663,524.40 $7,433.20 $670,957.60
$63,034.82 $706.15 $63,740.97
$726,559.22 $8,139.35 $734.698.57
%/� (A q,r-LA o , 2-019
ST ATt,
s.
f
� ly.
H� tew9a`
NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT
Name & Address of Public A2encv I
City of Renton
1055 S. Grady Way
Renton, WA 98057
UBI Number: 177000094
Contractor's UBI Number: 600264803
Date: 03/25/2014
Assigned to:
Date Assigned:
Use
Notice is hereby given relative to the completion of contract or project described below
Project Name
Contract Number
Job Order Contracting
President Park Water Main Replacement Project
CAG-13-044
❑ Yes ❑x No
Description of Work Done/Include Jobsite Address(es)
Installation of 4,200 linear feet of 8-inch diameter ductile iron water pipe, fittings, valves, and fire hydrants
for the City of Renton's President Park neighborhood
in the vicinity of Olympia Ave NE and NE 12th Street.
Federally funded road transportation project? ❑ Yes
V No
Contractor's Name
Telephone Number
Affidavit ID*
Rodarte Construction, Inc.
1(253) 939-0532
Contractor Address
17 E. Valley Way E Auburn, WA 98092-5531
If Retainage is Bonded, List Surety's Name (or attach a copy)
Surety Agent's Address
Date Contract Awarded
Date Work Commenced
Date Work Completed
Date Work Accepted
April 15, 2013
May 28, 2013
September 27, 2013
September 30, 2013
Contract Amount $ 669,410.00
Additions ( +) $ 1,547.60
Reductions (-) $
Sub -Total $ 670,957.60
Amount of Sales Tax Paid at 9.5
(if various rates apply, please send a breakdown) $ 63,740.97
TOTAL $ 734,698.57
NOTE: These two totals must be equal
Please List all Subcontractors and Sub -tiers Below:
Liquidated Damages $
Amount Disbursed $
Amount Retained $
701,150.69
33,547.88
TOTAL $ 734,698.57
Subcontractor's Name:
UBI Number: (Required)
Affidavit ID*
Ground Up Road Construction, Inc.
602790246
Corliss Resources, Inc.
602237779
Lloyd Enterprises, Inc.
171004642
F215-038-000 07-2012
REV 31 0020e (07/06/12) Continued on page 2
Please •List all Subcontractors and Sub -tiers Below:
Subcontractor's Name: IUBI Number: (Required) lAffidavit ID*
I Comments
Contact Name: Natalie Wissbrod Title: Accounting Assistant
Email Address: nissbrod@rentonwa.gov Phone Number: 425-430-6919
Note: The Disbursing Officer must submit this completed notice immediately after acceptance of the work done under this contract.
NO PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of all release certificates.
Affidavit ID* - Provide known ones at this time. No LNI release will be granted until all affidavits are completed.
Submitting Form: Please submit the completed form to all three agencies below. For a faster response, please submit by e-mail.
Washington State
A& Department of Revenue
Public Works Section
PO Box 47474
Olympia WA 98504-7474
(360)725-7588
FAX (360) 664-4159
PWC@dor.wa.gov
Washington State
( Department of Labor and Industries
♦ Contract Release
PO Box 44274
Olympia, WA 98504-4272
(360)902-5772
FAX (360) 902-6897
ContractRelease@lni.wa.gov
MWashington State
Employment Security Department
Registration, Inquiry, Standards &
Coordination Unit
PO Box 9046
Olympia WA 98507-9046
(360)902-9450
Fax (360) 902-9287
publicworks@esd.wa.gov
For tax assistance or to request this document in an alternate format, visit http://dor.wa.gov or call 1-800-647-7706.
Teletype (M) users may call (360) 705-6718.
F215-038-000 07-2012
REV 31 0020e (07/06/12)
CITY OF RENTON COUNCIL AGENDA BILL
Al #:
Submitting Data: Public Works For Agenda of:
Dept/Div/Board.. Utility Systems/Water Utility April 7, 2014
Staff Contact....... Andrew Weygandt, x7208 Agenda Status
Consent ................ X
Subject: Public Hearing......
Final Pay Estimate — CAG-13-044 (WTR-27-3638) Correspondence._.
President Park Water Main Replacement Project Ordinance...........
Resolution... DATE:
Old Business ....
N E 'NI -A
Exhibits: New Busine +
Pay Estimate #5 (Final) Study Sessioi is..
Notice of Completion of Public Works Contract Information....
Recommended Action: Approvals:
Council Concur Legal Dept..........
Finance Deot...... X
Fiscal Impact:
Expenditure Required... $8,139.35 (final pay est. only) Transfer/Amendment.......
Amount Budgeted........ $8,200.00 (final pay est. only) Revenue Generated.........
Total Project Budget..... $1,000,000 (Acct.425/455170) City Share Total Project.... 100%
SUMMARY OF ACTION:
On April 15, 2013, Council awarded the construction contract to Rodarte Construction, Inc.
Construction started on May 28, 2013, and the project was completed on September 30, 2013.
The original contract amount was $733,003.95 and the final contract amount is $734,698.57.
The increase in contract amount of $1,694.62 was due to additional pavement restoration
beyond the amount shown on the original engineering drawings. The project was completed on
schedule and within the amount budgeted. The final pay estimate and project closeout was
delayed until the contractor submitted as -built drawings.
STAFF RECOMMENDATION:
Accept the project, approve the final pay estimate in the amount of $8,139.35, and release the
retainage bond after 60 days, subject to the receipt of all required authorizations.
H:\File Sys\WTR - Drinking Water Utility\WTR-27 - Water Project Files\WTR-27-3638 President Park Main Replacement\Construction
Contract\WTR-27-3638_agenda-bill-final-payment.doc\AWtp
G
abouttlank
State of Washington
Department of Labor & Industries
Prevailing Wage Section - Telephone 360-902-5335
PO Box 44540, Olympia, WA 98504-4540
Affidavit of Wages Paid
Document 3/24/2014 Intent 568969 Affidavit 505237 Affidavit Approved
Received Date Id Id Status on
3/25/2014
Your Company Information
Name
Address
Contractor Registration no.
Industrial Insurance Account Id
Email Address
Filed By
Project Information
Awarding agency:
Awarding agency contact:
Awarding agency contact phone number:
Project Details
Project name
County where work was performed
RODARTE CONSTRUCTION INC
17 EAST VALLEY HWY E
AUBURN, W A, 98092
600264803
RODARI*225D9
38860100
aprit@rodarteconstruction.com
Rodarte,April
RENTON, CITY OF
1055 S GRADY WAY RENTON, WA -
98055
Andrew Weygandt
425-430-7208
President Park Water Main
Replacement Project
Ki ng
aboutblank 114
4/2/14 about: blank
City where work was performed
Renton
0
Job site address/directions:
Prime contractor name
Prime contractor registration no
Contract no.
Prime contractor Phone Number
Prime contractor Intent form Id# for this
project
Dollar amount of your contract:
Bid due date
Contract award date
Intent filed date
Job start date:MM-DD-YYYY
Date work completed: MM-DD-YYYY
Project Completion
Monroe Ave NE and Olympia Ave NE
and Pierce Ave NE from NE 11th PL
to NE 10th PL
RODARTE CONSTRUCTION INC
RODARI*225D9
CAG-13-044
253-939-0532
568969
$ 733,003.95
4/9/2013
4/15/2013
5/10/2013
5/20/2013
10/24/2013
Did your subcontractors perform all work No
on this project?
Did your company hire any subcontractors? Yes
Did your company have employees perform Yes
work on this project?
Did this project utilize American Recovery No
and Reinvestment Act (ARRA) funds?
Specifically, did this project utilize any No
weatherization or energy efficiency
upgrade funds (ARRA or otherwise)?
Is the prime contract at a cost of over one No
million dollars ($1,000,000)?
Company Owner Information
How many owner/operators performed 0
work on the project that own 30% or more
of the company?
2/4
4/2/14 aboutblank
i
No company owner added.
Affidavit Subcontractor(s)
Company Name
UBI
License#
CORLISS RESOURCES INC
602237779
CORLIR1880JZ
LLOYD ENTERPRISES, INC
171004642
LLOYDI.238QB
GROUND UP ROAD CONST
INC
602790246
GROUNUR929CR
Journeylevel Wages
#
#
County Trade
Occupation
Wages
Fringes
Workers
Hours
King Flaggers
Journey Level
32.86
1.75
5
342.50
King Laborers -
General Laborer
39.08
1.75
8
857.50
Underground
Et Topman
Sewer Et Water
King Laborers -
Pipe Layer
39.84
1.75
1
240.00
Underground
Sewer Et Water
King Power
Loaders, Plant
49.65
1.75
2
122.00
Equipment
Feed
Operators -
Underground
Sewer Et Water
King Power
Roller, Other
46.87
1.75
1
18.00
Equipment
Than Plant Mix
Operators -
Underground
Sewer Et Water
King Power
Shovel,
49.65
1.75
6
894.50
Equipment
Excavator,
Operators-
Backhoes,
Underground
Tractors: 15 To
Sewer Et Water
30 Metric Tons
King Truck Drivers
Dump Truck Et
46.16
1.75
6
147.00
Trailer
King Truck Drivers
Dump Truck (W.
45.32
1.75
5
73.25
WA -Joint Council
28)
abouttlank 3/4
4/2/14
Apprentice Wages
abouttlank
Public Notes
r=E Show/Hide Existing Notes
No note exists
about: blank 4/4
about: blank
State of Washington
Department of Labor & Industries
Prevailing Wage Section - Telephone 360-902-5335
PO Box 44540, Olympia, WA 98504-4540
Statement of Intent to Pay Prevailing Wage
Document Received Date:
5/10/2013
Company Details
Company Name:
Address:
Contractor Registration No.
WA UBI Number
Phone Number
Industrial Insurance Account ID
Email Address
Fi led By
Prime Contractor
Company Name
Contractor Registration No.
WA UBI Number
Phone Number
Project Information
Awarding Agency
Awarding Agency Contact
Intent ID: Affidavit ID: Status: Approved On
568969 5/15/2013
RODARTE CONSTRUCTION INC
17 EAST VALLEY HW Y E
AUBURN, WA, 98092
RODARI*225D9
600264803
253-939-0532
388,601-00
apri[@rodarteconstruction.com
Rodarte, April
RODARTE CONSTRUCTION INC
RODARI*225D9
600264803
253-939-0532
RENTON, CITY OF
1055 S GRADY WAY RENTON, WA - 98055
Andrew Weygandt
1/3
3I20114 about: blank
Awarding Agency Contact Phone Number
425-430- 7208
Contract Number
Project Name
Contract Amount
Bid due date
Award Date
Project Site Address or Directions
Payment Details
Check Number:
Transaction Id:
Intent Details
CAG-13-044
President Park Water Main Replacement
Project
$733,003.95
4/9/2013
4/15/2013
Monroe Ave NE and Olympia Ave NE and
Pierce Ave NE from NE 11th PL to NE
10th PL
103918864
Expected project start date: (MM-DD-YYYY) 5/20/2013
In what county (or counties) will the work be King
performed?
