Loading...
HomeMy WebLinkAboutWTR2703638_7Denis Law Mayor April 17, 2013 Mr. J.R. Rodarte Rodarte Construction, Inc. 17 E. Valley Hwy East Auburn, WA 98092 j� City of , r Public Works Department - Gregg Zimmerman, P. E., Administrator RE: Award of Contract for the President Park Water Main Replacement Project (CAG-13-044) Dear Mr. Rodarte: At the Renton City Council meeting on April 15, 2013, Council accepted Rodarte Construction, Inc.'s bid of $733,003.95 for the President Park Water Main Replacement Project. You should be receiving a letter from the City Clerk with the official bid award. For execution of the contract, please submit the following information as soon as possible so we can prepare the contract documents for review and signature by the Mayor: ❑ A list of names, addresses, phone numbers, and emergency phone numbers for: Responsible Officer, Job Foreman, and Bonding Agent. ❑ Corporation letter or Resolution giving names of those authorized to sign the contract and samples of their signatures. ❑ Photocopy of your current State Contractor's License (not master license). ❑ Photocopy of your current City of Renton Business License. (To activate your City Business license, please contact Linda Weldon 425-430-6851). ❑ City of Renton Vendor Form (if not on file with the City). ❑ Two signed contract bonds on City of Renton forms (enclosed), UNDATED. The date will be filled in when signed by the Mayor. ❑ One City of Renton Fair Practices Affidavit of Compliance (enclosed). ❑ Two signed contracts, also UNDATED (enclosed). ❑ One Certificate of Insurance for 2013 in accordance with Section 1-07.18 of the Special Provisions. Please add the Citv of Renton as additional insured. In the Cancellation section of the standard ACORD Certificate of Insurance form the "...Failure to Mail Such Notice..." section must be struck out. The ACORD Form shall be modified per Section 1- 07.18(4) of the Special Provisions (see enclosed example form and Special Provisions Section 1-07.18). ❑ The insurance policy declaration pages of all required insurance policies obtained from the insurance carrier. Renton City Hall • 1055 South Grady Way • Renton, Washington 98057 • rentonwa.gov Mr. Rodarte April 17, 2013 Page 2 of 2 After you submit the contract information, we will need the following information to review and approve before construction may start. We would like to have most of it before we schedule a pre -construction conference. If you intend to use private property for material storage or staging you will need the approval of our Development Services Department. In some instances this may include the need for a Temporary Use Permit. This does not apply to storage and staging areas within City rights -of -way. Provide material submittals as required for the work involved with this job. This will include, but not be limited to, information on the proposed source and specifications of all materials that will be used in the project. Show that the proposed materials meet the project specifications, per Standard Specifications and Special Provisions. Provide any shop drawings and submittals needed for the project per Standard Specifications and Special Provisions Section. Work Plan (include the following items): a. Proposed construction sequencing and schedule for the project. b. Mobilization Plan. C. Temporary Erosion and Sediment Control Plan. d. Traffic Control Plan. e. Street Cleaning and Sweeping Plan. f. Trench Excavation Safety Systems Plan. g. Disposal Site. 3. Construction Surveying: Identify the surveying firm/surveyor and a letter showing that the surveyor is licensed in the State of Washington. 4. Traffic Control Plan: The plan will be reviewed and final adjustments made at the pre - construction conference. Please refer to the project specifications for the traffic control permit application. Please let me know when you would like to have the pre -construction conference. We will need to notify the private utilities and City inspector, so there should be a lead-time of at least one week before the conference. If you have any questions or need additional information, please call me at 425-430-7208. Sincerely, Andrew Weygandt, P.E. Water Utility Civil Engineer Enclosures cc: Abdoul Gafour, Water Utility Supervisor H:\File Sys\WTR - Drinking Water Utility\WTR-27 - Water Project Files\WTR-27-3638 President Park Main Replacement\Construction Contract\Award and Submittals\WTR-27-3638_Award-aw.doc\AWah Denis Law -- --- Mayor City Of, �� O April 16, 2013 City Clerk -Bonnie