Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WWP2703320
Bravo Environmental BRAVO Kenmore, Wa 98028 TO 425A24-9000, Fax: 425A24-9002 Inspection report Date: P.O.#: Weather: Surveyed By: section number: PSR: 06/21/2007 1 Dry Tim 1 Total Pipe Length Survey Customer: System Owner: Clean Date: Pre -Cleaned: Map Grid11 #: J Jetting Street: NE 26th Flow Control: Start MH: MH-5 City: Renton Year Renewed End MH: MH-6 Location Code: B Main Highway - Suburban/Rural Tape/Media #: FRO-01 Total length surveyed: 394.76 ft Purpose: E Pre -Acceptance Dia/Height: C Circular 8' /8" Use: SS Sanitary Material: PVC Polyvinyl Chloride Pipe Joint length: Lining: Drain. Area: Category: eg ry: Comment: Location details: 1:975 position code observation MPEG photo grade MHS 0.00 AMH Manhole 00:00:07 7.78 TFA Tap Factory Made Active, at 09 o'clock, 6", within 8 inch: YES 00:00:59 79.79 TFA Tap Factory Made Active, at 09 o'clock, 6", within 8 inch: YES 00:04:09 124.57 TFA Tap Factory Made Active, at 03 o'clock, 6", within 8 inch: YES 00:06:01 — 1 151.00 TFA Tap Factory Made Active, at 09 o'clock, 6", within 8 inch: YES 000726 245.15 TFA Tap Factory Made Active, at 09 o'clock, 6", within 8 inch: YES 00:10:52 295.32 TFA Tap Factory Made Active, at 03 o'clock, 6", within 8 inch: YES 00:13:00 324.75 TFA Tap Factory Made Active, at 09 o'clock, 6", within 8 inch: YES 00:14:23 f� 349.58 TFA Tap Factory Made Active, at 03 o'clock, 6", within 8 inch: YES 00:15:38 — I 367.33 TFA Tap Factory Made Active, at 03 o'clock, 6", within 8 inch: YES 00:16:33 1 387.58 TFA Tap Factory Made Active, at 03 o'clock, 6", within 8 inch: YES 00,17:40 394.76 AMH Manhole, Finish survey 00,18,41 MH$ QSR QMR SPR MPR OPR SPRI MPRI OPRI 0000 0000 0 0 0 0 0 0 100th & Duvall.mdb // page: 1 BRAY Bravo Environmental j Kenmore, Wa 98028 env ronmen� Tel 425-424-9000, Fax 425 424-9002 Inspection report Date P.O.#: Weather: Surveyed By: section number: PSR 06/21/2007 1 Dry Tim 2 Total Pipe Length Survey Customer: System Owner: Clean Date: Pre -Cleaned: Map Grid # J Jetting Street: NE 26th Flow Control: Start MH: MH-4 City: Renton Year Renewed End MH: MH-5 Location Code. B Main Highway - Suburban/Rural Tape/Media #: FRO-01 Total length surveyed: 134.94 ft Purpose: E Pre -Acceptance Dia/Height: C Circular 8' /8" Use: SS Sanitary Material: PVC Polyvinyl Chloride Pipe Joint length: Lining: Drain. Area: Category: eg ry: Comment: Location details: 1:350 position code observation MPEG photo grade MH-0� 0.00 AMH Manhole 000005 62.34 TFA Tap Factory Made Active, at 09 o"clock, 6", within 8 inch: YES 000244 68.52 TFA Tap Factory Made Active, at 03 o'clock, 6", within 8 inch: YES 00:03:13 134.94 AMH Manhole, Finish survey 000606 (MH-5 QSR OMR SPR MPR OPR SPRI MPRI OPRI 0000 0000 0 0 0 0 0 0 100th & Duvall.mdb // page: 2 Bravo Environmental BRAV41w Kenmore, Wa 98028 envi ronlmintal Tel. 425-424-9000, Fax: 425424-9002 Inspection report Date: P.O.