HomeMy WebLinkAbout04 - Bid Tab For Bid 4-10-07Schedule of Prices -
Bid Tabulation Form
Item
No.
Estimated
Quantity
Description and Unit Price
(In Words)
Unit Price Total
Amount
1 1
Lump Sum
Mobilization and Demobilization
$
Per Lump Sum (written)
$
(Dollars cents)
$
(Dollars cents)
2 1
Lump Sum
Trench Excavation Safety Systems
$
Per Lump Sum (written)
$
(Dollars cents)
$
(Dollars cents)
3 1
Lump Sum
Construction Surveying, Staking, and
As-Builts
$
Per Lump Sum (written)
$
(Dollars cents)
$
(Dollars cents)
4 1
Lump Sum
Temporary Erosion/Sedimentation
Controls
$
Per Lump Sum (written)
$
(Dollars cents)
$
(Dollars cents)
5 1
Lump Sum
Traffic Control
$
Per Lump Sum (written)
$
(Dollars cents)
$
(Dollars cents)
6 1
Lump Sum
Existing CMP Culvert Crossing
$
Per Lump Sum (written)
$
(Dollars cents)
$
(Dollars cents)
6a 1
Lump Sum
Existing Culvert Repair
Contingency
$
Per Lump Sum (written)
$
(Dollars cents)
$
(Dollars cents)
6b 1
Lump Sum
Benson Road Future I-405 Retaining
Wall Casing Installation
$
Per Lump Sum (written)
$
(Dollars cents)
$
(Dollars cents)
Schedule of Prices -
Bid Tabulation Form
7 1,900
Linear Foot
Class 52, 16 Inch, Push-On, Ductile
Iron Water Pipe with Poly-Wrap and
Appurtenances - Complete
$
Per Linear Foot (written)
$
(Dollars cents)
$
(Dollars cents)
7a 80
Linear Foot
Class 52, 16 Inch, Restrained Joint,
Ductile Iron Water Pipe with Poly-Wrap
and Appurtenances - Complete
$
Per Linear Foot (written)
$
(Dollars cents)
$
(Dollars cents)
7b 60
Linear Foot
Class 52, 6 Inch, Push-On, Ductile Iron
Water Pipe with Poly-Wrap and
Appurtenances - Complete
$
Per Linear Foot (written)
$
(Dollars cents)
$
(Dollars cents)
8 7
Each
Gate Valve Assembly, 16 Inch
$
Per Each (written)
$
(Dollars cents)
$
(Dollars cents)
8a 5
Each
Gate Valve Assembly, 12 Inch
$
Per Each (written)
$
(Dollars cents)
$
(Dollars cents)
8b 3
Each
Gate Valve Assembly, 6 Inch
$
Per Each (written)
$
(Dollars cents)
$
(Dollars cents)
9 3
Each
Fire Hydrant Assembly
$
Per Each (written)
$
(Dollars cents)
$
(Dollars cents)
10 4
Each
Connection to Existing Water Mains
$
Per Each (written)
$
(Dollars cents)
$
(Dollars cents)
Schedule of Prices -
Bid Tabulation Form
11 20
Cubic Yard
Concrete For Thrust Blocking, Dead-
Man Anchor Blocks
$
Per Cubic Yard (written)
$
(Dollars cents)
$
(Dollars cents)
12 900
Ton
Removal of Unsuitable and Excess
Spoils Material
$
Per Ton (written)
$
(Dollars cents)
$
(Dollars cents)
13 1,100
Ton
Select Imported Trench Backfill
$
Per Ton (written)
$
(Dollars cents)
$
(Dollars cents)
13a 850
Ton
Gravel Backfill for Pipe Zone Bedding
$
Per Ton (written)
$
(Dollars cents)
$
(Dollars cents)
14 50
Ton
Crushed Surfacing Base Course
(CSBC)
$
Per Ton (written)
$
(Dollars cents)
$
(Dollars cents)
14a 280
Ton
Crushed Surfacing Top Course (CSTC)
$
Per Ton (written)
$
(Dollars cents)
$
(Dollars cents)
15 75
Ton
Temporary Asphalt Patch ‘1/2 Inch
PG70’ Asphalt Concrete Pavement
$
Per Ton (written)
$
(Dollars cents)
$
(Dollars cents)
16 450
Ton
Asphalt Concrete Paving Class ‘1/2
Inch PG70’
$
Per Ton (written)
$
(Dollars cents)
$
(Dollars cents)
Schedule of Prices -
Bid Tabulation Form
17 1
Lump Sum
Restore Traffic Detection Loop System
$
Per Lump Sum (written)
$
(Dollars cents)
$
(Dollars cents)
18 1
Lump Sum
Restore, Replace Lane Channelization,
Crosswalks, Stripping, and All
Temporary and Miscellaneous
Pavement Markings
$
Per Lump Sum (written)
$
(Dollars cents)
$
(Dollars cents)
19 1
Square Yard
Remove and Replace Sidewalk and
Driveway
$
Per Square Yard (written)
$
(Dollars cents)
$
(Dollars cents)
20 1
Lump Sum
Remove and Restore In Kind Curbing,
Lawn, Landscaping
$
Per Lump Sum (written)
$
(Dollars cents)
$
(Dollars cents)
21 1
Lump Sum
Excavation Dewatering
$
Per Lump Sum (written)
$
(Dollars cents)
$
(Dollars cents)
22 1
Lump Sum
SR 515 Storm Water Drainage
Modification
$
Per Lump Sum (written)
$
(Dollars cents)
$
(Dollars cents)