In what city (or nearest city) will the work be Renton
performed?
What is the estimated contract amount? OR is this $733,003.95
a time and materials estimate?
Will this project utilize American Recovery and No
Reinvestment Act (ARRA) funds?
Specifically, will this project utilize any No
weatherization or energy efficiency upgrade funds
(ARRA or otherwise)?
Does your company intend to hire ANY Yes
subcontractors?
Does your company intend to hire subcontractors No
to perform ALL work?
Will your company have employees perform work Yes
on this project?
about: blank 2/3
3120/14 abouttlank
Do you intend to use any apprentices? (Apprentices No
are considered employees.)
How many owner/operators performing work on 0
the project own 30% or more of the company?
Journey Level Wages
County Trade Occupation Wage Fringe #
Wo rkers
King
King
King
King
King
King
King
King
King
Flaggers Journey Level $32.86 $1.75 4
Laborers - Underground Sewer General Laborer Et Topman $39.08 $1.75 2
Et Water
Laborers - Underground Sewer
Pipe Layer
$39.84
$1.75
Et Water
Power Equipment Operators-
Loaders, Plant Feed
$49.65
$1.75
Underground Sewer Et Water
Power Equipment Operators-
Roller, Other Than Plant Mix
$46.87
$1.75
Underground Sewer Et Water
Power Equipment Operators-
Shovel , Excavator, Backhoe,
$49.23
$1.75
Underground Sewer Et Water
Tractors Under 15 Metric Tons.
Power Equipment Operators-
Shovel, Excavator, Backhoes,
$49.65
$1.75
Underground Sewer Et Water
Tractors: 15 To 30 Metric Tons
Truck Drivers
Dump Truck Et Trailer
$46.16
$1.75
Truck Drivers
Dump Truck (W. WA -Joint
$45.32
$1.75
Council 28)
Public Notes
-. Show/Hide Existing Notes
No note exists
2
2
2
2
2
4
4
about: blank 3/3
State of Washington
Department of Labor & Industries
Prevailing Wage Section - Telephone 360-902-5335
PO Box 44540, Olympia, WA 98504-4540
Statement of Intent to Pay Prevailing Wage
Document Received Date:
8/23/2013
Company Details
Company Name:
Address:
Contractor Registration No.
WA UBI Number
Phone Number
Industrial Insurance Account ID
Email Address
Fi led By
Prime Contractor
Company Name
Contractor Registration No.
WA UBI Number
Phone Number
Project Information
Awarding Agency
Awarding Agency Contact
Intent ID: Affidavit ID: Status: Approved On
589625 8/27/2013
GROUND UP ROAD CONST INC
PO BOX 1690
MILTON, WA, 98354
GROUNUR929CR
602790246
253-677-5594
915, 605-05
susan@grndup.com
Stultz, Susan
RODARTE CONSTRUCTION INC
RODARI*225D9
600264803
253-939-0532
RENTON, CITY OF
1055 S GRADY WAY RENTON, WA - 98055
Andrew Weygandt
3/20114 about blank
Awarding Agency Contact Phone Number
425-430-7208
Contract Number
Project Name
Contract Amount
Bid due date
Award Date
Project Site Address or Directions
Payment Details
Check Number:
Transaction Id:
Intent Details
CAG-13-044
President Park Water Main Replacement
Project
$733,003.95
4/9/2013
4/15/2013
Monroe Ave NE and Olympia Ave NE and
Pierce Ave NE from NE 11th PL to NE
10th PL
104041993
Expected project start date: (MM-DD-YYYY) 8/22/2013
In what county (or counties) will the work be King
performed?
In what city (or nearest city) will the work be Renton
performed?
What is the estimated contract amount? OR is this Time and materials
a time and materials estimate?
Will this project utilize American Recovery and No
Reinvestment Act (ARRA) funds?
Specifically, will this project utilize any No
weatherization or energy efficiency upgrade funds
(ARRA or otherwise)?
Does your company intend to hire ANY No
subcontractors?
Does your company intend to hire subcontractors No
to perform ALL work?
Will your company have employees perform work Yes
on this project?
about.blank 2,3
3/20'14 about: blank
Do you intend to use any apprentices? (Apprentices No
are considered employees.)
How many owner/operators performing work on 0
the project own 30% or more of the company?
Hiring Contractor
Company Name
Contractor Registration No.
WA UBI Number
Journey Level Wages
RODARTE CONSTRUCTION INC
RODARI*225D9
600264803
County Trade Occupation
King Power Equipment Operators Roto-mill, Roto-grinder
Public Notes
Show/Hide Existi
No note exists
Notes
Wage Fringe #
Workers
$46.88 $4.52 2
about:blank 313
312014 about blank
State of Washington
Department of Labor & Industries
Prevailing Wage Section - Telephone 360-902-5335
PO Box 44540, Olympia, WA 98504-4540
Statement of Intent to Pay Prevailing Wage
Document Received Date:
9/6/2013
Company Details
Company Name:
Address:
Contractor Registration No.
WA UBI Number
Phone Number
Industrial Insurance Account ID
Email Address
Fi led By
Prime Contractor
Company Name
Contractor Registration No.
WA UBI Number
Phone Number
Project Information
Awarding Agency
Awarding Agency Contact
about blank
Intent ID: Affidavit ID: 502889 Status: Approved On
592182 9/11/2013
CORLISS RESOURCES INC
16805 64TH ST E
SUMNER, WA, 98390
602237779
253-845-6983
041,114-07
cbettamy@cortissresources.com
Bellamy, Candice
RODARTE CONSTRUCTION INC
RODARI*225D9
600264803
253-939-0532
RENTON, CITY OF
1055 S GRADY WAY RENTON, WA - 98055
Andrew Weygandt
V3
3/20/ 14 about:blank
r
Awarding Agency Contact Phone Number
Contract Number
Project Name
Contract Amount
Bid due date
Award Date
Project Site Address or Directions
Payment Details
Check Number:
Transaction Id:
425-430-7208
CAG-13-044
President Park Water Main Replacement
Project
$733, 003.95
4/9/2013
4/15/2013
Monroe Ave NE and Olympia Ave NE and
Pierce Ave NE from NE 11th PL to NE
10th PL
104057227
Intent Details
Expected project start date: (MM-DD-YYYY) 8/19/2013
In what county (or counties) will the work be King
performed?
In what city (or nearest city) will the work be Renton
performed?
What is the estimated contract amount? OR is this Time and materials
a time and materials estimate?
Will this project utilize American Recovery and No
Reinvestment Act (ARRA) funds?
Specifically, will this project utilize any No
weatherization or energy efficiency upgrade funds
(ARRA or otherwise)?
Does your company intend to hire ANY No
subcontractors?
Does your company intend to hire subcontractors No
to perform ALL work?
Will your company have employees perform work Yes
on this project?
about: blank
3/20 14 about:blank
Do you intend to use any apprentices? (Apprentices No
are considered employees.)
How many owner/operators performing work on 0
the project own 30% or more of the company?
Hiring Contractor
Company Name
Contractor Registration No.
WA UBI Number
Journey Level Wages
County Trade
King Truck Drivers
Public Notes
- Show/Hide Existing Notes
No note exists
RODARTE CONSTRUCTION INC
RODARI*225D9
600264803
Occupation Wage Fringe #
Workers
Transit Mixer $35.55 $7.68 10
about: blank 3/ 3
3/20114 ahouthlank
State of Washington
Department of Labor & Industries
Prevailing Wage Section - Telephone 360-902-5335
PO Box 44540, Olympia, WA 98504-4540
Statement of Intent to Pay Prevailing Wage
Document Received Date:
9/16/2013
Company Details
Company Name:
Address:
Contractor Registration No.
WA UBI Number
Phone Number
Industrial Insurance Account ID
Email Address
Filed By
Prime Contractor
Company Name
Contractor Registration No.
WA UBI Number
Phone Number
Project Information
Awarding Agency
Awarding Agency Contact
about: blank
Intent ID: Affidavit ID: Status: Approved On
593862 9/18/2013
LLOYD ENTERPRISES, INC
PO BOX 3889
FEDERAL WAY, WA, 98063
LLOYDI*238QB
171004642
253-874-6692
256,406-00
LUANND@LLOYDENTERPRISESINC. COM
DAVIS, LUANN
RODARTE CONSTRUCTION INC
RODARI*225D9
600264803
253-939-0532
RENTON, CITY OF
1055 S GRADY WAY RENTON, WA - 98055
Andrew W eygandt
1/3
3/20/ 14 about:blank
Awarding Agency Contact Phone Number
425-430-7208
Contract Number
Project Name
Contract Amount
Bid due date
Award Date
Project Site Address or Directions
Payment Details
Check Number:
Transaction Id:
Intent Details
CAG-13-044
President Park Water Main Replacement
Project
$733,003.95
4/9/2013
4/15/2013
Monroe Ave NE and Olympia Ave NE and
Pierce Ave NE from NE 11th PL to NE
10th PL
104067583
Expected project start date: (MM-DD-YYYY) 6/28/2013
In what county (or counties) will the work be King
performed?
In what city (or nearest city) will the work be RENTON
performed?
What is the estimated contract amount? OR is this Time and materials
a time and materials estimate?
Will this project utilize American Recovery and No
Reinvestment Act (ARRA) funds?
Specifically, will this project utilize any No
weatherization or energy efficiency upgrade funds
(ARRA or otherwise)?
Does your company intend to hire ANY No
subcontractors?
Does your company intend to hire subcontractors No
to perform ALL work?
Will your company have employees perform work Yes
on this project?
about: blank 2/3
3/20/14 abouttlank
Do you intend to use any apprentices? (Apprentices No
are considered employees.)
How many owner/operators performing work on 0
the project own 30% or more of the company?
Hiring Contractor
Company Name RODARTE CONSTRUCTION INC
Contractor Registration No. RODARI*225D9
WA UBI Number 600264803
Journey Level Wages
County Trade
King
Laborers
King
Laborers
King
Power Equipment Operators
King
Power Equipment Operators
King Truck Drivers
King Truck Drivers
Occupation
General Laborer
Raker - Asphalt
Roller, Other Than Plant Mix
Roller, Plant Mix Or Multi -lift
Materials
Dump Truck (W. WA -Joint
Council28)
Dump Truck Et Trailer
#
Wage
Fringe
Wo rkers
$35.32
$5.51
2
$36.60
$5.51
1
$42.44
$6.18
1
$44.80
$6.18
1
$41.49 $5.58 2
$42.33 $5.58 1
Public Notes
Show/Hide Existing Notes
-- On 9/16/2013:--
The general laborer will be manually digging and spreading materials with hand shovels.