#: Weather: Surveyed By: section number: PSR: 0612112007 1 Dry Tim 3 Total Pipe Length: Survey Customer: System Owner: Clean Date: Pre -Cleaned: Map Grid #: J Jetting Street: NE 26th Flow Control: Start MH: MH-1A City: Renton Year Renewed End MH: MHA Location Code: B Main Highway - Suburban/Rural Tape/Media #: FRO-01 Total length surveyed: 173.24 ft Purpose: E Pre -Acceptance Dia/Height: C Circular 8"18" Use: SS Sanitary Material: PVC Polyvinyl Chloride Pipe Joint length: Lining: Drain. Area: Category: 9 ry Comment: Location details: 1:425 position code observation MPEG photo grade MH-1A 0.00 AMH Manhole 00:00:04 137.44 TFA Tap Factory Made Active, at 03 o'clock, 6", within 8 inch: YES 00:05:32 173.24 AMH Manhole, Finish survey 00:07:10 MH-1 QSR QMR SPR MPR OPR SPRI MPRI OPRI 0000 1 0000 0 0 0 0 0 0 100th & Duvall.mdb // page: 3 Bravo Environmental BRAVO Kenmore, Wa 98028 envilmrimental Tel 425-424-9000, Fax: 425-424-9002 Inspection report Date: P.O.#: Weather: Surveyed By: section number: PSR: 06/2112007 1 Dry Tim 4 Total Pipe length: Survey Customer: System Owner: Clean Date: Pre -Cleaned: Map Grid M J Jetting Street: NE 26th Flow Control: Start MH: Existing City: Renton Year Renewed End MH: MH-1A Location Code: B Main Highway - Suburban/Rural Tape/Media #: FRO-01 Total length surveyed: 61.54 ft Purpose: E Pre -Acceptance Dia/Height: C Circular 8' /8" Use: SS Sanitary Material: PVC Polyvinyl Chloride Pipe Joint length: Lining: Drain. Area: Category: eg ry: Comment: Location details: 1:175 position code observation MPEG photo grade ng 0.00 AMH Manhole 00:00:06 8.58 TFA Tap Factory Made Active, at 03 o'clock, 6", within 8 inch: YES 00:00:46 39.50 TFA Tap Factory Made Active, at 03 o'clock, 6", within 8 inch: YES 00:01:59 55.15 TFA Tap Factory Made Active, at 03 o'clock, 6", within 8 inch: YES 00:02:46 61.54 AMH Manhole, Finish survey 00:03:16 MH-1A QSR QMR 0000 SPR MPR JOPR 0 SPRI MPRI OPRI 0000 0 0 0 0 0 100th & Duvall.mdb // page: 4 Bravo Environmental BRAVO Kenmore, Wa 98028 Tel 425 424-9000, Fax 425 424-9002 environments Inspection report Date: P.O.# Weather: Surveyed By: section number: PSR: 05109/2007 1 Dry Tim 13 Total Pipe Length: Survey Customer: System Owner: Clean Date: Pre -Cleaned: rate: J Jetting Street: NE 26th St Flow Control: N Not Controlled Start MH: Existing City: Renton Year Renewed End MH: MHAA Location Code: B Main Highway - Suburban/Rural Tape/Media #: LAN-01 pipe length: 67.1 ft Reason for inspection: E Pre -Acceptance Dia/Height: C Circular 8' 18" Use of Sewer: SS Sanitary Material: PVC Polyvinyl Chloride Pipe Length: Lining Method: Drain, Area: Category: Remark:: 1:150 position code observation counter photo grade 0.00 AMH Manhole 00:00:00 12.60 TFA Tap Factory Made Active, at 03 o'clock, 6", within 8 inch: YES 00:00:00 h •. ate 43.40 TFA Tap Factory Made Active, at 03 o'clock, 6", within 8 inch: YES 00:00:00 59.80 TFA Tap Factory Made Active, at 03 o'clock, 6", within 8 inch: YES 00:00:00 67.10 AMH Manhole, Finish survey 00:00:00 OSR OMR SPR MPR OPR SPRI MPRI OPRI 0000 0000 0 0 0 0 0 0 Langley Ridge.mdb l/ page: 1 BRAVA Bravo Environmental Kenmore, Wa 98028 Tel: 425-424-9000, Fax: 425-424-9002 environments Inspection report Date: P.O.