Loading...
HomeMy WebLinkAboutBenson Rd Cost estimate Summary 4-10-07Water Line Relocation Benson Road I-405 Overpass Summary - Engineer's Opinion of Probable Cost Estimate Date 10-Apr-06 DIVISION 1 - GENERAL REQUIREMENTS 81,000.00$ DIVISION 2 - EARTHWORK 45,120.00$ DIVISION 3 - QUARRY PIT AND STOCKPILING -$ DIVISION 4 - BASES 8,280.00$ DIVISION 5 - SURFACE TREATMENTS AND PAVEMENTS 86,334.00$ DIVISION 6 - STRUCTURES -$ DIVISION 7 - DRAINAGE, STORM, SEWER, WATER 383,080.00$ DIVISION 8 - MISCELLANEOUS CONSTRUCTION 21,962.50$ DIVISION 9 - MATERIALS -$ Subtotal Direct Construction Cost 625,776.50$ Sub-Total Direct Construction Costs $625,777.00 Contractor's Field Overhead @ 8%$50,062.00 Contractor's Fee @ _15_% (Office Ovhd and Profit) $93,867.00 Sub-Total $769,706.00 Contractor Bonds and Insurance @ 2%$0.00 Sub-Total $769,706.00 Contingency @ 5%$38,485.00 Sales Tax Estimate @ _8.33_ %$67,322.00 Total Current Construction Estimate $875,513.00 Escalation to Mid-Point of Construction $19,699.00 Forecast Construction Estimate at Bid $895,212.00 0 $0.00 Escalation ENR 20 City Cost Index @ Time-Of-Estmate 8611.76 Date of Estimate Sept, 2006 Date of Nearest Index 9/5/2006 Bid Date 5/1/2007 Notice to Proceed 5/15/2007 Estimated Construction Start Date 6/1/2007 Estimated Construction Time (low/high working days)45/120 Scheduled Substantial Completion Date 10/15/2007 Scheduled Final Completion Date 12/31/2007 Months from Estimate to Mid Point of Construction 6 Previous 12 Months Escalation 4.50% Escalation from Estimate to Mid Point of Construction 2.25% Notes: 1 Dec estimate O&P, GC's, revised to be additive, not compounded. 2 Bonds and insurance removed & considered to be covered in GC's 3 Sept 06 estimate included a 5% contingency ($832K) 4 ENR index increased to offset bid timing uncertainties Benson Rd Cost estimate WSDOT V3.0 4-10-07.xls 1 of 1