LEI#263613
abouttlank 3/3
3/20/14
.14 about blank
State of Washington
Department of Labor & Industries
Prevailing Wage Section - Telephone 360-902-5335
PO Box 44540, Olympia, WA 98504-4540
Affidavit of Wages Paid
Document 3/7/2014 Intent 592182 Affidavit 502889 Affidavit Approved
Received Date Id Id Status on
3/10/2014
Your Company Information
Name
Address
02%VI'-]
Contractor Registration no.
Industrial Insurance Account Id
Email Address
Filed By
Project Information
Awarding agency:
CORLISS RESOURCES INC
16805 64TH ST E
SUMNER,WA,98390
602237779
041,114-07
cbellamy@cortissresources.com
Bellamy,Candice
RENTON, CITY OF
1055 S GRADY WAY RENTON, WA -
98055
Awarding agency contact: Andrew Weygandt
Awarding agency contact phone number: 425-430-7208
Project Details
Project name
County where work was performed
President Park Water Main Replacement
Project
King
about. blank 1/3
3/20/14 about: bIank
City where work was performed
Renton
Job site address/directions:
Monroe Ave NE and Olympia Ave NE
and Pierce Ave NE from NE 11th PL to
NE 10th PL
Prime contractor name
RODARTE CONSTRUCTION INC
Prime contractor registration no.
RODARI*225D9
Contract no.
CAG-13-044
Prime contractor Phone Number
253-939-0532
Prime contractor Intent form Id# for this
568969
project
Dollar amount of your contract:
$ 3,689.84
Bid due date
4/9/2013
Contract award date
4/15/2013
Intent filed date
9/6/2013
Job start date:MM-DD-YYYY
8/19/2013
Date work completed:MM-DD-YYYY
9/3/2013
Project Completion
Did your subcontractors perform all work
No
on this project?
Did your company hire any
No
subcontractors?
Did your company have employees
Yes
perform work on this project?
Did this project utilize American
No
Recovery and Reinvestment Act (ARRA)
funds?
Specifically, did this project utilize any
No
weatherization or energy efficiency
upgrade funds (ARRA or otherwise)?
Is the prime contract at a cost of over
No
one million dollars ($1,000,000)?
Company Owner Information
How many owner/operators performed
0
about: blank
2/3
3/20/14 -1 abouttlank
work on the project that own 30% or
more of the company?
No company owner added.
Affidavit Subcontractor(s)
No subcontractor is selected for this affidavit.
Journeylevel Wages
County
Trade
Occupation
Wages
Fringes
King
Truck Drivers
Transit Mixer
35.55
7.68
Apprentice Wages
Public Notes
- Show/Hide Existing Notes
No note exists
Workers Hours
2 5.75
about: blank 3/3
r
Escrow Number: LVI ' - t I .� { l ,1) IJ1
Agency: _ City of Renton
Contract Number: CAG-13-044
Project Name: President Park Water Main Replacement Project
RETAINED FUNDS
ESCROW AGREEMENT
TO: Wells FarRo Bank. N.A.
Tacoma Business Banking
Attn: Marsha Bums, Vice President Phone: 253-593-5422
1210 Pacific Ave., 3rd Floor
Tacoma, WA 98402
The undersigned, Rodarte Construction, Inc. , hereinafter referred to as the Contractor,
has directed the City of Renton , hereinafter referred to as the City, to deliver to you
its checks, which shall be payable to you and the Contractor jointly. Such checks are to be held and
disposed of by you in accordance with the following instructions and upon the terms and conditions
hereinafter set forth.
INSTRUCTIONS
The City shall deliver to you from time to time checks payable jointly to you and the Contractor.
You are hereby authorized by the Contractor to endorse in the Contractor's name any such check so
that you may receive the proceeds thereof and invest the same. The power of endorsement hereby
granted to you by the Contractor shall be deemed a power coupled with an interest and shall be
irrevocable during the term of this escrow. Although you may be a payee named in such checks as
shall be delivered to you, your duties and responsibilities with respect to the same shall be only those
duties and responsibilities which a depository bank would have pursuant to Article 4 of the Uniform
Commercial Code of the State of Washington for an item deposited with it for collection as of the
date such check shall be delivered to you. The proceeds from collections shall be used by you to
purchase, as directed by the City, bonds or other securities chosen by the City on behalf of the
Contractor and approved by you. For the purpose of each such purchase, you may follow the last
written direction received by you from the City, provided such direction otherwise conforms with
the restrictions on investments recited herein. Attached Addendum A is a list of such bonds, or other
securities approved by the City. No further approval is necessary if any of these bonds or securities
is selected by the City. Other bonds or securities, except stocks, may be selected by the City, subject
to express written approval by you. Purchase of such bonds or other securities shall be in a form,
Escrow Agreement for Retained Funds
Page 1 of 4
i
which shall allow you alone to reconvert such bonds or other securities into money, if you are
required to do so by the City as provided in paragraph 4 of this escrow agreement. The investments
selected by the City, and purchased by you must mature on or prior to the date set for the completion
of the contract, including extensions thereof or thirty days following the final acceptance of said
improvement of work.
2. You are not authorized to deliver to the Contractor all or any parts of the securities held by you
pursuant to this agreement (or any monies derived from the sale of such securities, or the negotiation
of the City's checks) except in accordance with written instructions from the City. The City shall
inform you and keep you informed in writing of the name of the person or persons with authority to
give you such written instructions. Compliance with such instructions shall relieve you of any
further liability thereto. The estimated completion date on the contract underlying this Escrow
Agreement is September 30, 2013 . Upon request by you, the City shall
advise you in writing of any change in estimated completion date. If the estimated completion date is
changed, you are authorized to reinvest the monies hereunder in accordance with the new estimated
completion date.
3. In the event the City orders you to do so in writing, and withstanding any other provisions of this
Agreement, you shall, within thirty-five (35) days of receipt of such order, reconvert into money the
securities held by you pursuant to this agreement and return such money together with any other
monies, including accrued interest on such securities, held by you hereunder, to the City.
4. The City agrees to pay you as compensation for your services any reasonable cost for set-up of this
escrow agreement: No payment required
Payment of all additional fees shall be the sole responsibility of the Contractor and shall not be
deducted from any property placed with you pursuant to this agreement until and unless the City
directs release to the Contractor of the securities and monies held hereunder whereupon you shall be
granted a first lien upon such property released and shall be entitled to reimburse yourself from such
property for the entire amount of your fees and any unanticipated amounts which might be owing as
provided herein. In the event that you are made a party to any litigation with respect to the property
held by you that you are inquired to render any services not provided for in these instructions, or the
event that the condition of the escrow are not promptly fulfilled or that there is any assignment of
interests of this escrow or any modification hereof, you shall be entitled to reasonable compensation
for such extraordinary services from the Contractor and reimbursement from the Contractor for all
costs and expenses, including attorney fees occasioned by such default, delay, controversy or
litigation.
Should you at any time and for any reason desire to be relieved of your obligations as escrow holder
hereunder, you shall give written notice to the City and Contractor. The City and Contractor shall,
within 20 days of the receipt of such notice jointly appoint a successor escrow holder and instruct
you to deliver all securities and funds held hereunder to said successor. If you are notified of the
appointment of the successor holder within 20 days, you may return the subject matter to the City
and upon so doing, it absolves you from all further charges and obligations in connection with this
escrow.
Escrow Agreement for Retained Funds
Page 2 of 4
r
6. This agreement shall not be binding until executed by the Contractor and City & accepted by you.
7. This instrument contains the entire agreement between you, the Contractor and the City with respect
to this escrow and you are not a party to nor bound by any instrument or agreement other than this;
you shall not be required to take notice of any default or any other matter, nor be bound by nor
required to give notice or demand, nor required to take any action whatever except as herein
expressly provided; you shall not be liable for any loss or damage not caused by your own
negligence or willful misconduct.
8. The foregoing provisions shall be binding upon the assigns, successors, personal representatives and
heirs of the parties hereto:
The undersigned have read and hereby approve the instructions as given above governing the administration of
this escrow and do hereby execute this agreement the
Rodarte Construction Inc.
(Contractor)
91-1016627
(Tax I.D. or Social Security Number)
By:
J
JR Rodarte, President
(Title)
17 East Valley j wy E
(Address)
Auburn, WA. 98092
(City, State, Zip)
day of 2013.
LIM
(City)
(Name and Title)
Approved as to form:
This above escrow instruction received and accepted thisday of , 2013.
Wells Fargo Bank, N.A.
2 (Bank or.Tnrst Co an )
(Au orized Sign re)
Escrow Agreement for Retained Funds
Page 3 of 4
rr
ESCROW AGREEMENT ADDENDUM A
Investment deposits, including certificates of deposit, kti ith qualified public depositories are
defined in Chapter 39.50 Revised Code of Washington.
Certificates, notes, or bonds of the United States, or other obligations of the United Stations or
its agencies, or of any corporation wholly owned by the government of the United States ( such as the
Government National Mortgage Association.)
Obligations of government -sponsored corporations which are eligible as collateral for advances
to member banks as determined by the Board of Governors of the Federal Reserve System. ( These
include but are not limited to Federal Home Loan Bank notes and bonds. Federal Farm Credit Bank,
consolidated notes and bonds. Federal National Mortgage Association notes, debentures, and
guaranteed certificates of Participation.)
Bankers acceptances purchased on the secondary market.
Escrow Agreement for Retained Funds
Page 4 of 4
LAKESIDE INDUSTRIES, INC.
i J
r gc: I i u I t s
Ta-rL —.—Hat.
'k'00
IRODUC, T MD I -QAj)- T 10
t/TODAY -21
V
�),j Co.Nx. RL
�R jj t
.V\ 1, LA IIIII(JINMA %W
HOT ASPHALT MATERIAL SAFETY DATA SHEET ON REVERSE
LA K 1--%) 1 D I -* INI) k—STRI F.S, INC.
ITE 0" KII Jq f F) I V JS I ON
IL J,
If
I Nq
f)ND LO(A) '1704f) L
7 I i
\1 I WIN )JU I \1*1'i I XWI (61 It m V t L CONT. REG # LkKESI*274JD 0 OR. CCI3 V18542
HOT ASPHALT MATERIAL SAFETY DATA SHEET ON REVERSE
}
Li.,.;'i lJi"tf F; � i••[; "ilT<1'ifb f 1 GiJ
1 ritr rc .�r:�3 1.:I►'rfcl=f!trii Liti�
T-Fa'r ca hies t.