# Weather: Surveyed By: section number: PSR. 20070507 1 Dry Tim 1 Total Pipe Length: Survey Customer: System Owner: Clean Date: Pre -Cleaned: rate: J Jetting Street: Fields Ave N Flow Control: N Not Controlled Start MH: MH4 7 City: Renton Year Renewed End MH: MHAX J Location Code: B Main Highway - Suburban/Rural Tape/Media #: LAN-01 pipe length: 149.9 ft Reason for inspection: E Pre -Acceptance Dia/Height: C Circular 8" /8" Material: PVC Polyvinyl Chloride Pipe Length: Use of Sewer: SS Sanitary Lining Method: Drain. Area: Category: Remark:: 1:350 position code observation counter photo grade i T 0.00 AMH Manhole 00:00:00 �j n �r 149.90 AMH Manhole, Finish survey 00:00:00 QSR QMR SPR MPR OPR SPRI MPRI OPRI 0000 0000 t 0 10 0 0 0 0 Langley mugummu 11 you— 1 Bravo Environmental BRAVO Kenmore, Wa 98028 Tel: 425 424-9000, Fax 425 424-9002 envuronmenta Inspection report Date: P.O.# Weather: Surveyed By: section number: PSR: 05/07/2007 1 Dry Tim 2 Total Pipe Length: Survey Customer: System Owner: Clean Date: Pre -Cleaned: rate: J Jetting Street: Fields Ave N Flow Control: N Not Controlled Start MH: MH-7 City: Renton Year Renewed End MH: PE Location Code: B Main Highway - Suburban/Rural Tape/Media M LAN-01 pipe length: 21.3 ft Reason for inspection: E Pre -Acceptance Dia/Height: C Circular 8" /8" Material: PVC Polyvinyl Chloride Pipe Length: Use of Sewer: SS Sanitary Lining Method: Drain. Area: Category: Remark:: 1:50 position code observation counter photo grade 0.00 AMH Manhole 00:00:00 y 21.30 ACOM Cleanout Mainline, Remark: Pipe End 00:00:00 QSR QMR SPR MPR OPR SPRI MPRI OPRI 0000 0000 0 0 0 0 0 0 Langley Ridge.mdb // page: 2 Bravo Environmental BRAV Kenmore, Wa 98028 Tel: 425-424-9000, Fax: 425424-9002 environments Inspection report Date: P.O.# Weather: Surveyed By: section number: PSR: 05/07/2007 1 Dry Tim 3 Total Pipe Length: Survey Customer: System Owner: Clean Date: Pre -Cleaned: rate: J Jetting Street: NE 26th St Flow Control: N Not Controlled Start MH: MH-6 City: Renton Year Renewed End MH: MH-7 Location Code: B Main Highway - Suburban/Rural Tape/Media #: LAN-01 pipe length: 400.6 ft Reason for inspection: E Pre -Acceptance Dia/Height: C Circular 8'Y8" Material: PVC Polyvinyl Chloride Pipe Length: Use of Sewer: SS Sanitary Lining Method: Drain. Area: Category: Remark:: 1:900 position code observation counter photo grade 0.00 AMH Manhole 00:00:00 4. 