HomeMy WebLinkAboutWWP2703473_4PRECONSTRUCTION CONFERENCE Sign -in Sheet Project Name: Stonegate Lift Station Conveyance Improvements Project Manager: John Hobson, x7279 Location: 4800 block of NE Sunset Blvd, Field Ave NE (Sunset to NE 20th St) NE 20th St (Field Ave NE to Ilwaco Ave NE) Lyons Ave (NE 20th St. Contractor Name: Shoreline Construction Co. Contact Name: Doug Suzuki Please print clearly! to NE 26th St.) Phone Number: (206) 571-3571 An City of 1115 e� Name Company Contact Phone/E-Mail John Hobson City of Renton/Utility Engineering 425-430-7279 /jhobson@rentonwa.gov Ron McPhee City of Renton/Inspector (primary) 206-999-1831/rmcphee@rentonwa.gov Tom Main City of Renton/Inspector (secondary) 206-999-1833/tmain@rentonwa.gov 70 6-571-3S7-20le c ._e4 6hc J6L-%l ZriqN. to-5- 71 - s __5 sew Jv r-4 E- Q u ✓ C-` C t T y 0, F�--� —0 N ZS G- O i -/cAre -�iuK Ch rr r Jo►�ts 1ILiE0 AS i l_ 70(e - i C e (o10 & X�l'L "c"M' � S c 4 le C.41 , k. I.t/u/ � W qS ' x(.W 74 dJ c TY . c� �3 ci1.61-q3v C Y ��- �33 28 $-7s-7 7Z 534o en ro (.(ilk . aau , H:\File Sys\WWP - WasteWater\WWP-27-3473 Summerwind-Stonegate LS Replacement\CONSTRUCTION\Conveyance\Contract Info\precon signin sheet Stonegate.doc PRECONSTRUCTION CONFERENCE Sign -in Sheet r) o City of =l Project Name: Stonegate Lift Station Conveyance Improvements Project Manager: John Hobson, x7279 Location: 4800 block of NE Sunset Blvd, Field Ave NE (Sunset to NE 20th St), NE 20th St (Field Ave NE to Ilwaco Ave NE) Lyons Ave (NE 20th St. to NE 26th St.) Contractor Name: Shoreline Construction Co. Contact Name: Doug Suzuki Phone Number: (206) 571-3571 Please print clearly Name Company Contact Phone/E-Mail VICE ��7" V �' :.sue' ��)7'v ,i 17'-,'2- � �' `1 L-� ��n,�(,✓ `' �©L-� bi A '- o A - A 4XT d I,6 rm t6 r h IIJ l-.L �ZS-8'bi-`��tY� x !�a Gr t:tz ro�I,►Ir►; I1 .us \\RVFPS-02\Depts\PW\File Sys\WWP - WasteWater\WWP-27-3473 Summerwind-Stonegate LS Replacement\CONSTRUCTION\Conveyance\Contract Info\precon signin sheet Stonegate.doc Denis Law City Of. �7 o Mayor .A^ T • r � Public Works Department - Gregg Zimmerman P. E., Administrator April 20, 2010 Douglas Suzuki Shoreline Construction Co. PO Box 358 Woodinville, WA 98072-0358 RE: Bid Opening — Stonegate Lift Station Conveyance Improvements Dear Mr. Suzuki: At the Renton City Council meeting on April 19, 2010, Council accepted Shoreline Construction's bid of $875,888.86, for the Stonegate Lift Station Conveyance Improvements. You should be receiving a letter from the City Clerk with the official bid award. For execution of the contract, please submit the following information as soon as possible so we can prepare the contract documents for review and signature by the Mayor: 1. A list of names, addresses, phone numbers, and emergency phone numbers for: Responsible Officer, Job Foreman, and Bonding Agent. 2. Corporation letter or Resolution giving names of those authorized to sign the contract and samples of their signatures. 3. Photocopy of your current State Contractor's License (not master license). 4. Photocopy of your current City of Renton Business License. (To activate your City Business license, please contact Linda Weldon at 425-430-6851). 5. Two signed contract bonds on City of Renton forms (enclosed), UNDATED. The date will be filled in when signed by the Mayor. 6. One City of Renton Fair Practices Affidavit of Compliance (enclosed). 7. Two signed contracts, also UNDATED (enclosed). 8. One Insurance Information form and one Endorsement form (enclosed). 9. One Certificate of Insurance for 2010. Please add the City of Renton as additional insured. In the Cancellation section of the standard ACORD Certificate of Insurance form, the Renton City Hall • 1055 South Grady Way • Renton, Washington 98057 • rentonwa.gov Mr. Suzuki April 20, 2010 Page 2 of 3 language should specify "45" days written notice and the language shall have the words "ENDEAVOR TO" and "BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATIONOR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR REPRESENTATIVES" struck (see attached example). 10. The insurance policy declaration pages of all required insurance policies obtained from the insurance carrier. After the contract information is submitted, we will need the following information to review and approve before construction can start. We would like to have most of it before we schedule a pre -construction conference. If you intend to use private property for material storage or staging you will need the approval of our Development Services Department. In some instances this may include the need for a Temporary Use Permit. This does not apply to storage and staging areas within City Rights -of -Way. Provide material submittals as required for the work involved with this job. This will include, but not be limited to, information on the proposed source and specifications of all materials that will be used in the project (e.g.; pipe, manholes, crushed surfacing rock, bank run gravel, gravel borrow, asphalt, etc.), showing that the proposed material meets the project specifications, per Standard Specifications and Special Provisions Section 1-06.1. Provide any shop drawings and submittals needed for the project per Standard Specifications and Special Provisions Section 1-06. 2. Work Plan. Include the following items: Proposed construction sequencing and schedule for the project. 2. Mobilization Plan. 3. Temporary Erosion and Sediment Control Plan. 4. Traffic Control Plan. Street Cleaning and Sweeping Plan. 6. Trench Excavation Safety Systems Plan. 7. Disposal Site. 3. Construction Surveying. Identify the surveying firm/surveyor and a letter showing that the surveyor is licensed in the State of Washington. 4. Traffic Control Plan. The form is included with this letter. If you have questions on traffic control requirements, please call Jun Aesquivel at 425-430-7301. The plan can be reviewed and final adjustments made at the pre -construction conference. H:\File Sys\WWP - WasteWater\WWP-27-3473 Summerwind-Stonegate LS Replace ment\CONSTRUCTION\Conveyance\Contract Info\Shoreline Award Letter - Stonegate.doc\JDHtp Mr. Suzuki April 20, 2010 Page 3 of 3 5. Provide submittals as required for the Auger Bore work (page 71 of the Special Provisions) and the Directional Drill work (page 73 of the Special Provisions) involved with this job. This will include, but not be limited to, specifications of all materials and equipment that will be used in the project and references for the installer. Please let me know when you would like to have the pre -construction conference. We will need to notify the private utilities and City Inspector, so there should be a lead-time of at least one week before the conference. Please contact me at 425-430-7279 or ihobson@ci.renton.wa.us, if you have any questions. Sincer ly, Y-1 John Hobson Wastewater Utility Engineer Attachments H:\File Sys\WWP - WasteWater\WWP-27-3473 Summerwind-Stonegate LS Replacement\CONSTRUCTION\Conveyance\Contract Info\Shoreline Award Letter - Stonegate.doc\JDHtp John D. Hobson From: Mark Barber Sent: Friday, April 16, 2010 12:33 PM To: John D. Hobson Cc: David Christensen; Lys L. Hornsby; Gregg A. Zimmerman; Bonnie Walton Subject: RE: Stonegate Lift Station Conveyance Improvements Bid Protest Hello John, I agree with you that the protest lacks merit. I discussed the issue with Larry and he agrees too. If you've got any questions, let me know. Mark Barber Senior Assistant City Attorney Renton City Attorney 100 S 2nd St PO Box 626 Renton, WA 98057 Phone: 425.255.8678 Fax: 425.255.9789 E-Mail: mbarber@rentonwa.eov WARNING: This electronic message is an attorney -client communication. The information in this electronic document is privileged and/or confidential and is only for the use of the intended recipient. Recipients are instructed not to forward, copy or distribute this electronic communication and its attachments without the prior written approval or consent of the sender. If the reader of this e-mail is not an intended recipient, you are hereby notified that any forwarding, dissemination, distribution, printing or copying of this electronic communication and the information in this electronic communication is expressly and strictly prohibited. If you receive this electronic communication in error, please immediately notify the sender and permanently delete this communication from your system, network and/or computer. From: John D. Hobson Sent: Friday, April 16, 2010 11:23 AM To: Mark Barber Cc: David Christensen; Lys L. Hornsby; Gregg A. Zimmerman; Bonnie Walton Subject: Stonegate Lift Station Conveyance Improvements Bid Protest Mark, I received a phone call at approximately 11:40 AM today by the second low bidder (Titan Earthwork) on the City's Stonegate Lift Station Conveyance Improvements project. He has informed me that he will be mailing a letter protesting the awarding of the bid to the low bidder Shoreline Construction Co. (bids were opened on Tuesday, April 13, 2010). He is basing his protest on the fact that they only bid $0.10 per ton on items 17 and 18 (see attached bid tab sheet) and therefore have off-loaded cost onto other bid items that they think may run over the estimated quantities. I have checked the low bidder's unit prices on all of the other items and they appear to be comparable to the prices that the other contractors used (including Titan Earthwork) for their bids. Given the comparisons, I believe that there is no merit to his protest. I'd like to know your opinion on this so that the bid award is not delayed by the protest. Thanks John CITY OF RENTON BID TABULATION SHEET PROJECT: Stonegate Lift Station Conveyance Improvements CAG-10-040 DATE: April 13, 2010 Page 1 of 2 FORMS BID Proposal / BIDDER Triple Bid L&I Sched. Of Form Bond Cert Prices N,;-. "Includes Sales Tax B&L Utility, Inc. ✓� / �/ / /$7 $g���� 7101 Sexton Rd. Snohomish, WA 98290 Buno Construction, LLC 1/ 20219 99th Ave. SEE Snohomish, WA 98296 Johanson Excavating, Inc. P.O. Box 674 Buckley, WA 98321 �� ��" Lakeridge Development, LLC �/ �/ �� ✓ �P3Z� P.O. Box 156 Renton, WA 98057 Laser Underground & Earthworks 20417 87th Ave. SE Snohomish, WA 98296 Pivetta Brothers Construction, Inc. l-� � r✓ !