I L11) 1 1) ',ill•) 1 ); i�?,'r'!J
rl
(`
rCONN'REG#1_;kI r ?
IiOT ASPHALT MATERIAL SAFETY DATA SHEET ON REVERSE
�):r �ii INDUSTRIES, I�.� .
i
I I Pli, .It It '-.I I ', FMPI.OYER ■ WA. ST. CONT. REG tt LAKESI'2'4JD ■ OR CCB :: !
HOT ASPHALT MATERIAL SAFELY DATA SHEE1 ON REVERSE
KENT DIVISION
WA 9804
T
4
o x
Tru6e.
r.L or
Tave
2 72 3 0 1. h
EPP!,, - 7471-' )00
12 3 41 Mg 37 llq
tits.LY
-. J.114LLlLy ny
Company:
01 LLOYD ENTERPRISES, INC.
Time:09:37
--------------------------------------------------------------------------------------
Customer
Number: R0005
Telephone:(253)939-0532
Terms:10TH OF MO FDI
RODARTE
CONSTRUCTION INC
Salesman :
Tax Auth. 27
17 EAST
VALLEY HWY E
Credit Limit:
999,999
YTD Sales
408
Largest Bal:
138,586
YTD Pymnts:
0
AUBURN WA 98092
Date Of Bal.:
11/04/13
Last Pymnt: 12/23/13
Open
Invoices: 11,928.59 On Account
Amnt:
27.00(All Companies)
Open
Credits
.00 Current Balance:
11,901.59
Open
Invoice
Date Job Number
Gross Amount
Payments
Adjustments
Balance
--------------------------------------------------------------------------------------
O/A
12/23/13
.00
27.00
.00
27.00-(())
173373
09/11/13 263613
94,291.41
82,124.27
2,547.58-
9,619.56 ifC�►G�tS
175195
11/14/13 267813
80.00
.00
.00
80.00
175205
11/13/13 MTP 0001
30.24
.00
.00
30.24
176235
01/14/14 MTP 0001
210.88
.00
.00
210.88
FCA02E
07/31/13
110.73
.00
.00
110.73
FCA02F
08/30/13
152.67
.00
.00
152.67
FCA030
09/30/13
44.31
.00
.00
44.31
FCA031
10/31/13
1,145.30
.00
.00
1,145.30
FCA032
11/30/13
240.89
.00
.00
240.89
FCA033
12/31/13
97.30
.00
.00
97.30
FCA034
01/31/14
97.30
.00
.00
97.30
FCA035
02/28/14
99.41
.00
.00
99.41
Current Over 30
Over 60
Over
90 Retention
On Account
99.41
97.30 308.18 11,423.70
.00 27.00-
(i)
LAKESIDE INDUSTRIES, INC.
KENT DIVISION 7icket #:
RM39'
18808 SE
256th STRE
Covj.ngton , WA 9t
ate: 08/26/1�
253-631
~�
3611 rJU[)
07
09 AM
«** Silo
1 L d
-
-r-e--s-s-:
004343
D I
999
9P�
Nme: Lloyd ,n
Ic.
P�RK
A-I-ld)-d:
P. 0. Box 3A89
NRAVE N� FIE",
109TH9
Federal Way, WA 980633A89
RENTON, WA
Phone: 2538�46692
P00:
Truck and Carrier Truck Weiahts
`
U\l
k
....Descript:
1 �]
�D
105120 lb 39020 lb
66100
lb
--
52.56 Tn 19.51 Tn
'
33.05
Tn
47.68 Mg 17.70 Mg '
29.98
Mg
0 lb -----Legal----'
. `
0
lb
PRODUCT AND
LOAD TOTALS
Name: 1/2NMA 6422
33.05 Tn
43.01 Tn
JMF#:
29.98 Mg
39.02 Mg
Seal: 307
W.Ill aster: Rcv'd By: ~�r Load Total: 66100
-----'AN't{UAL MWA. uzC0Nt�6 41A, i��141b'w-bk.oB # 108542
�� LJ",ACOUAI'r&Rx`=O.". Q^==rV°",""u==rnw0=vCm*=
LAKESIDE INDUSTRIES, INC.
KENT DIVISION /'et
#: �0�42�
18808 SE 256th STRE Covington Wr,
Date: 08/26/1�
~
,
|
. 253-631 3611 a/
Y'i 09 24
*** Sio 1
_______________
ID:
004343 ID: _ ITEM
999999
Name:
Lloyd Enterprises, Inc. Name: PARK
Address:
P. 0. Box 3839 Location MONROE AVE NE & NE
1011-1 P
Federal Way, WA 980633889 RENTON, WA
Phone:
25�8746692 PU#:
_____
b�� _ __ _
Truck ID:
L132T
r= Mo Gross Tare.
Met
Descript:
1 i05320 lb 39020 lb
66300 lb
�u" P�/ 52.66 Tn 19.51 Tn
3,:.15 Tn
�-� 47.77 Mg 17.70 Mg
30.07 Mg
0 lb
---._----........................
-_-PR.0DwT.-ANQ0-L0AD-T.0TAL.S_................ ...... ......... -...................... '
ID: 127
----.4/10PA0[
Name: 1/2HMA
6422 129.06 Tn 139.02 Tn
JMF#:
117.08 Mg 126.12 Mg
Seal: �07
W.Master:_
...................... _................... ____ Rcv'd By:_ __ . _____ __ Load Total:
66300
mxs0nm'OPPORTUNITY EMPLOYER 6 WA. ozcoxTnEs# LAuESa~274Jo0OR. Coo# 1085*
LAKESIDE INDUSTRIES,INC.
VENT DIVISION Ticket #: 20852-
�8808 SE 056�h SIRE Covingho�` , WA 9804 Date: 08/26/1��
253-6131.... 3611
*** Silo 1 Loaduut ***
____
ID: 004343
Name: Lloyd Enterprises, Inc.
Address: P. 0. Bmx 3889
Federal Way, WA 980633889
Phone: 2538746692
Truck and Carrier Information
Truck IQ: L132T
Descript: 1
---, _
_,-------......... ... -...... ....... ......... ............... .........
II>: ITEM 999999
Name: PR[SlDEN� PARK '
Location MONRUE AVE NE & NE 10TH P
KENTON, WA
PO#:
Truck Weights
Gross Tare
_
105�20 lb 39020 lb 66000 lb
52.51 Tn 19.51 Tn 33.00 Tv-1
47'C� Mn 17.70 Mg 29.94 Mg
Mpg noLegal---'- 0 lb
0UU
IB: 127 IWTODAY II/TO DATE
Name: 1/2HMA 6422 321.14 Tn 331.10 Tn
JMF#: 291.33 Mg 300.3,7 Mg
Seal: 307
W.Master: Rcv'd B �-�'__ _ .
Load Total: 66000
------����l�����nj����ur�up�n�cn � x��sz���t�i���L���/�z�o� nu���o�mos�m
LAKESIDE INDUSTRIES, INC.
KENT DIVISION
18808 SE 256th STRE Covington , '')A 9804
Date: 08/26/1�
253-631-3611
Time: 12:13 P�
Loadout ***
ID: `
004343 ID: IlEM
999999
Name:
Lloyd Enterprises, �nc. Name: NT PARK
'
Address:
P. 0a Box 3889 Location MUNRDE AVE'NF & NE
1011-1 P
Federal Way, WA 980633889 RENTON, WA '
Phone:
2538746692 ' PD#:
__- ��[�_�l�fx�rm��t"1� -l[��@��
_......._ -.
'[ruck
IDo L1���T
[�]
�
��
__ __ ___ '___04�rt_.__
Descript:
l p�
`|) 3g020 lb
66100 lb
\n 19.51 Tn
33.05Tn
47.68 Mg 17.70 Mg
29.��8 Mg
0 lb .... .... ...... .... Legal-^ .... ....
- 0`lb
PRODUCT AND LOAD TOTALS
ID:
127 ----��8�O��, '---'���l��']0�B[�
Name:
1/2HMA 6422 224.99 Tn 234.95 Tn
JMF#:
244.11 Mg 213.14 Mg
Seal:
307
� �
W.Master:
d Load Total:
----musVrmopPORTuwo,-cmpmvFR MnA�srcnx�-nms#LAmRSj-274Jo-lff'o»z1rB #)08542
66100
HOT Amp*A/rMArpm/u/sAprrvnArun*FpromnrvFmnp
INC.
-----~'--^-INDUSTRIES, (l�)/
�u. .�
.�ur=
KENT DIVISION #: 298401
18808 SE 256th STm-, Covington , WA 9804 Date: 08/26/1�
253-631-3611 ' 7ime: 07:28 (-)IV
*** 8ilo 1
ID:
Name: Lloyd Ent' �nc..
Address: P. 0. Bo
R, Q
Federal |` U(/U
Phone: 253874(
Truck and Carrier Information
Truck ID: L1W8t
Descript: 1
ES
KENTON, WA
PO#:
Truck Weiahts
Gross
Tare
Halt
992lb
35680 lb
63540
lb
49.61 Tn
17.84 ln
31.77
Tn
45.M1 Mg
16.18 Mg
28.82
Mg
0 lb
-----Legal-----
0
lb
_PRODUCT AND LI
3/TO DATE
Load Total: 63540
VAT. npPOnnMnrEMPLOYER N WK # 1085*
U^'r°OMLI A''r"""'rM0'"` C"VC-k; k";r"eu�v-r ^M n=`P"nl-�
LAKESIDE INDUSTRIES, INC.
KENT DIVISION
1.860i:4 .:3€: ?5(:,J, 6w ':)t3o4 Da -{:Fa 08:
%?;`.';::'s... (:.:31_... ;3E:,:1, :1 T':i.lr�c::• e :1.1. r. (��"? r'ctY
CUSTOMER IWORMAT I ON
............ .... ...... . _ ................ ............,.
004::34:.3
c•-
t�'ic:it:l i•i:�::»:: F�' i�)., %;t3ri ::3.':11�4 :�
F ede-rixl. W-.-v, Wit
�. _.._.. ijFp! i'iATION
€''I(:)1.1N(:)(:: 1:)VL:.
1il::iaTi)h!y 6W)
i::IO ::
_Truck
_.....................................................................................__
and Carrier
Information
.... _.......... , ........................ _
.
T)CMg Weights_......._
.......... ...................._......:
i �r� c.cc� 1��. :i: T} ::
1...1. t%)�il•i;
�
�rr�s�
ri pt, ::
I
:1.