10.20 TFA Tap Factory Made Active, at 09 o'clock, 6", within 8 inch: YES 00:00:00 81.60 TFA Tap Factory Made Active, at 03 o'clock, 6", within 8 inch: YES 00:00:00 88.10 TFA Tap Factory Made Active, at 09 o'clock, 6", within 8 inch: YES 00:00:00 152.80 TFA Tap Factory Made Active, at 03 o'clock, 6", within 8 inch: YES 00:00:00 172.30 TFA Tap Factory Made Active, at 09 o'clock, 6", within 8 inch: YES 00:00:00 236.20 TFA Tap Factory Made Active, at 03 o'clock, 6", within 8 inch: YES 00:00:00 252.00 TFA Tap Factory Made Active, at 09 o'clock, 6", within 8 inch: YES 00:00:00 305.10 TFA Tap Factory Made Active, at 03 o'clock, 6", within 8 inch: YES 00:00:00 348.20 TFA Tap Factory Made Active, at 09 o'clock, 6", within 8 inch: YES 00:00:00 377.40 TFA Tap Factory Made Active, at 03 o'clock, 6", within 8 inch: YES 00:00:00 400.60 AMH Manhole, Finish survey 00:00:00 QSR QMR SPR MPR OPR SPRI MPRI OPRI 0000 0000 0 0 0 0 0 0 Langley Ridge.man 11 page: s Bravo Environmental BRAV o Kenmore, Wa 98028 Tel: 425A24-9000, Fax: 425A24-9002 environments Inspection report Date: P.O.# Weather: Surveyed By: section number: PSR: 05/07/2007 1 Dry Tim 4 Total Pipe Length: Survey Customer: System Owner: Clean Date: Pre -Cleaned: rate: J Jetting Street: NE 26th St Flow Control: N Not Controlled Start MH: MH-5 City: Renton Year Renewed End MH: MH-6 Location Code: B Main Highway - Suburban/Rural Tape/Media #: LAN-01 pipe length: 395.4 ft Reason for inspection: E Pre -Acceptance Dia/Height: C Circular 8'78" Material: PVC Polyvinyl Chloride Pipe Length: Use of Sewer: SS Sanitary Lining Method: Drain. Area: Category: Remark:: 1:900 position code observation counter photo grade 0.00 AMH Manhole 00:00:00 6.00 TFA Tap Factory Made Active, at 09 o'clock, 6", within 8 inch: YES 00:00:00 79.10 TFA Tap Factory Made Active, at 09 o'clock, 6", within 8 inch: YES 00:00:00 123.80 TFA Tap Factory Made Active, at 03 o'clock, 6", within 8 inch: YES 00:00:00 j149.30 T TFA Tap Factory Made Active, at 09 o'clock, 6", within 8 inch: YES 00:00:00 243.30 TFA Tap Factory Made Active, at 09 o'clock, 6", within 8 inch: YES 00:00:00 293.70 TFA Tap Factory Made Active, at 03 o'clock, 6", within 8 inch: YES 00:00:00 323.00 TFA Tap Factory Made Active, at 09 o'clock, 6", within 8 inch: YES 00:00:00 349.00 TFA Tap Factory Made Active, at 03 o'clock, 6", within 8 inch: YES 00:00:00 366.10 TFA Tap Factory Made Active, at 03 o'clock, 6", within 8 inch: YES 00:00:00 387.40 TFA Tap Factory Made Active, at 03 o'clock, 6", within 8 inch: YES 00:00:00 395.40 AMH Manhole, Finish survey 00:00:00 QSR QMR SPR MPR OPR SPRI MPRI OPRI 0000 0000 0 0 0 0 0 0 Langley Ridge.man // page: 4 Bravo Environmental BRAV Kenmore, Wa 98028 Tel:425A24-9000,Fax:425-424-9002 environmentall Inspection report Date: P.O.