HomeMy WebLinkAboutWTR2703638_7Denis Law
Mayor
April 17, 2013
Mr. J.R. Rodarte
Rodarte Construction, Inc.
17 E. Valley Hwy East
Auburn, WA 98092
j� City of ,
r
Public Works Department - Gregg Zimmerman, P. E., Administrator
RE: Award of Contract for the President Park Water Main Replacement Project
(CAG-13-044)
Dear Mr. Rodarte:
At the Renton City Council meeting on April 15, 2013, Council accepted Rodarte Construction,
Inc.'s bid of $733,003.95 for the President Park Water Main Replacement Project. You should
be receiving a letter from the City Clerk with the official bid award.
For execution of the contract, please submit the following information as soon as possible so
we can prepare the contract documents for review and signature by the Mayor:
❑ A list of names, addresses, phone numbers, and emergency phone numbers for:
Responsible Officer, Job Foreman, and Bonding Agent.
❑ Corporation letter or Resolution giving names of those authorized to sign the contract
and samples of their signatures.
❑ Photocopy of your current State Contractor's License (not master license).
❑ Photocopy of your current City of Renton Business License.
(To activate your City Business license, please contact Linda Weldon 425-430-6851).
❑ City of Renton Vendor Form (if not on file with the City).
❑ Two signed contract bonds on City of Renton forms (enclosed), UNDATED.
The date will be filled in when signed by the Mayor.
❑ One City of Renton Fair Practices Affidavit of Compliance (enclosed).
❑ Two signed contracts, also UNDATED (enclosed).
❑ One Certificate of Insurance for 2013 in accordance with Section 1-07.18 of the Special
Provisions. Please add the Citv of Renton as additional insured. In the Cancellation
section of the standard ACORD Certificate of Insurance form the "...Failure to Mail Such
Notice..." section must be struck out. The ACORD Form shall be modified per Section 1-
07.18(4) of the Special Provisions (see enclosed example form and Special Provisions
Section 1-07.18).
❑ The insurance policy declaration pages of all required insurance policies obtained from
the insurance carrier.
Renton City Hall • 1055 South Grady Way • Renton, Washington 98057 • rentonwa.gov
Mr. Rodarte
April 17, 2013
Page 2 of 2
After you submit the contract information, we will need the following information to review
and approve before construction may start. We would like to have most of it before we
schedule a pre -construction conference. If you intend to use private property for material
storage or staging you will need the approval of our Development Services Department. In
some instances this may include the need for a Temporary Use Permit. This does not apply to
storage and staging areas within City rights -of -way.
Provide material submittals as required for the work involved with this job. This will
include, but not be limited to, information on the proposed source and specifications of all
materials that will be used in the project. Show that the proposed materials meet the
project specifications, per Standard Specifications and Special Provisions. Provide any shop
drawings and submittals needed for the project per Standard Specifications and Special
Provisions Section.
Work Plan (include the following items):
a. Proposed construction sequencing and schedule for the project.
b. Mobilization Plan.
C. Temporary Erosion and Sediment Control Plan.
d. Traffic Control Plan.
e. Street Cleaning and Sweeping Plan.
f. Trench Excavation Safety Systems Plan.
g. Disposal Site.
3. Construction Surveying: Identify the surveying firm/surveyor and a letter showing that the
surveyor is licensed in the State of Washington.
4. Traffic Control Plan: The plan will be reviewed and final adjustments made at the pre -
construction conference. Please refer to the project specifications for the traffic control
permit application.
Please let me know when you would like to have the pre -construction conference. We will
need to notify the private utilities and City inspector, so there should be a lead-time of at least
one week before the conference. If you have any questions or need additional information,
please call me at 425-430-7208.
Sincerely,
Andrew Weygandt, P.E.
Water Utility Civil Engineer
Enclosures
cc: Abdoul Gafour, Water Utility Supervisor
H:\File Sys\WTR - Drinking Water Utility\WTR-27 - Water Project Files\WTR-27-3638 President Park Main Replacement\Construction
Contract\Award and Submittals\WTR-27-3638_Award-aw.doc\AWah
Denis Law -- ---
Mayor City Of, �� O
April 16, 2013
City Clerk -Bonnie I.Walton
RECEIVED
APR 17 2013
CITY OF RENTON
J.R. Rodarte UTILITY SYSTEMS
Rodarte Construction, Inc.
17 E. Valley Hwy East
Auburn, WA 98092
RE: President Park Water Main Replacement Project: CAG-13-044
Dear Mr. Rodarte:
At its regular meeting of April 15, 2013 the Renton City Council accepted your bid for the
above -referenced project in the amount of $733,003.95.
Please contact Andrew Weygandt, Project Manager, for submission of required documents to
complete the contract. These may include proof of City and State business licenses,
performance bond, and insurance certificates.
Sincerely,
Jason A. Seth
Deputy City Clerk
cc: Andrew Weygandt, Project Manager
Linda Weldon, Accounting Assistant
Tracy Schuld, Accounting Supervisor
1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov
DeMayoLaw City Of,
�— -- —:;
NOV
a
.ems F
City Clerk -Bonnie I.Walton
April 16, 2013
Jacob Cimmer
Johansen Excavating
PO Box 674
Buckley, WA 98321
RE: President Park Water Main Replacement Project: CAG-13-044
Dear Mr. Cimmer:
At its regular meeting on April 15, 2013 the Renton City Council accepted the low bid
submitted by Rodarte Construction, Inc. for the above -referenced project in the
amount of $733,003.95.
Thank you for your interest and your bid.
Sincerely,
#Deputy
Seth
CityClerk
cc: Andrew Weygandt, Project Manager
1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov
Denis Law City OfMar __. - t - (9/0
City Clerk -Bonnie I. Walton
April 16, 2013
Mark Waldner
Kar-Vel Construction
PO Box 58275
Renton, WA 98058
RE: President Park Water Main Replacement Project: CAG-13-044
Dear Mr. Waldner:
At its regular meeting on April 15, 2013 the Renton City Council accepted the low bid
submitted by Rodarte Construction, Inc. for the above -referenced project in the
amount of $733,003.95.
Thank you for your interest and your bid.
Sincerely,
ason A. Seth
Deputy City Clerk
cc: Andrew Weygandt, Project Manager
1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov
Denis Law
Mayor City Cif .
-t
City Clerk -Bonnie (.Walton
April 16, 2013
Bret Lane
Lase Underground & Earthworks, Inc.
20417 87th Ave. SE
Snohomish, WA 98296
RE: President Park Water Main Replacement Project: CAG-13-044
Dear Mr. Lane:
At its regular meeting on April 15, 2013 the Renton City Council accepted the low bid
submitted by Rodarte Construction, Inc. for the above -referenced project in the
amount of $733,003.95.
Thank you for your interest and your bid.
Sincerely,
Pl`1
Deputy
A.Seth
City Clerk
cc: Andrew Weygandt, Project Manager
1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov
Denis Law - - Mayor city Of
City Clerk -Bonnie I. Walton
April 16, 2013
Douglas Watt
Northwest Cascade, Inc.
PO Box 73399
Puyallup, WA 98373
RE: President Park Water Main Replacement Project: CAG-13-044
Dear Mr. Watt:
At its regular meeting on April 15, 2013 the Renton City Council accepted the low bid
submitted by Rodarte Construction, Inc. for the above -referenced project in the
amount of $733,003.95.
Thank you for your interest and your bid.
Sincerely,
i�
i Jason A. Seth
Deputy City Clerk
cc: Andrew Weygandt, Project Manager
1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov
Denis Law
C
Mayor Of, ^ SY
/+ a
City Clerk -Bonnie I. Walton
April 16, 2013
Richard L. Alia
R.L. Alia Company
107 Williams Ave. S.
Renton, WA 98057
RE: President Park Water Main Replacement Project: CAG-13-044
Dear Mr. Alia:
At its regular meeting on April 15, 2013 the Renton City Council accepted the low bid
submitted by Rodarte Construction, Inc. for the above -referenced project in the
amount of $733,003.95.
Thank you for your interest and your bid.
Sincerely,
Jason A. Seth
Deputy City Clerk
cc: Andrew Weygandt, Project Manager
1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov
Denis Law Cl Of
Mayor _ `7
� ..t...rt NV
City Clerk -Bonnie I.Walton
April 16, 2013
Shawn Reed
Reed Trucking & Excavating, Inc.
2207 Inter Ave., Ste. A
Puyallup, WA 98372
RE: President Park Water Main Replacement Project: CAG-13-044
Dear Mr. Reed:
At its regular meeting on April 15, 2013 the Renton City Council accepted the low bid
submitted by Rodarte Construction, Inc. for the above -referenced project in the
amount of $733,003.95.
Thank you for your interest and your bid.
Sincerely,
PSeth
ity Clerk
cc: Andrew Weygandt, Project Manager
1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov
Denis Law r City Of .
MayorAmPh
i
City Clerk -Bonnie (.Walton
April 16, 2013
Keggen Thompson
Santana Trucking & Excavating
2316 NE Redmond — Fall City Rd., #647
Redmond, WA 98053
RE: President Park Water Main Replacement Project: CAG-13-044
Dear Mr. Thompson:
At its regular meeting on April 15, 2013 the Renton City Council accepted the low bid
submitted by Rodarte Construction, Inc. for the above -referenced project in the
amount of $733,003.95.
Thank you for your interest and your bid.
Sincerely,
Jason A.Seth
Deputy City Clerk
cc: Andrew Weygandt, Project Manager
1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov
Denis Law
Mayor
May 15, 2013
VIA EMAIL
Mr. JR Rodarte
Rodarte Construction, Inc.
17 East Valley Hwy E
Auburn, WA 98092
City Of
1 �AIN
Public Works Department - Gregg Zimmerman, P. E., Administrator
s
RE: REVIEW OF SUBMITTAL#1 FOR PRESIDENT PARK WATER MAIN REPLACEMENT
PROJECT (WTR-27-3638)
Dear Mr. Rodarte:
On May 10, 2013, we received your submittals for the materials to be used on the City's
water main improvements for the above project. Our review comments are attached.
We anticipate future submittals for the remaining bid items in the contract, including
erosion and sediment control, concrete for thrust blocking, reinforcing bars, concrete
for curbing and driveways, temporary blow -off assembly, pigging station, and
foundation material.
If you have any questions, please contact me at 425-430-7208 or by email at
aweygandt@rentonwa.gov.
Sincerely,
Andrew Weygandt, PE
Water Utility Civil Engineer
Attachments
H:\File Sys\WTR - Drinking Water Utility\WTR-27 - Water Project Files\WTR-27-3638 President Park Main
Replacement\Construction Contract\Award and Submittals\3638_Submittal Review 5-10.docx\AWtp
Renton City Hall - 1055 South Grady Way* Renton, Washington 98057 - rentonwa.gov
Date:
05/15/2013
D c:;tyof
�0
Project Name:
President Park Water Main Replacement
Project Number:
CAG-13-044
Contractor:
Rodarte Construction, Inc.
Sub-Contractor:
City Review:
lAndrew Weygandt, PE
Item No.
Material or Manufacturer's Product/Type
City Comments
19
Icon Materials Cold Mix Asphalt Patching
Source Approved
20
Lakeside Industries Hot Mix Asphalt
Source Approved
17
Select Imported Trench Backfill
Source Approved
18
CSTC/Crushed Rock/Shoulder Restoration
Source Approved
8
Griffin 8" DI Tyton Push -On Joint
Source Approved
8
Griffin 8" DI Mechanical Joint
Source Approved
8
Tubular Poly Wrap, 8mil
Source Approved
8
Tyler/Star DI Compact Fittings
Source(s) Approved
8
Tyler/Star DI Flanged Fittings
Source(s) Approved
8
Mechanical Joint Restraint
EBAA Series 1100 and 1700 approved for all sizes. Star Grip approval witheld.
9
Mueller 2360 Resilient Wedge Gate Valve
Source Approved
9
Mechanical Joint Restraint
EBAA Series 1100 and 1700 approved for all sizes. Star Grip approval witheld.
9
Flange Gasket and Bolts
Source Approved
9
Cast Iron Valve Box Top and Lid, #940
Source Approved
9
Cast Iron Valve Box Base, 24"
Source Approved
11
Mueller Super Centurion 250 Hydrant
Source Approved
11
Tyler/Star DI Compact Fittings
Source(s) Approved
11
Tyler/Star DI Flanged Fittings
Source(s) Approved
11
Mueller 2360 Resilient Wedge Gate Valve
Source Approved
11
Cast Iron Valve Box Top and Lid, #940
Source Approved
11
Cast Iron Valve Box Base, 24"
Source Approved
11
Ductile Iron Pipe, Tyton Joint, CI-52
Source Approved
11
Harrington Permanent Hydrant Adapter
Source Approved
12
Mueller Ball Corporation Stop (CC x CTS)
Source Approved
Page 1 of 4
Date:
05/15/2013
D -ityof
Project Name:
President Park Water Main Replacement
Project Number:
CAG-13-044
Contractor:
lRoclarte Construction, Inc.
Sub -Contractor:
City Review:
jAndrew Weygandt, PE
Item No.
Material or Manufacturer's Product/Type
City Comments
12
Cerrotube Type-K 1" Copper Tubing
Source Approved
12
Mueller B-2470 Copper Meter Setter
Source Approved
12
Oldcastle 15x27 Meter Box and Iron Lid
Source Approved
13
Merit Brass 2" Brass Fittings
Source Approved
13
Mueller 2360 2" Gate Valve
Source Approved
13
Cast Iron Valve Box Top and Lid, #940
Source Approved
13
Cast Iron Valve Box Base, 24"
Source Approved
13
Mueller 2" MIPT x Compression Fitting
Source Approved
13
Cerrotube Type-K 2" Copper Tubing
Source Approved
13
Muller B-2427 2" Meter Setter
Source Approved
13
Oldcastle 17x30 Meter Box and Iron Lid
Source Approved
14
Tyler/Star DI Compact Fittings
Source(s) Approved
14
Mechanical Joint Restraint
EBAA Series 1100 and 1700 approved for all sizes. Star Grip approval witheld.
14
AWWA C153 DI Compact MJ Fittings
Source(s) Approved
14
Griffin 8" DI Tyton Push -On Joint
Source Approved
14
ROMAC 501 Transition Coupling
Source Approved
Additional Comments:
Need submittals for bid items 6, 10, 15, and 16.
Page 2 of 4