M
`
(�� '�17(,f0
I. L)
.Tare
3.:.,t:,t:li:3 I la
..�...._..._....
UV�LStJ
►��
)•• i S:4
T 1'1
1. !„ 44 Tit
.3i:.'.„ 04
` 1--[
f:?:i
I111A
l.t:;„ :1.i:4 fYll:€,
is?`::4,. i9"l'
1YIr:l
0
:1. 1:1
........,........ I...eEA:l................_..
0
:L L;
_.........._......_,.
........ _._._.PRODUCT....AND....LOAD..
TOTALS............_
... _...._._. _................
._......._..
I: X} 1.,(.27
5/TODAY`
...... .................... ..__..........
6/TO
__.....__.. �_....__......__..__....
DATE
N,.kme- 1/21-1110
161. 1,0 Tv)
Tv)
J'I1F*W:
:146„ 1.5 Ivin
:15r.":„
18
Mg
W. !Y€.-.I >-t e-v f:c:.'v'' d 1::4 l c;i:u:l l ca i;s:t:€. ;: (:,�4Q)�40
y •.
AN EQUAL OPPORTUNITY EMPLOYER ■ WA. ST CONT. REG # L.AK SI.274JD ■ OR. CCB # 108542
HOT ASPHALT MATERIAL SAFFTY nATA SHFFT ON RFVFRSF
LAKESIDE INDUSTRIES, INC.
K.EMT DIVISION 208-q&
:1.�5fJ08 S1:_ i�,:;G'!'.1'r F::: �;��v i.rz i;c31� ., W(a `it f=s l�: i:caw [:it3ri'r:;�':1.::
r 53....G:31 -13611.
x x x ;:) :i.1. c) :I. L (w:ua (:xt't # )c x
CUSTOMER INFORMATION
_................._.._............_....._..............._....
_.........
...........__.._..........__.._..............
_....
_........
_.......
_.......
I�I��n�Fr I...1c)yci
Way, Wfl 98r36,3:388`)
INFORMATION
..... .._...... _ .._.... _._. . _.__._..._.............._...w-.m__............... ..... ... ...._......... .......... ..._.._............
I'Fil-�iJ:T)l:::I{r I::,f1Fil:
I...�:�c zt:ic:)►� .:i::. (tVl: 1�IE:: & 1'li: I.i%13{I F•1
r ENI'01,1, WA
_....Truck and Carrier. ,information Truck. Weights..._ ...... 4:..__......_......._......_...._._..._.
............................._......_..........-........._._......_.._........._...._
i'ru(:; k. T 1) :: 1-1. 0, 811; Gross Tare Met
__...._..._..._._. .............-.._......_..,..._..._.....�.............. _... ....
.._
1Dc� )c 'r i l:> !; ; L i`�t,t=,ft :1. la :3;:fE,tSti) 1 . f:,::3` 8..0 11:
ERncTr=
MINL�DD A`:),. 813 '1 1.1 1.'7.. 1.14 -f n .:31... �:i9 �f•,..F
5.. 211 114 1.f ..:1.8 el 29. 0i? I*Icl
0 1. h ........ .._.... .... L ra tl al . ................. 0 1 b
PRODUCT AND .. LOAD„_ TOTALS
_......._....__..._......_...._...._....___..._..._..._.._....__...._............. ........ .......... ........
I DD : 1.27 8lTODAY 4/TO DATE
Itl<amca s 1/21-111(l 64'r.ti.. f f :1Lr . `:3i:1 'Y'rl 266.. 94 '1'r)
1'IYI# 0 ; i::?::3,3. 113 Ill ;?42. 1...., Viol
W.. rl<..%i-; I:F..''1' :........ ............_ ... P'c--v �, H 1?}l:................................ ..-......,. .....__.. L.(.)ad X (7tl."N ,
.. �.,............... .. .7
tCN EZUA PORTUNITY EMPLOYER ■ WA. ST. CONT. REG # LALKESI.2.4JD ■ OR. CCB # 108542
UAT ACDYAI T IIAATCDIAI CACCTV AATA CI.ICCT Akl DCVCDCC
LAKESIDE INDUSTRIES, INC.
KENT DIVISION T a.r f�.cat; # c'dSat
1.8808 #:;G.:: 2•`..i@: -Uh �;Ti;FW C(:)Vi.)')i1t;(:)rl , W(a 980/t
•`l' i.m6: 0,3 w .:34 Ully
ar**-
CUSTOMER INFORMATION INFORMATION
........ ................. ........... ........
_.........._......__................_..........................__....._......._......._._...._....................... _._._........ _........_
,.............
�.ar:,.:3f,:i.:a 'f %111 91:`:?')�}`:)
I�l�:�ri�F�,;; I...:1.rayil E::z){:ta•,-1,•e�i��,r>7 1:rtf�.. hlati7i•:�;; �:•.::<.�::'.:.I�1't' ,1��(�F41; ' '.
�'�r.1 r1 .+°t:•ti r..l t:b%.' 1•<°.. 0., Dox 134,89 Iy(0F•iN0[:: CWE:: Ni . & HE. :1 0 41-4 P
F(-.,der;A:1. WAY, WW'--)8 6,3.:38F+`::1 Ii'E::hal'f11�1., 44)
Truck and, ..Carrier Information
........•........ .... ......... _............ .... ............ _...... ................. .......
T, v-u e f•f. :C T) 1.:.1. 08 ' .
1.7Ga Se -f` a. 1..) 1::: :1
LKI MR7
I ip
-
PCAl ::
_....__ ..
......... _ .
Truck Wei nht�::._........:.........:........._
... .........
�...rnss..._....
_...... Tare ..............
Net
........_..
26. ir113 Tr)
1 P.. 10 I Yl
T .)
r":-
e:..,.r .. F ::3 1"f i.
1. 0,. ?: 8 1'11:j
E 4.. 4
Ili Ij
0 :1.1.)
0
JA-)
,f}RODUCT AND EGAD TOTALS
1:1) :: 127 I1/TODAY IPYTO DATE
.._.._ ......_.__...� ._.........._............_..._ _
3::P. 07 'T 1.1 ,"347.. 03 'T"n
.3:1.4.8P ip1r.1
L,k:�A :I.. ::30 r '� r
�.,
W. hl�A.:>i,e'('v
-EQUf LOP VT
.:iPLOYER ■ WA: ST'CONT. RFG ## LAKf:SI*274JD ■ OR. CCB # 108542
PHAI T MATFRIAl RAFFTV nATA RNFFT nN RFVFRCF
31860 0
L&K ESDDEINDUSTRIES, INC.
�
KENT DIVISION ��~ Ticket #: 2w4at
18808 SE 256th STR[ Covington Wo 9804 Date: 08/26/1,`
_ 253-631-3611 ' me" m8:07 A�
*** Siln 1 Lo d
CUSTOMER INFORMATION
ID: 004343 ��----------------
Name: �loyd E\�terprises, Inc. Name: + N[ PARK
Address: P. 0. 8ox 3889 Lcfc"ation M(]MROE AYF NE & NE 10TH P '
Federal �ay, WA 980633889 ` ''� ' RENTON, WA
Phone: 2538746692
..
Descript: 1
Gross
Tare
met
105220 ]b
'430 +b
6218N
lb
52.61 Tn
21. W. Tn
31.09
Tn
47,73 MQ.
Mg
28.1.11
Mg
0 lb
-----Leqal-----
0
lb
Naoe: 1/21-iMA 6422 95.91 Tn 105.87 Tn
Seal: 307
W.Master: '~ �� «� d-��� �n�t Total: 62180
'-----AmeQuA�OpponrczwrrrMpLbt�um vucxzcnnzxrs�u���a^zr�onn�nn.cca��on��
(i)
LAKESIDE INDUSTRIES, INC.
,65100
b?0
KENT DIVISION It. 2084&
:l.t:)t:}08 ;:,C::. 'r:';��f,•t;l-) >'I�l-"1:: (:.ovi.iicli:t:»� ., WFa ':�1',t�)=t ))�aGi t<8/%.'.f:,/ {.;
251,:5 f..31..-3CiJ.:1. , .
rE x x : J.
L
oacl
as(:
CUSTOMER INFORMATION .... ................................................................... __ ('1 )a1`):`1Y). 'F'.: l_
hl; mcro :: I...1c)yd I:i:rl ht•:� r Iy r:i.<y�:.,:,, :C rtc: Id�y.ntc::� � !='f�h:`yJ:Y) : �t T !'f`iF r , .._ .; :.
flrlclP. N). Y:rc3x 38f3`) I ... r.>t::<:tt::i.tarf {*! ..)I::.- OVE ill:: t Idk:: :1.0TI-I 1''
Way, Wf"t ':�t:Y►)k:,:3:3F.1fJ`::i hF:::hI Tt;)I�i., Wfi '
,.__ ,, Truck._,and...-Carrier. Infor'mat on _ ...-_.
..T.ruck....Wei'ghts_.::.`?.:.....:..... _... _.. ...................... ................ .....
Gross Tare;-., Net
``4P.:3f:, TY1 4?1. 5c? .1..1i.-'. :30.. 64 T ri
47'.50 111.1 P.). `':ir i'1 rl i:? f . `: b Ill la
r':...ODIICT .AND LOAD TOTALO_...._........._.........
b/TODAY 7/To „ DATE
1.9 1— ` 4 T y..i
111F It ;: :L'7�a .. 'L ::3 1•i ►� 1,813.1.6 MCI
W. Mal :it,'ei ...._..._............. .-1--... cl I ... -... ........... _ ....... ...... ... ..-... L..(w.-t a
AN EQUAL OPPORTUNITY ENIPL0IT-.R ■ WA. ST. CONT. REG # LAKESI.274JD ■ OR. CCB # 108542
HOT ASPHALT MATERIAL SAFETY DATA SHEET ON REVERSE
LAKESIDE INDUSTRIES,
--^ 7\� �
��-�
L/ ~
KENT DIVISION #: uINkW.