I.Walton RECEIVED APR 17 2013 CITY OF RENTON J.R. Rodarte UTILITY SYSTEMS Rodarte Construction, Inc. 17 E. Valley Hwy East Auburn, WA 98092 RE: President Park Water Main Replacement Project: CAG-13-044 Dear Mr. Rodarte: At its regular meeting of April 15, 2013 the Renton City Council accepted your bid for the above -referenced project in the amount of $733,003.95. Please contact Andrew Weygandt, Project Manager, for submission of required documents to complete the contract. These may include proof of City and State business licenses, performance bond, and insurance certificates. Sincerely, Jason A. Seth Deputy City Clerk cc: Andrew Weygandt, Project Manager Linda Weldon, Accounting Assistant Tracy Schuld, Accounting Supervisor 1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov DeMayoLaw City Of, �— -- —:; NOV a .ems F City Clerk -Bonnie I.Walton April 16, 2013 Jacob Cimmer Johansen Excavating PO Box 674 Buckley, WA 98321 RE: President Park Water Main Replacement Project: CAG-13-044 Dear Mr. Cimmer: At its regular meeting on April 15, 2013 the Renton City Council accepted the low bid submitted by Rodarte Construction, Inc. for the above -referenced project in the amount of $733,003.95. Thank you for your interest and your bid. Sincerely, #Deputy Seth CityClerk cc: Andrew Weygandt, Project Manager 1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov Denis Law City OfMar __. - t - (9/0 City Clerk -Bonnie I. Walton April 16, 2013 Mark Waldner Kar-Vel Construction PO Box 58275 Renton, WA 98058 RE: President Park Water Main Replacement Project: CAG-13-044 Dear Mr. Waldner: At its regular meeting on April 15, 2013 the Renton City Council accepted the low bid submitted by Rodarte Construction, Inc. for the above -referenced project in the amount of $733,003.95. Thank you for your interest and your bid. Sincerely, ason A. Seth Deputy City Clerk cc: Andrew Weygandt, Project Manager 1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov Denis Law Mayor City Cif . -t City Clerk -Bonnie (.Walton April 16, 2013 Bret Lane Lase Underground & Earthworks, Inc. 20417 87th Ave. SE Snohomish, WA 98296 RE: President Park Water Main Replacement Project: CAG-13-044 Dear Mr. Lane: At its regular meeting on April 15, 2013 the Renton City Council accepted the low bid submitted by Rodarte Construction, Inc. for the above -referenced project in the amount of $733,003.95. Thank you for your interest and your bid. Sincerely, Pl`1 Deputy A.Seth City Clerk cc: Andrew Weygandt, Project Manager 1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov Denis Law - - Mayor city Of City Clerk -Bonnie I. Walton April 16, 2013 Douglas Watt Northwest Cascade, Inc. PO Box 73399 Puyallup, WA 98373 RE: President Park Water Main Replacement Project: CAG-13-044 Dear Mr. Watt: At its regular meeting on April 15, 2013 the Renton City Council accepted the low bid submitted by Rodarte Construction, Inc. for the above -referenced project in the amount of $733,003.95. Thank you for your interest and your bid. Sincerely, i� i Jason A. Seth Deputy City Clerk cc: Andrew Weygandt, Project Manager 1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov Denis Law C Mayor Of, ^ SY /+ a City Clerk -Bonnie I. Walton April 16, 2013 Richard L. Alia R.L. Alia Company 107 Williams Ave. S. Renton, WA 98057 RE: President Park Water Main Replacement Project: CAG-13-044 Dear Mr. Alia: At its regular meeting on April 15, 2013 the Renton City Council accepted the low bid submitted by Rodarte Construction, Inc. for the above -referenced project in the amount of $733,003.95. Thank you for your interest and your bid. Sincerely, Jason A. Seth Deputy City Clerk cc: Andrew Weygandt, Project Manager 1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov Denis Law Cl Of Mayor _ `7 � ..t...rt NV City Clerk -Bonnie I.Walton April 16, 2013 Shawn Reed Reed Trucking & Excavating, Inc. 2207 Inter Ave., Ste. A Puyallup, WA 98372 RE: President Park Water Main Replacement Project: CAG-13-044 Dear Mr. Reed: At its regular meeting on April 15, 2013 the Renton City Council accepted the low bid submitted by Rodarte Construction, Inc. for the above -referenced project in the amount of $733,003.95. Thank you for your interest and your bid. Sincerely, PSeth ity Clerk cc: Andrew Weygandt, Project Manager 1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov Denis Law r City Of . MayorAmPh i City Clerk -Bonnie (.Walton April 16, 2013 Keggen Thompson Santana Trucking & Excavating 2316 NE Redmond — Fall City Rd., #647 Redmond, WA 98053 RE: President Park Water Main Replacement Project: CAG-13-044 Dear Mr. Thompson: At its regular meeting on April 15, 2013 the Renton City Council accepted the low bid submitted by Rodarte Construction, Inc. for the above -referenced project in the amount of $733,003.95. Thank you for your interest and your bid. Sincerely, Jason A.Seth Deputy City Clerk cc: Andrew Weygandt, Project Manager 1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov Denis Law Mayor May 15, 2013 VIA EMAIL Mr. JR Rodarte Rodarte Construction, Inc. 17 East Valley Hwy E Auburn, WA 98092 City Of 1 �AIN Public Works Department - Gregg Zimmerman, P. E., Administrator s RE: REVIEW OF SUBMITTAL#1 FOR PRESIDENT PARK WATER MAIN REPLACEMENT PROJECT (WTR-27-3638) Dear Mr. Rodarte: On May 10, 2013, we received your submittals for the materials to be used on the City's water main improvements for the above project. Our review comments are attached. We anticipate future submittals for the remaining bid items in the contract, including erosion and sediment control, concrete for thrust blocking, reinforcing bars, concrete for curbing and driveways, temporary blow -off assembly, pigging station, and foundation material. If you have any questions, please contact me at 425-430-7208 or by email at aweygandt@rentonwa.gov. Sincerely, Andrew Weygandt, PE Water Utility Civil Engineer Attachments H:\File Sys\WTR - Drinking Water Utility\WTR-27 - Water Project Files\WTR-27-3638 President Park Main Replacement\Construction Contract\Award and Submittals\3638_Submittal Review 5-10.docx\AWtp Renton City Hall - 1055 South Grady Way* Renton, Washington 98057 - rentonwa.gov Date: 05/15/2013 D c:;tyof �0 Project Name: President Park Water Main Replacement Project Number: CAG-13-044 Contractor: Rodarte Construction, Inc. Sub-Contractor: City Review: lAndrew Weygandt, PE Item No. Material or Manufacturer's Product/Type City Comments 19 Icon Materials Cold Mix Asphalt Patching Source Approved 20 Lakeside Industries Hot Mix Asphalt Source Approved 17 Select Imported Trench Backfill Source Approved 18 CSTC/Crushed Rock/Shoulder Restoration Source Approved 8 Griffin 8" DI Tyton Push -On Joint Source Approved 8 Griffin 8" DI Mechanical Joint Source Approved 8 Tubular Poly Wrap, 8mil Source Approved 8 Tyler/Star DI Compact Fittings Source(s) Approved 8 Tyler/Star DI Flanged Fittings Source(s) Approved 8 Mechanical Joint Restraint EBAA Series 1100 and 1700 approved for all sizes. Star Grip approval witheld. 9 Mueller 2360 Resilient Wedge Gate Valve Source Approved 9 Mechanical Joint Restraint EBAA Series 1100 and 1700 approved for all sizes. Star Grip approval witheld. 9 Flange Gasket and Bolts Source Approved 9 Cast Iron Valve Box Top and Lid, #940 Source Approved 9 Cast Iron Valve Box Base, 24" Source Approved 11 Mueller Super Centurion 250 Hydrant Source Approved 11 Tyler/Star DI Compact Fittings Source(s) Approved 11 Tyler/Star DI Flanged Fittings Source(s) Approved 11 Mueller 2360 Resilient Wedge Gate Valve Source Approved 11 Cast Iron Valve Box Top and Lid, #940 Source Approved 11 Cast Iron Valve Box Base, 24" Source Approved 11 Ductile Iron Pipe, Tyton Joint, CI-52 Source Approved 11 Harrington Permanent Hydrant Adapter Source Approved 12 Mueller Ball Corporation Stop (CC x CTS) Source Approved Page 1 of 4 Date: 05/15/2013 D -ityof Project Name: President Park Water Main Replacement Project Number: CAG-13-044 Contractor: lRoclarte Construction, Inc. Sub -Contractor: City Review: jAndrew Weygandt, PE Item No. Material or Manufacturer's Product/Type City Comments 12 Cerrotube Type-K 1" Copper Tubing Source Approved 12 Mueller B-2470 Copper Meter Setter Source Approved 12 Oldcastle 15x27 Meter Box and Iron Lid Source Approved 13 Merit Brass 2" Brass Fittings Source Approved 13 Mueller 2360 2" Gate Valve Source Approved 13 Cast Iron Valve Box Top and Lid, #940 Source Approved 13 Cast Iron Valve Box Base, 24" Source Approved 13 Mueller 2" MIPT x Compression Fitting Source Approved 13 Cerrotube Type-K 2" Copper Tubing Source Approved 13 Muller B-2427 2" Meter Setter Source Approved 13 Oldcastle 17x30 Meter Box and Iron Lid Source Approved 14 Tyler/Star DI Compact Fittings Source(s) Approved 14 Mechanical Joint Restraint EBAA Series 1100 and 1700 approved for all sizes. Star Grip approval witheld. 14 AWWA C153 DI Compact MJ Fittings Source(s) Approved 14 Griffin 8" DI Tyton Push -On Joint Source Approved 14 ROMAC 501 Transition Coupling Source Approved Additional Comments: Need submittals for bid items 6, 10, 15, and 16. Page 2 of 4