Loading...
HomeMy WebLinkAboutWTR2703638_8PUBLIC WORKS DEPARTMENT 11000� City of �ie��O� M E M O R A N D U M DATE: April 10, 2013 TO: Bonnie Walton, City Clerk FROM: Abdoul Gafour, Water Utility Supervisor, x7210 P(n Andrew Weygandt, Water Utility Engineer x720� SUBJECT: Bid Award for President Park Water Main Replacement Project WTR-27-3638, CAG-13-044 On April 9, 2013, at 2:30 p.m., the City received eight bids for the President Park Water Main Replacement Project. The City Clerk opened and publicly read all bids at 2:40 p.m. Rodarte Construction, Inc. of Auburn, WA submitted the apparent low bid, in the total amount $731,361.45. The engineer's estimate for this project is $925,767.75. We have checked all bids for completeness, mathematical correctness, and inclusion of all required forms. We have determined that Rodarte Construction, Inc. made a mathematical error of $1,500.00 in the addition of the bid amount of each bid item in the subtotal of their bid. The corrected subtotal of the bid before sales tax is $669,410.00 and the actual total bid amount including sales tax is $733,003.95. With the total bid amount correction, Rodarte Construction, Inc. remains the low bidder. The 2013-2014 total budget amount (account 425.455170) for this project is $1,000,000 including expenditures for staff time for project management, construction inspection, contract administration and contingencies. In accordance with Council procedure, the low bid meets all three conditions for award: 1. The low bid must be within the total project budget. 2. There must be more than one bidder. 3. The lowest responsive, responsible bid contains no significant irregularities. The Water Utility recommends that Council award the contract to Rodarte Construction, Inc., in the total amount of $733,003.95, at its meeting of April 15, 2013. If you have any questions, please contact Andrew. Thank you for your assistance. Attachments cc: Gregg Zimmerman, PW Administrator Lys Hornsby, Utility Systems Director H:\file Sys\WTR - Drinking Water Utility\WTR-27 - Water Project Files\WTR-27-3638 President Park Main Replacement\Construction Con tract\WTR-27-3638_memo-to-city-clerk-contract-award. doc\AW'p Project Titlr President Park Water Main Replacement Project BID DATE: April 09, 2013 Item Unit Est. City of Renton Engineers Estimate Unit Bid 1 Mobilizafion, Demobilization, Site Preparation & Clean-up Lump Sum 1 50,000.00 50,000.00 2 Traffic Control Lump Sum 1 20,000.00 20,000.00 3 Trench Excavation Safety Systems Lump Sum 1 15,000.00 15,000.00 4 Construction Surveying and Staking Lump Sum 1 15,000.00 15,000.00 5 As -Built Surveying for Progress Payments and Final As-Builts Lump Sum 1 10,000.00 10.000.00 6 Temporary Erosion and Sedimentation Control Lump Sum 1 5.000.00 5.000.00 7 Site Specific Potholing Each 20 1,000.00 20,000.00 8 Fumish and Install 8' Cl 52 DI Water Pipe & Fittings w/ Polym Lineal Foot 4,210 75.00 315,750.00 9 Fumish and Install 8' Gate Valve Assembly Each 28 1,000.00 28,000.00 10 Concrete for Thrust Blocking, Dead -Man Anchor Blocks Cubic Yard 30 200.00 6,000.00 11 Fumish and Install Fire Hydrant Assembly Each 5 4,000.00 20.000.00 12 Fumish & Install 1" Water Service Connection Each 69 1,400.00 96,600.00 13 Fumish & Install 2' Water Service Connection Each 1 1,600.00 1,600.00 14 Connection to Existing Water Main Each 8 3,000.00 24,000.00 15 Cut, Cap, and Block Existing Water Main Each 1 1,500.00 1,500.00 16 Removal and Replacement of Unsuitable Foundation Material Ton 150 20.00 3,000.00 17 Select Imported Trench Backfll Ton 1,100 20.00 22.000.00 18 Crushed Surfacing Top Course, Crushed Rock Backfill, Crush Ton 1,150 20.00 23,000.00 19 T' Temporary Cold Mix Asphalt Trench Patching Ton 360 100.00 36.000.00 20 H.M.A. Class W PG 64-22 for Roadway Reconstruction Ton 720 150.00 108,000.00 21 Removal and Replacement of Concrete Curb and Gutter Lineal Foot 250 30.00 7,500.00 22 Concrete Driveway and/or Sidewalk Restoration Square -Yard 100 75.00 7,500.00 23 Property & Landscape Restoration Lump Sum 1 10.000.00 10,000.00 Subtotal $845.450.00 Tax $80,317.75 Total $925,767.75 Rodarte Construction, Inc. Kar-Vel Construction Laser Underground & Earthworks, Inc. R.L. Ali. Company Northwest Cascade, Inc. Reed Trucking & Excavatirg, In6antana Trucking & Excavating, Inc. Johansen Excavating, Inc. Unit Bid Unit Bid Unit Bid Unit Bid Unit Bid Unit Bid Unit Bid Unit Bid Price Amount Price Amount Price Amount Price Amount Price Amount Price Amount Price Amount Price Amount 34,000.00 34,000.00 69.000.00 69,000.00 69,500.00 69,500.00 50,000.00 50,000.00 62,000.00 62,000.00 50,000.00 50,000.00 78,000.00 78,000.00 83,000.00 83,000.00 25,000.00 25.000.00 4.500.00 4.500.00 30.000.00 30,000.00 5.000.00 5.000.00 32,000.00 32,000.00 50.000.00 50,000.00 71,200.00 71,200.00 130,000.00 130,000.00 500.00 500.00 200.00 200.00 5,000.00 5,000,00 500.00 500.00 50,000.00 50,000.00 500.00 500.00 5,900.00 5,900.00 7,610.00 7,610.00 5.000.00 5,000.00 7,000.00 7,000.00 3,500.00 3,500.00 4.000.00 4,000.00 5,600.00 5,600.00 9,000.00 9.000.00 6,000.00 6,000.00 5,800.00 5,800.00 800.00 800.00 3.000.00 3,000.00 3,500.00 3.500.00 2.000.00 2.000.00 2.600.00 2.600.00 2.500.00 2,500.00 4.500.00 4,500.00 3,000.00 3,000.00 1,200.00 1,200.00 10,000.00 10.000.00 3,000.00 3,000.00 4,000.00 4,000.00 12,000-00 12,000.00 4,500.00 4,500.00 5,800.00 5,800.00 1,700.00 1.700.00 250.00 5.000.00 25.00 500.00 400.00 0,000.00 40.00 800.00 225.00 4,500.00 200.00 4.000.00 750.00 15.000.00 8,200.00 164,000.00 61.00 256.810.00 61.60 259,336.00 60.00 252,600.00 73.00 307,330.00 35.00 147,350.00 66.00 277.860.00 46.50 195,765.00 72.00 303.120.00 1,000.00 28.000.00 1,000.00 28,000.00 1.000.00 28,000.00 1.000.00 28,000.00 1.300.00 36,400.00 1,200.00 33.600.00 1,300.00 36,400.00 1.182.00 33,096.00 300.00 9,000.00 15.00 450.00 100.00 3,000.00 150.00 4,500.00 175.00 5.250.00 200.00 6,000.00 300.00 9.000.00 182.00 5,460.00 4.200.00 21.000.00 5,000.00 25,000.00 4,500.00 22,500.00 3.000.00 15,000.00 4,400.00 22,000.00 4,500.00 22.500.00 4,600.00 23,000.00 6,250.00 31,250.00 1.200.00 82,800.00 1,800.00 124,200.00 1.700.00 117,300.00 2.000.00 138,000.00 1,585.00 109,365.00 1,300.00 89,700.00 1,000.00 69,000.00 1.350.00 93,150.00 3,800.00 3,800.00 3,600.00 3,800.00 4,000.00 4,000.00 3,000.00 3,000.00 4,250.00 4,250.00 3,000.00 3,000.00 3,500.00 3,500.00 3.900.00 3,900.00 2,500.00 20,000.00 3,200.00 25.600.010 2.500.00 20.000.00 4,000.00 32,000.00 2,200.00 17,600.00 2,500.00 20,000.00 4,000.00 32,000.00 2.075.00 16,600.00 1.000.00 1,000.00 2,600.00 2,600.00 2,951.55 2,951.55 2,000.00 2.000.00 1,545.00 1.545.00 500.00 500.00 320.00 320.00 1,122.00 1,122.00 32.00 4,800.00 2.00 300.00 30.00 4.500.00 1.00 150.00 24.00 3,600.00 20.00 3,000.00 40.00 6.000.00 36.20 5A30.00 12.00 13,200.00 2.00 2,200.00 5.00 5.500.00 25.00 27.500.00 23.00 25,300.00 15.00 16,500.00 27.00 29,700.00 27.00 29,700.00 20.00 23,000.00 2.00 2,300.00 25.00 28.750.00 25.00 28.750.00 32.00 36,800.00 20.00 23,000.00 29.00 33,350.00 32.00 36,800.00 100.00 36,000.00 10.00 3,600.00 1.00 360.00 10.00 3,600.00 132.00 47,520.00 100.00 36,000.00 110.00 39,600.00 190.00 68,400.00 115.00 82,800,00 140.00 100,800.00 135.00 97,200.00 130.00 93,600.00 112.00 80,640.00 140.00 100,800.00 140.00 100,800,00 125.00 90,000.00 20M0 5,000.00 30.00 7,500.00 35.00 8,750.00 10.00 2.500.00 45.00 11,250.00 30.00 7.500.00 32.50 8,125.00 48.00 12,000.00 42.00 4,200.00 80.00 8,000.00 65.00 6,500.00 50.00 6,000.00 92.00 9,200.00 70.00 7,000.00 59.00 5,900.00 94.30 9.430.00 6.500.00 6,500.00 14.000.00 14,000,00 20,000.00 20,000.00 6,000.00 6.000.00 47.000.00 47,000.00 15.000.00 15,000.00 4,000.00 4,000.00 95,000.00 95,000.00 Subtotal $669,410.00 Subtotal $701,886.00 Subtotal $744.411.55 Subtotal $763.230.00 Subtotal $773,770.00 Subtotal $782,460.00 Subtotal $782.860.00 Subtotal $1,229.568.00 Tax $63,593.95 Tax $66.679.17 Tax $70,719.10 Tax $72.506.85 Tax $73.508.15 Tax $74,333.70 Tax $74,371.70 Tax $116.808.96 Total $733,003.95 Total $768.565A7 Total $815.130.65 Total $835,736.85 Total $847,278.15 Total $856,793.70 Total $857,231.70 Total $1,346.376.96