18808 SE 256th STRE <�ovingt".' , WA 98W� uate: 08/26/1��
' 253-631-J611
*** Silo 1 Loadout ***
--'-----------'---------^-~'-' -' '-'-------'l-D-�---' ORMATION
--'=====���------.................. -.' �'
l7EM 999)9004343
Name: Lloyd Enterprise,*, Inc. Hame: T PARK
Address: P. 0. Box 388� ' Locatinn MONR[E A�E NE & NE 10TH P
�gderal Way'� WA 9806338 8:9 REN1,81"l, WA
Phone: 2538746692 PO#:
][vv pp,
Truck ID: 1-.94T Gross Tare met
Descript: 1 105360 lb 43040 lb 62320 lb
uu" 52.G0 ln 21.52 Tn 31.16 Tn
L� ^~ 47.79 Mg 19.52 Mg 26'27 Mg
0 lb -----Legal----' 0 lb
PRODUCT AND LOAD TOTALS
Seal: 307
-� By: |nad Total: 62320
ot'AL OP � vn\src���n����- �midR'. 108542
woT Aqpwu/rUur=pm pu==rvn«raQu==rnmm=v=0p=
����SIO6l�DDS�RJ��1 --' INC. ^7�'��-��/l
�l c�«
(i) ` -
KENT DIVISION Ticket #: 2086M
18808 SE 256th STRE Covington , WA 9804 Date: 08/27/1':;
253-631 5 A�
*** Silo 2 LdMit
CUSTOMER INFORMATIONFORMATION
------_---'-_-___-----_'--_----_-'__�--------- _--,_-' _---... ........ .... ...... -........................
__--
ID: 004343 ID: ' ITEM 999999
Name: Lloyd Enterprises, Inc. Name: I g��N}'PARK
Address: P. 0. Box 3889 Location MONRG AVE HE & NE10TH p
Federal Way, WA Rl*::_*N
Phone: 2538746692 PO#: 07
���_������������ �����_ ��_��������� ���������_���
....... Net____
Descript: | 96960 lb v*-'�60 lb 60100 l6
48.4&'s Tn v 18.43 Tn 30.05 Tn
43.98 Mg '' 16.72 Mg 27.26 Mg
0 lb ---'-Legal----- 0 lb
PRODUCT,
�����������_�-�_������ ����_�����....... ........ �_
ID: 127 9/TODAY 21/TO DATE
Name: 1/2HMA 6422 286.94 Tw .97 Ti-)
JMF#: 260.31 Mg,�/n �575.13 MQ
Seal: 307 .
W.Master:... .............. ___________ Rc 'd K Load Total: 60100
AxEQUAL OPPORTUNITY EMPLOYER 0 NNx.xr C REG c»Kaarz74JoNOR. cca# 108542
lAK-ESDDETNDO5TRIES' INC. //�y\
L/� J
~~
KENT DIVISION
lu'".'. "' OW&P
18808 SE 256thSTKE
Covinyton ' WA
9804
Date: 08/2711�
253-631-3611
�' � �
' ?�m�
Time: 02:5� Pt
*** Silo
it
CUSTOMER INFORMATION'
II):
004343
ID:
i
ITEM
999999
Name:
Lloyd Enterpriees, Inc.
Name:^' -
.[ PARK
Address:
P. Y9. Box 3889
Lmc�tion MONRUE
AV� NE & NE
10lH P
Fed�ral Way, WA 980633889
RENTUN,
WA
Phone
PQ#:
�
ier Information
- -----------.... ........... .... --....
Truck W iahts
Truck ID:
1...126T
Gross
Tare
Met
Descript:
1
96980 lb
36860 lb
60120 lb
48.49 Tn
18.43 Tn
30.06 Tn
43.99 Mg
16.72 Mg
27.27 Mg
ID: 1
Name: 1/2414A 6422 444.08 Tn
JMF#: 402.86 Mg
Seal: 307
W.Master:
-......... -'xN-EQmALOPPORTUNITY EMPLOYER 0vmA:
HOT ASPHALT MATERIAL SAI
1 Tn
.68 M12
DATA SHEET xN REVERSE
otal: 60120
LAKESIDE INDUSTRIES, INC.
NENT DIVISION Ticket #: 28S63-
18808 SE 256th WA 9804 Date: 08/27/1�
253-631-3611 ` n^� ~ ime0240 p
*** Silo 1- Loado �l*��Wl��Y�`��x : :P
ID: 00�343
Name: Lloyd Enterprises, Inc. N PARK
Address: P. 0. Box 3889 |ocati o I. NE & NE 10T1.1 P
Federal Way, WA RE#TON, WA
Phone: 2538746692 b��E=991
�~]y�J
��
--
Truck I1): L941
DescripL: 1
PRODUCT AND LOAD TOTALS
.............��?��-_-.
----8���-'_-
104780 lb
43020 lb
61760
lb
52.39 Tn
21.51 Tn
30.88
Tn
47.53 Mg
19.51 Mg
28.01
Mg
0 lh -----Legal-----
0
lb
ID: 127
Name: 1�2HMA 6422 414.02 Tn 761.05 Tn
JMF#: 375.59 Mg 690.41 Mg
r~
Seal: 307
W.Master:_ Load Total: 61760
ovsmpco�nuN vwAsrro\znFo9L\xzSrz�4oioncca#1o8m
LAKESIDE INDUSTRIES, INC.
KENT DIVISION
1.1: 0,08 `3FF:
t"-.': 6i h 1::'iTRl::: ( ov:L1-1ci �..
,.. ,,., ',1�,r�: D a•te.
061-'c '711.;:i
r 5,:3 F13I . .3f.', f..l.
5 V" I "`/ y :1. n1LCi :
1. t!) » :{.1. t �l•I
;e x tc �-3 :i. l (:) i. L.. a a cl o t.t t
CUSTOMER .:INI~ORMATION . ._._
........ .. ... .... '
FORMA 7IC3N
N(%,434::3
__..................._..._
C3()»
................_.w�....._......_..-__..�._:
':)`:)"-)`�99
„1laille»
Lloyd l...ttte{:�(I.)r i.`.,,os.,
L;tl w Idaim..')..
!dI b�tl�M�l:fI:l
� `
Add
P.. 0., T.lox :3869
I._(a(it.a.c,tl
11tJh11� OI::. ()Vl::: {� F 8, 1-`1t 1.0 1-1
F�
Truck and Carrier Information
_...__._........__._....._......._._...__.............._.........._..._............_ _ �..............._......_..
Trt.tcl-:. ID.- 1...':4T
):)(4s(:-r a. pt -. :{.
Truck _We.is9hts.._...........:..._ ..__.._....._...
_._Gross.......... _......Tare...._........ _..._.._.M................
D
,,.1. 'T r) 31... 04 'T rt
0 cl, C-11
rl tt:1..._............._. 0 :1. b
_. ___.._._........_......_. PRODUCT AND LOAD TOTALS
_... __.._ . _._...._....__.................._.._..........._............_......._.........__.._.__......._.._..........__.._... _.......
_.._....__.�...
ID.-, 1.%?7 G/TODAY IS/TO DATE
_.........._........
__.._.._ ....._..__ _ __..._...
1.92. 19 'Trt 539. 22. Tt't
.flyll'44. FJ4,.3— lYly 4t1`) 1."7 I*!cl
f>cr<:iI u ::307
W. p{aS>t;(r»...._..__. _ .... I.cv' (:! lE:;Y»_..._..............._...._..........__....._.._..........__.._..._..._ ..... L..(as�(I 'T(at:ta.
AL PORTL'NI MPLOYER ■ TWA. ST. CUNT. REG # LAKESI.274JD ■ OR. CCB # 108542
HOT ASP ALT MATERIAL SAFETY DATA SHEET ON REVERSE
t:,i.�yF)t:lL7
L�Q�8lDI�INDUSTRIES, . ---___
KENT DIVISION Ticket #: 2086a
18808 SE 256th STRE CovinQton WA 9804 Date: 08/27/1�
253-631-3611 Time: 12:20 P�
0/X)
CUSTOMER INFORMATION
004343 '
Name: Lloyd Ent�rprises, Inc.
Address: P. 0. Bov 3889
Federal Way, WA 980633889
Phone: 2:j��8746692
J FORMATION
999999
'/ REWTON, WA
Truck and Carrier Information Truck Wei-qbts--, .. . ..........
__
ruck ID: L941' Gross Tare Met
Descript: 1 Ib 43W20 lb 62240 lb
21.51 Tn 31.12 Tn
28.23 Mg
�� `-----Lega1----- 68 lb
PRODUCT AND LOAD TOTALS
ID: 127
N�ne: 1/21-111A 6422 318.06 Tn 665.09 Tn
JMF#: 288.54 Mg 603.36 Mg
�
Seal: 307
W.Masterx � x Load Total: 62@40
- ��pLoY�n 9 vw(sz0 7OR. CCa#/08S42
LA8-E8DDEINDUSTRIES, INC.
KENT DIVISION Ticket #: ROB54.1
18808
SE 256th SllR� Covington WA 98Q4
Date: 08/2�/1�
,
'07:25 AV
*** Silo J. L d
�����_�.��������_�
CUSTOMER INFORMATION -ORPIATION
ID:
004343
ID: ' lTEM'
999g99
Hame:
I loyd Enterprisee, Inc. Name: PARK,
.
Address:
P. @. Box 3889
Location MO��OE AVE NE & NE
10TH P '
Federal Way, WA
980633889 14ENT01'4.jWA
Phone:
2538746692
PQ#:
` '
Truck ID: L941'
Desoript: 1 Dg
MEN
Truck Weiahts
`Gross
--Ta@���-.....met
10500� lb
43020 lb
61980
lb
52~50`Tn
21.51 Tn
30.99
Tn
47.63 Mg
19.51 Mg
28.11
Mg
i&lb
--~--Legal-----
0
lb
PRODUCT AND LOAD TOTALS
ID: 127 3/TODAY 15/TO DATE
Name: 1/2HMA 6422 95.97 Tn 443.00 Tn
87.06 Mo 401.88 Mo
SeaI: 307
W.�Master: By: Load Total: 61980
~~---�� 0ns.ScCoWTXEG ftiAKES�2�mNOR. d�# 1u�m
wn`��nwu/rMur=m/u/ purr:`vnurupmrp`nmurv=nn=
INC.LAX-ESIDE INDUSTRIES,
KENT DIVISION Ticket 44: ~61L:ml
18808SE 256th STRE Covington , \/� 980« Date: 08/��7/1�
253-63 CUSTOMER INFORMATION WOkMATION
*** Silm 1 ad
Name: LIoyd
Addre�s: P. 0. Box 3889 Location MBNRQE AVE NE & NE 10TH P
`Federal Way, WA 980633889 `'RENT8H, WA ^'
Phone: 2538746692 PO#: '
Truck and Carrier Information
`��
(A.- N'
Truck ID: L108t ` Gr.���__� Tare No,
Descript: 1 99740 1.b 35700 lb 64040 lb
4987 n 1.8Tv), �Tn
OF42M905 g
' 0 lb -----L*,nal--=--0 lb
ID: 127
Name: 1/2HMA 6 Tn PRODUCT AND LOAD TOTALS
730.17 Tn
JMF#x Mg 662.40 Mg
SeaI: 307
W.Master:W-P'PDXTUNFMn' N L(WER 0 WN. STCONIT. REG # LAKEST*274JD ff OR.'(,CB 108542
By: Lzna1 Total: 64040
LAKESIDE INDUSTRIES, INC.