# Weather: Surveyed By section number: PSR: 05/07/2007 1 Dry Tim 5 Total Pipe Length: Survey Customer: System Owner: Clean Date: Pre -Cleaned: rate: J Jetting Street: NE 26th St Flow Control: N Not Controlled Start MH: MH-4 City: Renton Year Renewed End MH: MH-5 Location Code: B Main Highway - Suburban/Rural Tape/Media #: LAN-01 pipe length: 135.4 ft Reason for inspection: E Pre -Acceptance Dia/Height: C Circular 8" /8" Material: PVC Polyvinyl Chloride Pipe Length: Use of Sewer: SS Sanitary Lining Method: Drain. Area: Category: Remark:: 1:325 position code observation counter photo grade 0.00 AMH Manhole 00:00:00 :y T 62.50 TFA Tap Factory Made Active, at 09 o'clock, 6", within 8 inch: YES 00:00:00 67.90 I I'll TFA Tap Factory Made Active, at 03 o'clock, 6", within 8 inch: YES 00:00:00 106.10 D Deformed, 1 %, Remark: Bulge 00:00:00 S 4 135.40 AMH Manhole, Finish survey 00:00:00 QSR QMR SPR MPR OPR SPRI MPRI OPRI 4100 0000 4 0 4 4 0 4 Langley rzlage.maD If page: a Bravo Environmental BRAW Kenmore, Wa 98028 Tel: 425-424-9000, Fax: 425-424-9002 environments Inspection report Date: P.O.# Weather: Surveyed By: section number: PSR: 05/07/2007 1 Dry Tim 6 Total Pipe Length: Survey Customer: System Owner: Clean Date: Pre -Cleaned: rate: J Jetting Street: NE 26th St Flow Control: N Not Controlled Start MH: MH-4 City: Renton Year Renewed End MH: MH-9 Location Code: B Main Highway - Suburban/Rural Tape/Media #: LAN-01 pipe length: 123.2 ft Reason for inspection: E Pre -Acceptance Dia/Height: C Circular 8" /8" Material: PVC Polyvinyl Chloride Pipe Length: Use of Sewer: SS Sanitary Lining Method: Drain, Area: Category: Remark:: 1:275 position code observation counter photo grade 0.00 AMH Manhole 00:00:00 T 123.20 AMH Manhole, Finish survey 00:00:00 QSR QMR SPR MPR OPR SPRI MPRI OPRI 0000 0000 0 0 0 0 0 0 Langley Ridge.mde 11 page: b Bravo Environmental BRAV Kenmore, Wa 98028 Tel:425-424-9000,Fax:425-424-9002 environments Inspection report Date: P.O.# Weather: Surveyed By: section number: PSR: 06/07/2007 1 Dry Tim 7 Total Pipe Length: Survey Customer: System Owner: Clean Date: Pre -Cleaned: rate: J Jetting Street: NE 26th St Flow Control: City: Renton Year Renewed Location Code: B Main Highway - Suburban/Rural Tape/Media #: Reason for inspection: E Pre -Acceptance Use of Sewer: SS Sanitary Drain. Area: Remark 1:25 position code observation AMH Manhole N Not Controlled Start MH: MH-9 End MH: PE LAN-01 pipe length: 6.9 It Dia/Height: C Circular 8" /8" Material: PVC Polyvinyl Chloride Pipe Length: Lining Method: ACOM Cleanout Mainline, Remark: Pipe End counter photo grade 00:00:00 00:00:00 QSR QMR SPR MPR OPR SPRI MPRI OPRI 0000 0000 0 0 1 0 0 0 0 Langley raage.moo a page: r Bravo Environmental BRAVOaEo Kenmore, Wa 98028 Tel: 425A24-9000, Fax: 425A24-9002 environments Inspection report Date: P.O.# Weather: Surveyed By: section number: PSR: 05/07/2007 1 Dry Tim 8 Total Pipe Length: Survey Customer: System Owner: Clean Date: Pre -Cleaned: rate: J Jetting Street: NE 26th St Flow Control: N Not Controlled Start MH: MH-3 City: Renton Year Renewed End MH: MH-4 Location Code: B Main Highway - Suburban/Rural Tape/Media #: LAN-01 pipe length: 272.9 ft Reason for inspection: E Pre -Acceptance Dia/Height: C Circular 8"18" Use of Sewer: SS Sanitary Material: PVC