/ /{Z g ) � P.O. Box 370 Sumner, WA 98390 R.L. Alia Company ✓ ✓ `� �f ��lo2lD ¢, (p Q 107 Williams Ave. S. Renton, WA 98057 Rodarte Construction, Inc. L/ , �: ! /f3? ¢/ '3 b P.O. BOX 1875 L *� Auburn, WA 98071-1875 Shoreline Construction, Co. ✓ f ! �j��J �j P.O. Box 358 Woodinville, WA 98072-0358 (OVER) J a) G8,1 C., D CITY OF RENTON BID TABULATION SHEET PROJECT: Stonegate Lift Station Conveyance Improvements CAG-10-040 DATE: April 13, 2010 Page 2 of 2 FORMS BID Proposal/ BIDDER Triple Bid L&I Sched. Of A Form Bond Cert Prices .1 I **Includes Sales Tax Titan Earthwork 13806 16th St. E. Sumner, WA 98390 ENGINEER'S ESTIMATE LEGEND: Forms: Triple Form: Non -Collusion Affidavit, Anti -Trust Claims, Minimum Wage $1,471,6S3.00 City of Renton Job: 15-00018.001 Stonegate Lift Station Conveyance Improvements Date: 3/12/2010 Final Design Costs Prepared by: BPW/EJW Schedule A _Item # Description Quantity Unit Unit Cost Total Cost 1 Mobilization 1 LS $96,200.00 $96,200 2 Trench Excavation Safety Systems 1 LS $10,000.00 $10,000 3 Contractor Supplied Survey 1 LS $15,000.00 $15,000 4 Traffic Control 1 LS $35,000.00 $35,000 5 Temporary Erosion/Sedimentation Controls 1 LS $8,000.00 $8,000 6 8" PVC C900 Sewer Force Main 4720 LF $45.00 $212,400 7 10" HDPE Sewer Pipe, Directional Drill 1 LS $75,000.00 $75,000 8 15" PVC Gravity Sewer Pipe 590 LF $110.00 $64.900 9 12" PVC Gravity Sewer Pipe 120 LF $100.00 $12,000 10 6" PVC Side Sewer Pipe 10 LF $50.00 $500 11 Ductile Iron Fittings 2200 LBS $2.00 $4,400 12 48" Sanitary Sewer Manhole 5 EA $4,000.00 $20,000 13 60" Sanitary Sewer Manhole 1 EA $5,500.00 $5,500 14 Connect New Sewer Line to Existing Sewer Facility 2 EA $1,000.00 $2.000 15 Type 1 Catch Basin 1 EA $1,000.00 $1,000 16 Modified Type 2 Catch Basin 1 EA $5,000.00 $5,000 17 Removal and Replacement of Unsuitable Foundation Material 135 ton $15.00 $2,025 18 Bank Run Gravel for Trench Backfill Sewer 3800 ton $13.00 $49,400 19 Crushed Surfacing Top Course 250 ton $20.00 55,000 20 Asphalt Patch Including CSTC 4500 SY $12.00 $54,000 21 Asphalt Grinding For Overlay 27000 SY $3.00 $81,000 22 2" Deep HMA Class 1/2" Overlay PG 64-22 27000 SY $18.00 $486,000 23 Replace Pavement Markings and Traffic Buttons 1 LS $4.000.00 $4,000 24 8" PVC C900 SDR 18 Sewer Pipe, Auger Bore (18-Inch Casing) 1 LS $40,000.00 $40,000 25 Air Vacuum Valve Assembly 1 EA $10,000.00 $10,000 26 Fire Access Gate 2 EA $5,000.00 $10,000 27 Concrete Sidewalk 15 SY $50.00 $750 28 Concrete Curb and Gutter 25 LF $50.00 $1,250 29 Controlled Density Fill 10 CY $200.00 $2,000 Subtotal $1,312,325 Sales Tax 9.5% $124.671 Total $1,436,996 hem # Description i Quantity Unit Unit Cost Total Cost 1 Mobilization 1 LS $1,800.00 $1,800 z 4 Traffic Control 1 LS $3,000.00 $3,000 3 5 Temporary Erosion/Sedimentation Controls 1 LS $1,000.00 $1,000 ¢ 21 Asphalt Grinding For Overlay 850 SY $3.00 $2,550 g 22 2" Deep HMA Class 1/2" Overlay PG 64-22 850 SY $18.00 $15,300 l0 23 Replace Pavement Markings and Traffic Buttons 1 LS $1,000.00 $1,000 -y 27 Concrete Sidewalk 50 SY $50.00 $2.500 8 28 Concrete Curb and Gutter 90 LF $50.00 $4.500 Subtotal Sales Tax Total Total Opinion of Probable Construction Cost Schedules A & B $31,650 9.5% $3,007 $34,657 $1,471,653 F:\0015\00018.001\DESIGN (28245)\Costs\Final 1500018 OPCC Conveyance\Final 001500018 OPCC Conveyance.xlsx 3/12/2010 PUBLIC WORKS DEPARTMENT City of M E M O R A N D U M DATE: April 14, 2010 TO: Bonnie Walton, City Clerk FROM: John Hobson, Wastewater Utility Engineer (ext. 7279)� SUBJECT: Bid Award for Stonegate Lift Station Conveyance Improvements Project The Public Works Department has reviewed the bids submitted for the Stonegate Lift Station Conveyance Improvements project and recommends that the bid be awarded to Shoreline Construction Co. We are requesting that an agenda bill for "Council Concur" be prepared for the April 19, 2010, Council Meeting. The bid opening was on Tuesday, April 13, 2010. There were 10 bids received. There was one irregularity in the third low bid from Titan Earthwork that moved them to the second low bid. The low bidder is Shoreline Construction Co. with a bid of $875,888.86 for Schedule A (Schedule A was the basis of award as specified in the contract documents). The engineer's estimate was $1,436,996.00 for Schedule A. The project budget amount is $1,450,000. The low bid is within the amount budgeted. The project will install approximately 710 linear feet of new 15"and 12" diameter gravity sanitary sewer main and 4,720 linear feet of 8" diameter sanitary sewer force main. Attachments cc: Lys Hornsby, Utility Systems Director Dave Christensen, Wastewater Utility Supervisor H:\File Sys\WWP - WasteWater\WWP-27-3473 Sum merwind-Stonegate LS Replacement\DESIGN\Award-Clerk- Stonegate Conveyance.doc\JHtp Project Title Stonegate Lift Station Conveyance Improvements BID DATE: DATE E Item � No. Description Unit Est. Quantity 1 Mobilization Lump Sum 1 2 Trench Excavation Safety Systems Lump Sum 1 3 Contractor Supplied Surveying Lump Sum 1 4 Traffic Control Lump Sum 1 5 Temporary Erosion/Sedimentation Controls Lump Sum 1 6 8" Diameter PVC C900 SDR 18 Sewer Force Main Lineal Foot 4,720 7 10" diameter HDPE Sewer Pipe, Directional Drill Lump Sum 1 8 15" Diameter PVC Gravity Sewer Pipe Lineal Foot 590 9 12" Diameter PVC Gravity Sewer Pipe Lineal Foot 120 10 6" Diameter PVC Side Sewer Pipe Lineal Foot 10 11 Ductile Iron Sewer Fittings Pounds 2,200 12 48" Diameter Sanitary Sewer Manhole Each 5 13 60" Diameter Sanitary Sewer Manhole Each 1 14 Connect New Sewer Pipe to Existing Sewer Facility Each 2 15 Type 1 Catch Basin Each 1 16 Modified Type 2 Catch Basin, 60" Diameter Each 1 17 Removal and Replacement of Unsuitable Foundation Material Ton 135 18 Bank Run Gravel for Sewer Trench Backf ill Ton 3,800 19 Crushed Surfacing Top Course Ton 250 20 Asphalt Patch including CSTC Square -Yard 4,500 21 Asphalt Grinding for Overlay Square -Yard 27,000 22 2" Deep HMA Class 1/2" Overlay PG 64-22 Square -Yard 27,000 23 Replace Pavement Marking and Traffic Buttons Lump Sum 1 24 8" Diameter PVC C900 SDR 18 Sewer Force Main, Auger Bon Lump Sum 1 25 2" Air Vacuum Valve Assembly Each 1 26 Fire Access Gate Each 2 27 Concrete Sidewalk Square -Yard 15 28 Concrete Curb & Gutter Lineal Foot 25 29 Controlled Density Fill Cubic Yard 10 1 Mobilization Lump Sum 1 2 Traffic Control Lump Sum 1 3 Temporary Erosion/Sedimentation Controls Lump Sum 1 4 Asphalt Grinding for Overlay Square -Yard 850 5 2" Deep HMA Class 1/2" Overlay PG 64-22 Square -Yard 850 6 Replace Pavement Marking and Traffic Buttons Lump Sum 1 7 Concrete Sidewalk Square -Yard 50 8 Concrete Curb & Gutter Lineal Foot 90 City of Renton Shoreline Construction Engineers Estimate Unit Price Bid Amount Unit Price Bid Amount $96,200.00 96,200.00 70,000.00 70,000.00 $10,000.00 10,000.00 5,000.00 5,000.00 $15,000.00 15,000.00 7,000.00 7,000.00 $35,000.00 35,000.00 40,000.00 40,000.00 $8,000.00 8,000.00 3,000.00 3,000.00 $45.00 212,400.00 30.00 141,600.00 $75,000.00 75,000.00 39,000.00 39,000.00 $110.00 64,900.00 57.00 33,630.00 $100.00 12,000.00 55.00 6,600.00 $50.00 500.00 460.00 4,600.00 $2.00 4,400.00 1.00 2,200.00 $4,000.00 20,000.00 3,000.00 15,000.00 $5,500.00 5,500.00 4,500.00 4,500.00 $1,000.00 2,000.00 5,000.00 10,000.00 $1,000.00 1,000.00 1,300.00 1,300.00 $5,000.00 5,000.00 6,200.00 6,200.00 $15.00 2,025.00 0.10 13.50 $13.00 49,400.00 0.10 380.00 $20.00 5,000.00 13.00 3,250.00 $12.00 54,000.00 18.00 81,000.00 $3.00 81,000.00 1.40 37,800.00 $18.00 486,000.00 9.00 243,000.00 $4,000.00 4,000.00 5,000.00 5,000.00 $40,000.00 40,000.00 20,000.00 20,000.00 $10,000.00 10,000.00 11,000.00 11,000.00 $5,000.00 10,000.00 3,000.00 6,000.00 $50.00 750.00 50.00 750.00 $50.00 1,250.00 35.00 875.00 $200.00 2,000.00 120.00 1,200.00 Subtotal Sch. A $1,312,325.00 Subtotal Sch. A $799,898.50 Tax 9.5% $124,670.88 Tax 9.5% $75,990.36 Total Sch. A $1,436,995.88 Total Sch. A $875,888.86 $1,800.00 1,800.00 500.00 500.00 $3,000.00 3,000.00 500.00 500.00 $1,000.00 1,000.00 500.00 500.00 $3.00 2,550.00 1.40 1,190.00 $18.00 15,300.00 9.00 7,650.00 $1,000.00 1,000.00 100.00 100.00 $50.00 2,500.00 50.00 2,500.00 $50.00 4,500.00 35.00 3,150.00 Subtotal Sch. B $31,650.00 Subtotal Sch. B $16,090.00 Tax 9.5% $3,006.75 Tax 9.5% $1,528.55 Total Sch. B $34,656.75 Total Sch. B $17,618.55 Project Title Stonegate Lift Station Conveyance Improvements BID DATE: DATE E Item Unit Est. � No. Description Qu2 Lakeridge Development, LLC Unit Bid Price Amount 1 Mobilization Lump Sum 1 75,000.00 2 Trench Excavation Safety Systems Lump Sum 1 100.00 3 Contractor Supplied Surveying Lump Sum 1 7,000.00 4 Traffic Control Lump Sum 1 62,000.00 5 Temporary Erosion/Sedimentation Controls Lump Sum 1 2,500.00 6 8" Diameter PVC C900 SDR 18 Sewer Force Main Lineal Foot 4,720 47.00 7 10" diameter HDPE Sewer Pipe, Directional Drill Lump Sum 1 35,500.00 8 15" Diameter PVC Gravity Sewer Pipe Lineal Foot 590 84.00 9 12" Diameter PVC Gravity Sewer Pipe Lineal Foot 120 79.19 10 6" Diameter PVC Side Sewer Pipe Lineal Foot 10 300.00 11 Ductile Iron Sewer Fittings Pounds 2,200 5.00 12 48" Diameter Sanitary Sewer Manhole Each 5 1,865.00 13 60" Diameter Sanitary Sewer Manhole Each 1 2,453.00 14 Connect New Sewer Pipe to Existing Sewer Facility Each 2 2,500.00 15 Type 1 Catch Basin Each 1 845.00 16 Modified Type 2 Catch Basin, 60" Diameter Each 1 2,955.00 17 Removal and Replacement of Unsuitable Foundation Material Ton 135 33.00 18 Bank Run Gravel for Sewer Trench Backf ill Ton 3,800 10.25 19 Crushed Surfacing Top Course Ton 250 33.50 20 Asphalt Patch including CSTC Square -Yard 4,500 22.00 21 Asphalt Grinding for Overlay Square -Yard 27,000 1.74 22 2" Deep HMA Class 1/2" Overlay PG 64-22 Square -Yard 27,000 7.62 23 Replace Pavement Marking and Traffic Buttons Lump Sum 1 3,500.00 24 8" Diameter PVC C900 SDR 18 Sewer Force Main, Auger Bon Lump Sum 1 21,000.00 25 2" Air Vacuum Valve Assembly Each 1 9,500.00 26 Fire Access Gate Each 2 2,500.00 27 Concrete Sidewalk Square -Yard 15 50.00 28 Concrete Curb & Gutter Lineal Foot 25 40.00 29 Controlled Density Fill Cubic Yard 10 110.00 1 Mobilization Lump Sum 1 2 Traffic Control Lump Sum 1 3 Temporary Erosion/Sedimentation Controls Lump Sum 1 4 Asphalt Grinding for Overlay Square -Yard 850 5 2" Deep HMA Class 1/2" Overlay PG 64-22 Square -Yard 850 6 Replace Pavement Marking and Traffic Buttons Lump Sum 1 7 Concrete Sidewalk Square -Yard 50 8 Concrete Curb & Gutter Lineal Foot 90 Subtotal Sch. A Tax 9.5% 100.00 7,000.00 62,000.00 2,500.00 221,840.00 35,500.00 49,560.00 9,502.80 3,000.00 11,000.00 9,325.00 2,453.00 5,000.00 845.00 2,955.00 4,455.00 38,950.00 8,375.00 99,000.00 46,980.00 205,740.00 3,500.00 21,000.00 9,500.00 5,000.00 750.00 1,000.00 1,100.00 $942,930.80 $89,578.43 Titan Earthwork Unit Price 6,700.00 7,900.00 20,000.00 8,650.00 32.00 35,500.00 65.00 55.00 550.00 5.00 2,850.00 4,900.00 1,500.00 1,000.00 7,000.00 