KENT DIVISION 00659
08/2.7".;
253-6 1-3
Sil.c) P. 06
CUSTOMER INFORMATION -&Uv:vlwflUN
................. . ...... ..........
ITEM 999999
I lame. 1 1(-.), d Ento-f,prises, 3,11C.
P. 0.. I'tox 3889 1-(:watiar) 110W01-- OVE. 1-41". & 1-tl'::: 104H F,
Fed(-.-ry]. Way, WA 98063,3889 lq--Nl ON, WA
00
Truck and Carrier Information Truck- Weights.,__ .... .. ......... ................ Carrier_ ............ Information ........... I ... ............... - ................ . . ........
T-vu(:'P. 1D.- L-108t EMET [EMD Tare Net
("3600 1 b
ull A lb (40 1 IJ I
(,.-,5
r-t M 16. 19 111.1 28"65 -411
0 1-1) al 0 1 b
11) -. 127
307
W. mas-t;e-r.
8/TODAY 20/TO D
............
256"
fTE
NL
Y
v I nad I I
AI. ()TYPoRl't-'Ni'l-)'[-',NI131.OYER 0 WA, ST CONT. REG # LAKESI'2-4 ID N OR. C-CB # 108542
14nT ARS314AI T MATSMIAl QAPr-TV nATA RWr-I=T nN 01:v;:P-qr-
(13t."(10
T.AJ{E3lDE INDUSTRIES, INC.
�
VENT DIVISILN4 0*49571
18808 SE 256th S[RE Covington e: 08/27/1":
253-�31-3611 /me: 09:53 AV
. ` «�^
*** Silo 1 Loadout
IB: 004343 ID . 'ITEM 999999
Name: Lloyd Enterprises,�Inc. Name: , PARK
Address: P.' 0. Bmx3889 Locatio n~/ HVE NE Q NE 10TH P
WA
Deser�p�: 1
JNFO
307
W. vlastk�.fl
/ 1- rL�
�
Gros
'
45.25 Mg 16.l9 Mg 29.06 Mg
0 lb -----LeaI----- 0 lb
OAP TOTALS
161.15 Tn 5G8.18 Tn
146.19 Mg 461.01 Mg
_ Rcv'd Byx
Load Total: 64060
EQUAL OPPORTUNITY EMPLOYEVIrVA. ozcowTnEo#uuoESrur4JD MOR. cca# 108542
LAKESIDE INDUSTRIES, INDU8TRIES, INC.
NUENI DIVISION Ticket #:
18808 SE STRE C^vinQton , WA 9804 Date;
2153-631-3611 ' ' �� Time: 07:20 Or
*** Silo 1 Loadout
_----C:�='ORMAT:���-__---_--'
3z4-J-'�-D:
ITEM 999999
-Name: Lloyd Entmrprise�, Inc. Name: PARK
Address: P. 0. Box '��889 Locatic OE' Au6 NE & NE 1oTH P
Federal Way, WA EMTON, WA
Truck I1): 1 108t Gross Tare' 'Net
Descript: 1 3���0 lh '35700 lb 64060 lb
�n 17.85 Tn 32.03 Tn
q 16.19 Mg 29.06 Mg
-----Legal----- 0 lb
W.Master: _ Load Total: 64060
LAKESIDE INDUSTRIES, INC.
KENT DIVISION t.. , F:.()is z# :: 20 55:
:€.t�8013 G1--, a:'.5f.-', f.�i'T'!ik l t7l�:l.t'tl "Lt:)t') , lJ(1 `:3(:'t7�, Z:•t:N. i:as: tsali'I/i:i
't:t;-1.�..-6 3:�.....361 �. ,.t i Y :1.R All
CUSTOMER
__._......_..._.._...._.INFO....R....M,...ATION ......_.__...............'......._J..O._.B_..__1r.N._F._.O_.R.....M._.A..._T._._I.,.O....N
T........ ................_.....0......4.............._....--........._......_........_.._.............1_,......................._....._i_...3..`._}....}..
1):03 �3 E `.'..}._'..._j...._-..._... -..
F::v) (--.-v )'ri.sel.,, Tvw .. ! I{ F.5:r1 M..14T-PflF4,
Address:: 0., I:((ax :3889 IMC)NROE:: (.)V[.. HE HE:. 10 T I -I r)
I.. (--; 3de"rta.l. Way,) W(a 9806 3.3f18`.J I;i..Iq T ()I%I, Wfa
Truck and Carrier Information uck Weight
..... _......... ..._........,..,_.._........._..._....._.......w__............_.._.__............_.................._................. .........
'... Tare fit
....._
Dessc:'r i p-L W �. 4:;t�l ; 3`-t t3it) l t) " (:,i,::it�(1 J. I;)
{:,`:)' )'1 :I..C.) •.:i�4 1 )l S,a.. i.',"r (1'1
4'7.. 110 l''111 :1. 7 .r i.:3 l'1 ., 'its ;. 0 7 1 1 e1
0 1.F) ..... _..... ....:._ 0 :I.b
PRODUCT AND LOAD TOTALS
_........_..._.............................__.--....._..._........_._.._.._..._._....................,....�,..w_....._.___......_...._..._..............._._..._......_.
J ? l 4/TODAY. 16/TO DATE
..._......................_....._._....,......._..._..._...............
Name. 1./i?hilYl(1 (14i�c' :Lr".?� ].i:? 'Tt� ;i'76., 1 F) 'i)')
J'1' F,#3 :1.:I.'r„ 1.4 Nq 431..96, Vlr_.l
307 V
W.. �r 'I:F7'r ; _.., ..._. AN EQUAL OPPORTUNITY E\IPLOYER WA: S` . CONNT
I"I<':REGG #-ZAKESI*274JD ■ OR. CCB # 108542
HOT ASPHALT MATERIAL SAFETY DATA SHEET ON REVERSE
LAKESIDE INDUSTRIES, INC.
KBNT DIVISION #:
18�*508 S[ 256i-,h SIRE- Covington , WA 9804 Date: 08/2//1.
253-631-.3611 � -� .�' ' Time: 06:35 AP
*** Silo 1 Loadmut ***
..........--' --
ID: 004343 ^ ID: �' 263613 JOB - ` �MAT -TEM 999ON
999
Name: Lloyd Enterprises, Inc. Name: [NT PARK
Address: P. 0. Box 13889 Locio �[ AVE NE & NE 107H P
Federal Way, WA 980633889Jl/}H, WA'
Phone: 2538746692 POP: \/
Truck and Carrier Information
Truck 132T
Descript: 1
-- --'---- -----
Gross Tare.'met
1.049410 lb 39080 lb 65900 lb
19.54 Tn 32.95 Tn
17.73 Mg 29.89 Mg
...
.........
.... Legal----- 0 lb
PRODUCT AND LOAD TOTALS
ID: 127
Name: 1/2HMA 6422 32.95 Tn 379.98 Tn
JMF#: 29.89 Mg 344.71 Mg
Seal: 307
W.Master: Rcv'd B °^°' ~ Load Totalx 65900
-A, EOU'Ar w na.s�T1�NT.*nffi�#1,�QffSYW2��ji5miD�Iffta#1oa54z
011-1/
�
���D�DINDUSTRIES,INC. T�
KENI DIVISION t 4:
18808 SE 256th STR::'. Covingtmn , WA 9804 i� Date:
'^253-631-3611 '' - Time:
Loadout ***
CUSTOMER INFORMATION
JOB INFORMATION
08/27�13
01:37 Py
ID:
A04343 `
ID: 263613
ITEM
999999
Name:
Lloyd Enterpris�s,
Inc.
Name: PRESIDENT PARK
Address:
P.' 0. Box
MUNROE
AVE NE NE
1071-1 P
Federal Way, WA 980633889
RENTON,
WA
'
Phone:
2538746692
PO#'
Truck and Carrier Information
Truck ID:
L132T `
�
`met
Descript:
1
105200 lb
9080 lb
66120
lb
52.60'Tn
19.54 ln
33.06
Tv-1
47.72 Mg
17.73 Mg
29.99
Mg
0 lb -----Legal-----
0
lb
____
PRODUCT AND
LOAD TOTALS
ID: 127
Name: �/2HMA
6422
351.12 Tn
698.15 Tn
JMF#:
318.53 Mg
633.35 Mg
Seal: 307
W.Master: di-t' Total: 66120
-~--' AN w vo�srcnmTxem�'u�ue��er�onr�u�coa��oe4z
INC.LAKESIDE INDUSTRIES,
KENT DIVISION (icket #: ZOS-518�
, ,218808 S256th 7/1�
»** Silo 1 d
CUSTOMER INFORMATION
___
ID: 004343 .D ITEM 999999
Name: Lloyd Enterprises, Inc. [PARK
Ad�ress: P. 0~ Box 3889 Loc E AVE NE 8 NE 10TH P
Federal Way, WA 980633889 RENTON, WA
Phone: 2538746692 POW:
Truck and Carrier �
����������-������``���.�`�.��`������� ����������^���
Truck L132T �
___������___ �_�e��____ 1���____ �
Des cript: 1 �4880 lb 39080 lb 65800 lb
.141.44Tn' 19.54 7n 32.90 Tn
�7.57 Mg 17.73 Mg 29.85 Mg
0 l6 -----Legal----- 0 lb
ID: 127 7/TODAY 19/TO DATE
Name: 1/2HMA 6422 225.09 Tn 572.12 Tn
JMF#: 204.20 Mg 519.02 Mg
Seal: 307 '------
W.Master: Load Totalx 65800
-----'7�� pLovsx 0 voA.rcCONT.iREG # '0'OR. CCB #/oo54z
(9)
[AfQES1DEINDUSTRIES, INC.
^
KENT DIVISION
18808 SE 256th STRE
Covington00
-------COSTOMER INFORMATION----- '
ID: 804343 ID: ITEM. 999999
Name: Lloyd`EDterprises, Inc. Name: PARK
Address: P. 0. Box 3889 Locati�n��NROE AVE HE & NE 101�1 P
�ederal Way WA 98063389 RENTON, WA `
Phone: 2538746692 PO#Truck and Carrier Information Truck Weiahts
Tare Not
Descript: 1 99740 lh 35�40 lk 64000 lb
49.87 Tn 17.87 Tv) 32.00 Tn
~
45. 29. 03 M§
� — 0 lb
hf/U�zU���5
127 2/TODAY 28/TO DATE
Seal: 307
W Master:WOT ASPHALT MATERIAL SAFETY DATA SHEET ON REVERSE
[ota]: 64000
W. --'---*w cco# 108542
LAKESIDE INDUSTRIES, INC.