Polyvinyl Chloride Pipe Length: Lining Method: Drain. Area: Category: Remark 1:625 position code observation AMH Manhole counter photo grade 00:00:00 TFA Tap Factory Made Active, at 09 o'clock, 6", within 8 inch: YES 00:00:00 TFA Tap Factory Made Active, at 09 o'clock, 6", within 8 inch: YES 00:00:00 TFA Tap Factory Made Active, at 03 o'clock, 6", within 8 inch: YES 00:00:00 TFA Tap Factory Made Active, at 09 o'clock, 6", within 8 inch: YES 00:00:00 TFA Tap Factory Made Active, at 03 o'clock, 6", within 8 inch: YES 00:00:00 AMH Manhole, Finish survey QSR QMR I SPR I MPR OPR 0000 0000 0 I 0 0 Langley Ridge.mdb // page: 8 00:00:00 SPRI MPRI OPRI 0 0 0 Bravo Environmental BRAVA Kenmore, Wa 98028 Tel 425-424-9000,Fax: 425-424-9002 environmenta Inspection report Date: P.O.# Weather: Surveyed By: section number: PSR: 05/07/2007 1 Dry Tim 9 Total Pipe Length: Survey Customer: System Owner: Clean Date: Pre -Cleaned: rate: J Jetting Street: NE 26th St Flow Control: N Not Controlled Start MH: MH-3 City: Renton Year Renewed End MH: CO-1 Location Code: B Main Highway - Suburban/Rural Tape/Media #: LAN-01 pipe length: 125.8 ft Reason for inspection: E Pre -Acceptance Dia/Height: C Circular 8" /8" Material: PVC Polyvinyl Chloride Pipe Length: Use of Sewer: SS Sanitary Lining Method: Drain. Area: Category: Remark:: 1:300 position code observation counter photo grade lViti�3= 0.00 AMH Manhole 00:00:00 l:? 125.80 ACOM Cleanout Mainline, Remark: Pipe End 00:00:00 QSR QMR SPR MPR OPR SPRI MPRI OPRI 0000 0000 0 0 0 0 0 0 Langley Ridge.mao 11 page: u BRA I Bravo Environmental Kenmore, Wa 98028 Tel:425-424-9000,Fax:425-424-9002 envi ronmenta Inspection report Date: P.O.# Weather: Surveyed By: section number: PSR: 05/07/2007 1 Dry Tim 10 Total Pipe Length: Survey Customer: System Owner: Clean Date: Pre -Cleaned: J Jetting rate: Street: NE 26th St Flow Control: N Not Controlled Start MH: MH-2 City: Renton Year Renewed End MH: MH-3 Location Code: B Main Highway - Suburban/Rural Tape/Media #: LAN-01 pipe length: 106.3 ft Reason for inspection: E Pre -Acceptance Dia/Height: C Circular 8"/8" Material: PVC Polyvinyl Chloride Pipe Length: Use of Sewer: SS Sanitary Lining Method: Drain. Area: I Category: Remark:: 1:250 position code observation counter photo grade 0.00 AMH Manhole 00:00:00 T i 63.60 TFA Tap Factory Made Active, at 03 o'clock, 6", within 8 inch: YES 00:00:00 I i 86.10 TFA Tap Factory Made Active, at 09 o'clock, 6", within 8 inch: YES 00:00:00 106.30 AMH Manhole, Finish survey 00:00:00 QSR QMR SPR MPR OPR SPRI MPRI OPRI 0000 0000 0 0 0 0 0 0 Langley rtlage.mon n page: iu Bravo Environmental BRAV Kenmore, Wa 98028 Tel:425-424-9000,Fax:425-424-9002 environments Inspection report Date: P.O.