33.00 15.00 17.00 32.00 3.25 8.25 8,500.00 18,000.00 10,000.00 3,500.00 85.00 50.00 135.00 Subtotal Sch. A Tax 9.5% Bid Amount 6,700.00 7,900.00 20,000.00 8,650.00 151,040.00 35,500.00 38,350.00 6,600.00 5,500.00 11,000.00 14,250.00 4,900.00 3,000.00 1,000.00 7,000.00 4,455.00 57,000.00 4,250.00 144,000.00 87,750.00 222,750.00 8,500.00 18,000.00 10,000.00 7,000.00 1,275.00 1,250.00 1,350.00 $938,970.00 $89,202.15 Total Sch. A $1,032,509.23 Total Sch. A $1,028,172.15 5,000.00 5,000.00 500.00 500.00 3,000.00 3,000.00 1,000.00 1,000.00 1,000.00 1,000.00 100.00 100.00 1.25 1,062.50 2.00 1,700.00 7.62 6,477.00 10.00 8,500.00 300,00 300,00 2,500,01 2,500.00 50.00 2,500.00 50.00 2,500.00 40.00 3,600.00 25.00 2,250.00 Subtotal Sch. B $22,939.50 Subtotal Sch. B $19,050.00 Tax 9.5% $2,179.25 Tax 9.5% $1,809.75 Total Sch. B $25,118.75 Total Sch. B $20,859.75 Project Title Stonegate Lift Station Conveyance Improvements Buno Construction Rodarte Construction BID DATE: DATE E Item Unit Est. Unit Bid Unit Bid IN No. Description Quantity Price Amount Price Amount 1 Mobilization Lump Sum 1 80,000.00 80,000.00 10,000.00 10,000.00 2 Trench Excavation Safety Systems Lump Sum 1 10,000.00 10,000.00 2,500.00 2,500.00 3 Contractor Supplied Surveying Lump Sum 1 10,000.00 10,000.00 17,500.00 17,500.00 4 Traffic Control Lump Sum 1 25,000.00 25,000.00 25,000.00 25,000.00 5 Temporary Erosion/Sedimentation Controls Lump Sum 1 3,000.00 3,000.00 3,000.00 3,000.00 6 8" Diameter PVC C900 SDR 18 Sewer Force Main Lineal Foot 4,720 58.00 273,760.00 54.00 254,880.00 7 10" diameter HDPE Sewer Pipe, Directional Drill Lump Sum 1 35,000.00 35,000.00 42,500.00 42,500.00 8 15" Diameter PVC Gravity Sewer Pipe Lineal Foot 590 76.00 44,840.00 92.00 54,280.00 9 12" Diameter PVC Gravity Sewer Pipe Lineal Foot 120 73.00 8,760.00 92.00 11,040.00 10 6" Diameter PVC Side Sewer Pipe Lineal Foot 10 100.00 1,000.00 300.00 3,000.00 11 Ductile Iron Sewer Fittings Pounds 2,200 3.00 6,600.00 4.00 8,800.00 12 48" Diameter Sanitary Sewer Manhole Each 5 4,000.00 20,000.00 1,800.00 9,000.00 13 60" Diameter Sanitary Sewer Manhole Each 1 5,000.00 5,000.00 2,800.00 2,800.00 14 Connect New Sewer Pipe to Existing Sewer Facility Each 2 2,800.00 5,600.00 800.00 1,600.00 15 Type 1 Catch Basin Each 1 900.00 900.00 800.00 800.00 16 Modified Type 2 Catch Basin, 60" Diameter Each 1 7,000.00 7,000.00 6,000.00 6,000.00 17 Removal and Replacement of Unsuitable Foundation Material Ton 135 10.00 1,350.00 25.00 3,375.00 18 Bank Run Gravel for Sewer Trench Backfill Ton 3,800 10.00 38,000.00 12.00 45,600.00 19 Crushed Surfacing Top Course Ton 250 15.00 3,750.00 20.00 5,000.00 20 Asphalt Patch including CSTC Square -Yard 4,500 20.00 90,000.00 25.00 112,500.00 21 Asphalt Grinding for Overlay Square -Yard 27,000 1.00 27,000.00 1.75 47,250.00 22 2" Deep HMA Class 1/2" Overlay PG 64-22 Square -Yard 27,000 7.80 210,600.00 10.00 270,000.00 23 Replace Pavement Marking and Traffic Buttons Lump Sum 1 3,000.00 3,000.00 1,500.00 1,500.00 24 8" Diameter PVC C900 SDR 18 Sewer Force Main, Auger Bon Lump Sum 1 22,000.00 22,000.00 25,000.00 25,000.00 25 2" Air Vacuum Valve Assembly Each 1 15,000.00 15,000.00 6,000.00 6,000.00 26 Fire Access Gate Each 2 1,200.00 2,400.00 4,500.00 9,000.00 27 Concrete Sidewalk Square -Yard 15 36.00 540.00 50.00 750.00 28 Concrete Curb & Gutter Lineal Foot 25 20.00 500.00 20.00 500.00 29 Controlled Density Fill Cubic Yard 10 100.00 1,000.00 200.00 2,000.00 Subtotal Sch. A $951,600.00 Subtotal Sch. A $981,175.00 Tax 9.5% $90,402.00 Tax 9.5% $93,211.63 Total Sch. A $1,042,002.00 Total Sch. A $1,074,386.63 1 Mobilization Lump Sum 1 1,600.00 1,600.00 1,500.00 1,500.00 2 Traffic Control Lump Sum 1 3,000.00 3,000.00 3,500.00 3,500.00 3 Temporary Erosion/Sedimentation Controls Lump Sum 1 1,500.00 1,500.00 1,800.00 1,800.00 4 Asphalt Grinding for Overlay Square -Yard 850 1.00 850.00 2.00 1,700.00 5 2" Deep HMA Class 1/2" Overlay PG 64-22 Square -Yard 850 7.80 6,630.00 12.00 10,200.00 6 Replace Pavement Marking and Traffic Buttons Lump Sum 1 1,000.00 1,000.00 250.00 250.00 7 Concrete Sidewalk Square -Yard 50 36.00 1,800.00 40.00 2,000.00 8 Concrete Curb & Gutter Lineal Foot 90 20.00 1,800.00 20.00 1,800.00 Subtotal Sch. B $18,180.00 Subtotal Sch. B $22,750.00 Tax 9.5% $1,727.10 Tax 9.5% $2,161.25 Total Sch. B $19,907.10 Total Sch. B $24,911.25 Project Title Stonegate Lift Station Conveyance Improvements BID DATE: DATE E Item � No. Description Unit Est. Quantity 1 Mobilization Lump Sum 1 2 Trench Excavation Safety Systems Lump Sum 1 3 Contractor Supplied Surveying Lump Sum 1 4 Traffic Control Lump Sum 1 5 Temporary Erosion/Sedimentation Controls Lump Sum 1 6 8" Diameter PVC C900 SDR 18 Sewer Force Main Lineal Foot 4,720 7 10" diameter HDPE Sewer Pipe, Directional Drill Lump Sum 1 8 15" Diameter PVC Gravity Sewer Pipe Lineal Foot 590 9 12" Diameter PVC Gravity Sewer Pipe Lineal Foot 120 10 6" Diameter PVC Side Sewer Pipe Lineal Foot 10 11 Ductile Iron Sewer Fittings Pounds 2,200 12 48" Diameter Sanitary Sewer Manhole Each 5 13 60" Diameter Sanitary Sewer Manhole Each 1 14 Connect New Sewer Pipe to Existing Sewer Facility Each 2 15 Type 1 Catch Basin Each 1 16 Modified Type 2 Catch Basin, 60" Diameter Each 1 17 Removal and Replacement of Unsuitable Foundation Material Ton 135 18 Bank Run Gravel for Sewer Trench Backfill Ton 3,800 19 Crushed Surfacing Top Course Ton 250 20 Asphalt Patch including CSTC Square -Yard 4,500 21 Asphalt Grinding for Overlay Square -Yard 27,000 22 2" Deep HMA Class 1/2" Overlay PG 64-22 Square -Yard 27,000 23 Replace Pavement Marking and Traffic Buttons Lump Sum 1 24 8" Diameter PVC C900 SDR 18 Sewer Force Main, Auger Bon Lump Sum 1 25 2" Air Vacuum Valve Assembly Each 1 26 Fire Access Gate Each 2 27 Concrete Sidewalk Square -Yard 15 28 Concrete Curb & Gutter Lineal Foot 25 29 Controlled Density Fill Cubic Yard 10 1 Mobilization Lump Sum 1 2 Traffic Control Lump Sum 1 3 Temporary Erosion/Sedimentation Controls Lump Sum 1 4 Asphalt Grinding for Overlay Square -Yard 850 5 2" Deep HMA Class 1/2" Overlay PG 64-22 Square -Yard 850 6 Replace Pavement Marking and Traffic Buttons Lump Sum 1 7 Concrete Sidewalk Square -Yard 50 8 Concrete Curb & Gutter Lineal Foot 90 R.L. Alia Company Pivetta Bros. Construction Unit Price Bid Amount Unit Price Bid Amount 85,000.00 85,000.00 80,390.00 80,390.00 4,000.00 4,000.00 3,484.00 3,484.00 5,000.00 5,000.00 6,785.00 6,785.00 10,000.00 10,000.00 53,827.00 53,827.00 3,000.00 3,000.00 1,765.00 1,765.00 87.00 410,640.00 48.00 226,560.00 24,000.00 24,000.00 34,287.00 34,287.00 110.00 64,900.00 64.00 37,760.00 100.00 12,000.00 64.00 7,680.00 75.00 750.00 417.00 4,170.00 2.00 4,400.00 3.00 6,600.00 3,000.00 15,000.00 2,609.00 13,045.00 6,000.00 6,000.00 3,131.00 3,131.00 1,000.00 2,000.00 2,059.00 4,118.00 900.00 900.00 754.00 754.00 6,000.00 6,000.00 9,107.00 9,107.00 5.00 675.00 14.00 1,890.00 1.00 3,800.00 24.00 91,200.00 20.00 5,000.00 22.00 5,500.00 17.75 79,875.00 19.00 85,500.00 1.00 27,000.00 2.00 54,000.00 7.62 205,740.00 9.00 243,000.00 3,800.00 3,800.00 4,401.00 4,401.00 14,000.00 14,000.00 20,872.00 20,872.00 5,000.00 5,000.00 10,120.00 10,120.00 5,000.00 10,000.00 1,581.00 3,162.00 30.00 450.00 38.00 570.00 30.00 750.00 26.00 650.00 100.00 1,000.00 147.00 1,470.00 Subtotal Sch. A $1,010,680.00 Subtotal Sch. A $1,015,798.00 Tax 9.5% $96,014.60 Tax 9.5% $96,500.81 Total Sch. A $1,106,694.60 Total Sch. A $1,112,298.81 3,500.00 3,500.00 7,443.00 7,443.00 5,000.00 5,000.00 5,981.00 5,981.00 3,500.00 3,500.00 1,765.00 1,765.00 3.00 2,550.00 2.00 1,700.00 17.00 14,450.00 9.00 7,650.00 1,300.00 1,300.00 880.00 880.00 60.00 3,000.00 38.00 1,900.00 60.00 5,400.00 26.00 2,340.00 Subtotal Sch. B $38,700.00 Subtotal Sch. B $29,659.00 Tax 9.5% $3,676.50 Tax 9.5% $2,817.61 Total Sch. B $42,376.50 Total Sch. B $32,476.61 Project Title Stonegate Lift Station Conveyance Improvements BID DATE: DATE E Item � No. Desc Unit Est. Quantity 1 Mobilization Lump Sum 1 2 Trench Excavation Safety Systems Lump Sum 1 3 Contractor Supplied Surveying Lump Sum 1 4 Traffic Control Lump Sum 1 5 Temporary Erosion/Sedimentation Controls Lump Sum 1 6 8" Diameter PVC C900 SDR 18 Sewer Force Main Lineal Foot 4,720 7 10" diameter HDPE Sewer Pipe, Directional Drill Lump Sum 1 8 15" Diameter PVC Gravity Sewer Pipe Lineal Foot 590 9 12" Diameter PVC Gravity Sewer Pipe Lineal Foot 120 10 6" Diameter PVC Side Sewer Pipe Lineal Foot 10 11 Ductile Iron Sewer Fittings Pounds 2,200 12 48" Diameter Sanitary Sewer Manhole Each 5 13 60" Diameter Sanitary Sewer Manhole Each 1 14 Connect New Sewer Pipe to Existing Sewer Facility Each 2 15 Type 1 Catch Basin Each 1 16 Modified Type 2 Catch Basin, 60" Diameter Each 1 17 Removal and Replacement of Unsuitable Foundation Material Ton 135 18 Bank Run Gravel for Sewer Trench Backfill Ton 3,800 19 Crushed Surfacing Top Course Ton 250 20 Asphalt Patch including CSTC Square -Yard 4,500 21 Asphalt Grinding for Overlay Square -Yard 27,000 22 2" Deep HMA Class 1/2" Overlay PG 64-22 Square -Yard 27,000 23 Replace Pavement Marking and Traffic Buttons Lump Sum 1 24 8" Diameter PVC C900 SDR 18 Sewer Force Main, Auger Bon Lump Sum 1 25 2" Air Vacuum Valve Assembly Each 1 26 Fire Access Gate Each 2 27 Concrete Sidewalk Square -Yard 15 28 Concrete Curb & Gutter Lineal Foot 25 29 Controlled Density Fill Cubic Yard 10 1 Mobilization Lump Sum 1 2 Traffic Control Lump Sum 1 3 Temporary Erosion/Sedimentation Controls Lump Sum 1 4 Asphalt Grinding for Overlay Square -Yard 850 5 2" Deep HMA Class 1/2" Overlay PG 64-22 Square -Yard 850 6 Replace Pavement Marking and Traffic Buttons Lump Sum 1 7 Concrete Sidewalk Square -Yard 50 8 Concrete Curb & Gutter Lineal Foot 90 Laser Underground & Earthworks B&L Utility, Inc. Unit Price Bid Amount Unit Price Bid Amount 80,000.00 80,000.00 60,000.00 60,000.00 15, 000.00 15,000.00 15, 000.00 15, 000.00 10,000.00 10,000.00 7,500.00 7,500.00 21,000.00 21,000.00 55,000.00 55,000.00 5,600.00 5,600.00 10,000.00 10,000.00 50.00 236,000.00 44.00 207,680.00 40,000.00 40,000.00 40,000.00 40,000.00 120.00 70,800.00 80.00 47,200.00 105.00 12,600.00 78.00 9,360.00 100.00 1,000.00 100.00 1,000.00 5.00 11,000.00 4.00 8,800.00 5,000.00 25,000.00 5,000.00 25,000.00 6,000.00 6,000.00 5,500.00 5,500.00 4,000.00 8,000.00 2,500.00 5,000.00 1,000.00 1,000.00 1,000.00 1,000.00 5,000.00 5,000.00 5,500.00 5,500.00 1.00 135.00 25.00 3,375.00 1.00 3,800.00 18.00 68,400.00 25.00 6,250.00 25.00 6,250.00 28.00 126,000.00 25.00 112,500.00 2.00 54,000.00 3.25 87,750.00 9.00 243,000.00 8.70 234,900.00 5,000.00 5,000.00 