L
KE14T DIVISION
_...._..._...__._.....__ CUSTC>R..I1Cltl'►AT I OM...._.._..._..........
......
.....
1�lranlc:�. 1.7.i:>p•i:i E_li�t;i:�r};ra.<.�t::��:>, 7����t::,,
cklt:l f•E7ss.— Fi. 0..,- 1. ox ::3889
Way',, WO r?80("3;3889
"f :i. t:: t-:ra -. 0
�Q_'09100 i nzfa
M()Wt AVE::'
Ftf. hI T"i:Jh17 Wfi
00865!
i! 8 11.? 8/I":t
06, . _': ri? t--AY
991.),399
1.0TII F:'
Truck ant! Carrier Inftarma�i�..... __...__.. _ _. �.....T urrk_Weights_...... ...........
_....Gross Tare met
IJV�L�II 13C-"7 `:i�}.. �fi;' -T-11 '`). 5'.�7 T11 ;:ii,�. 90 fn
DD
47.,:. 8 11rf 1.-7.. "f'%+ IVI11 2`:)., Fi`:', IYIi1
} -
_......__......__ ................_.__.........._._PRODUCT. AND LOAD . TOTALS
T I> : I/TODAY 27'/TO DATE
.............._.............._._._....... _....._ _ _....__..._._......_.._.._
Flikine - 1. /tE.11 10 6422 32. 90 T vi 82 4.. i4:1. T"1.1
J"IYiF"f1: « 29 . f.."5 M11 747.. 51*3 !'Irl
i fly
W„ ilit'..-i t(=!'f' . _...... _......AN-SQUAL OPPORTU.Nl '-EMPLOYER 0 WA, ST. CGNT®;-RE"" G-## iAKE:Sl-27.4j.D 0 OR. GC-B � 1'({$5�4� T ol*,'a.l is 65800
HOT ASPHALT MATERIAL SAFETY DATA SHEET ON REVERSE
LAKESIDE INDUSTRIES, INC.
(i) E cl,
~
I 1=1 1=1 19
KENT DIVISION ! 20866�
^ 18�08 SE 256th STRE Covingto �at�: 08/28/13
Ti09:29 AM
*** Silo 1 Loadmut »)�/�/�«"- --
ID: 004343
Name: Lloyd Enterprises, Inc".
A6dresso 1:11" 0. Box3�B9
Federal Way, WA 980833889
Phone: 2538746692
Truck and Carrier Information
_
Descript: 1
Gross
Tare
_ Net
52.56
Tn
33.01
Tn .
47.68
Mg
17.74 Mg '
29�95
Mg
0
lb �----'egal--�-�
0
lb`
AND LOAD TOTItlLS
ID: 127 4/TODAY 3@/TO DATE
Name: 1/2HMA 6422 128.97 Tn 920.08 Tn
JMF#: 117.00 MQ ''834.68 Mg
Seal: 3 14 7
W.Master:___����ro�������� ^�oNz��#aK�/^�oM_����� Total: 66�20
unr^QPumr=",CO."/ *"==,V"","""==,°"O=.=OO=
LAKESIDE INDUSTRIES, INC.
L
KENT DIVISION
1-t3t3�.6 Sr. 25f.-,'l;tt ��tFtl:-.:
«� _,
253 6,31 :361.1.
{'M'ik `,:i:i.:Lt7 'I 1 r•�.�rdr-�}�•� .p•.ti,
_..........._. __........C-UST..:.._........_..-..IW RMATIOM..__._......:.:..._...._.
004 343
t•d:.�ntr.�: I...:ic)yci C:t'tt:r•.=�r�{:rri:;c:�t�, :Lrtc�,.
(1cltlrc:ts;; a„ t!. 6,. Dox :3tll:s`a
F, -yt: e- Wray, Wfi `�t� (•.,:i;:3�:)!�'`1
%':':i;38 "'W
Truck and Carrier Information
Trucl•e. I I) s, L-941'
lice<_ c,ript;: 'I.
D A'LQ ° 0B/2(3,' 1.;:
I 1 : 01. t"tl'`
.......SMATION _.W.._ .
I...ctr.:�a'I~i.r.)tt htflFlkt.; . Ji NE:_ & FIE: 1.01+1 I"'
WA
Poft
Trucf€ Weights
Gross
_Tare..... ....
_.._ met..._
.._...
t3�'rlt:st:) 1. L)
4,3060 1 b
.390(120
1. b
it "L . 04 .t t t
i? 1.., 53 T 1-1
1. 9. 51.
1* 1.)
3'/. 23 11 g
l it.1
1. . 7(3
lylla
0 :Li:)
'L.................•..
t1
J.I:)
_.._._._..._ ......................._....._......_._.PRODUCT �AND..LOAD TOTALS
........ _........ _..---..-....------•-----------...
1 27 5/TODAY 31lTO DATIF
I I�:t►It� a . 1. /;:4.1110 6422 148.48 1).-I : ;3`7 !:'i�) Royr
4HOT�
L,34.70 r`Ir, t35,2.D
W. I•I<�`�'%e- r ......._._.. ��<
..OE�IPLbYER'r WA;ST. C.OtiZ.R.EG # LAKF.SI'274JD.i..OR..CCB # 3'68542
ALT MATERIAL SAFETY DATA SHEET ON REVERSE
3`: 02L
(i)
LAKESIDE INDUSTRIES, INC.
KEWT DIVISIOhi 2W66i
(11:0", C OV:i.ti•ita l:d��°� y L3f-d `: t,i: Iia�°i; a� t�311.'f?tlr`
361. a. -w%� , 08- tl `30 Ells
"V'.
CUSTOMER INFORMATION
_..._.. ............._._._..._......_.._....,..__..._......__-..........._..._........_...........,..._...._..._......._.....__....
_......._.._.._.__..__.._
JOB
� = OkMAT�Qt?I
... _.._...._...__...............
P?f" 361.-3
..
TEN
.................. .... __...__._..._,..
999999
Haim--) ;
Lloyd I:;:i•i•t';e:a•r° la•r i. iie—�.>,
1:)« n., flax 13689
Nc3NRi:3E::
f1t11::.: Hr.:: Ht'.*
:I.t%3"ti l U.'
WAy., WA 9806 3:'31 &.-)
I�:L:'hl'f'Ohly
W04
............ !Carrier_._Irtiforation......._........
_......................
_........_...._Truck.. Weight.........._..........._......_....._
........... ....._.....
`T''rlm:4: I' D
a 1-94'T
Grass.
Tare'
Net
IA)
4 3i ("0 1b
62:I20 :I b
52. .., .J
Y i t
r:.. .. _,,:3 t 7"r
,c, .I. « CIF, 1' n
ic7
a.ts-.....:..._.._.:i...�::�rl:a7....:....._.........
0 1.I:1
.• .PROD.UCT AND LOAD TOTALS D
-_.__...3/TCIDAY 29/TO DATE UV �L-
_._....._......_.... _.............. _.l DD
{�lrasuca '1./21 {1''Ift C"Iti c.? `!3. `: 6 'T n 11117. 0-11, Tn
W 1'1<�.G> t;t:a r ; ........__. QrnId'Ii 'ii VbA: 5T. CONT. REO._#..I �1ICS1*274)D.■ OR. Cc.,s # i'os2 T ra trti:t f:,c 1. c?i�
HOT A PHALT MATERIAL SAFETY DATA SHFFT AN RFVFRRF
LAKESIDE INDUSTRIES, ' ��� '
uu v czuu��
Cr
KENT DIVISION
18808 SE 256th STRE Covington WA 9804 Date:
253-631-3611 (?N���/' r^'^� '^}�- T,`��: 07:30 r'4vl
w**CUSTOMER INFORMATION
Silo 3 Loadout **�
1D: 004343 IBo 263613 ITEM 99999-9
Name: Lloyd �nterp��ses, Inc. Name: PRESI�ENT PARK ` `
Address: P. 0. Box 3889' Location MO4RUE AVE NE & HF.�' 10TR P
' Feder*J Way, WA 980633889 RENTON, WA
PhonePO#: '
and Carrier Information_-_--,'-_'--'_'----�-----'___'-- Truck Weiahts
____-'_--'-_--------_-_-~^--_--'_--'----'---_--
Truck ID: L108 ' Gross Tare
`
D�script: 1 56880 Ib 245|@ lb 32360 .b
28.44 Tn 12.26 Tn 16.18 Tn
25.80 Mg 11.12 Mg 14.68 Mg
0 lb ---'-Legal----- 0 lb
PRODUCT P44D LOAD TOTALS
U.Master: Load Total: �2360
-F IYAL ITC P�RTLNQTnY ENIPLOYER 0 WA. S�tINIT.DEG.4-I�KESI��74JD�bk,'*d--B # 108542
LAKESIDE INDUSTRIES, INC.
T UFt
W L5 D 1'GEI4T DIVISION #
JM1;�;;
u.'.x:.x. 5 i :!. o ::3 L..O�,:,kCf Oi.t1.
{�#;a�aac:�r ;, 1_,1 a:;� ri l:: a•a t t�ar• #:r r a. t� �:a ��s � :C a'u:: ,.
0. FiOK 3889
p I W{:av, Wra 91.,W-,::3388. :
F''#ac;+ac:};;
Truck and .Carrier Information,.__.._..,
.,__�.......w... _...._........ ._•............ __........... _
{'r uCA:. :[DU L.A.(%1L'
1)o sC, v i. t: t:, I
Name
1•t:ion f*IClh1R{7E AVE:: hI#:;: & 1',IE 1.OT1"1 14
WA
P O.
_...._. _. _....... 7ru..... t •....... _.._...... . _... _.
Gross_...... Tare .......
44460 :L Lr
Lp,,r.:0 {aa 1,0,01-3 .1.a..�
;?1:1.:L7 mg 1.1."07 11 0 N
E!3 :#.b........_.........#_.,egal..... .... .... _.. 0 1.1:a
" DCIO.T... iAN,D-LO'AD*.._TCITAdLS......_........_.............._._.._. .
:#. c?"r' 2/TCII)AY 33/TO DATE
:1'C'11- 0 ; / 11 ;i3::3.. 7 fi 1,11-1 876..:1. (:. ITIq
?�;
e� <:t 1.: .:3 {) r
W. r1,:k af;I�r — - } ca n I...t:iml Tc:rt;< :L s i:'o{iI(10
ANC AL OPPORTUNITY EMPLOYER ■ VA. ST. CONT REG # LAKESI.274JD ■ OR. CCB # 108542
HOT ASPHALT MATERIAL SAFETY DATA SHEET ON REVERSE