# Weather: Surveyed By: section number: PSR: 05/07/2007 1 Dry Tim 11 Total Pipe Length: Survey Customer: System Owner: Clean Date: Pre -Cleaned: rate: J Jetting Street: NE 26th St Flow Control: N Not Controlled Start MH: MH-2 City: Renton Year Renewed End MH: MHA Location Code: B Main Highway - Suburban/Rural Tape/Media #: LAN-01 pipe length: 176.1 ft Reason for inspection: E Pre -Acceptance Dia/Height: C Circular 8" /8" Material: PVC Polyvinyl Chloride Pipe Length: Use of Sewer: SS Sanitary Lining Method: Drain. Area: Category: Remark:: 1:400 position code observation counter photo grade 0.00 AMH Manhole 00:00:00 Ik 176.10 AMH Manhole, Finish survey 00:00:00 OSR OMR SPR MPR OPR SPRI4_ MPRI OPRI 0000 0000 0 0 0 0 0 0 Langley Ridge.man i/ page: ii Bravo Environmental BRAVO Kenmore, Wa 98028 Tel 425-424-9000. Fax 425-424-9002 _ environments Inspection report Date P.O.# Weather: Surveyed By: section number: PSR: 05/07/2007 1 Dry Tim 12 Total Pipe Length: Survey Customer: System Owner: Clean Date: Pre -Cleaned: rate J Jetting Street: NE 26th St Flow Control: N Not Controlled Start MH: MH-1 A City: Renton Year Renewed End MH: MHA Location Code: B Main Highway - Suburban/Rural Tape/Media #: LAN-01 pipe length: 177.7 ft Reason for inspection: E Pre -Acceptance Dia/Height: C Circular 8"/8" Material: PVC Polyvinyl Chloride Pipe Length: Use of Sewer: SS Sanitary Lining Method: Drain. Area: Category: Remark 1:400 position code observation counter photo grade 0.00 AMH 1' i1 iI Lj �j I:; J Manhole 00:00:00 T, rr is='I J lca -i i 140.10 TFA Tap Factory Made Active, at 03 o'clock, 6", within 8 inch: YES 00:00:00 >1 177.70 AMH Manhole, Finish survey 00:00:00 QSR QMR SPR MPR OPR SPRI MPRI OPRI 0000 0000 0 0 0 0 0 0 Langley Ridge.mdb It page: iz SANITARY SEWER SYSTEM PROJECT - �;4, DATE LOW PRESSURE AIR TEST INPF7 T P /its, �N LOCATION LENGTH K C M� RESULT S S i4l ly or 7bSal A ILI 77 6q L, �5 m R ti I' -ll _ I - PROJECT REQUEST FORM PLANNINGBUILDING/PUBLIC WORKS DATE: t_ CONTACT: EXT. FILE STATUS NEW OR ❑ EXISTING: FILE CODE (Plu-xx-xxxx): LOCATION `B My Work Space: 0 File Bay Shelf #: 0 Other: PROJECT NAME/ FILE TITLE: characters DESCRIPTION OF PROJECT: UTILITY PERMIT # (���� LUA# o S' -of 3 WO# ADDRESS / STREET NAME(S): ,�_ JV ,= Vic iiv/ tz DEV: - VTR :OWN: 5- ZMA ; CNSLT/ENG. C% OTHER ALIASES: Circle Size of Waterline: 10" 12" Circle One: New / Replace / Extension Circle Size of Sewerline: 10" 12" Circle One: New / Replace / Extension Circle Size of Stormline: 12" 18" 24" Circle One New / Replace / Extension CHECK EACH DISCIPLINE INVOLVED IN PROJECT Ltr Drwg # of sheets TED )9 13 (off site improvements) (include TESC) TRO $9 ❑ (Signalization, Channelization, Lighting) � WWP (sanitary sewer main, include basin name) Wm � El(Mains, Valves, Hydrants) (inc. composite & HorizontalCtrl) S WP 0 (CIP onlyxinclude basin name) I PLR (For Developer Files Only) O (letter only) PLEASE CIRCLE TBE DISCIPLINES WHICH NEED TO SIGN MYLARS WATER WASTEWATER SURFACE WATER TRANSPORTATION FIRE FOR WIN MA TWA INANrW rtcc nwn v File Codes File Alias Date Entered and Labels Made ^^ - ottr% ' 33,zv 0- OIL ? -