3,827.00 3,827.00 40,000.00 40,000.00 21,000.00 21,000.00 13,000.00 13,000.00 7,500.00 7,500.00 4,000.00 8,000.00 3,000.00 6,000.00 45.00 675.00 35.00 525.00 35.00 875.00 35.00 875.00 100.00 1,000.00 100.00 1,000.00 Subtotal Sch. A $1,049,735.00 Subtotal Sch. A $1,057,442.00 Tax 9.5% $99,724.83 Tax 9.5% $100,456.99 Total Sch. A $1,149,459.83 Total Sch. A $1,157,898.99 1,000.00 1,000.00 3,000.00 3,000.00 1,500.00 1,500.00 6,000.00 6,000.00 200.00 200.00 3,000.00 3,000.00 2.00 1,700.00 7.00 5,950.00 9.00 7,6%00 8.50 7,225.00 500.00 500.00 1,000.00 1,000.00 45.00 2,250.00 35.00 1,750.00 35.00 3,150.00 35.00 3,150.00 Subtotal Sch. B $17,950.00 Subtotal Sch. B $31,075.00 Tax 9.5% $1,705.25 Tax 9.5% $2,952.13 Total Sch. B $19,655.25 Total Sch. B $34,027.13 Project Title Stonegate Lift Station Conveyance Improvements Johansen Excavating, Inc. BID DATE: DATE E Item Unit Est. Unit Bid � No. Description Quantitv Price Amount 1 Mobilization Lump Sum 1 38,000.00 38,000.00 2 Trench Excavation Safety Systems Lump Sum 1 25,200.00 25,200.00 3 Contractor Supplied Surveying Lump Sum 1 6,400.00 6,400.00 4 Traffic Control Lump Sum 1 145,700.00 145,700.00 5 Temporary Erosion/Sedimentation Controls Lump Sum 1 24,150.00 24,150.00 6 8" Diameter PVC C900 SDR 18 Sewer Force Main Lineal Foot 4,720 33.65 158,828.00 7 10" diameter HDPE Sewer Pipe, Directional Drill Lump Sum 1 61,300.00 61,300.00 8 15" Diameter PVC Gravity Sewer Pipe Lineal Foot 590 53.80 31,742.00 9 12" Diameter PVC Gravity Sewer Pipe Lineal Foot 120 61.35 7,362.00 10 6" Diameter PVC Side Sewer Pipe Lineal Foot 10 575.00 5,750.00 11 Ductile Iron Sewer Fittings Pounds 2,200 4.35 9,570.00 12 48" Diameter Sanitary Sewer Manhole Each 5 2,300.00 11,500.00 13 60" Diameter Sanitary Sewer Manhole Each 1 3,300.00 3,300.00 14 Connect New Sewer Pipe to Existing Sewer Facility Each 2 1,800.00 3,600.00 15 Type 1 Catch Basin Each 1 1,000.00 1,000.00 16 Modified Type 2 Catch Basin, 60" Diameter Each 1 5,650.00 5,650.00 17 Removal and Replacement of Unsuitable Foundation Material Ton 135 25.50 3,442.50 18 Bank Run Gravel for Sewer Trench Backfill Ton 3,800 11.25 42,750.00 19 Crushed Surfacing Top Course Ton 250 12.65 3,162.50 20 Asphalt Patch including CSTC Square -Yard 4,500 28.40 127,800.00 21 Asphalt Grinding for Overlay Square -Yard 27,000 1.80 48,600.00 22 2" Deep HMA Class 1/2" Overlay PG 64-22 Square -Yard 27,000 9.65 260,550.00 23 Replace Pavement Marking and Traffic Buttons Lump Sum 1 6,400.00 6,400.00 24 8" Diameter PVC C900 SDR 18 Sewer Force Main, Auger Bon Lump Sum 1 20,900.00 20,900.00 25 2" Air Vacuum Valve Assembly Each 1 12,680.00 12,680.00 26 Fire Access Gate Each 2 3,255.00 6,510.00 27 Concrete Sidewalk Square -Yard 15 53.15 797.25 28 Concrete Curb & Gutter Lineal Foot 25 31.90 797.50 29 Controlled Density Fill Cubic Yard 10 195.00 1,950.00 Subtotal Sch. A $1,075,391.75 Tax 9.5/ $102,162.22 Total Sch. A $1,177,553.97 1 Mobilization Lump Sum 1 15,900.00 15,900.00 2 Traffic Control Lump Sum 1 18,275.00 18,275.00 3 Temporary Erosion/Sedimentation Controls Lump Sum 1 7,700.00 7,700.00 4 Asphalt Grinding for Overlay Square -Yard 850 9.40 7,990.00 5 2" Deep HMA Class 1/2" Overlay PG 64-22 Square -Yard 850 15.75 13,387.50 6 Replace Pavement Marking and Traffic Buttons Lump Sum 1 4,265.00 4,265.00 7 Concrete Sidewalk Square -Yard 50 88.45 4,422.50 8 Concrete Curb & Gutter Lineal Foot 90 45.35 4,081.50 Subtotal Sch. B $76,021.50 Tax 9.5% $7,222.04 Total Sch. B $83,243.54 RECEIVED APR 2 19 2010 UTILITY SYSTEMS From: Bonnie Walton Sent: Monday, April 19, 2010 1:25 PM To: John D. Hobson; Gregg A. Zimmerman Cc: Larry Warren Subject: Titan Earthworks Bid Protest via Fed Ex Delivery I received via Fed Ex this morning, delivery of four sets of a Bid protest on the Stonegate lift station conveyance improvements project from Total Earthworks. I will send yours, Gregg and John, to you each via interoffice mail, and will send the other original, which is mis- addressed to "Randy Corman, Council President" on to Larry Warren for possible response on behalf of us all. Bonnie Walton City Clerk x6502 1 Bonnie Walton City Clerk City of Renton Re: Bid Protest on Project: Stonegate lift station conveyance Improvements Schedule A & Schedule B Dear Ms. Walton, April 16, 2010 Via Certified Mail Via Facsimile Please consider this correspondence a formal bid protest for Shoreline Constructions bid of the above reference project opened on April 13, 2010. After reviewing the bid tabulations (attached exhibit A) it is vividly apparent that Shorelines bid is excessively unbalanced and should be considered irregular and non -responsive per WASHDOT Standard Specifications (Attached Exhibit B) 1-02.13. Making Titan Earthworks the lowest responsive responsible bidder for the project. www.TITANEarthworks.com Core Principles: Integrity/ Safety/ Quality/ Production Unbalanced bids as Defined. Contain lump sum or unit bid items that DO NOT reasonably reflect the ACTUAL COST To construct the items. Unbalancing of bid items has an expected potential detrimental effect upon the competitive process and has proven to cause contract administration/construction conflict after the award. Acceptance of unbalanced bids productively results in the real potential for disputes and claims with extra costly resolution for the OWNERS. Again, for this reason, WASHDOT has a Specific Standard. 1-02 BID PROCEDURES AND CONDITIONS 1-02.13 Irregular Proposals 2. A proposal may be considered irregular and may be rejected if; b. Any of the unit prices are excessively unbalanced(either above or below the amount of a reasonable bid) to the potential detriment of the Contracting Agency. In conclusion, the fact is that Shoreline Construction submitted a bid that is Irregular and Unbalanced per the Standard Specifications. The City of Renton has sufficient reason to question Items #17 and #18 Schedule A of Shoreline's bid and conclude that they should be disqualified due to an UNBALANCED BID proposal. Thank you for your attention and consideration to this matter and I look forward to the City of Renton's decision to award this project to TITAN EARTHWORKS, The lowest responsive responsible bidder. David C. Durnford Titan Earthworks (206)249-2678 13806 16`h St. E Sumner, WA 98030 cc: Randy Corman/City Council President John Hobson/Project EngineerGregg Zimmerman/Public Works Admin Project Title Stonegate Lift Station Conveyance Improvements City of Renton Shoreline Construction BID DATE: DATE Engineers Estimate E Item Unit Est. Unit Bid Unit Bid P No. Description Quantitv Price Amount Price Amount 1 Mobilization Lump Sum 1 $96,200.00 96,200.00 70,000.00 70,000.00 2 Trench Excavation Safety Systems Lump Sum 1 $10,000.00 10,000.00 5,000.00 5,000.00 3 Contractor Supplied Surveying Lump Sum 1 $15,000.00 15,000.00 7,000.00 7,000.00 4 Traffic Control Lump Sum 1 $35,000.00 35,000.00 40,000.00 40,000.00 5 Temporary Erosion/Sedimentation Controls Lump Sum 1 $8,000.00 8,000.00 3,000.00 3,000.00 6 8" Diameter PVC C900 SDR 18 Sewer Force Main Lineal Foot 4,720 $45.00 212,400.00 30.00 141.600.00 7 10" diameter HDPE Sewer Pipe, Directional Drill Lump Sum 1 $75,000.00 75,000.00 39,000.00 39,000.00 8 15" Diameter PVC Gravity Sewer Pipe Lineal Foot 590 $110.00 64,900.00 57.00 33,630.00 9 12" Diameter PVC Gravity Sewer Pipe Lineal Foot 120 $100.00 12,000.00 55.00 6,600.00 10 6" Diameter PVC Side Sewer Pipe Lineal Foot 10 $50.00 500.00 460.00 4,600.00 11 Ductile Iron Sewer Fittings Pounds 2,200 $2.00 4,400.00 1.00 2,200.00 12 48" Diameter Sanitary Sewer Manhole Each 5 $4,000.00 20,000.00 3,000.00 15,000.00 13 60" Diameter Sanitary Sewer Manhole Each 1 $5,500.00 5,500.00 4,500.00 4,500.00 14 Connect New Sewer Pipe to Existing Sewer Facility Each 2 $1,000.00 2,000.00 5,000.00 10,000.00 15 Type 1 Catch Basin Each 1 $1,000.00 1,000.00 1,300.00 1,300.00 16 Modified Type 2 Catch Basin, 60" Diameter Each 1 $5,000.00 5,000.00 2,025.00 6,200.00 6,200.00 13.50 17 Removal and Replacement of Unsuitable Foundation Material Ton 135 $;�Q, 18 Bank Run Gravel for Sewer Trench Backfill Ton 3,800 $13.00 49,400.00 0..10 380.00 19 Crushed Surfacing Top Course Ton 250 $20.00 5,000.00 13.00 3,250.00 20 Asphalt Patch including CSTC Square -Yard 4,500 $12.00 54,000.00 18.00 81,000.00 21 Asphalt Grinding for Overlay Square -Yard 27,000 $3.00 81,000.00 1.40 37,800.00 22 2" Deep HMA Class 112" Overlay PG 64-22 Square -Yard 27,000 $18.00 486,000.00 9.00 243,000.00 23 Replace Pavement Marking and Traffic Buttons Lump Sum 1 $4,000.00 4,000.00 5,000.00 5,000.00 24 8" Diameter PVC C900 SDR 18 Sewer Force Main, Auger Bon Lump Sum 1 $40,000.00 40,000.00 20,000.00 20,000.00 25 2" Air Vacuum Valve Assembly Each 1 $10,000.00 10,000.00 11,000.00 11,000.00 26 Fire Access Gate Each 2 $5,000.00 10,000.00 3,000.00 6,000.00 27 Concrete Sidewalk Square -Yard 15 $50.00 750.00 50.00 750.00 28 Concrete Curb & Gutter Lineal Foot 25 $50.00 1,250.00 35.00 875.00 29 Controlled Density Fill Cubic Yard 10 $200.00 2,000.00 120.00 1,200.00 Subtotal Sch. A $1,312,325.00 Subtotal Sch. A $799,898.50 Tax 9.5% $124,670.88 Tax 9.5% $75,990.36 Total Sch. A $1,436,995.88 Total Sch. A $875,888.86 1 Mobilization Lump Sum 1 $1,800.00 1,800.00 500.00 500.00 2 Traffic Control Lump Sum 1 $3,000.00 3,000.00 500.00 500.00 3 Temporary Erosion/Sedimentation Controls Lump Sum 1 $1,000.00 1,000.00 500.00 500.00 4 Asphalt Grinding for Overlay Square -Yard 850 $3.00 2,550.00 1.40 1,190.00 5 2" Deep HMA Class 1/2" Overlay PG 64-22 Square -Yard 850 $18.00 15,300.00 9.00 7,650.00 6 Replace Pavement Marking and Traffic Buttons Lump Sum 1 $1,000.00 1,000.00 100.00 100.00 7 Concrete Sidewalk Square -Yard 50 $50.00 2,500.00 50.00 2,500.00 8 Concrete Curb & Gutter Lineal Foot 90 $50.00 4,500.00 35.00 3,150.00 Subtotal Sch. B $31,650.00 Subtotal Sch. B $16,090.00 Tax 9.5°% $3,006.75 Tax 9.5% $1,528.55 Total Sch. B $34,656.75 Total Sch. B $17,618.55 Project Title Stonegate Lift Station Conveyance Improvements Lakeridge Development, LLC Titan Earthwork BID DATE: DATE E Item Unit Est. Unit Bid Unit Bid � No. Description Quantity Price Amount Price Amount 1 Mobilization Lump Sum 1 75,000.00 75,000.00 50,000.00 50,000.00 2 Trench Excavation Safety Systems Lump Sum 1 100.00 100.00 6,700.00 6,700.00 3 Contractor Supplied Surveying Lump Sum 1 7,000.00 7,000.00 7,900.00 7,900.00 4 Traffic Control Lump Sum 1 62,000.00 62,000.00 20,000.00 20,000.00 5 Temporary Erosion/Sedimentation Controls Lump Sum 1 2,500.00 2,500.00 8,650.00 8,650.00 6 8" Diameter PVC C900 SDR 18 Sewer Force Main Lineal Foot 4,720 47.00 221,840.00 32.00 151,040.00 7 10" diameter HDPE Sewer Pipe, Directional Drill Lump Sum 1 35,500.00 35,500.00 35,500.00 35,500.00 8 15" Diameter PVC Gravity Sewer Pipe Lineal Foot 590 84.00 49,560.00 65.00 38,350.00 9 12" Diameter PVC Gravity Sewer Pipe Lineal Foot 120 79.19 9,502.80 55.00 6,600.00 10 6" Diameter PVC Side Sewer Pipe Lineal Foot 10 300.00 3,000.00 550.00 5,500.00 11 Ductile Iron Sewer Fittings Pounds 2,200 5.00 11,000.00 5.00 11,000.00 12 48" Diameter Sanitary Sewer Manhole Each 5 1,865.00 9,325.00 2,850.00 14,250.00 13 60" Diameter Sanitary Sewer Manhole Each 1 2,453.00 2,453.00 4,900.00 4.900.00 14 Connect New Sewer Pipe to Existing Sewer Facility Each 2 2,500.00 5,000.00 1,500.00 3,000.00 15 Type 1 Catch Basin Each 1 845.00 845.00 1,000.00 1,000.00 16 Modified Type 2 Catch Basin, 60" Diameter Each 1 2,955.00 2,955.00 7,000.00 7,000.00 17 Removal and Replacement of Unsuitable Foundation Material Ton 135 33.00 4,455.00 33.00 4,455.00 18 Bank Run Gravel for Sewer Trench Backfill Ton 3,800 10.25 38,950.00 15.00 57,000.00 19 Crushed Surfacing Top Course Ton 250 33.50 8,375.00 17.00 4,250.00 20 Asphalt Patch including CSTC Square -Yard 4,500 22.00 99,000.00 32.00 144,000.00 21 Asphalt Grinding for Overlay Square -Yard 27,000 1.74 46,980.00 3.25 87,750.00 22 2" Deep HMA Class 1/2" Overlay PG 64-22 Square -Yard 27,000 7.62 205,740.00 8.25 222,750.00 23 Replace Pavement Marking and Traffic Buttons Lump Sum 1 3,500.00 3,500.00 8,500.00 8,500.00 24 8" Diameter PVC C900 SDR 18 Sewer Force Main, Auger Bon Lump Sum 1 21,000.00 21,000.00 18,000.00 18,000.00 25 2" Air Vacuum Valve Assembly Each 1 9,500.00 9,500.00 10,000.00 10,000.00 26 Fire Access Gate Each 2 2,500.00 5,000.00 3,500.00 7,000.00 27 Concrete Sidewalk Square -Yard 15 50.00 750.00 85.00 1,275.00 28 Concrete Curb & Gutter Lineal Foot 25 40.00 1,000.00 50.00 1,250.00 29 Controlled Density Fill Cubic Yard 10 110.00 1,100.00 135.00 1,350.00 Subtotal Sch. A $942,930.80 Subtotal Sch. A $938,970.00 Tax 9.5% $89,578.43 Tax 9.5% $89,202.15 Total Sch. A $1,032,509.23 Total Sch. A $1,028,172.15 1 Mobilization Lump Sum 1 5,000.00 5,000.00 500.00 500.00 2 Traffic Control Lump Sum 1 3,000.00 3,000.00 1,000.00 1,000.00 3 Temporary Erosion/Sedimentation Controls Lump Sum 1 1,000.00 1,000.00 100.00 100.00 4 Asphalt Grinding for Overlay Square -Yard 850 1.25 1,062.50 2.00 1,700.00 5 2" Deep HMA Class 1/2" Overlay PG 64-22 Square -Yard 850 7.62 6,477.00 10,00 8,500.00 6 Replace Pavement Marking and Traffic Buttons Lump Sum 1 300.00 300.00 2,500.00 2,500.00 7 Concrete Sidewalk Square -Yard 50 50.00 2,500.00 50.00 2,500.00 8 Concrete Curb & Gutter Lineal Foot 90 40.00 3,600.00 25.00 2,250.00 Subtotal Sch. B $22,939.50 Subtotal Sch. B $19,050.00 Tax 9.5% $2,179.25 Tax 9.5% $1,809.75 Total Sch. B $25,118.75 Total Sch. B $20,859.75 Project Title Stonegate Lift Station Conveyance Improvements BID DATE: DATE E Item Unit Est. r No. Description Quant Buno Construction Unit Bid Price Amount 1 Mobilization Lump Sum 1 80,000.00 2 Trench Excavation Safety Systems Lump Sum 1 10,000.00 3 Contractor Supplied Surveying Lump Sum 1 10,000.00 4 Traffic Control Lump Sum 1 25,000.00 5 Temporary Erosion/Sedimentation Controls Lump Sum 1 3,000.00 6 8" Diameter PVC C900 SDR 18 Sewer Force Main Lineal Foot 4,720 58.00 7 10" diameter HDPE Sewer Pipe, Directional Drill Lump Sum 1 35,000.00 8 15" Diameter PVC Gravity Sewer Pipe Lineal Foot 590 76.00 9 12" Diameter PVC Gravity Sewer Pipe Lineal Foot 120 73.00 10 6" Diameter PVC Side Sewer Pipe Lineal Foot 10 100.00 11 Ductile Iron Sewer Fittings Pounds 2,200 3.00 12 48" Diameter Sanitary Sewer Manhole Each 5 4,000.00 13 60" Diameter Sanitary Sewer Manhole Each 1 5,000.00 14 Connect New Sewer Pipe to Existing Sewer Facility Each 2 2,800.00 15 Type 1 Catch Basin Each 1 900.00 16 Modified Type 2 Catch Basin, 60" Diameter Each 1 7,000.00 17 Removal and Replacement of Unsuitable Foundation Material Ton 135 10.00 18 Bank Run Gravel for Sewer Trench Backfill Ton 3,800 10.00 19 Crushed Surfacing Top Course Ton 250 15.00 20 Asphalt Patch including CSTC Square -Yard 4,500 20.00 21 Asphalt Grinding for Overlay Square -Yard 27,000 1.00 22 2" Deep HMA Class 1/2" Overlay PG 64-22 Square -Yard 27,000 7.80 23 Replace Pavement Marking and Traffic Buttons Lump Sum 1 3,000.00 24 8" Diameter PVC C900 SDR 18 Sewer Force Main, Auger Bon Lump Sum 1 22,000.00 25 2" Air Vacuum Valve Assembly Each 1 15,000.00 26 Fire Access Gate Each 2 1,200.00 27 Concrete Sidewalk Square -Yard 15 36.00 28 Concrete Curb & Gutter Lineal Foot 25 20.00 29 Controlled Density Fill Cubic Yard 10 100.00 1 Mobilization Lump Sum 1 2 Traffic Control Lump Sum 1 3 Temporary Erosion/Sedimentation Controls Lump Sum 1 4 Asphalt Grinding for Overlay Square -Yard 850 5 2" Deep HMA Class 112" Overlay PG 64-22 Square -Yard 850 6 Replace Pavement Marking and Traffic Buttons Lump Sum 1 7 Concrete Sidewalk Square -Yard 50 8 Concrete Curb & Gutter Lineal Foot 90 Subtotal Sch. A Tax 9.5% 80,000.00 10,000.00 10,000.00 25,000.00 3,000.00 273,760.00 35,000.00 44,840.00 8,760.00 1,000.00 6,600.00 20,000.00 5,000.00 5,600.00 900.00 7,000.00 1,350.00 38,000.00 3,750.00 90,000.00 27,000.00 210,600.00 3,000.00 22,000.00 15,000.00 2,400.00 540.00 500.00 1,000.00 $951,600.00 $90,402.00 Total Sch. A $1,042,002.00 Rodarte Construction Unit Price 10,000.00 2,500.00 17,500.00 25,000.00 3,000.00 54.00 42,500.00 92.00 92.00 300.00 4.00 1,800.00 2,800.00 800.00 800.00 6,000.00 25.00 12.00 20.00 25.00 1.75 10.00 1,500.00 25,000.00 6,000.00 4,500.00 50.00 20.00 200.00 Subtotal Sch. A Tax 9.5% Bid Amount 10,000.00 2,500.00 17,500.00 25,000.00 3,000.00 254,880.00 42,500.00 54,280.00 11, 040.00 3,000.00 8,800.00 9,000.00 2,800.00 1,600.00 800.00 6,000.00 3,375.00 45,600.00 5,000.00 112,500.00 47,250.00 270,000.00 1,500.00 25,000.00 6,000.00 9,000.00 750.00 500.00 2,000.00 $981,175.00 $93,211.63 Total Sch. A $1,074,386.63 1,600.00 1,600.00 1,500.00 1,500.00 3,000.00 3,000.00 3,500.00 3,500.00 1,500.00 1,500.00 1,800.00 1,800.00 1.00 850.00 2.00 1,700.00 7.80 6,630.00 12.00 10,200.00 1,000.00 1,000.00 250.00 250.00 36.00 1,800.00 40.00 2,000.00 20.00 1,800.00 20.00 1,800.00 Subtotal Sch. B $18,180.00 Subtotal Sch. B $22,750.00 Tax 9.5% $1,727.10 Tax 9.5% $2,161.25 Total Sch. B $19,907.10 Total Sch. B $24,911.25 Project Title Stonegate Lift Station Conveyance Improvements II R.L. Alia Company Pivetta Bros. Construction BID DATE: DATE E Item l\ No. Description Unit Est. Quantity Unit Price 1 Mobilization Lump Sum 1 85,000.00 2 Trench Excavation Safety Systems Lump Sum 1 4,000.00 3 Contractor Supplied Surveying Lump Sum 1 5,000.00 4 Traffic Control Lump Sum 1 10,000.00 5 Temporary Erosion/Sedimentation Controls Lump Sum 1 3,000.00 6 8" Diameter PVC C900 SDR 18 Sewer Force Main Lineal Foot 4,720 87.00 7 10" diameter HDPE Sewer Pipe, Directional Drill Lump Sum 1 24,000.00 8 15" Diameter PVC Gravity Sewer Pipe Lineal Foot 590 110.00 9 12" Diameter PVC Gravity Sewer Pipe Lineal Foot 120 100.00 10 6" Diameter PVC Side Sewer Pipe Lineal Foot 10 75.00 11 Ductile Iron Sewer Fittings Pounds 2,200 2.00 12 48" Diameter Sanitary Sewer Manhole Each 5 3,000.00 13 60" Diameter Sanitary Sewer Manhole Each 1 6,000.00 14 Connect New Sewer Pipe to Existing Sewer Facility Each 2 1,000.00 15 Type 1 Catch Basin Each 1 900.00 16 Modified Type 2 Catch Basin, 60" Diameter Each 1 6,000.00 17 Removal and Replacement of Unsuitable Foundation Material Ton 135 5.00 18 Bank Run Gravel for Sewer Trench Backfill Ton 3,800 1.00 19 Crushed Surfacing Top Course Ton 250 20.00 20 Asphalt Patch including CSTC Square -Yard 4,500 17.75 21 Asphalt Grinding for Overlay Square -Yard 27,000 1.00 22 2" Deep HMA Class 1/2" Overlay PG 64-22 Square -Yard 27,000 7.62 23 Replace Pavement Marking and Traffic Buttons Lump Sum 1 3,800.00 24 8" Diameter PVC C900 SDR 18 Sewer Force Main, Auger Bon Lump Sum 1 14,000.00 25 2" Air Vacuum Valve Assembly Each 1 5,000.00 26 Fire Access Gate Each 2 5,000.00 27 Concrete Sidewalk Square -Yard 15 30.00 28 Concrete Curb & Gutter Lineal Foot 25 30.00 29 Controlled Density Fill Cubic Yard 10 100.00 1 Mobilization Lump Sum 1 2 Traffic Control Lump Sum 1 3 Temporary Erosion/Sedimentation Controls Lump Sum 1 4 Asphalt Grinding for Overlay Square -Yard 850 5 2" Deep HMA Class 1/2" Overlay PG 64-22 Square -Yard 850 6 Replace Pavement Marking and Traffic Buttons Lump Sum 1 7 Concrete Sidewalk Square -Yard 50 8 Concrete Curb & Gutter Lineal Foot 90 Subtotal Sch. A Tax 9.5% • 'u• S 85,000.00 4,000.00 5,000.00 10,000.00 3,000.00 410,640.00 24,000.00 64,900.00 12,000.00 750.00 4,400.00 15,000.00 6,000.00 2,000.00 900.00 6,000.00 675.00 3,800.00 5,000.00 79,875.00 27,000.00 205,740.00 3,800.00 14,000.00 5,000.00 10,000.00 450.00 750.00 1,000.00 $1,010,680.00 $96,014.60 Unit Bid Price Amount 80,390.00 80,390.00 3,484.00 3,484.00 6,785.00 6,785.00 53,827.00 53,827.00 1,765.00 1,765.00 48.00 226,560.00 34,287.00 34,287.00 64.00 37,760.00 64.00 7,680.00 417.00 4,170.00 3.00 6,600.00 2,609.00 13,045.00 3,131.00 3,131.00 2,059.00 4,118.00 754.00 754.00 9,107.00 9,107.00 14.00 1,890.00 24.00 91,200.00 22.00 5,500.00 19.00 85,500.00 2.00 54,000.00 9.00 243,000.00 4,401.00 4,401.00 20,872.00 20,872.00 10,120.00 10,120.00 1,581.00 3,162.00 38.00 570.00 26.00 650.00 147.00 1,470.00 Subtotal Sch. A $1,015,798.00 Tax 9.5% $96,500.81 Total Sch. A $1,106,694.60 Total Sch. A $1,112,298.81 3,500.00 3,500.00 7,443.00 7,443.00 5,000.00 5,000.00 5,981.00 5,981.00 3,500.00 3,500.00 1,765.00 1,765.00 3.00 2,550.00 2.00 1,700.00 17.00 14,450.00 9.00 7,650.00 1,300.00 1,300.00 880.00 880.00 60.00 3,000.00 38.00 1,900.00 60.00 5,400.00 26.00 2,340.00 Subtotal Sch. B $38,700.00 Subtotal Sch. B $29,659.00 Tax 9.5% $3,676.50 Tax 9.5% $2,817.61 Total Sch. B $42,376.50 Total Sch. B $32,476.61 Project Title Stonegate Lift Station Conveyance Improvements Laser Underground & Earthworks B&L Utility, Inc. BID DATE: DATE E Item Unit Est. Unit Bid Unit Bid I\ No. Description Quantity Price Amount Price Amount 1 Mobilization Lump Sum 1 80,000.00 80,000.00 60,000.00 60,000.00 2 Trench Excavation Safety Systems Lump Sum 1 15,000.00 15,000.00 15,000.00 15,000.00 3 Contractor Supplied Surveying Lump Sum 1 10,000.00 10,000.00 7,500.00 7,500.00 4 Traffic Control Lump Sum 1 21,000.00 21,000.00 55,000.00 55,000.00 5 Temporary Erosion/Sedimentation Controls Lump Sum 1 5,600.00 5,600.00 10,000.00 10,000.00 6 8" Diameter PVC C900 SDR 18 Sewer Force Main Lineal Foot 4,720 50.00 236,000.00 44.00 207,680.00 7 10" diameter HDPE Sewer Pipe, Directional Drill Lump Sum 1 40,000.00 40,000.00 40,000.00 40,000.00 8 15" Diameter PVC Gravity Sewer Pipe Lineal Foot 590 120.00 70,800.00 80.00 47,200.00 9 12" Diameter PVC Gravity Sewer Pipe Lineal Foot 120 105.00 12,600.00 78.00 9,360.00 10 6" Diameter PVC Side Sewer Pipe Lineal Foot 10 100.00 1,000.00 100.00 1,000.00 11 Ductile Iron Sewer Fittings Pounds 2,200 5.00 11,000.00 4.00 8,800.00 12 48" Diameter Sanitary Sewer Manhole Each 5 5,000.00 25,000.00 5,000.00 25,000.00 13 60" Diameter Sanitary Sewer Manhole Each 1 6,000.00 6,000.00 5,500.00 5,500.00 14 Connect New Sewer Pipe to Existing Sewer Facility Each 2 4,000.00 8,000.00 2,500.00 5,000.00 15 Type 1 Catch Basin Each 1 1,000.00 1,000.00 1,000.00 1,000.00 16 Modified Type 2 Catch Basin, 60" Diameter Each 1 5,000.00 5,000.00 5,500.00 5,500.00 17 Removal and Replacement of Unsuitable Foundation Material Ton 135 1.00 135.00 25.00 3,375.00 18 Bank Run Gravel for Sewer Trench Backfill Ton 3,800 1.00 3,800.00 18.00 68,400.00 19 Crushed Surfacing Top Course Ton 250 25.00 6,250.00 25.00 6,250.00 20 Asphalt Patch including CSTC Square -Yard 4,500 28.00 126,000.00 25.00 112,500.00 21 Asphalt Grinding for Overlay Square -Yard 27,000 2.00 54,000.00 3.25 87,750.00 22 2" Deep HMA Class 1/2" Overlay PG 64-22 Square -Yard 27,000 9.00 243,000.00 8.70 234,900.00 23 Replace Pavement Marking and Traffic Buttons Lump Sum 1 5,000.00 5,000.00 3,827.00 3,827.00 24 8" Diameter PVC C900 SDR 18 Sewer Force Main, Auger Bon Lump Sum 1 40,000.00 40,000.00 21,000.00 21,000.00 25 2" Air Vacuum Valve Assembly Each 1 13,000.00 13,000.00 7,500.00 7,500.00 26 Fire Access Gate Each 2 4,000.00 8,000.00 3,000.00 6,000.00 27 Concrete Sidewalk Square -Yard 15 45.00 675.00 35.00 525.00 28 Concrete Curb & Gutter Lineal Foot 25 35.00 875.00 35.00 875.00 29 Controlled Density Fill Cubic Yard 10 100.00 1,000.00 100.00 1,000.00 Subtotal Sch. A $1,049,735.00 Subtotal Sch. A $1,057,442.00 Tax 9.5% $99,724.83 Tax 9.5% $100,456.99 Total Sch. A $1,149,459.83 Total Sch. A $1,157,898.99 1 Mobilization Lump Sum 1 1,000.00 1,000.00 3,000.00 3,000.00 2 Traffic Control Lump Sum 1 1,500.00 1,500.00 6,000.00 6,000.00 3 Temporary Erosion/Sedimentation Controls Lump Sum 1 200.00 200.00 3,000.00 3,000.00 4 Asphalt Grinding for Overlay Square -Yard 850 2.00 1,700.00 7.00 5,950.00 5 2" Deep HMA Class 1/2" Overlay PG 64-22 Square -Yard 850 9.00 7,650.00 8.50 7,225.00 6 Replace Pavement Marking and Traffic Buttons Lump Sum 1 500.00 500.00 1,000.00 1,000.00 7 Concrete Sidewalk Square -Yard 50 45.00 2,250.00 35.00 1,750.00 8 Concrete Curb & Gutter Lineal Foot 90 35.00 3,150.00 35.00 3,150.00 Subtotal Sch. B $17,950.00 Subtotal Sch. B $31,075.00 Tax 9.5% $1,705.25 Tax 9.5% $2,952.13 Total Sch. B $19,655.25 Total Sch. B $34,027.13 Project Title Stonegate Lift Station Conveyance Improvements BID DATE: DATE E Item Unit � No. Description Est. Quantity Johansen Excavating, Inc. Unit Bid Price Amount 1 Mobilization Lump Sum 1 38,000.00 38,000.00 2 Trench Excavation Safety Systems Lump Sum 1 25,200.00 25,200.00 3 Contractor Supplied Surveying Lump Sum 1 6,400.00 6,400.00 4 Traffic Control Lump Sum 1 145,700.00 145,700.00 5 Temporary Erosion/Sedimentation Controls Lump Sum 1 24,150.00 24,150.00 6 8" Diameter PVC C900 SDR 18 Sewer Force Main Lineal Foot 4,720 33.65 158,828.00 7 10" diameter HDPE Sewer Pipe, Directional Drill Lump Sum 1 61,300.00 61,300.00 8 15" Diameter PVC Gravity Sewer Pipe Lineal Foot 590 53.80 31,742.00 9 12" Diameter PVC Gravity Sewer Pipe Lineal Foot 120 61.35 7,362.00 10 6" Diameter PVC Side Sewer Pipe Lineal Foot 10 575.00 5,750.00 11 Ductile Iron Sewer Fittings Pounds 2,200 4.35 9,570.00 12 48" Diameter Sanitary Sewer Manhole Each 5 2,300.00 11,500.00 13 60" Diameter Sanitary Sewer Manhole Each 1 3,300.00 3,300.00 14 Connect New Sewer Pipe to Existing Sewer Facility Each 2 1,800.00 3,600.00 15 Type 1 Catch Basin Each 1 1,000.00 1,000.00 16 Modified Type 2 Catch Basin, 60" Diameter Each 1 5,650.00 5,650.00 17 Removal and Replacement of Unsuitable Foundation Material Ton 135 25.50 3,442.50 18 Bank Run Gravel for Sewer Trench Backfill Ton 3,800 11.25 42,750.00 19 Crushed Surfacing Top Course Ton 250 12.65 3,162.50 20 Asphalt Patch including CSTC Square -Yard 4,500 28.40 127,800.00 21 Asphalt Grinding for Overlay Square -Yard 27,000 1.80 48,600.00 22 2" Deep HMA Class 1/2" Overlay PG 64-22 Square -Yard 27,000 9.65 260,550.00 23 Replace Pavement Marking and Traffic Buttons Lump Sum 1 6,400.00 6,400.00 24 8" Diameter PVC C900 SDR 18 Sewer Force Main, Auger Bon Lump Sum 1 20,900.00 20,900.00 25 2" Air Vacuum Valve Assembly Each 1 12,680.00 12,680.00 26 Fire Access Gate Each 2 3,255.00 6,510.00 27 Concrete Sidewalk Square -Yard 15 53.15 797.25 28 Concrete Curb & Gutter Lineal Foot 25 31.90 797.50 29 Controlled Density Fill Cubic Yard 10 195.00 1,950.00 Subtotal Sch. A $1,075,391.75 Tax 9.5% $102,162.22 Total Sch. A $1,177,553.97 1 Mobilization Lump Sum 1 15,900.00 15,900.00 2 Traffic Control Lump Sum 1 18,275.00 18,275.00 3 Temporary Erosion/Sedimentation Controls Lump Sum 1 7,700.00 7,700.00 4 Asphalt Grinding for Overlay Square -Yard 850 9.40 7,990.00 5 2" Deep HMA Class 1/2" Overlay PG 64-22 Square -Yard 850 15.75 13,387.50 6 Replace Pavement Marking and Traffic Buttons Lump Sum 1 4,265.00 4,265,00 7 Concrete Sidewalk Square -Yard 50 88.45 4,422.50 8 Concrete Curb & Gutter Lineal Foot 90 45.35 4,081.50 Subtotal Sch. B $76,021.50 Tax 9.5% $7,222.04 Total Sch. B $83,243.54 S AND CONDIT1ONS BID PROCEDURE sired and agreed to the 1-02 deemed to have sign edeml-Aid Contracts• osal, the Bidder will be Contracts gy suing the piOPents °f the Cettification for for Federal -Aid Contracts lower and requirem Certification Subcontractor any conditions contract with any ing the con The Contractor shall ensure that every 100,000 BY signing signed and agreed DOT 2'12-p40) is included deemed to have ontracts. (Fern hose contract exceeds will be for Federal -Aid C lower tier actor w actor tier subcontr or lower tier subcontractor the Certification Subcontractor or 1ov'` Subcontractor d iequiremen then files that such to the conditions an evidence in ent funds other than to this re -des that, if any influencing The Contractor shaclomm, red 12l also provides person for i� Member in 101- vnl] be paid t0 any P ency, a Men subcontractor has public Law been paid or Federal ag Section 319 of of P have employee of any Member of Congress topriated fundsan officer or empl°Yee of a Bement, the Federal app to influence Congress, of an or cooperative Standard Fort, an officer or employee of t loan, a Stan or attempting Contract, gran ' acring Agency the instructions Congress, with this Federal it to the COI tr Ce with connection fete and subm CTIVITIES, in accor whose contract exceeds ul Conn OF LOBBYING A tractor whose t that, Standard Fomi Contractor shall cJRE omp or lower tier suhe°Contr,actor, eXCeP A ency. LLL, p1SCLOS tractor amier as a Contracring g Subcon on the form- AnY in the same m for for processing to $100,000 shall disclose to the Contra fiance with this section• be $ fitted comp DOT 2�2-040) may LLL shall be subm ensure conducted to is available from the Federal -Al The Contracts (FOiir Ce, Tran`Portation Audits will be Contract office, osal form. The disclosure fern► The Certification for F ottation's pre - reproduced from the Praortpment of Transp Washington State DeP 99504. Olympia' Washingtonprovided with it, ur Building, of Proposal fitted in the envelope P e identified Delivery sealed and subm corn at the location and time a 1-02.9 osal shall be are and BidX• this envelope t0 ensure P P Each PTOP . edite softw all blanks on vta Exp the tine frsci ' electronically 02 12 The Bidder shall fill in in Section 1- proposals it receives after handling and delivery'Agency will not consider The Contracting a call for Bids. opening Bids in of Proposal A ency, the Bidder may for P or 11 Revision Withdrawa a Bid Proposal to the Contracting g and " 1-02.10 erson, After submitting ed by an authorized P' or o entd or revise it if: written request sign tin withdraw its a the request before thee official Ot l The Bidder subm Agency receives itted as aids: Contracting Ag and resubm for opening 2. The C°n osal may be revised a time final Bid Prof Agency receives it before th The origin proposal if the Contracting g le Proposals b various n1etho,F and Multiple and construction y consti"riction Combination ed for Bidding or for the biped or se 1-02.11 be organs biped projects d com A project may itted for comes the right to tAlie Contracting Afen proposals to be sub Agency reserves eous to visions„ enable Prop Contracting most advantag project Special Pr° con The deemed a,,_,," the prof cmat!" BID PROCEDURES AND CONDITIONS 1-02 "We prefer to be Awarded Contracts of a total value of not more than $ for projects for which we have submitted Bids at this letting." Such attachments will not make the Proposals irregular. The Contracting Agency will Award each Contract to the lowest responsible Bidder but will consider such attachment in determining the responsibility of the Bidder to perform each Contract for which a statement has been attached. 1-02.12 Public Opening of Proposals Proposals will be opened and publicly read at the time indicated in the call for Bids unless the Bid opening has been delayed or canceled. Bidders, their authorized agents, and other interested parties are invited to be present. i-(12�1 Irregular Proposals ''. A Proposal will be considered irregular and will be rejected if: a. The Bidder is not prequalified; b. The authorized Proposal Form furnished by the Contracting Agency is not used or is altered; c. The completed Proposal form contains any unauthorized additions, deletions, alternate Bids, or conditions; d. The Bidder adds provisions reserving the right to reject or accept the Award, or enter into the Contract; e. A price per unit cannot be determined from the Bid Proposal; f. The Proposal form is not properly executed; g. The Bidder fails to submit or properly complete a Subcontractor list, if applicable, as required in Section 1-02.6. li. The Bidder fails to submit or properly complete a Disadvantaged, Minority or Women's Business Enterprise Certification, if applicable, as required in Section 1-02.6; or i. The Bid Proposal does not constitute a definite and unqualified offer to meet the material terms of the Bid invitation. .� A Proposal may be considered irregular and may be rejected if: b a. The Proposal does not include a unit price for every Bid item; b. Any of the unit prices are excessively unbalanced (either above or below the amount of a reasonable Bid) to the potential detriment of the Contracting Agency; . C. Receipt of Addenda is not acknowledged; 1. A member of a joint venture or partnership and the joint venture or partnership submit Proposals for the same project (in such an instance, both Bids may be rejected); or If Proposal form entries are not made in ink. ]Disqualification of Bidders ider may be deemed not responsible and the Proposal rejected if: More than one Proposal is submitted for the same project from a Bidder under 'te same or different names; vfdence of collusion exists with any other Bidder" Participants in collusion ?Nill be restricted from submitting further Bids; PUBLIC WORKS DEPARTMENT p City M E M O R A N D U M DATE: April 29, 2010 TO: Bonnie Walton FROM: John Hobson SUBJECT: CAG-10-040 Construction Bond Verification At 9:15 am today, I spoke with Anne E. Strieby, Attorney -In -Fact, with Travelers Casualty and Surety Company of America and she confirmed that they issued Bond No. 105424143 in the amount of $875,888.86 for Shoreline Construction Co. for the Stonegate Lift Station Conveyance Improvements project. h:\file sys\wwp - wastewater\wwp-27-3473 summerwind-stonegate Is replace ment\co nstructio n\co nveya nce\co ntract info\stonegate conveyance bond verification.doc �.o re I iKe Construction Co. GENERAL CONTRACTORS Letter of Transmittal #1 To: City of Renton 1055 South Grady Way Renton, WA 98055 Ladies/Gentlemen: We Are Sending You Date: 04/23/10 Job: 1025 Attn.: John Hobson Re: Stonegate Lift Sta. Conveyance Copies Date No. Description 1 SCC Names, Phone # etc 1 Corp Resolution 1 WA License 2 Bonds 1 Fair Practice Policy 2 Signed Contract 1 Insurance Forms 1 Renton Business License These Are Transmitted For Remarks: City Business License will follow, provided a copy of the application Signet e wZ-5Z-r P.O. Box 358 9 Woodinville, Washington 98072 • Phone: (425) 483-0600 • Fax: (360) 668-5133 City ot f APPLICATION FOR CITY OF RENTON BUSINESS LICENSE FILL OUT THIS FORM COMPLETELY INCOMPLETE APPLICATIONS WILL NOT BE PROCESSED OUT N CITY BUSINESSES GENERAL BUSINESS LICENSE Required: Every business enterprise, including those with a temporary or portable sales location, shall first obtain, from the Fiscal Services Division, a general business license for the current calendar year or unexpired portion thereof. The license shall be nontransferable. Reference Renton Municipal Code Title 5 Chapter S. Business Name & Physical Location: Shoreline Construction Co. PO Box 358/8315 216th St SE Telephone: Mailing Address Qplease check if same as above) F0MZT*T=3a? Woodinville, WA 98072 Have you previously had a Renton Business License? Yes Is your business door-to-door solicitation/peddler? No (if so, please stop and complete a Peddler Permit Form) Are you a non-profit entity? No If so, please provide Form 501(c)(3) Date Business is Expected to Open in Renton: May 1, 2 010 Emergency Name & Telephone Number (other than owner) Chymene Hoadley 425-483-0600 Business License Fees: WAStateUBI#: C178072242 Legal Owner(s) Name and Address: Doug Suzuki, 438 172nd Pl NE,Belleve Alec Andry, 11019 33rd Dr SE, Everett Telephone: 206/571__3571 / 206-571 -3572 Email address: dsuzuki@sccwa . net DESCRIBE TYPE OF BUSINESS IN DETAIL: Public works contractor specializing i n unrit=rgrc)iinc3 ut i l i t i es Contractors, plumbers, electricians, etc. please complete State Contractor's Lic. No. SHOREC*374NO Address where work to be performed SR 900 & Field Ave NE 1. Total hours estimated for 1 full year from date business is to open (this includes all hours, including owners hours) 2,900 2. FTE Calculation: Line 1 divided by 1,920 1 - Ili 3. FEE Calculation: Line 2 x $55.00 $ 83 .08 4. Minimum Fee: (if line 3 is below $55.00, please pay the minimum $55.00) $ 55.00 5. Business License Fee: Greater of Line 4 or Line 5: $ 83.08 I hereby certify that the statements and information furnished by me on this application are true and complete, to the best of my knowledge. I acknowledge that the statements and information furnished by me on this application are public records and are available for public inspection pursuant to Sy�f Wa,�iington,RCW 42-17-260. SIGNATURE: Print Name: ou J Suz Title: President Return Completed Application with payment to: FOR OFFICE USE ONLY Amount How Paid Date:4/23/10 Phone: 425-483-0600 City of Renton License Division Phone: 425-430-6851 1055 South Grady Way Fax: 425-430-6983 Renton, WA 98057 Date SIC NAICS Parcel ID# Application # DC/FISbl-03 2/10 SHORELINE CONSTRUCTION CO. Project 1025 - COR - Stonegate Lift Sta ISARGUARD_ LITHO USA Srsu CVS09114L TO REORDER, CALL YOUR LOCAL SAFEGUARD DISTRIBUTOR AT 800-660-6599 HCOX15001000O M04SFOO6493 �u e, n ® FRONTIER BANK Woodinville, WA 98072 DATE CHECK NO. COnStfUCtlOtl CO. GENERAL CONTRACTORS 98-762/1251 4/23/10 613138 -.0. Box 358, Woodinville, VJA 98072 (425) 483-0600 Fox (360) 668-5133 VOID AFTER 90 DAYS PAY Eighty Three and 08/100--- Dollars TO THE ORDER OF City of Renton CHECK AMOUNT -$83.08-- SHORELINE CONSTRUCTION CO. a'J Ill 6L3L38Ill 1:L25L076261:332711,004556110 �(Dre 1 i1.e Construction Co. GENERAL CONTRACTORS Key Employees Doug Suzuki, President Doug has over 30 years of experience in all phases of underground utility construction and has been with Shoreline since 1980. His duties include estimating, planning, budgeting and directing projects. Experienced in evaluating various construction methods to determine the most cost-effective plan. Monitors and coordinates all phases of the construction project, meets with owners and other contractors on a regular basis, oversees all progress billings and monitors compliance with building codes and regulations. Doug oversees all operations including financial decisions, budget preparations, reviewing and answering correspondence and all administrative issues. Alec Andry, Superintendent Alec has 28 years of experience in all phases of underground utility construction and has been with Shoreline since December 1996. His responsibilities include supervising crews, coordinating equipment, interpreting building plans and regulations, negotiating with subcontractors, recording changes and completing projects profitably and safely. Jay Brown, Foreman Jay has 20 years of construction experience in sitework and utilities and has been with Shoreline since March 1997. His duties include handling the labor requirements, supervising the hiring and dismissal of workers, preparing daily reports of progress and requirements for labor, material and equipment at the construction site and acts as on -site supervisor to direct the progress of work.. P.O. Box 358 • Woodinville, Washington 98072 • Phone: (425) 483-0600 • Fax: (360) 668-5133 Shoreline Construction Co SHOREC*374NO Work History Owner: Seattle Yacht Club Address: 1807 East Hamlin Street, Seattle WA 98112-2098 Contact: Seattle Yacht Club Contact Phone #: 206-325-1000 Project Name: Seattle Yacht Club Contract Amount: $44,200 Location: Seattle WA SCC PN: 1015 Scope: Owner: City of Lake Forest Park Address: 17425 Ballinger Way NE Lake Forest Park WA 98155 Contact: Frank Zenk Contact Phone #: 206-957-2803 x103 Project Name: LFP Emergency Repair Contract Amount: $22,000 Location: 15740 Beach Dr. NE, Lake Forest Park SCC PN: 1010 Scope: Owner: City of Everett Public Works Address: 3200 Cedar Street Everett WA 98201 Contact: Al Rosenzwie Contact Phone #: 425-257-8895 Project Name: BOND STREET Contract Amount: Location: Bond & Gedney Everett SCC PN: 1005 Scope: Owner: Northshore Utility District Address: 6830 NE 185 St, Kenmore WA 98028 Contact: George Matote Contact Phone #: 425-398-4400 Project Name: 2009 SEWER EXTENSION Contract Amount: $227,968 Location: 86 & NE 177tn St Bothell SCC PN: 1000-2009 SEWER EXTENSION Scope: Shoreline Construction Co SHOREC*374NO Work History Owner: Southwest Suburban Sewer Dist Address: 431 SW Ambaum Blvd Burien WA 98166 Contact: Jason Richardson Contact Phone #: 206-244-9575 Project Name: CHELSEA PARK Contract Amount: $652,202 Location: 4 Ave SW & S 136 Burien, WA SCC PN: 0925 Start Date November 2009 Scope: Owner: City of Redmond, P O Box 97010, Redmond, WA 98073 Address: P O Box 97010, Redmond, WA 98073 Contact: Dennis Brunelle Contact Phone #: 425-556-2724 Project Name: CLEVELAND STREET SEWER REPLACEMENT Contract Amount: $583,432 Location: Cleveland St & 161 sc Ave NE, Redmond SCC PN: 0920 Start Date August 2009 Scope: Owner: Skagit County PUD # 1 Address: P O Box 1436, Mount Vernon, WA 98273 Contact: Doug McConnell Contact Phone #: 360-424-7104 Project Name: JUDY RESERVOIR TRANSMISSION LINE Contract Amount: $3,906,604 Location: Kulshan & 26 , Mount Vernon, WA 98273-1436 SCC PN: 0915 Start Date May 2009 Scope: Owner: City of Monroe Address: 806 West Main St, Monroe, WA 98272 Contact: Mike Lande Contact Phone #: 360-794-7400 Project Name: PARK PLACE PUMP STATION & FORCE MAIN Contract Amount: $1,319,784 Location: 17866 West Main Street, Monroe SCC PN: 0910- Start Date May 2009 Scope: Shoreline Construction Co SIIOREC„374NO Work History Owner: City of Kirkland Address: 123 Fifth Avenue, Kirkland, WA 98033 Contact: Diane Pirolo Contact Phone #: 425-587-3830 Project Name: 2008 WATER SYSTEM IMPROVEMENTS Contract Amount: $430,680 Location: Slater & Alexander Roads, Kirkland SCC PN: 0905- Completed January 2009 Scope: Owner: City of Kirkland Address: 123 Fifth Avenue, Kirkland, WA 98033 Contact: Diane Pirolo Contact Phone #: 425-587-3830 Project Name: 2008 WATER SYSTEM IMPROVEMENTS Contract Amount: $430,680 Location: Slater & Alexander Roads, Kirkland SCC PN: 0905-Completed October 2008 Scope: Owner: King County Wastewater Treatment Address: 201 So Jackson, Seattle, WA Contact: Bob Peterson Contact Phone #: 206-263-9469 Project Name: Water Supply Project Phase I Contract Amount: $505,215 Location: Lake Forest Park SCC PN: 0900 UP - KING COUNTY- Completed May2009 Scope: Owner: City of Bothell Address: 9654 NE 182" St, Bothell, WA 98011 Contact: Contact Phone #: 425-486-2768 Project Name: Drainage System Improvements Contract Amount: $430,680 Location: Bothell SCC PN: 0855 - EAST RIVERSIDE DRIVE Completed May2009 Scope: Shoreline Construction Co SIIOREC*374NO Work History Owner: City of Renton Address: 1055 Grady Way, Renton, WA 98055 Contact: Mike Benoit Contact Phone #: 425-430-7206 Project Name: Sanitary Sewer Extension Contract Amount: $1,483,569 Location: Renton SCC PN: 0850 - WHITE FENCE RANCH -Completed January 2009 Scope: Owner: City of Lake Forest Park Address: 17425 Ballinger Way NE, L F P, WA 98155 Contact: Susan Stine Contact Phone #: 206-368-5440 Project Name: Sanitary Sewer Expansion Contract Amount: $ 598,558 Location: Lake Forest Park SCC PN: 0845 - LAKE FOREST PARK -Completed October 2008 Scope: Owner: City of Everett Address: 3101 Cedar St, Everett WA 98201 Contact: Tom Fuchs Contact Phone #: 425-257-8895 Project Name: Replace sanitary sewer lines Contract Amount: $4,493,950 Location: Everett SCC PN: 0840 - SANITARY SEWER REPLACEMENT "K"- Completed May 2009 Scope: Owner: City of Kirkland Address: 123 Fifth Avenue, Kirkland WA 98033-6189 Contact: Dave Snyder Contact Phone #: 425-587-3832 Project Name: New Water & Sanitary Sewer Contract Amount: $926,847 Location: Kirkland SCC PN: 0835 - NE 80 STREET- Completed August 2008 Scope: Shoreline Construction Co SHOREC*374NO Work History Owner: City of Renton Address: 1055 Grady Way, Renton WA 98055 Contact: Mike Benoit Contact Phone #: 425-430-7206 Project Name: Multi -location sewer repairs Contract Amount: $619,878 Location: Renton SCC PN: 0830 - 2008 SANITARY SEWER REPAIRS Completed August 2008 Scope: Owner: Sammamish Plateau Water & Sewer Address: 1510 - 228 Ave SE, Sammamish WA 98075 Contact: Kyle Wong Contact Phone #: 425-392-6256 Project Name: Water & Storm Improvements Contract Amount: $1,264,945 Location: Sammamish SCC PN: 0825 - NORTHEAST PINE LAKE Completed July 2008 Scope: Owner: City of Shoreline Address: 17544 Midvale Ave No, Shoreline WA 98133-4921 Contact: John Vicente Contact Phone #: 206-576-1700 Project Name: Storm Drainage Improvements Contract Amount: $157,650 Location: Shoreline SCC PN: 0820 - DRAINAGE IMPROVEMENTS Completed April 2008 Scope: Owner: City of Lake Forest Park Address: 17425 Ballinger Way NE, Lake Forest Park, WA 98155 Contact: Frank Zenk Contact Phone #: 206-368-5440 Project Name: 0810 - DEC 3 m EMERGENCY STORM REPAIRS Completed January 2008 Contract Amount: $120,607 Location: Lake Forest Park SCC PN: Storm drainage repairs Scope: Shoreline Construction Co SHORECx374NO Work History Owner: City of Kirkland Address: 123 Fifth Avenue, Kirkland, WA 98033 Contact: Denise Pirolo Contact Phone #: 425-587-3830 Project Name: Sewer Repairs Contract Amount: $1,363,525 Location: Kirkland SCC PN: 0805 - 2007 EMERGENCY SEWER PROJECTS Completed July 2008 Scope: Owner: City of Renton Address: 1055 Grady Way, Renton, WA 98055 Contact: Mike Benoit Contact Phone #: 425-430-7206 Project Name: Water & Sewer Main Installation Contract Amount: $711,934 Location: Renton SCC PN: 0800 - DUVALL AVENUE Completed April 2008 scope: Owner: Harlow Construction Co Inc Address: 3815 100` St SW, #2A, Lakewood, WA 98499 Contact: Harlow Construction Co Inc Contact Phone #: 253-588-4705 Project Name: Utilities Installation Contract Amount: $321,890 Location: Olympia SCC PN: 0735 - WHITMORE GLEN Completed December 2007 Scope: Owner: Alderwood Water & Sewer District Address: 3626 - 156` St SW, Lynnwood, WA 98087 Contact: Chris Schumacher Contact Phone #: 425-743-4605 Project Name: Sewer ULID Contract Amount: $541,560 Location: Lynnwood SCC PN: 0730 - MARTHA LAKE Completed September 2008 Scope: Shoreline Construction Co SHOREC*374NO Work History Owner: Watson Asphalt Paving Co Inc Address: P O Box 845, Redmond, WA 98073 Contact: Tina Contact Phone #: 425-868-4377 Project Name: Water, Sewer, Storm Extensions Contract Amount: $213,655 Location: Redmond SCC PN: 0725 - UNION HILL -Completed September 2007 Scope: Owner: City of Lake Forest Park Address: 17425 Ballinger Way NE, Lake Forest Park, WA 98155 Contact: Neil Jensen Contact Phone #: 206-368-5440 Project Name: Sanitary Sewer Expansion Contract Amount: $ 1,560,687 Location: Lake Forest Park SCC PN: 0720 - LAKE FOREST PARK- Completed June 2008 Scope: Owner: Goodfellow Bros., Inc. Address: PO Box 1419, Maple Valley, WA 98038 Contact: Contact Phone #: 425-432-2202 Project Name: Install Water, Storm & Sewers Contract Amount: $ 827,010 Location: Issaquah SCC PN: 0715 - TALUS PARCELS 10, 11, & 12- Completed April 2008 Scope: Owner: Goodfellow Bros., Inc. Address: PO Box 598, Wenatchee, WA 98807 Contact: Contact Phone #: 509-662-7111 Project Name: Install Water, Storm & Sewers Contract Amount: $696,951 Location: Mukilteo SCC PN: 0710 - ARBORS AT HARBOUR POINTE- Completed January 2008 Scope: Denis Law City Of Mayor 00000 t A � t A i',.j.•. ■a I I City Clerk -Bonnie I. Walton April 21, 2010 Douglas J. Suzuki Shoreline Construction, Co. P.O. Box 358 Woodinville, WA 98072-0358 RE: Stonegate Lift Station Conveyance Improvements; CAG-10-040 Dear Mr. Suzuki: RECEIVED APR 2 7 2010 CITY OF REWfON UTILITY SYSTEMS At its regular meeting of April 19, 2010, the Renton City Council accepted your bid for the above -referenced project in the total amount of $875,888.86. Please contact John Hobson, Project Manager, for submission of required documents to complete the contract. These may include proof of City and State business licenses, performance bond, and insurance certificates. Sincerely, JW Jason A. Seth Deputy City Clerk cc: John Hobson, Project Manager Linda Weldon, Accounting Assistant Tracy Schuid, Accounting Supervisor 1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov Denis Law City Of lie Mayor .i City Clerk -Bonnie I. Walton April 21, 2010 William L. Liffrig B&L Utility, Inc. 7101 Sexton Rd. Snohomish, WA 98290 RE: Stonegate Lift Station Conveyance Improvements; CAG-10-040 Dear Mr. Liffrig: At its regular meeting on ApriI19, 2010, the Renton City Council accepted the bid submitted by Shoreline Construction, Co. for the above -referenced project in the total amount of $875,888.86. Thank you for your interest and your bid. Sincerely, Jason A. Seth Deputy City Clerk cc: John Hobson, Project Manager 1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov Denis Law City Of Mayor City Clerk -Bonnie I. Walton April 21, 2010 Dan E. Buno Buno Construction 20219 99th Ave. SE Snohmish, WA 98296 RE: Stonegate Lift Station Conveyance Improvements; CAG-10-040 Dear Mr. Buno: At its regular meeting on April19, 2010, the Renton City Council accepted the bid submitted by Shoreline Construction, Co. for the above -referenced project in the total amount of $875,888.86. Thank you for your interest and your bid. Sincerely, ,ason A. Seth Deputy City Clerk cc: John Hobson, Project Manager 1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov Denis Law -- City Of Mayor000 , City Clerk - Bonnie I. Walton April 21, 2010 Jacob Cimmer Johanson Excavating, Inc, P.O. Box 674 Buckley, WA 98321 RE: Stonegate Lift Station Conveyance Improvements; CAG-10-040 Dear Mr. Cimmer: At its regular meeting on ApriI19, 2010, the Renton City Council accepted the bid submitted by Shoreline Construction, Co. for the above -referenced project in the total amount of $875,888.86. Thank you for your interest and your bid. Sincerely, f ason A. Seth Deputy City Clerk cc: John Hobson, Project Manager 1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov Denis Law - City Of Mayor, .- ��1 r�* irl `Or +es�w1 N City Clerk -Bonnie I. Walton April 21, 2010 Wayne Jones Lakeridge Development, LLC P.O. Box 156 Renton, WA 98057 RE: Stonegate Lift Station Conveyance Improvements; CAG-10-040 Dear Mr. Jones: At its regular meeting on April19, 2010, the Renton City Council accepted the bid submitted by Shoreline Construction, Co. for the above -referenced project in the total amount of $875,888.86. Thank you for your interest and your bid. Sincerely, G Jason A. Seth Deputy City Clerk cc: John Hobson, Project Manager 1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov Denis Law City Of,-� Mayor - 1 Air, ` • ri .. _��. City Clerk - Bonnie I. Walton April 21, 2010 Bret Lane Laser Underground & Earthworks 20417 87th Ave. SE Snohomish, WA 98296 RE: Stonegate Lift Station Conveyance Improvements; CAG-10-040 Dear Mr. Lane: At its regular meeting on ApriI19, 2010, the Renton City Council accepted the bid submitted by Shoreline Construction, Co. for the above -referenced project in the total amount of $875,888.86. Thank you for your interest and your bid. Sincerely, JaC son A. Seth /;/ Deputy City Clerk cc: John Hobson, Project Manager 1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov Denis Law Cl Of Mayor rT _ _ t A +> .n I r City Clerk -Bonnie I. Walton April 21, 2010 Mark Pivetta Pivetta Brothers Construction, Inc. P.O. Box 370 Sumner, WA 98390 RE: Stonegate Lift Station Conveyance Improvements; CAG-10-040 Dear Mr. Pivetta: At its regular meeting on ApriI19, 2010, the Renton City Council accepted the bid submitted by Shoreline Construction, Co. for the above -referenced project in the total amount of $875,888.86. Thank you for your interest and your bid. Sincerely, Jason A. Seth Deputy City Clerk cc: John Hobson, Project Manager 1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov Denis s- City Of k - Y0000 City Clerk - Bonnie I. Walton April 21, 2010 Richard L. Alia R.L. Alia Company 107 Williams Ave. S. Renton, WA 98057 RE: Stonegate Lift Station Conveyance Improvements; CAG-10-040 Dear Mr. Alia: At its regular .meeting on April19, 2010, the Renton City Council accepted the bid submitted by Shoreline Construction, Co. for the above -referenced project in the total amount of $875,888.86. Thank you for your interest and your bid. Sincerely, Jason A. Seth Deputy City Clerk cc: John Hobson, Project Manager 1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov Denis Law Mayor Cl _Of � • City Clerk - Bonnie I. Walton April 21, 2010 J.R. Rodarte Rodarte Construction, Inc. P.O. Box 1875 Auburn, WA 98071-1875 RE: Stonegate Lift Station Conveyance Improvements; CAG-10-040 Dear Mr. Rodarte: At its regular meeting on April19, 2010, the Renton City Council accepted the bid submitted by Shoreline Construction, Co. for the above -referenced project in the total amount of $875,888.86. Thank you for your interest and your bid. Sincerely, Jason A. Seth Deputy City Clerk cc: John Hobson, Project Manager 1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov Denis Law _ Mayor j.677 A , ..� 1. City Clerk -Bonnie I. Walton April 21, 2010 Steve Geiling Titan Earthwork 13806 16th St. E. Sumner, WA 98390 RE: Stonegate Lift Station Conveyance Improvements; CAG-10-040 Dear Mr. Geiling: At its regular meeting on ApriI19, 2010, the Renton City Council accepted the bid submitted by Shoreline Construction, Co. for the above -referenced project in the total amount of $875,888.86. Thank you for your interest and your bid. Sincerely, Jason A. Seth Deputy City Clerk cc: John Hobson, Project Manager 1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov