Loading...
HomeMy WebLinkAboutWWP2703557_2Ca �VAVw'lo% Engineers... Working Wonders With Water" August 9, 2010 8235B.10 Renton City Hall 1055 South Grady Way Renton, WA 98057 Attention: Michael A. Benoit Subject: Preliminary 90 Percent Lake Washington Beach Lift Station Replacement Design Submittal Dear Mike, Please see enclosed two (2) copies of the 90 Percent Design Submittal for the Lake Washington Beach Lift Station Replacement project for your review. Please let us know if you have any questions or comments. Sincerely, CAROLLO ENGINEERS, P.C. Tyler Whitehouse TJW:tlh Enclosures: Two copies of the following: - Preliminary 90% Project Schedule - Preliminary 90% Construction Cost Estimate - Preliminary 90% Specifications - Preliminary 90% Drawings 1218 Third Avenue, Suite 1600, Seattle, Washington 98101 P. 206.684.6532 F. 206.903.0419 pw:\\Carollo\Documents\Client\WA\Renton\8235B10\Correspondence\Client\Benoit L-20100809.docx carollo.com LAKE WASHINGTON BEACH LIFT STATION REPLACEMENT PROJECT Task Name Duration Start Finish L Task 3.2 - 60 Percent Design Development 15 days Fri 6/18/90 Thu 7/8%10 Task 3.3 - 90 Percent Design Development 32 days Fri 7/9/10 Mon 8/23/10 90 Percent Design Development 22 days Fri 7/9/10 Mon 8/9/101 City Pothole Force Main 5 days Thu 7/29/10 Wed 8/4/101 90 Percent Design Submittal 0 days Mon 8/9/10 Mon 8/9/10I City Review and Comments 10 days Tue 8/10/10 Mon 8/23/10 90 Percent Carollo Internal Review 5 days Tue 8/10/10 Mon 8/16/10 90 Percent Design Review Meeting 0 days Mon 8/23/10 Mon 8/23/10 Task 3.4 - Final (Contract Document) Design Development 8 days Tue 8/24/10 Thu 9/2/10 Contract Documents Development 8 days Tue 8/24/10 Thu 9/2/10 Contract Documents Submittal 0 days Thu 9/2/10 Thu 9/2/10 Task 4 - Bid Assistance 25 days Fri 9/3/10 Thu 10/7/10 Task 4.1 - Respond to Questions and Issue Addenda 25 days Fri 913/10 Thu 10/7/10 Advertise 15 days Fri 9/3/10 Thu 9/23/10 Open Bids 0 days Thu 9/23/10 Thu 9/23/10 Award Contract 10 days Fri 9/24/10 Thu 10/7/10 Task 5 - Assistance During Construction 30 days Thu 10/14/10 Thu 11/25/10 Tasks 5.1-5.4 - Submittals, RFIs, Mech & Elect Inspection 30 days Thu 10/14/10 Thu 11/25/10 Pre -Construction Meeting 0 days Thu 10/14/10 Thu 10/14/10 Submittals 20 days Fri 10/22/10 Thu 11/18/10 Materials Wait Time 15 days Fri 11/5/10 Thu 11/25/10 Construction 78 days Thu 11/25/10 Tue 3/15/11 Mobilization 0 days Thu 11/25/10 Thu 11/25/10 Landscape and Site Demolition 5 days Fri 11/26/10 Thu 12/2110 City Install Waterline and Meter 3 days Fri 12/3/10 Tue 12/7/10 Install Wet Well 15 days Wed 12/8/10 Tue 12/28/10 Install 8" SS 5 days Wed 12/29/10 Tue 1/4/11 Install Valve Vault, Site and Yard piping 10 days Wed 1/5/11 Tue 1/18/11 Install Mechanical in Wet Well 5 days Wed 1/19/11 Tue 1/25/11 Install Power Extension and Transfer Switch Cabinet 5 days Wed 1/26/11 Tue 2/1/11 Test New Lift Station 2 days Wed 2/2/11 Thu 2/3/11 Convert Exist Wet Well to Flow Thru Manhole 4 days Fri 2/4/11 Wed 2/9/11 Startup and Commissioning 2 days Thu 2/10/11 Fri 2/11/11 Decommission and Demo Existing Lift Station 5 days Mon 2/14/11 Fri 2/18/11 Site Improvements 12 days Mon 2/21/11 Tue 3/8/11 Substantial Completion 5 days Wed 3/9/11 Tue 3/15/11 Final Acceptance 0 days Tue 3/15/11 Tue 3/15/11 1 I Task 5.5 - Record Drawings 15 days Wed 3/16/11 Tue 4/5/11 Record Drawing Development 15 days Wed 3/16/11 Tue 4/5/11 Project Completion 0 days Tue 4/5/11 Tue 4/5/111 2010 90% PRELIMINARY PROJECT SCHEDULE ;r 2010 C 1/1 11/2 i 1/2 8/23 Project: Lake WA Beach Schedule Task Progress Summary V External Tasks Deadline Date: Fri 8/6/10 Split Milestone ♦ Project Summary - External Milestone 1 1. March 2011 _ Aril 2011 I202/27 3/6 13/13',3/203/27 4/3 i4/164/174/241 sn 4/5 Page 1 Ca r� PROJECT SUMMARY Estimate Class: 3 Project: Lake Washington Beach Lift Station Replacement Preliminary 90% Construction Cost Estimate PIC: Brian Matson Job #: 8235610 PM: Lara Kammereck Location: Renton, WA Date: August 4, 2010 Zip Code: 98055 By: Tyler Whitehouse Reviewed: Brian Casey NO. DESCRIPTION TOTAL 01 Lake WA Beach New LS $245,061 02 Demolition $10,106 TOTAL DIRECT COST F $255,167 General Conditions 5.0% $13,000 Subtotal $268,000 Contingency 5.0% $13,000 Subtotal $281,000 General Contractor Overhead, Profit & Risk 10.0% $28,000 Subtotal $309,000 Sales Tax (Based on King County, WA) 9.5% $29,000 Subtotal $338,000 TOTAL ESTIMATED CONSTRUCTION COST $338,000 The cost estimate herein is based on our perception of current conditions at the project location. This estimate reflects our professional opinion of accurate costs at this time and is subject to change as the project design matures. Carollo Engineers have no control over variances in the cost of labor, materials, equipment, nor services provided by others, contractor's means and methods of executing the work or of determining prices, competitive bidding or market conditions, practices or bidding strategies. Carollo Engineers cannot and does not warrant or guarantee that proposals, bids or actual construction costs will not vary from the costs presented as shown. fin: Lake WA Beach LS Cost Estimate.xls-PROJECT SUMMARY Page 1 of 1 Printed: 8/4/2010-10:11 AM G" cat►r�, �s Project: Lake Washington Beach Lift Station Replacement Preliminary 90 % Construction Cost Estimate Job #:8235B10 Location: Renton, WA Estimate Class: Build Cost Matrix I 3 Help? I Capacity: Connected HP: RECAP MATRIX Date : August 4, 2010 By: Tyler Whitehouse SPEC. DIVISION/ ELEMENT DESCRIPTION DIV, 01 GEN REOTS DIV. 02 SITE WORK DIV. 03 CONC DIV. 04 MSNRY DIV. 05 METALS DIV. 06 WOOD 8 Plastics DIV. 07 MOIST PROTN DIV. OB DOORS 8 WOOS DIV. 09 FINISHES IDIV. 10 SECIAL- TIES DIV. 11 EQUIP DIV12 FURN DIV. 13DV. SPECIAL CONST 14DIV. CONVEY 15DV.16 PLUMBG 8 MECH ELECT/ 18 C Div 17 INST. 8 CONT. ELEMENT TOTALS ELEMENT %ot Total 01 Lake WA Beach New LS 02 Demolition_ $4 000 __ $63�824 $10.106 $39,287_ $5,320_ $1,657 ______ _____ _ _ __�_ $14,877 $23,315_A ___ $42,057 $47,524 "-' $3,200 ---$245,061 _8_6.04% 167 Page 1 of 1 Project: Lake Washington Beach Lift Station Replacement Preliminary 90 % Construction Cost Estimate Job #: 8235810 Location: Renton, WA Element: 01 Lake WA Beach New LS DETAILED COST ESTIMATE Date: August 4, 2010 By: Tyler Whitehouse Reviewed: Brian Casey SPEC. NO. DESCRIPTION QUANTITY UNIT UNIT COST SUBTOTAL TOTAL 01000 Division 01 - General Conditions Vactor Truck and Accessories Total 4.00 Day $1,000.00 $4,000.00 $4,000 Division 02 - Site Construction 02000 Misc Site Restoration Allowance LS 1.00 LS $4,000.00 $4,000.00 02000 42" Colored Chain Link Fence 75.00 LF $22.86 $1,714.35 02000 Slurry Seal 1,469.44 BY $3.12 $4,580.24 02000 Dewatedng Allowance 1.00 LS $7,500.00 $7,500.00 02000 Restripe Parking Lot Spaces 45.00 EA $14.18 $638.21 02000 Wet Well Slide Rail Shoring System 1.00 LS $7,886.01 $7,886.01 02000 Valve Vault Slide Rail Shoring System 1.00 LS $3,584.55 $3,584.55 02000 Trench Boxes 15.00 Da $103.90 $1,558.50 02000 Shoring Install Allowance 1.00 LS $5,000.00 $5,000.00 02220 Asphalt Pavement Cutting 360.00 inFT $.78 $281 02220 Remove 2"-3" Asphalt Pavement 800.00 SF $.42 $334 02220 Asphalt Pavement Cutting 343.00 inFT $.78 $267 02220 Remove 2"-3" Asphalt Pavement 268.67 SF $.42 $112 02220 Core Drilling, 12" Diameter 1.50 LF $157.10 $236 02300 20 Cy Dump Truck, 10 Miles/Round Trip 152.44 CY $5.88 $896 02300 Cat 225 Trackhoe, 3/4Cy Bucket, Class B (Medium Digging), 0-16' D 73.19 CY $6.18 $452 02300 Imported Pipe Bed & Zone/Confined Structure Backfill, Class B Material 13.21 CY $68.11 $900 02300 Cat 235 Trackhoe 1.12Cy Bucket, Class B (Medium Digging), 0-20' D 152.44 CY $4.10 $625 02300 Imported Trench Backfill/Unconfined Struct. Bf, Class B Material 54.87 CY $34.98 $1,920 02300 Imported Trench Backfill/Unconfined Strict. Bf, Class B Material 59.97 CY $34.98 $2,098 02300 Cat 225 Trackhoe, 3/4Cy Bucket, Class B (Medium Digging), 0-16' D 24.00 CY $6.18 $148 02300 20 Cy Dump Truck, 10 Miles/Round Trip 73.19 CY $5.88 $430 02300 20 Cy Dump Truck, 10 Miles/Round Trip 24.00 CY $5.88 $141 02300 Imported Trench Backfill/Unconfined Struct. Bf, Class B Material 9.26 CY $34.98 $324 02300 Tractor/Backhoe, 12" Bucket Class B (Medium Digging), 0-5' D 31.48 CY $38.54 $1,213 02300 20 Cy Dump Truck, 10 Miles/Round Trip 31.48 CY $5.88 $185 02300 Imported Pipe Bed & Zone/Confined Structure Backfill, Class B Material 11.54 CY $68.11 $786 02300 Imported Trench Backfill/Unconfined Struct. Bf, Class B Material 19.94 CY $34.98 $698 02742 3" Pavement Replacement On 8" Abc Over Trench 268.67 SF $10.23 $2,748 02742 3" Pavement Replacement On 8" Abc Over Trench 800.00 SF $10.23 $8,184 02772 6" Straight Conc Curb 70.00 LF $9.20 $644 02820 3.5' H Double Swing Gate, Chain Link, 18'Opening 2.00 EA $1,870.20 $3,740 Total $63,824 Division 03 - Concrete 03000 Precast Concrete Manhole 8' ID, 19' deep 1.00 EA $20,780.00 $20,780.00 03000 Precast Concrete Manhole 7x7x5 deep 1.00 EA $13,507.00 $13,507.00 03000 Concrete Formwork in Wet Well 1.00 LS $3,000.00 $3,000.00 03000 Flow Thru Manhole Conversion 1.00 LS $2,000.00 $2,000.00 Total $39,287 Division 05 - Metals 05000 SST Ladders 19.00 LF $280.01 $5,320.20 Total $5,320 Division 06 - Wood and Plastics 06000 FRP Grating 25.00 SF $36.37 $909.13 06000 FRP Handrail 6.00 LF $41.56 $249.36 06000 FRP Flange Beam 8.00 LF $62.34 $498.72 Total $1,657 Division 09 - Finishes 09000 Wet Well Coating 1,193.20 SF $12.47 $14,876.82 Total $14,877 Division 11 -Equipment 11000 Vaughan Chopper Pumps 2 and Accessories 1.00 LS $21,839.78 $21,839.78 11000 Vault Sump Pump and Accessories 1.00 LS $1,475.38 $1,475.38 Total $23,315 Division 15 - Mechanical 15000 4" Force Main Installation and Patch 25.00 LF $103.90 $2,597.50 15000 Hot Box Enclosure and Installation 1.00 LS $1,039.00 $1,039.00 15000 SST Supports and Fasteners 1.00 LS $2,500.00 $2,500.00 15000 Misc Piping and Fittings 1.00 LS $2,000.00 $2,000.00 15000 4" RFCA, Fusion Epoxy, SST B&N 10.00 EA $367.80 $3,677.96 15000 314" Reduced Press Backflow Preventer 1.00 EA $332.48 $332.48 Un Lake W A Be LS C- Eslknae l Lak" W A B--LS Page 1 of 2 F- Rev 20MJ- i Project: Lake Washington Beach Lift Station Replacement Preliminary 90 % Construction Cost Estimate Job #: 8235B10 Location: Renton, WA Element: 01 Lake WA Beach New LS SPEC. NO. DESCRIPTION 15114 4"- 200 Psi Ci Fxf Swing Check Valve 15115 8" Mj X Mj D.I. Gate Valve, Nrs 15116 4" Fxf Cast Iron Plug Valve W/Handwheel Op 15120 5' C. 1. Valve Box For 3"-20" Valves 15120 Up To 6' Trench/Bury Indicator Post 15120 Add For Ea 6" Indicator Post Over 6' 15121 4" Flex Cpig, Buried Or Underwater 15121 8" Flex Cpig, Buried Or Underwater 15251 8" Cl 52 Cldi Mj Pipe In Open Trench 15251 4" Flg Cldi Pipe In Bldg 15251 4"X 3" 125# Cldi Fxf Concentric Rdcr 15251 4" 90" 125# Cldi Fxf Ell 15251 4" Cldi Fla Straiaht Tee In Place DETAILED COST ESTIMATE Date : August 4, 2010 By : Tyler Whitehouse Reviewed: Brian Casey QUANTITY UNIT UNIT COST SUBTOTAL TOTAL 2.00 EA $1,325.86 $2,652 1.00 EA $1,615.81 $1,616 3.00 EA $888.43 $2,665 1.00 EA $530.93 $531 1.00 EA $876.92 $877 8.00 EA $51.95 $416 4.00 EA $653.70 $2,615 2.00 EA $865.62 $1,731 5.00 LF $34.51 $173 30.00 LF $50.29 $1,509 2.00 EA $546.13 $1,092 4.00 EA $679.70 $2,719 1.00 EA $1,008.33 $1,008 60.00 LF $30.54 $1.832 15251 4" 45" Cldi Mj Bend 4.00 EA $696.23 $2,785 15251 4" 22-1/2" Cldi M' Bend 1.00 EA $696.23 $696 15251 8" Cldi FIg Straight Tee In Place 1.00 EA $1,686.26 $1,686 15251 8" Cl 52 Cldi Mj Pipe In Open Trench 5.00 LF $34.51 $173 15251 4" 45" 125# Cldi Fxf Ell 2.00 EA $679.70 $1,359 15251 4" X 4" Cldi M' Tee Or Wye 1.00 EA $1,173.19 $1,173 15257 .75" Type K Copper Piping In An Open Trench 20.00 LF $8.09 $162 15265 8" Sdr-26 Pvc Sewer Pipe, In Trench 47.00 LF $7.60 $357 15265 2" Sch 80 Pvc Pipe In A Trench 15.00 LF $5.59 $84 Total $42,057 Division 16 - Electrical 16000 Misc Electrical/Instrumentation 1.00 LS $8.000.00 $8.000.00 16000 Standard Control Panel 1.00 LS $17,081.16 $17,081.16 16000 Trenched Conduit Allowance 1.00 LS $3,117.00 $3,117.00 16000 Power Service Extension 120.00 LF $109.10 $13,091.40 16000 Utility Meter and Transfer Switch Cabinet 1.00 LS $6,234.00 $6,234.00 Total $47,524 Division 17 - Instrumentation and Controls 17000 BackupLevel Float System 1.00 LS $997.44 $997.44 17000 Level Transducer 1.00 LS $2.202.68 $2202.68 Total Grand Total Un: L*e W A Bean LS Cml Esibnale.. -01 Le W A B-c New LS Page 2 of 2 Porn R- 200&km DETAILED COST ESTIMATE Project: Lake Washington Beach Lift Station Replacement Preliminary 90% Construction Cost Estimate Job #: 8235B10 Date : August 4, 2010 Location: Renton, WA By: Tyler Whitehouse Element: 02 Demolition Reviewed: Brian Casey SPEC. NO. DESCRIPTION F QUANTITY UNIT UNIT COST SUBTOTAL TOTAL Division 02 - Site Construction 02000 Gut Existing Lift Station 1.00 LS $3,000.00 $3,000.00 02000 Drain Rock Fill _ 24.23 CY $31.17 $755.25 02000 Demo Elect Panel 2.00 LS $1,000.00 $2.000.00 02000 Misc Demolition and Restoration Allowance 1.00 LS $2,000.00 $2,000.00 02000 Demo Top of Steel Structure 1.00 LS $1,000.00 $1,000.00 02220 Concrete Curb/Gutter Demolition 120.00 LF $5.63 $675 02300 Cut & Remove Tree, 24" Diameter 1.00 EA $675.35 $675 Total $10,106 Grand Total $10-106 Iln. Lake WA Beach LS Ceal Esamale 4.-02 D it Page 1 of 1 F— R- 20081u- ¢s� �s�Isrtteac:0 ia.21 a� APPROXIMATE - FENCED AREA = 720 SO FT 's (20FTx36FT) ANTENNA (-20 FT TALL, TYPI LIMITS OF CONTRACTOR LIFT STATION OPERATIONS (BELOW GRADE) r VALVE VAULT I (BELOW GRADE) en i-A.KF C�vT k1,415 t;5L-& 56 a(�o Tc�— T�►2�� �c� �S . .......... j„ '•<,.aRap GENE COULON MEMORIAL BEACH et,Q PARK ENTRANCE A SITE- PLAN SCALE: 1"40' FILE: 8453-SRV C:\pw_working\projectwise\elongoda\dms99193\Figure-1 3-08-10 08:49am ELongoria XREFS:8453-SRV � � h • ► � , ��� � �t 2 rLq CHAIN LINK FENCE WI PRIVACY SLATS (PRIVACY SLATS NOT SHOWN FOR CLARITY, TYP) TOWN 3'-0') 1 12'-0- (TYP) rl—AN SECTION SCALE: 1'=5' FILE: - :T i I, ::{' r.•. :::ti:':`:�:•:::•:::•: •:•Y•:•:•:•:•::•Yo:• SECTION - SCALE: l'-5' FILE: - 3'-(' - 6'-0' SHOWN 3'-0-) 1 SECTION `��c�c,•a �-v 2 �p T�"� SCALE: 1 `=5' FILE: - _ Figure No. 1 SITE PLAN AND SECTIONS LAKE WASHINGTON BEACH LIFT STATION CITY OF RENTON 4C_ Engineers...Wortdng Wonders With Water " Engineers... Working Wonders With Water" June 18, 2010 8235B.10 Renton City Hall 1055 South Grady Way Renton, WA 98057 Attention: Michael A. Benoit Subject: Preliminary 60 Percent Design Submittal Dear Mike, Please see enclosed two (2) copies of the 60 Percent Design Submittal for the Lake Washington Beach Lift Station Replacement project. It shall be noted that the estimated construction cost of the project has increased since the preliminary design phase. The preliminary design construction cost for the Lake Washington Beach Lift Station Replacement project was estimated to be $280,000 (Carollo, Lake Washington Beach Alternatives Analysis Final, July 2009). The current 60 percent construction cost for Lake Washington Beach Lift Station Replacement project is estimated to be $339,000. Key project elements not included in the preliminary design construction cost include: • Additional power service extension. • Additional gravity sewer extension. • Slurry seal and parking lot re -striping. • Fencing and swing gates. • Ladders and platform in wet well. • On -site water accessories. Please let us know if you have any questions or comments. Sincerely, CAROLLO ENGINEERS, P.C. Tyler a use TJW:tlh Enclosures: Two copies of the following: - 60% Lake Washington Beach Lift Station Replacement Construction Schedule - 60% Lake Washington Beach Lift Station Replacement Construction Cost Estimate - 60% Lake Washington Beach Lift Station Replacement Specifications - 60% Lake Washington Beach Lift Station Replacement Drawings 1218 Third Avenue, Suite 1600, Seattle, Washington 98101 P.206.684.6532 F.206.903.0419 pw \\Carollo\Documents\Client\WA\Renton\8235810\Correspondence\Client\Benoit L-20100618.docx Carollo.com PROJECT SUMMARY Estimate Class: Project: Lake Washington Beach Lift Station Replacement Preliminary 60% Construction Cost Estimate PIC: Job #: 8235B10 PM: Location: Renton, WA Date: Zip Code: 98055 By: Reviewed: 3 Brian Matson Lara Kammereck June 17, 2010 Tyler Whitehouse Brian Casey NO. DESCRIPTION TOTAL 01 Lake WA Beach New LS $215,033 02 Demolition $8,823 TOTAL DIRECT COST $224,000 General Conditions 5.0% $11,000 Subtotal Contingency 20.0% $235,000 $47,000 Subtotal $282,000 General Contractor Overhead, Profit & Risk 10.0% $28,000 Subtotal $310,000 Sales Tax Based on King County, WA) 9.5% $29,000 Subtotal $339,000 TOTAL ESTIMATED CONSTRUCTION COST 339,000 The cost estimate herein is based on our perception of current conditions at the project location. This estimate reflects our professional opinion of accurate costs at this time and is subject to change as the project design matures. Carollo Engineers have no control over variances in the cost of labor, materials. equipment: nor services provided by others. contractor's means and methods of executing the work or of determining prices, competitive bidding or market conditions, practices or bidding strategies. Carollo Engineers cannot and does not warrant or guarantee that proposals, bids or actual construction costs will not vary from the costs presented as shown. f rcn Lake WA Beach LS Cost Estimate xls-PROJECT SUMMARY Page 1 of 1 Printed: 6/17/2010-10:22 AM Project:Lake Washington Beach Lift Station Replacement Preliminary 60% Construction Cost Estimate Job #:823SB10 Location: Renton, WA Estimate Class: Build Cost Matrix , J Capacity: Connected HP: RECAP MATRIX Date: June 17, 2010 By: Tyler Whnehouso SPEC. DMSIOW ELEMENT DESCRIPTION DIV. 01 GEN REOTS DIV. 02 SITE WORK DIV. 03 GONC DIV. 04 MSNRY DIV. OS METALS DIV, 06 WOOD 8 Plastics DIV. 07 MOIST PROTN DIV 08 DOORS 8 WDOS OIV. 09 FINISHES DIV. 10 SPECIAL- TIES DIV. 11 EOUIP DIV, 12 FURN DIV. 13 SPECIAL CONST DIV. t4 CONVEY OIV. 16 PLUMBG S MECH DIV. 16 ELECT/ I & C Div 17 INST. & CONT. ELEMENT TOTALS ELEMENT x of row 01 Lake WA Beach Now LS $4.000 $47.573 $27.729 $5.320 $1.657 $14.877 $2.3_315 $4011.2 $37.251 S3.200 $215,033 96.06% 02 Demolition $8.823 _ _ -` $8,823 3.91% --------------- Page 1 of 1 41 DETAILED COST ESTIMATE Project: Lake Washington Beach Lift Station Replacement Preliminary 60 % Construction Cost Estimate Job #: Location: Element: 8235BIO Renton, WA 01 Lake WA Beach New LS Date : June 17, 2010 BY: Tyler Whitehouse Y Reviewed: Brian Casey SPEC. NO. DESCRIPTION QUANTITY UNIT UNIT COST SUBTOTAL TOTAL Division 01 " General Conditions 01000 Vector Truck and Accessories 4.00 Day $1 000.00 $4,000.00 TOW $ Division 02 - Site Construction 02000 Misc Site Restoration Allowance LS 1.00 LS $4,000.00 $4,000.00 02000 42' Colored Chain Link Fence 75.00 LF $22.86 $1,714.35 02000 Shoring Allowance 1.00 LS $3,000.00 $3,000.00 02000 Slurry Seal 1,469.44 SY $3.12 $4,580.24 02000 Dewatering Allowance 1.00 LS $5 000.00 $5 000.00 02000 Restripe Parking Lot Spaces 45.00 EA $14.18 $638.21 02220 Asphalt Pavement Cutting 360.00 inFT $38 $281 02220 Remove 2"-3" Asphalt Pavement 800.D0 SF $.37 $298 02220 Asphalt Pavement Cutting 343.00 mFT $.78 $267 02220 Remove 2"-3" Asphalt Pavement 268.67 SF $.37 $100 02220 Core Drilling, 12" Diameter 1.50 LF $157.10 $236 02260 12' D X 12' W Trench And Manhole Boxes 30-00 DAY $72,73 $2,182 02300 20 Cy Dump Truck, 10 Miles/Round Trip 112.00 CY $5 14 $576 02300 Cat 225 Trackhoe, 3/4Cy Bucket, Class B (Medium Digging), 0-16' D 73.19 CY $6.83 $500 02300 Imported Pipe Bed S Zone/Confined Structure Backfill, Class B Material 13.21 CY $68,64 $907 02300 Cat 235 Trackhoe 1.12Cy Bucket, Class B (Medium Digging), 0-20' D 112.00 CY S4.10 S459 02300 Imported Trench Backfill/Unoonfined Struct. Bf, Class B Material 54 87 CY S37.26 $2,045 02300 02300 02300 Imported Trench Backfill/Unconfined Struct. Bf, Class B Material Cat 225 Trackhoe, 3I4Cy Bucket, Class B (Medium Digging), 0-16' D 20 Cy Dump Truck, 10 Miles/Round Trip 59.97 21.00 73.19 CY CY CY S37.26 $6.83 $5.14 $2,235 $143 $376 02300 20 Cy Dump Truck, 10 Miles/Round Trip 21.00 CY $5.14 $108 02300 Imported Trench Backfill/Unconfined Struct. Bf, Class B Material 926 CY $37.26 $345 02300 Tractor/Backhoe, 12" Bucket Class B (Medium Digging), 0-5' D 31.48 CY $38.54 $1,213 02300 20 Cy Dump Truck, 10 Miles/Round Trip 31.48 CY $5.14 $162 02300 Imported Pipe Bed 6 Zone/Confined Structure Backfill, Class B Material 11.54 CY $68.64 S792 02300 Imported Trench Backfill/Unconfined Struct. Bf, Class B Material 19.94 CY $37,26 $743 02742 3" Pavement Replacement On 8" Abc Over Trench 268.67 SF $10.23 $2,748 02742 3" Pavement Replacement On 8' Abc Over Trench 80000 SF $10.23 $8,184 02820 3.5' H Double Swing Gate, Chain Link, 18' Opening 200 EA $1,87020 $3,740 Total $47,573 Division 03 - Concrete 03000 03000 03000 03000 Precast Concrete Manhole V ID, 19' deep Precast Concrete Manhole 7x7x5 deep Concrete Formwork in Wet Well Flow Thru Manhole Conversion 1.00 1.00 1.D0 1.00 EA EA LS LS $20,260.50 $12,468.D0 $3,000.00 $2,000.00 $20,260.50 $12,468.00 $3,000.D0 $2,000.00 Total $37,729 Division 05 - Metals 05M SST Ladders 19.DO LF $280.01 $5 320.20 Total $5,320 1 M r wx�LSc E-e l E-wAB� i-!-S Page 1 of 2 F-Rw, ppyi,m DETAILED COST ESTIMATE Project: Lake Washington Beach Lift Station Replacement Preliminary 60 % Construction Cost Estimate Job #: 82351310 Date : June 17, 2010 Location: Renton, WA By : Tyler Whitehouse Element: 01 Lake WA Beach New LS Reviewed: Brian Casey SPEC. NO. DESCRIPTION QUANTITY UNIT UNIT COST SUBTOTAL TOTAL Division 15 - Mechanical 15000 4" Force Main Installation and Patch 25.00 LF $103 90 $2,597.50 15000 Hot Box Enclosure and Installation 1.00 LS $1,039,00 $1,039.00 15000 SST Supports and Fasteners 1.00 LS $2,500.00 $2,500.00 15000 Misc Piping and Fittings 1.00 LS $2,000.00 $2.000.00 15000 4" RFCA, Fusion Epoxy, SST B&N 3.00 EA $367.80 $1,103.39 15114 4'- 200 Psi Ci Fxf Swing Check Valve 2.00 EA $1,325.86 $2,652 15115 8' Mj X Mj D.I. Gate Valve, Nrs 1.00 EA $1,615.81 $1,616 15116 4" Fxf Cast Iron Plug Valve W/Handwheel Op 3.00 EA $888.43 $2,665 15118 1" Bf Preventer Ass W/2 Cv 8 2 Gtv 1.00 EA $1,452.07 $1,452 15120 5' C. I. Valve Box For 3"-20" Valves 1.00 EA $530.93 $531 15120 Up To 6' Trench/Bury Indicator Post 1.00 EA $876.92 $877 15120 Add For Ea 6" Indicator Post Over 6' 8.00 EA $51.95 $416 15121 4" Flex Cplg, Buried Or Underwater 6.00 EA $653.70 $3,922 15121 8" Flex Cplg, Buried Or Underwater 2.00 EA $865.62 $1,731 15251 8" CI 52 Cldi M' Pipe In Open Trench 5.00 LF $34.51 $173 15251 4" Fig Cldi Pipe In Bldg_ 30.00 LF $50.29 $1,509 15251 4'X 3" 125# Cldi Fxf Concentric Rdcr 2.00 EA $546.13 $1,092 15251 4" 90' 125# Cldi Fxf Ell 4.00 EA $679.70 $2,719 15251 4" Cldi Fig Straight Tee In Place 1.00 EA $1,008.33 $1 008 15251 4" Cl 52 Cldi Mj Pipe In Open Trench 60.00 LF $30.54 $1.832 15251 4" 90' Cldi Mj Bend 2.00 EA $695.19 $1,390 15251 4" 45' Cldi Mj Bend 3.00 EA $696.23 $2,089 15251 4' 22-1/2' Cldi Mj Bend 1.D0 EA $696.23 $696 15251 8" Cldi Fig Straight Tee In Place 1.00 EA $1.686.26 $1,686 15251 8" Cl 52 Cldi Mj Pipe In Open Trench 5.00 LF $34.51 $173 15257 1" Type K Copper Piping In An Open Trench 20.00 LF $10.10 $202 15265 8" Sdr-26 Pvc Sewer Pipe, In Trench 47.00 LF $7.60 $357 15265 2" Sch 80 Pvc Pipe In A Trench 15.00 LF $5.59 $84 Total $40,112 Division 16 - Electrical 16000 Misc Electrical/Instrumentation 1.00 LS $5,000.00 $5,000.00 16000 Standard Control Panel 1.00 LS $17.081.16 $17,081.16 16000 Trenched Conduit Allowance 1.00 LS $2,078.00 $2,078.00 16000 _ Power Service Extension 120.00 LF $1D9.10 $13.091.40 Total $37,251 Division 17 - Instrumentation and Controls 17000 Backup Level Float System 1.00 LS $997,44 $997 44 17000 Level Transducer 1 00 LS $2.202.68 $2,202 68 Total $3.200 Grand Total $215,033 imLacewAB-a LSc E-esorL-wAeeerew LS Page 2of2 F-Rev'o - DETAILED COST ESTIMATE Project: Lake Washington Beach Lift Station Replacement Preliminary 60% Construction Cost Estimate Job A: 8235B10 Date : June 17, 2010 Location: Renton, WA By : Tyler Whitehouse Element: 02 Demolition Reviewed: Brian Casey SPEC. NO. DESCRIPTION QUANTITY UNIT UNIT COST SUBTOTAL TOTAL Division 02 - Site Construction 02000 Misc Demolition and Restoration Allowance _ 1.00 LS $3.000.00 $3,000.00 02000 Gut Existing Lift Station 1.00 LS $3,000.00 _ $3,000.00 02000 Drain Rock Fill 24.23 CY $31.17 $755.25 02000 Demo Elect Panel 1.00 LS $1,000.00 $1.000.00 02220 Demo Small Steel Buildings %27 CF $.30 $15 02220 Concrete Curb/Gutter Demolition 75.00 LF $5.02 $377 02300 Cut & Remove Tree, 24" Diameter 1 00 EA $675.35 $675 Total $8,823 Grand Total $8,823 Im Le WABer LSEsi—21D� Page 1 of 1 F—R.2008J— PROJECT SUMMARY Estimate Class: Project: Lake Washington Beach Litt Station Replacement Preliminary 60% Construction Cost Estimate PIC: Job 8235B10 PM: Location: Renton, WA Date: Zip Code: 98055 By: Reviewed: 3 Brian Matson Lara Kammereck June 17, 2010 Tyler Whitehouse Brian Case NO 71, -• DESCRIPTION 01 Lake WA Beach New LS TOTAL $215,033 02 Demolition $8 823 TOTAL DIRECT COST $224,000 General Conditions 5.0% $11,000 Subtotal Contingency 20.0% Subtotal $235,000 $47,000 $282,000 _ General Contractor Overhead, Profit & Risk 10.0% $28,000 Subtotal $310,000 Sales Tax (Based on King County, WA) 9.5% $29,000 Subtotal $339,000 TOTAL ESTIMATED CONSTRUCTION COST The cost estimate herein is based on our perception of current conditions at the project location. This estimate reflects our professional opinion of accurate costs at this time and is subject to change as the project design matures. Carollo Engineers have no control over variances in the cost of labor, materials, equipment: nor services provided by others, contractor's means and methods of executing the work or of determining prices, competitive bidding or market conditions, practices or bidding strategies. Carollo Engineers cannot and does not warrant or guarantee that proposals, bids or actual construction costs will not vary from the costs presented as shown. Vn_ Lake WA Beach LS Cost EsWnete-xlr, P UECT SUMMARY Page 1 of 1 Prnted: rot 7/2010-10 zz AM Gti ca+rr, Project:Lake Washington Beach Lift Station Replacement PreBminary BOY. Construction Cost Estimate Job 0:8235BIO Location: Renton, WA Estimala Class BubdCost Katrix I 3 Help? Capacay: Connaclad HP: RECAP MATRIX Dab : June 17, 2010 By: Tyler Whitehouse SPEC. DMaIOW ELEMENT DESCI"FTION DIV. 01 OEN REQTS DIV. 02 SITE WORK DIV. 03 CO. DN. 04 YSNItY DIV. 06 YETALS DN. 00 WOOD a Plastics DIV. 07 MOIST PROTN DN. 00 DOORS a WDOS DIV 00 FINISHES DN. 10 8►ECIAL- TIES ON. it EQUIP DIV. 12 FURN DN. 13 SPECIAL CONST DN. 14 CONVEY DIV. 16 PLUMBG a MECH DIV. It ELECT/ I & C Div 17 MST. a CONT. ELEMENT TOTALS ELEW T x a row 1 Lake WA Bosch New LS 2 DsmoUtK>n $4,000 $41 573 $8,823 $37 729 $5 320 $I 657 $14,877 $23,315 $40, 112 $37,251 $3.200 $215,033 $8,923 96.04% 3.0 % OW DLIMM Came 1 aN LA f f • •se n w Page 1 011 nnwa. sirrmiow2a,w 43rca Project: Lake Washington Beach Lift Station Replacement Preliminary 60% Construction Cost Estimate Job 0: 8235B10 Location: Renton, WA RIGN rlt: 01 Lake WA Beach New LS DETAILED COST ESTIMATE Date : June 17, 2010 By: Tyler Whitehouse Reviewed• Brian Casey SrM NO. DtUMPT10M s- CA ANTITY u1a r [ UW CM 3, SUITOTAL TOTAL Dfvisbn Ot - General Co�etdoes 01000 Vector Truck and Accessories 4.00 Day $1.000.00 $4.000.00 - - - Total $4,000 W vision 02 •Site Construction _ 02000 Misc Site Restoration Allowance LS 1.00 LS $4,000.00 $4.000.00 02000 42' Colored Chain Link Fence 75.00 LF $22.86 $1,714.35 02000 Sharing Allowance 1.00 LS $3,000.00 $3,000.00 02000 Slurry Seal 1469.44 SY $3.12 $4.580.24 02000 Dewatering Allowance 1.00 LS S5,000.00 $5,000.00 02000 Restripe Parking Lot Spaces 45.00 Fir $14.18 $638.21 02220 Asphalt Pavement Cutting 360.00 inFT $.78 $281 02220 Remove 2'-3' Asphalt Pavement 800.00 SF $.37 $298 02220 Asphalt Pavement Cutting 343.00 inFT $.78 $267 02220 Remove 2'-3' Asphalt Pavement 268.67 SF $.37 $100 02220 Core Drilling, 12' Diameter 1.50 LF $157.10 $236 02260 12' D X 17 W Trench And Manhole Boxes 30.00 DAY $72.73 S2,182 02300 20 Cy Dump Truck, 10 Miles/Round Trip 112.00 CY $5.14 $576 02300 Cat 225 Trackhos. 3/4Cy Bucket, Class B (Medium Digging), 0-16' D 73.19 CY $6.83 $500 02300 Imported Pipe Bed 3 Zone/Confined Structure Backfill, Class B Material 13-21 CY $68.64 $907 02300 Cat 235 Trackhoe 1.12Cy Bucket, Class B (Medium Digging), 0-20' D 112.00 CY $4.10 S459 02300 Imported Trench BackfilWnoonfined Strut. Bf, Class B Material 54.87 CY $37.26 $2,045 02300 Imported Trench BaddiilWnconfined Strut. Bf, Class B Material 59.97 CY S37.26 $2,235 02300 Cat 225 Trac hoe, 3/4CY Bucket, Class B (Medium Digging), 0-16' D 21.00 CY $6.83 $143 02300 20 Cy Dump Truck, 10 Miles/Round Trip 73.19 CY $5.14 $376 02300 20 Cy Dump, Truk, 10 Miles/Round Trip 21.00 CY $5.14 $108 02300 Imported Trench BackfilUUnoonfined Struct. Bf, Class B Matenial 926 CY $37.26 $345 02300 TractorBac hoe, 12' Bucket Class B (Medium Digging), 0-5' D 31.48 CY S38.54 $1,213 02300 20 Cy Dkxnp Truk, 10 Miles/Round Trip 31.48 CY S5.14 $162 Imported Pipe Bed 6 Zone/Corrfined Structure BackfiO, Class B 02300 Material 11.54 CY $68.64 $792 02300 Imported Trench Backfill/Un confined Strout at, Gass B Materal 19.94 CY $37.26 $743 02742 3" Pavement Replacement On 8' Abe Over Trench 268.67 SF $10.23 $2,748 02742 3' Pavement Replacement On 8' Abc Over Trench 800.00 SF $10.23 S8 184 02820 3-5' H Double Swing Gate, Chain Link, 19 Opening 2.00 EA $t 870.20 $3.740 Total $47,573 Division 03 - Concrete 03000 Precast Concrete Mangle 8' ID, 19 1.00 EA $20,260.50 $20,260.50 03000 Precast Concrete Manhole 7x7x5 deep 1.00 EA $12,468.00 $12,468.00 03000 Concrete Formwork in Wet Well 1.00 LS $3,000.00 S3,000.00 03000 Flow Thru Manhole Conversion 1.00 LS S2,000.00 $2,000.00 S37,7211 visien OS - Metals Division 05000 SST Ladders 19.00 LF $280.01 S5 320.20 TOW SS,320 Division Of - Wood and Mastics 06000 FRP Grating 25.00 SF S36.37 5909.13 06000 FRP Handrail 6.00 LF $41.56 $249.36 06000 FRP Flange Beam 8.00 LF $62.34 $498.72 Total i1,037 Division 09 - FhOshes 09000 Wet Well Costing 1,193.20 SF $12.47 $14 876.82 TOW S7 S77 DMsisn 11 11000 Vaughan Chopper Pumps 2 and Accessories 1.00 LS $21,839.78 $21,939.78 11000 Vault Sump Pump and Accessories 1.00 LS $1,475.38 $1,475.38 TOW $23,315 as LrWAO MLscarbrr.e.okkr.WAa."a LS Page 1 of 2 y,,,P- „� Project: Lake Washington Beach Lift Station Replacement Preliminary 60 % Construction Cost Estimate Job #: 8235B10 Location: Renton, WA Clement: 01 Lake WA Beach New LS DETAILED COST ESTIMATE Dab : June 17, 2010 By : Tyler Whitehouse Reviewed: Brian Casey SPEC NO. # fs }1Qp (MANT"Y, : UN" UINT COST SUIrTQTAL TOTAL . DMOon 15 - Mechanical 15000 4' Force Main Installation and Patch 25.00 LF $103.90 $2,597.50 15000 Hot Box Enclosure and Installation 100 LS $1,039.00 $1,039,00 15000 SST Supports and Fasteners 1.00 LS $2,500.00 $2,500.00 15000 Misc Pip and Fittings _ _ _ _ 1 00 LS $2,000.00 $2.000.00 15000 15114 15115 15116 4' RFCA, Fusion Epoxy, SST B&N 4'- 200 Psi G F)f Swing Check Valve 8' M' X Mj D.I. Gate Valve, Nrs _ 4' Fxf Cast Iron Pkig Valve W/Hartdwheel Op 3-00 2.00 1.00 3.00 EA EA EA EA $367.80 $1.325.86 $1,615.81 S888.43 $1,103.39 $2,652 $1,616 $2,665 15118 1' Bf Preventer Ass W/2 Cv 8 2 Gtv 1.00 EA $1,452.07 $1,452 15120 5' C. I. Valve Box For 3'-20' Valves 1,00 EA $530.93 $531 15120 Up To 6'Trench/Bury Indicator Post 1.00 EA $876.92 $877 15120 Add For Ea 6' Indicator Post Over 6' 8.00 EA S51 95 $416 15121 4' Flex Cplg, Buried Or Underwater 6.00 EA S653.70 $3,922 15121 15251 8' Flex Cplg, Buried Or Underwater 8' Cl 52 Ckti FA Pipe In Open Trench _ 200 5.00 EA LF $865.62 $34.51 $1 731 $173 15251 4' Fig Cldi Pipe In Bldg 30.00 LF $50.29 $1,509 15251 4'X 3' 125# Cldi Fd Concentric Rda 2.00 EA $546.13 $1,092 15251 4' 90' 125# Ckti Fxf Ell 4.00 EA S679.70 $2,719 15251 4' Cldi FIg Straigtit Tee In Place 1.00 EA $1,008.33 $1,008 15251 4' Cl 52 Cldi 4 Pipe In Open Trench 60.00 LF $30.54 $1,832 15251 4- 90- Cldi Mj Bend 2.00 EA $695.19 $1,390 15251 4- 45- Cidi Mj Bend - - 3.00 EA $696-23 $2,089 15251 4' 22-1/2' Cldi Mj Bend 1.00 EA SM-23 $696 15251 8' Cldi Flg Straight Tee In Place 1.00 EA $1,686.26 $1,686 15251 8' CA 52 C16 4 Pipe In Open Trench 500 LF S34.51 $173 15257 1' Type K Copper Piping In An Open Trench 20,00 LF $10.10 $202 15265 8' Sdr-26 Pvc Sewer Pipe. In Trench 47,00 LF $7.60 $357 15265 2' Sch 80 Pvc Pipe In A Trench 15.00 LF $5.59 $84 Tatid 540,112 Division III - [kttrkal 16000 Misc Elect icalAnstrimrontation 16000 Standard Cor" Panei 1.00 1.00 LS LS $5,000.00 $17,081.16 $5,000.00 _ $17,081.16 16000 Trenched Con" Albwancs - -- - - 1.00 LS $2,078.00 $2,078A0 16000 Power Service Extension 120.00 LF $109.10 $13,091.40 - Tabill $37,251 Division 17 - Instruntenbtlon and Controls 17000 Backup Level Float System 1,00 LS $997.44 $997.44 17000 Level Transducer 1.00 LS $2.202.68 $2,202.68 _ Total $3,200 Grand Total $215,033 v LrwAems,LSC-E.`„r. Il wA&�M LS Page 2of2 F-q � Q CA_ !i? DETAILED COST ESTIMATE Project: Lake Washington Beach Lift Station Replacement Preliminary 60 Construction Cost Estimate Job #: 8235810 Date : June 17, 2010 Location: Renton, WA By :Tyler Whitehouse Element: 02 Demolition Reviewed: Brian Casey SPM NO. DascaurnON OUAItTTTY UMIT UWT COST SUBTOTAL TOTAL x Etta DMslon 02 • Sit* Construction 02000 Misc Demolition and Restoration Alknvance 1.00 LS $3.000.00 S3.D00.00 02000 Gut Existing Lift Station 1.00 LS $3,000.D0 _ S3,000.00 02000 Drain Rock Fill 24.23 CY $31.17 $75525 02000 Demo Elect Panel 1.D0 LS $1,D00.00 $1.000.00 02220 Demo Small Steel Boldings 50.27 CF $.30 $15 02220 Concrete Curb/Gutter Dernolihon 75.00 LF $5,02 $377 02300 Cut 6 Remove Tree, 24' Diameter 1.00 EA $675,35 $675 --- _ Total $8,823 Grand Total $3,823 u..i wA era LS C-Es.mr.i D.ba Page 1 of 1 CC 'AP1 MOrAoft 11,110% Task Name Task 3.2 - 60 Percent Design Development 60 Percent Design Submittal City Review and Comment Response 60 Percent Design Review Meeting Tbik 3.3 - 90 Percent Design Development 90 Percent Design Development 90 Percent Carollo Internal Review 90 Percent Design Submittal City Review and Comment Response 90 Percent Design Review Meeting Task 3.4 - Final (Contract Document) Design Development Contract Documents Development Contract Documents Submittal Task 4 - Bid Assistance Task 4.1 - Respond to Questions and Issue Addenda Advertise Open Bids Award Contract Task 5 - Assistance During Construction Tasks 5.1-5.4 - Submittals, RFIs, Mech & Elect Inspection Pre -Construction Meeting Submittals Materials Wait Time construction Mobilization Landscape and Site Demolition City Install Waterline and Meter Install Wet Well Install 8" SS Install Valve Vault, Site and Yard piping Install Mechanical in Wet Well Install Power Extension Test New Lift Station Convert Exist Wet Well to Flow Thru Manhole, Vactor U/S MH Startup and Commissioning Decommission and Demo Existing Lift Station Site Improvements Substantial Completion Final Acceptance Task 5.5 - Record Drawings Record Drawing Development Project Completion Duration 15 days 0 days 10 days 0 days 25 days 10 days 5 days 0 days 10 days 0 days 10 days 10 days 0 days 30 days 30 days 20 days 0 days 10 days 30 days 30 days 0 days 20 days 15 days 78 days 0 days 5 days 3 days 15 days 5 days 10 days 5 days 5 days 2 days 4 days 2 days 5 days 12 days 5 days 0 days 15 days 15 days 0 days Fri 6/1W10 Fri 6/18/10 Fri 6/16/10 Thu 7/8/10 Fri 719/10 Fri 7/9/10 Fri 7/23110 Thu 7/29/10 Fri 7/30/10 Thu 8/12110 Fri 8/13110 Fri 8/13/10 Thu 8/26/10 Fri 8/27110 Fri 8/27/10 Fri 8/27/10 Thu 9/23/10 Fri 9/24110 Thu 10114/10 Thu 10/14/10 Thu 10/14/10 Fri 10/22/10 Fri 11/5110 Thu 11/25/10 Thu 11/25/10 Fri 11/26/10 Fri 1213/10 Wed 12/8/10 Wed 12/29/10 Wed 1/5111 Wed 1/19/11 Wed 1/26/11 Wed 2/2/11 Fri 2/4/11 Thu 2/10/11 Mon 2/14111 Mon 2/21 /11 Wed 3/9/11 Tue 3/15/11 Wed 3/16/11 Wed 3/16/11 Tue 4/5111 Thu 718/10 Fri 6/18/10' Thu 7/1/10 Thu 7/8/10 Thu 8/12/10 Thu 7/22/10 Thu 7/29/10 Thu 7/29/10 Thu 8/121,0 Thu 8/12/10 Thu 8/26110 Thu 8/26/10 Thu 8/26/10 Thu 1017/101, Thu 10/7/10' Thu 9/23/10 Thu 9/23/10, Thu 1017/10 Thu 11/25/10 Thu 11/25/10 Thu 10/14/10 Thu 11/18/10' Thu 11/25/10 Tue 3/15/11 Thu 11/25/10 Thu 12/2/10 Tue 1217/10 Tue 12/28/10; i Tue 114/111 I Tue 1/18/11� Tue 1/25/11� Tue 2/1/11 Thu 2/3/11I I Wed 2/9/11 Fri 2/11/11 Fri 2/18/11I Tue 3/8/11 Tue 3/ 15/11 j I Tue 3/15/111 Tue 415111 Tue 4/5/11 Tue 4/5/11' LAKE WASHINGTON BEACH LIFT STATION REPLACEMENT PROJECT 60% PRELIMINARY PROJECT SCHEDULE 30 6/6 6/136l20 Y August 2 P_ —0 _ - r 2 ___ November 2010 June ___T 'Jul 2010- A ust 2010 Se tember 2010 October 2010 No _ 6/27 7/4 7/117/18,1/25 8/1 8/8 8/15 /22 /29 9/5 /1219/1919/26 10/TO/1 �1� 0/2 0/3 111/71 1/1� 112 111111"'MMMMMMV 6/18 i 7/8 MOW 7/29 8112 �8126 MMMMMW 9/23 *-4W14 Project: Lake WA Beach Schedule Task -- Progress Summary 00000111V External Tasks Deadline Date: Fri 6/18/10 Split Milestone O Project Summary External Milestone 12/5 11 February 2011 /16 1/231/30 2/6 �/l32/202� p 4/5 1 Page 1 CCAM POPAIIIIII11lift 19,v% Task Name I Duration Start k 3.2 - 60 Percent Design Development 15 days Fri 6/18/10 Thu 7/81101 60 Percent Design Submittal 0 days Fri 6/18/10 Fri 6118/10 City Review and Comment Response 10 days ind 6/18110 Thu 7%1/10 60 Percent Design Review Meeting 0 days Thu 7/8110 Thu 7/8/10 k 3.3 - 90 Percent Design Development 25 days Fri 7/9110 Thu 8/12/10 90 Percent Design Development 10 days Fri 7/9/10 Thu 7/22/10 90 Percent Carollo Internal Review 5 days Fri 7/23/10 Thu 7/29/10 90 Percent Design Submittal 0 days Thu 7/29/10 Thu 7/29/10 City Review and Comment Response 10 days Fri 7/30/10 Thu 8/12/10 90 Percent Design Review Meeting 0 days Thu 8/12/10 Thu 8/12/10 k 3.4 - Final (Contract Document) Design Development 10 days Fri 8/13/10 Thu 8126110 Contract Documents Development 10 days Fri 8/13110 Thu 8/26/10 Contract Documents Submittal 0 dayst Thu 8/26/10 Thu 8/26/10 k 4 - Bid Assistance 30 days Fri 8/27/10 Thu 10/7/10 Task 4.1 - Respond to Questions and Issue Addenda 30 days Fri 8/27/10 Thu 10/7/10 Advertise 20 days Fri 8/27110 Thu 9/23/10 Open Bids 0 days Thu 9/23/10 Thu 9/23/10 Award Contract 10 days Fri 9/24110 Thu 10/7/10 k 5 - Assistance During Construction 30 days Thu 10/14/10 Thu 11125/10 Tasks 5.1-5.4 - Submittals, RFIs, Mech & Elect Inspection 30 days Thu 10/14/10 Thu 11/25/10 Pre -Construction Meeting 0 days Thu 10/14/10 Thu 10/14/10 Submittals 20 days Fri 10/22/10 Thu 11/18110, Materials Wait Time 15 days Fri 11/5/10 Thu 11/25/10I tstruction 78 days Thu 11/25/10 Tue 3/15/11 Mobilization 0 days Thu 11/25/10 Thu 11/25/10 Landscape and Site Demolition 5 days Fri 11/26/10 Thu 12/2/10 City Install Waterline and Meter 3 days Fri 12/3/10 Tue 12/7/10l Install Wet Well 15 days Wed 12/8/10 Tue 12/28/101 Install 8" SS 5 days Wed 12/29/10 Tue IA/11I Install Valve Vault, Site and Yard piping 10 days Wed 1/5/11 Tue 1/18/11 Install Mechanical in Wet Well 5 days Wed 1/19/11 Tue 1125/11) Install Power Extension 5 days Wed 1/26/11 Tue 2/1/11 Test New Lift Station 2 days Wed 2/2/11 Thu 2/3/11 Convert Exist Wet Well to Flow Thru Manhole, Vactor U/S MH 4 days Fri 2/4/11 Wed 2/9/11. Startup and Commissioning 2 days Thu 2/10/11 Fri 2/11/11 Decommission and Demo Existing Lift Station 5 days Mon 2/14/11 Fri 2/18/11 Site Improvements 12 days Mon 2121/11 Tue 3/8/11 Substantial Completion 5 days Wed 3/9111 Tue 3/15/11 j Final Acceptance 0 days Tue 3/15/11 Tue 3/15/11 k 5.5 - Record Drawings 15 days Wed 3/16/11 Tue 4/5H1 Record Drawing Development 15 days Wed 3/16/11 Tue 4/51111 Project Completion 0 days Tue 4/5/11 Tue 4/5/11I LAKE WASHINGTON BEACH LIFT STATION REPLACEMENT PROJECT 60% PRELIMINARY PROJECT SCHEDULE ( 6/18 7/8 �8/26 9123 11 /Z5 3/15 ® 4/5 Project: Lake WA Beach Schedule I Task (— Progress Summary External Tasks Deadline Date: Fri 6/18/10 Split Milestone O Project Summary External Milestone Page 1 PROJECT SUMMARY Estimate Class: 3 Project: Lake Washington Beach Lift Station Replacement Preliminary 60% Construction Cost Estimate PIC: Brian Matson Job #: 8235B10 PM: Lara Kammereck Location: Renton, WA Date: June 17, 2010 Zip Code: 98055 By: Tyler Whitehouse Reviewed: Brian Casey NO. DESCRIPTION TOTAL 01 Lake WA Beach New LS $215,033 02 Demolition $8,823 TOTAL DIRECT COST $224,000 General Conditions 5.0% $11,000 Subtotal $235,000 Contingency 20.0% $47,000 Subtotal $282,000 General Contractor Overhead, Profit & Risk 10.0% $28,000 Subtotal $310,000 Sales Tax (Based on King County, WA) 9.5% $29,000 Subtotal $339,000 TOTAL ESTIMATED CONSTRUCTION COST $339,000 The cost estimate herein is based on our perception of current conditions at the project location. This estimate reflects our professional opinion of accurate costs at this time and is subject to change as the project design matures. Carollo Engineers have no control over variances in the cost of labor, materials, equipment; nor services provided by others, contractor's means and methods of executing the work or of determining prices, competitive bidding or market conditions, practices or bidding strategies. Carollo Engineers cannot and does not warrant or guarantee that proposals, bids or actual construction costs will not vary from the costs presented as shown. t/n: Lake WA Beach LS Cost Estimate.xls-PROJECT SUMMARY Page 1 Of 1 Printed: 6/17/2010-10:22 AM Project:Lake Washington Beach Lift Station Replacement Preliminary 60% Construction Cost Estimate Job #:82351310 Location:Renton, WA Estimate Class: Build Cost Matrix 3 Capacity: Connected HP: RECAP MATRIX Date : June 17, 2010 By: Tyler Whitehouse SPEC. DIVISION ELEMENT DESCRIPTION DIV. 01 GEN REQTS DIV. 02 SITE WORK DIV. 03 CONC DIV. 04 MSNRY DIV. 05 METALS DIV. 06 WOOD 8 Plastics DIV. 07 MOIST PROTN DIV. 08 DOORS 8 WDOS DIV. 09 FINISHES DIV. 10 SPECIAL- TIES DIV. 11 EQUIP DIV. 12 FURN DIV. 13 SPECIAL CONST DIV. 14 CONVEY DIV. 15 PLUMBG 8 MECH DIV. 16 ELECT/ 18 C Div 17 INST. 8 CONT. ELEMENT TOTALS ELEMENT %of Tows 01 Lake WA Beach New LS 02 Denrolition $4,000 $47,573 $8,82 3 $37,729 $5,320 $1,657 __---_-____ $14,877 ___-_______-_______________ ------- $23,315 40,112 37,251 $3,200 $215,033 $8,823- 96.06% _---------- Page 1 of 1 P—.17-1—AN Ls - Project: Lake Washington Beach Lift Station Replacement Preliminary 60 % Construction Cost Estimate Job #: 8235B10 Location: Renton, WA Element: 01 Lake WA Beach New LS DETAILED COST ESTIMATE Date : June 17. 2010 By: Tyler Whitehouse Reviewed: Brian Casey SPEC. NO. DESCRIPTION QUANTITY UNIT UNIT COST SUBTOTAL TOTAL 01000 Division 01 - General Conditions Vactor Truck and Accessories Total 4.00 Day $1,000.00 $4.000.00 $4,000 Division 02 - Site Construction 02000 Misc Site Restoration Allowance LS 1.00 LS $4,000.00 $4,000.00 02000 42" Colored Chain Link Fence 75.00 LF $22.86 $1,714.35 02000 Shoring Allowance 1.00 LS $3.000.00 $3,000.00 02000 Slurry Seal 1.469.44 SY $3.12 $4,580.24 02000 Dewatering Allowance 1.00 LS $5,000.00 $5,000.00 02000 Restria Parking Lot Spaces 45.00 EA $14.18 $638.21 02220 Asphalt Pavement Cutting 360.00 inFT $.78 $281 02220 Remove 2"-3" Asphalt Pavement 800.00 SF $.37 $298 02220 Asphalt Pavement Cutting 343.00 inFT $.78 $267 02220 Remove 2"-3" Asphalt Pavement 268.67 SF $.37 $100 02220 Core Drilling, 12" Diameter 1,50 LF $157.10 $236 02260 12' D X 12' W Trench And Manhole Boxes 30.00 DAY $72.73 $2,182 02300 20 Cy Dump Truck, 10 Miles/Round Trip 112.00 CY $5.14 $576 02300 Cat 225 Trackhoe, 3/4Cy Bucket, Class B (Medium Digging), 0-16' D 73.19 CY $6.83 $500 02300 Imported Pipe Bed & Zone/Confined Structure Backfill, Class B Material 13.21 CY $68.64 $907 02300 Cat 235 Trackhoe 1.12Cy Bucket, Class B (Medium Digging), 0-20' D 112.00 CY $4.10 $459 02300 Imported Trench Backfill/Unconfined SUuct. Bf, Class B Material 54.87 CY $37.26 $2,045 02300 Imported Trench Backfill/Unconfined Struct. Bf, Class B Material 59.97 CY $37.26 $2,235 02300 Cat 225 Trackhoe, 3/4Cy Bucket, Class B (Medium Digging), 0-16' D 21.00 CY $6.83 $143 02300 20 Cy Dump Truck, 10 Miles/Round Trip 73.19 CY $5.14 $376 02300 20 Cy Dump Truck, 10 Miles/Round Trip 21.00 CY $5.14 $108 02300 Imported Trench Backfill/Unconfined Struct. Bf, Class B Material 9.26 CY $37.26 $345 02300 Tractor/Backhoe, 12" Bucket Class B Medium Digging), 0-5' D 31.48 CY $38.54 $1,213 02300 20 Cy Dump Truck, 10 Miles/Round Trip 31.48 CY $5.14 $162 02300 Imported Pipe Bed & Zone/Confined Structure Backfill, Class B Material 11.54 CY $68.64 $792 02300 Imported Trench Backfill/Unconfined Struct. Bf, Class B Material 19.94 CY $37.26 $743 02742 3" Pavement Replacement On 8" Abc Over Trench 268.67 SF $10.23 $2,748 02742 3" Pavement Replacement On 8" Abc Over Trench 800.00 SF $10.23 $8.184 02820 3.5' H Double Swing Gate, Chain Link, 18' Opening 2.00 EA $1,870.20 $3.740 Total $47,573 03000 Division 03 - Concrete Precast Concrete Manhole 8' ID, 19' deep 1.00 FA $20,260.50 $20,260.50 03000 Precast Concrete Manhole 7x7x5 deep 1.00 EA $12,468.00 $12,468.00 03000 Concrete Formwork in Wet Well 1.00 LS $3,000.00 $3,000.00 03000 Flow Thru Manhole Conversion 1.00 LS $2,000.00 $2,000.00 Total $37,729 Division 05 - Metals 05000 SST Ladders 19.00 LF $280.01 $5,320.20 Total $5,320 Division 06 - Wood and Plastics 06000 FRP Grating 25.00 SF $36.37 $909.13 06000 FRP Handrail 6.00 LF $41.56 $249.36 06000 FRP Flange Beam 8.00 LF $62.34 $498.72 Total $1,657 Division 09 - Finishes 09000 Wet Well Coati 1,193.20 SF $12.47 $14,876.82 Total $14,877 Ohrision 11 - E ui nt 11000 Va han Chopper Pumps 2 and Accessories 1.00 LS $21,839.78 $21,839.78 11000 Vault Sump Pump and Accessories 1.00 LS $1.475.38 $1.475.38 Total $23,315 11n Lac"WA8-LS C.. Eslimal.-1 lake WA Beat"N-LS Page oft --2o J- C� cam a� Project: Lake Washington Beach Lift Station Replacement Preliminary 60 % Construction Cost Estimate Job #: 8235610 Location: Renton, WA Element: 01 Lake WA Beach New LS DETAILED COST ESTIMATE Date : June 17. 2010 By : Tyler Whitehouse Reviewed: Brian Casey SPEC. NO. DESCRIPTION F QUANTITY UNIT UNIT COST SUBTOTAL TOTAL Division 15 - Mechanical 15000 4" Force Main Installation and Patch 25.00 LF $103.90 $2,597.50 15000 15000 15000 Hot Box Enclosure and Installation SST Supports and Fasteners Misc Piping and Fittings 1.00 1.00 1.00 LS LS LS $1,039.00 $2,500.00 $2.000.00 $1,039.00 $2,500.00 $2,000.00 15000 4" RFCA, Fusion Epoxy, SST B&N 3.00 EA $367.80 $1,103.39 15114 4"- 200 Psi Ci Fxf Swing Check Valve 2.00 EA $1,325.86 $2,652 15115 8" Mj X M' D.I. Gate Valve, Nrs 1.00 EA $1.615.81 $1.616 15116 4" Fxf Cast Iron Plug Valve W/Handwheel Op 3.00 EA $888.43 $2,665 15118 1" Bf Preventer Assy W/2 Cv & 2 Gtv 1.00 EA $1,452.07 $1.452 15120 5' C. 1. Valve Box For 3"-20" Valves 1.00 EA $530.93 $531 15120 Up To 6' Trench/Bury Indicator Post 1.00 EA $876.92 $877 15120 Add For Ea 6" Indicator Post Over 6' 8.00 EA $51.95 $416 15121 4' Flex Cpl , Buried Or Underwater 6.00 EA $653.70 $3,922 15121 8' Flex Cpl , Buried Or Underwater 2.00 EA $865.62 $1,731 15251 8" Cl 52 Cldi M' Pipe In Open Trench 5.00 LF $34.51 $173 15251 4" F1g Cldi Pipe In Bldg 30.00 LF $50.29 $1,509 15251 4"X 3" 125# Cldi Fxf Concentric Rdcr 2.00 EA $546.13 $1,092 15251 4" 90' 125# Cidi Fxf Ell 4.00 EA $679.70 $2,719 15251 4' Cldi Fig Straight Tee In Place 1.00 EA $1.008.33 $1,D08 15251 4" CI 52 Cldi Mj Pipe In Open Trench 60.00 LF $30.54 $1,832 15251 4" 90' Cldi Mj Bend 2.00 EA $695.19 $1,390 15251 4" 45' Cldi Mj Bend 3.00 EA $696.23 $2,089 15251 4" 22-1/2' Cldi M' Bend 1.00 EA $696.23 $696 15251 8" Cldi FIq Straight Tee In Place 1.00 EA $1,686.26 $1,686 15251 8" Cl 52 Cldi Mj Pipe In Open Trench 5.00 LF $34.51 $173 15257 1" Type K Copper Piping In An Open Trench 20.00 LF $10,10 $202 15265 8" Sdr-26 Pvc Sewer Pipe, In Trench 47.00 LF $7.60 $357 15265 2" Sch 80 Pvc Pipe In A Trench 15.00 LF $5.59 $84 Total $40,112 Dlvislon 16 - Electrical 16000 Misc Electrical/Instrumentation 1.00 LS $5,000.00 $5.000.00 16000 Standard Control Panel 1.00 LS $17.081.16 $17.081.16 16000 Trenched Conduit Allowance 1.00 LS $2.078.00 $2.078.00 16000 Power Service Extension 120.00 LF $109.10 $13,091.40 Total $37,251 Division 17 - Instrumentation and Controls 17000 Backup Level Float System 1.00 LS $997.44 $997.44 17000 Level Transducer 1.00 LS $2,202.68 $2.202.68 Total $3,200 Grand Total $215,033 Ilm. Lnka WABMh LSCoil Eillma*a 41 LMa WABarb Now LS Page of form R-2 J- DETAILED COST ESTIMATE Project: Lake Washington Beach Lift Station Replacement Preliminary 60 Construction Cost Estimate Job #: 8235B10 Date : June 17, 2010 Location: Renton, WA By: Tyler Whitehouse Element: 02 Demolition Reviewed: Brian Casey SPEC. NO. I DESCRIPTION QUANTITY I UNIT I UNIT COST I SUBTOTAL I TOTAL 02000 Drain Rock Fill 24.23 CY $31.17 02000 Demo Elect Panel 1.00 LS $1,000.00 02220 Demo Small Steel Buildings 50.27 CIF $.30 02220 Concrete Curb/Gutter Demolition 75.00 LF $5.02 02300 Cut & Remove Tree, 24" Diameter 1.00 EA $675.35 Grand Total W �, WA Beam Esc tEsr are A�2Dwdmw Page 1 of 1 F—R—mo 1— ............... ................... ................... ................... .............. ................... ................... ................... ................... ................. ................... ................... ................... ............................................ .................. :7Z) irS ....................... ................... ................... ................... ................... C�A ................... ................. ................... ................... ................... ................... ................... ......... .............. ........................................ ....................................... ....................................... ....................................... ......... ........................... ......................... ..t.c... .............. ................... ................... ................... ................... .............. ................... . . . . . . . . . . . . . . . . . . . . . . . . ....................................... ....................................... ............................. ....................................... ........... ........................... . . . . . . . . . . . . ............... ................... ................... ................... . .................. ................... ................... . . . . . . . . . . . . . . . . . . . . . . . ................ ...:: ................... ................... ................... ................. .......... .............................. ....................................... .............. . ....................... ....................................... ......... ......... ......... ........... .......................... To lb ... .. .. ................ :L i--t 41 .............................. ................... ................... ................... .......... ................... ................... .................. ................... ................... ................... ................... ....................................... ....................... ... . .......... ....................................... ....................................... ......... ......... ..................................... oe- 4'3 ........... ......................... t ........................ ................... ................... ................. ........ .......... ................. ors �b ....................................... ....................................... ....................................... ....................................... ......... ......... ...................................... ........... ................... ................... ................... ............... ................... ................... ................... ................... ................... ................... ................... ................... ................... .................... . . . . . . . . . . . . . . . . . . . . . Michael A Benoit To: Tyler Whitehouse Subject: Lake WA Nameplate Data Tyler, The information given is from #2 pump name plate: Smith & Loveless Vertical Size 4B2A SER. # 68941821 GPM 125 Head 25 Motor Data Code J Frame 254UP Type HV DES B Phase 3 HP 3 RPM 900 Cycle 60 SER. P4177865 Volt 230/460 AMPS 10.6/ 5.3 Max. AMB 40 degree C Class of INS. A Duty. Cont Shaft end Bearing. 310 S.F.1.15 Oscar again stated that they are using 3 wire single phase 240 volt. Project Manager Wastewater Utility City of Renton (425) 430-7206 1 Wb http:JJ' bing.com ap-J?FORM=Z9LHS#JnE9F,:AucmVudG9ui:3dn)Tdlc3NOLjAlN2'vitroZy4x3m1PTVOLjg5ODUMTr5t,,lDUi vMTkIN2LItUDEufJjMStdtQvvGCrA43TdirliEuC A 4� X i FS binq P Fjle Edit yew Favorites Tools t(elp - Favorites I ,d �„� Free Hotmail :O 549ested Sites b Map of Renton, WA - Bing Maps ® L--j go ' Page • Wety • Tgols • ®• = r renton wa Get directions LY [Business, address, or landmark 13usiness, address, or landmark Explore Bing Maps Beta With the beta you can see svhat s near a location pin results you like. and explore cities at eye level OF Make Bing your decision engine g 2009 Microsoft I Privacv I Leoal I Ad✓ertrse I Advertisino Irfo I Heir -ell us :; nat cu tr ni. Done r U tercet 48 'q 100% mr Fr,�insera_ Nb�rs wr, willsr- 1218 THIRD AVENUE, SUITE 1600 SEATTLE, WASHINGTON 98101-3032 FAX: (206) 903-0419 PHONE: (206) 684-6532 PROJECT MEMORANDUM Project Name: Lake Washington Beach Lift Station Final Design and Construction Services Client: City of Renton Prepared By: Tyler Whitehouse Reviewed By: Brian Casey Subject: Final Siting Alternatives Memorandum Distribution: Carollo and City Project Team 1.0 PURPOSE Date: November 6, 2009 Project Number: 8235B.10 The purpose of this memorandum is to identify potential lift station locations for the Lake Washington Beach Lift Station at Gene Coulon Memorial Beach Park (Park) in Renton, Washington. Alternatives are analyzed with respect to gravity sewer length, force main length, power service, loss of vegetation, elimination of parking spaces, and facility operation and maintenance. Planning level cost estimates are included for key project elements that differ for each alternative. 2.0 BACKGROUND The existing lift station constructed in 1968 consists of a below -grade wet well and separate cylindrical -shaped dry pit, which houses the mechanical and electrical equipment, and an above -grade control panel. The existing facility is located in an island in the northern portion of the Park parking lot. The new lift station recommended in the Lake Washington Beach Alternatives Analysis (Carollo, Final, July 2009) includes a below -grade, duplex submersible type lift station with valve vault and above -grade control panel. For constructability reasons, it is anticipated that the new lift station will not occupy the footprint of the existing lift station. The existing facility will be abandoned in place once the new lift station is online. City of Renton (City) operation and maintenance (O&M) staff have expressed that the existing lift station is difficult to service in the summer when the parking lot is full. O&M staff indicate they rarely find an available parking space next to the lift station and typically have to block part of the roadway during service calls, which occur daily during the summer season. It is anticipated that the new lift station design will reduce service calls as a result of using chopper type pumps. However, access during the peak use season will remain a significant issue. FINAL - November 6, 2009 pw:\\oco-pw-app:Carollo\Documents\Client\WA\Renton\8235810\Deliverables\Siting Ntematives Memorandum.doc ME PROJECT MEMORANDUM 3.0 LIFT STATION LOCATION ALTERNATIVES Carollo conducted a site visit with City staff on October 22, 2009 to identify potential lift station locations. Five different location alternatives were discussed and are listed below, with locations shown in Figure 1. • Alternative A: Utilizing two parking spaces adjacent to the existing lift station on either the north side or south side of the existing station. • Alternative B: Utilizing two parking spaces north of the Park entrance. • Alternative C: Utilizing the vegetated area along the north side of the Park entrance. • Alternative D: Utilizing the grass roundabout at the Park entrance. • Alternative E: Utilizing one parking space and open area at the south end of the parking lot. All sites were selected for their location away from the active Park area. Comparison of these potential sites include: gravity sewer extension, force main extension, power service extension, loss of parking spaces, and potential loss of vegetation. As information from Puget Sound Energy (PSE) is not yet available, power extension considerations are based on the distance from the existing facility site. Gravity sewer extensions for Alternatives A, B, and C assume that the existing wet well is converted to a flow -through manhole. It is assumed that construction in or adjacent to the existing facility will not impact the existing trees. Should construction of the gravity sewer interfere with the existing trees, a new manhole located in the parking lot travel lane would be required to intercept and divert the gravity sewer to an alternate location. The costs for the new manhole are not included for these three alternatives. Alternative A Alternative A includes a new lift station located adjacent to the existing facility site. It is anticipated that two parking spaces, either on the north side or the south side of the existing facility, will be required for the new lift station facilities. • Advantages: o Shortest gravity sewer piping, 10 linear feet (LF) o No extension of power service o Reuse existing wet well as flow -through manhole • Disadvantages: o Longest force main, 360 LF FINAL - November 6, 2009 2 pw:\\oco-pw-app:Carollo\Documents\Client\WA\Renton\8235B10\Deliverables\Siting Alternatives Memorandum.doc PROJECT MEMORANDUM Loss of two parking spaces Probable tree loss at existing facility island Alternative B Alternative B includes a new lift station located in two parking spaces along the north side of the Park entrance. • Advantages: o Short force main, 230 LF o Reuse existing wet well as flow -through manhole • Disadvantages: o Gravity sewer extension required, 110 LF C) Loss of two parking spaces o Potential tree loss at existing facility island o Extension of power service, 110 LF Alternative C Alternative C includes a new lift station located in a vegetated area along the north side of the Park entrance. • Advantages: o Shortest force main, 220 LF o Reuse existing wet well as flow -through manhole o No loss of parking spaces • Disadvantages: Gravity sewer extension required, 130 LF Potential tree loss at existing facility island Extension of power service, 130 LF Loss of vegetation at new site Alternative D Alternative D includes a new lift station located in the grass roundabout at the Park entrance. FINAL - November 6, 2009 3 pw:lloco-pw-app:CarollolDocumentslClientlWAlRenton18235810IDeliverables\Siting Alternatives Memorandum.doc PROJECT MEMORANDUM • Advantages: o Short force main, 230 LF o No loss of parking spaces o Unimpeded access to site for larger service vehicles o Least concern for cars blocking access to facility o Potential to incorporate Park entrance sign as part of project • Disadvantages: o Gravity sewer extension required, 140 LF o Extension of power service, 150 LF o New manhole required o High visibility will require landscaping or Park sign to screen view from entrance Alternative E Alternative E includes a new lift station located in an open area at the south end of the parking lot directly south of the grass roundabout. It is anticipated that one parking space would be required for access to the lift station. • Advantages: o Short force main, 260 LF o Lower visibility area away from Park • Disadvantages: o Loss of one parking space o Longest gravity sewer extension, 240 LF o Longest power service extension, 250 LF o New manhole required FINAL - November 6, 2009 4 pw:\\oco-pw-app:Carollo\Documents\ClientlWAlRenton\8235B10\Deliverables\Siting Aternatives Memorandum.doc 4.0 COST ANALYSIS The costs for each alternative include estimated planning level construction costs for four differing project elements; gravity sewer piping, force main piping, power service extension, and a new manhole. The costs presented do not represent all project elements. For example, the cost for the lift station and facility operation and maintenance is not included, as the cost for these project elements are not anticipated to differ between the site locations. Planning level construction costs for each alternative for differing project elements are provided in Table 1. Prepared By: Tyler Whitehouse FINAL - November 6, 2009 5 pw:\\oco-pw-app:Carollo\Documents\Client\WA\Renton\8235B10\Deliverables\Siting Alternatives Memorandum.doc New Manhole a 7 0 � Existing Lift Station Existing Wet Well LEGEND ALTERNATIVE SITE GRAVITY FORCE LOCATION SEWER(2) MAIN13) Am D— — E (1) Two potential locations represented. (2) 8-inch diameter PVC gravity sewer pipe. (3) 4-inch diameter PVC force main. COMMON FORCE MAIN FLOW DIRECTION 1 inch = 45 feet Feet 0 45 90 a GENE COULON MEMORIAL BEACH PARK ENTRANCE Figure 1 LIFT STATION LOCATION ALTERNATIVES LAKE WASHINGTON BEACH LIFT STATION FINAL DESIGN AND CONSTRUCTION SERVICES CITY OF RENTON Eg...z_�q lWtl�,.IW� Nary" m z D r Z 0 CD 3 0- cD rn N O 0 Q0 Table 1 Planning Level Construction Cost Estimates For Differing Project Elements Lake Washington Beach Lift Station Final Design and Construction Services City of Renton Alternative Project Element Unit Cost(4) A B C D E Gravity sewer piping(') $380/LF $4,000 $42,000 $50,000 $54,000 $91,000 Force main piping(2) $150/LF $54,000 $35,000 $33,000 $35,000 $39,000 Power service extension (3) $160/LF $0 $18,000 $21,000 $24,000 $40,000 New manhole $22,000 EA N/A(5) N/A(5) N/A(5) $22,000 $22,000 Estimated Construction Cost For Differing $58,000 $95,000 $104,000 $135,000 $192,000 Project Elements Additional Cost From Lowest Alternative $0 $37,000 $46,000 $77,000 $134,000 Notes: 1. 8-inch diameter polyvinyl chloride (PVC) sewer pipe installed in parking lot. Average installation depth equal 13 feet. 2. 4-inch diameter C-900 PVC pressure pipe installed in parking lot. Average installation depth equal 4 feet. 3. 4-inch diameter PVC conduit with No. 8 cable installed in parking lot. Average installation depth equal 4 feet. Power service extension based on distance from existing facility site. 4. Representative of planning level construction unit costs. 5. Assumes existing wet well is converted to a flow -through manhole. Abbreviations: EA each LF linear foot N/A not applicable N O � O I � Tn 0 10 20 40 T/) I ° SCALE 1'-20' 0 z rje a m l �\�o. 7111!A \\\ £_17a1~ $ -' i,�'� 0 VERIFY LOCATION v 1 F I ��.1 �1� IXISIPTG 6 DI O 1 \ awo '\Y w�RIOR TO Fy \�� •, � \ / o \\ SA'ch.. SEE87 SIA ¢ \_" ,.., ••"' 1 aNeEr�at�osr 6 w' �1;'6TA MC VALVE Et(EX e) D •r}.. •t, \ \ sfjd \ \ �.^ �� ' 181E TE wrAf1�E�R MAN v a i) 6" 45 K. FwA 7D (NJ) T B ' y" / �d \ •• \ WARD P05r ,F '�UL SILfVE SPOOL S \ ` W E ( v/ t \."r _ 'i ti%%\ \ \\ I \\ Y5 crs eLor+ OEPAXItENf �• B+aeµivnE�T,•'.' is I\PE h VER / tr4Ql P's+\FF� ' c \ `IN 3 z F z� •. x- -R4 NSIRUCTLDN 12' t0 REOUC (MJ,PE) 2' TEE f-y I F=2: STA 2+67'�••..., • _ 1e.�. -.N' �� I \\ W) UST BLOCKttIG 2'CATE'VAL - ". d QQQ"""" / \ f �, -., ; - . \ % °'•.�� aM�ll �� `\ -.. �I) 10 1 � �) _. 2 - Wl1PlANS ¢+. ..� - - a4 - - dJ'• n! Psru ' G e �. \ REJ10'VE i ' e -•' I DD -PUT N Sc.F 11 POD+nR ,• ... _ pJ . /. - — x d 0' W () • C ` i 6 PIPING A5 2NEEDED O d P.4 9<x y I II- : W -•TF�1 - [ NO1tiS 1 IN $NEW CONNEC<�OF! T i \ TDSKSTAMMIcn�BHANarK o j W1aECf -� nE 5.E OR OF CX. 861= OF �,� `/J \ a\ - \ \ .c,oc. �RESiORA Law a R.of J E7R06�fA 6 6 1ER a _ 51 L i��.-�`•_i�. • •waB1--.`� _ ��—/ �� t <� .c.`:.� .fin N W roe — — — � IEs9.21 1 (IU) F WA ( 12' +6• 1 BEND (to) F-1Bs, \ e' ATER \., \ to E� 1 s-tile I - •; w " � 1 I (t)tz•.a � 'x-1___ � +, �''. �x p .46•. 1 ' CA Y VE (FUdIJ � .sr p A 4 STA 4+78 $ $T45y w/IIRUSf SLOCIONG E-'�. •! S .. -..... j, ><6' TES (Fllt67•) SEE 6� - PHI2'4 TEE CONIELTION ?tj i VE (F1xMJ) I °Q \ \ � � 1 / 12 � � EX 50x16' o u 1 12' CA VE fltdll , • I / ilCFl. CASING Z —:: DP.raOrG cOUNfex 1 ` � � �./ � { 1Y:10' REWCER ( �� \ CAL r�AOAFTDL (FLdAI) �, ♦\IWx 9tXtt5� / \ �\ FO(i C01151}P1Ci1JN / \ W JHRU5T BLOCKING OZ s - 1 12' SPOOL1lY �tib• yYcd' \ V 3 �. \ _ 116) IF 12' DI wA1FR al \ �• / i \ 1 0' 11 7�(\r E—A IT nw z- c RAVIS _ ovlD s \` i- •r w/ THRUST EILOCK - // /� a� �' FE-, W a' \ _ - / _ •\ ` / de`«J` y 4,!` / /REMOVE IX 6' WATER INSIDE PARK ACCESS / + �� T tb• '� / ExsTING 16' STLEL CASING. \ EXIST CRAOE ` / ' / / INSTALL NEW 10' p INSIDE EX \ \ B CASNG WITH PIPE SKIDS INSULATIbm ON PER DETAIL c K ENCITAII no,/ •.\ /+ _ 113 If CAP (�'(NG /� \ •��•`'` \ \ RUBBER BOOTS \ \ \ \ \\ �I c PROVE Lf! 6' 7}aCK EIfi4TOW PAp n PROWDE ASPHALT // _ / PROVIDE 1FDAPORMT 6 3ti� / + I / 0 12' 01 eDwEE1T EDOSf PPE AND NEW 12% _ `0, • PATCH SEE - / . BL.OWOFF EE DDT�I a WATER WHEN MIN 12' ETFARANCE _`p 6H T !.' / 1o'CF C4TNOT BE x alp C ..IE=17.86 72" CUP IE=18.83 / \ \ \ \ \ \ 24L. \\ \\ \ :NOTE CONWOR SHVl :.r CONTRACTOR TO HATE ` Pr�E.. P.Avrws I d '%.. _ -�, / I CONTACT BUAI ROAD ACth1TIE5 WTF4N - `0 cN' TO CONSTRUCTION UCTIO NO PRIOR «�y �\ \ \ \ \ \ GG�. BED \ \ / — • _ GENE PARK W/ THE A/C - _ / �,¢` TO ER MAIN. CON PP NL1Y j �s' 1 d" / I WATER MAIN. WNI(JT \ \ 40111h, \ o PARKS �a }. * •F' cF / I MII� LAWLES AT 6gSfi146 , \y t.as`ure zE \ 103 \\ - -T Elm( i �/ - - 11 1 I i S '� 72•�� �\ ��\�J \ \\� \ \\ gg 1\ 1! w DGaNG NEW 10' DI \ \ \ \ _ ,LroWC ClAvm TYPICAL CASING END DETAIL, 6 (ate 12'c12' VERTICAL CROSS(MJXFL) s .w, • ` `7' 1 , / I I �� I ( / � ��` 2-12' BLIND FIAIGES(ONE W/2TAP a 2'PLUG) NOTE: RESTRAINED JOINTS (RJ) I 4 1-12- PLUG(AU) W/2TAP a 2' BLOW-OEF SHALL BE USED WHERE THE NEWiD1P. BLOCK -REMOVE CIFANNG 'POLY -NKr' WATER IS INSTALILD IN UNDISTURBED a ' q i FILL ROADS. RESTRAINED JOINTS I I l I DOSrAr, 12' 01 WATER UN \ \ 1 \ aG. / ,.' •ti �/� SWILL BE 'GRIFFIIH BOLT LOCKS- AS I I J \ \ \ \ \ i [NJ. 21.20 \ / CONTRACT BY THE INSPECTOR. I I �. I 12' 01 WATER LINE CONTRACTOR TO COORDINATE IfLtiE WLIH \ TOP OF i\\ COPE \ e GO �a — / • ° /* / q I I I // i Cp1EClglIOEf WATERLINE lWw'/FKAL/ P.S.) (� (z P.0 I 1 I TES M CETAL I2'xl2' TEE (FL6L) W/ CONC. BLOCK 3-12' GATE vAllfs (FLAW) \ \ I Y \ \ \ 2- SOYA SLEEVE (WJ) OR RO-WC COUPLINGS \ \ \ \ \ °•o'a ,�- , �/. / r I .S I TE$'EM, CLEANING AND DISINFECIION, 1-12' PLUG (MJ) W/ 2'TAP k TENP. BJXV-OFF / / I R TFA1P. BLOCK aBLOW-Off & CONNECT \ I t \ \ \ Y ly. Y SLE YE (LU) It 1T SPOOL TEMP. BLOCK \ \ I \ \ \ \ _ • _ ! EXISTING 1Y D.I. WATER LINE Y \ \ o .a x, ':,/��/ — _ _ l_ _ ` _I r?i'— EXISTING 12' D.I. WATER UN _ — — — — — rn MATONLINE SEE SHEET-C32 C3? Off A ,•pN C. /, KEYMAP SOUTBPORT SHEET 4d Seco Development, Bellevue, Washington 98004 . Rill rmuc COUGHUNPORTERLUNDEEN �`V��n PHASE 1 �3�d w: — u— mu -Awn rwu FNClNFF0.1Nfi'4pplf�IlAY1DN — .N . _ _ _ _ _ _ _ _ —_ _ 0 F5,l G7 C1 a 0 `o m �3 i t O E i s o > p 0 ur fi _ n O wz E) 3 Z a - E- w v m a Q it € O a ?a s F 0 xxy z 1 DETAIL I NECIAN i ftMV. MMK a ULIM sr R W14ECT %WM 12• SLEEVE ?: _ k 12 67'(Mri. REAVE KQ FLANGES W/ TAP B RFPLACE w/snmwLyn nm R1DRW Y PER CRY ON �AAl" 4 1111 o zo ao so SCALE 1'-40' O COUGHLIN PORTERLUNDEEN n CMISILTING MU)CnmN. AND OW R4G3NFFK*4G C.*"ATNXJ 4-4-08OF 9. Aisle Width Standards: a. Parallel Parking Minimum Aisle Width: ME rtvxlwti i. One Way Circulation: For one way circulation, the minimum width of the aisle shall be ten feet (10'). ii. Two Way Circulation: For two way circulation, the minimum width of the aisle shall be eighteen feet (18'). (Ord. 3988, 4-28-1986) f AMNC - FARALLEL bw- t NO W/(AY I iY" 4F1' . CI GIFZIIATR(.N nrl CT10N O { TkAV b. Ninety Degree (900) Head -In Park- ing Aisle Width Minimums: For one row and two (2) rows of ninety degree (900) head -in parking using the same aisle in a one way or two way circulation pattern, the minimum width of the aisle shall be twenty four feet (24'). PARKING - 90 DECREE PARKErK� 0W. 0K Two WAY - IPA=-' C (MIA ATION Off-CTTON Cr t TRAVFL c. Sixty Degree (60°) Head -In Parking Aisle Width Minimums: i. For one row and two (2) rows of sixty degree (600) head -in parking using a one way circulation pattern, the minimum width of the aisle shall be seventeen feet (1 T). 4 - 29 (Revised 5108) & �S s x5 lAFMW ILt try - C`,f3kIRRICAOE -IA -+ tl) 6' GATE vA�YE ( ) r' . YYlTH. NNECTi•DQSf 6 W W/TEil5T 1 jki�— COWPXTORWATER WW6" 45. BEND- (VJ)DUNN oGUARO POST PRQ�rIDE60 SPOOLDEPARTMENT cs W//lTlHfkR Ile Tc=?s.7{ N1F-z, 3,7�g'Ft=2&09 i ; 0 WA _ � qpSIG 6 'CffY cSEH H�tAJifC NU.iif8���+_ DISK STAMPED GiY OF RQiTON WCT o THE S.E COR. OF CONC. BASE OFEfiiST ltK SIGN 5 1F 12' TRANSMS" TOWED- ELEV MSLEEVEWAroE IE=1ez3 -t4�+`j��Ce T` 12 46' (f�J)r� IE=18.544& 1Z �� roe°DIWATER��STA 4f�78 ��,, SiA 4+ P�w�ErrTIO�� TH INGc,.12' GAIE VAVE FUW ._ t1} W 22b...1,.. 1 12' ADAPTER (FLxMJ)BiACK eERRtES1 i2' SPOOL16 LF 12" DI . WATER(1) .12* 22W , BEN ��. ...... .. . _ ��� \ O-modi Tl / � `I� THRUST BLOCK r ;� s: ; `otiQEAST GRADE = 294110 1B"O.iiCAP( w/w/ rHRusTocKiNc PROVIDE Yi�l 6' THlgC ETKAFOALf PA[} �PROVIDE ASPHALT � PROVIDE TEMPOBETWEEN D(iST PIPE AND NEW 12' I r BLOWOFF EE DETAILPATCH SEE 3 WATER WHEN IAN 12 G'LEARANU r �,0 iCANNOT BE MAINTAINED 72' CUP IE=18.8324'G.NOTE CONTRACfi SHALL TR1-Fc k PL4'JT@VGS TO COORDINATE _ .�� ( !fiACF BURLINGi'�l CONSTRLUWACTNITIES WITHIN _ % � ,ti`�� ,�,QP NORTHERN: RAILROAD PRIOR 3 /f ti�h �� P� GENE COUL PARK wJ THE A/c TO CONSiRUCI)ON ,OF NEN r ieff, _- _\ / `` g° WATER MAIN, - CONT �_ �/ PARKS 5 ,' ♦ / r MIKE LOWLES AT 5-6145 _ _ ,._' .................. . .. t c ...... .. ... .. .......... ... ...�:• % ��J k - .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .... QL C i :�J ... .. .. .. .. .. .. i/;;C1 .L .'F... 'T/i5.. . ,!JL:":/`C ,• s,: •^.i. .. .. .. .. .. .....:... ... .. .. .. .. .. .. .. ..... .. .. .:... :... .. ... i....:....:... ...i. .. ... :..\� ..................:_........ ..:.E.........:.........:.�l.f ....................... ................. .. ... )lam ... ... ... ... .n ... ................... ................... ................... y� .....:�.�' ...Y : )...a`' 377.�:` :... 'Y... ..1.�/d:f r":^.'�5..: .. .. :...^ ....:....... : .. .. .. .. .. .. ...: .. .. ........ .......... .. .... .. ....., .. ......... : LTC .lt'iq'':��� :....:....:...................._...................:..............:...;...................:........................... • .. v..... .. .. .. .. .. .. .. :...... . .............................Qr f;....................................€....................................€................................... .:. .:. .:. ................... .. :. :. ....... ..... . ik.......... y.......... ........�.�............................................................................................. ................ �.. �`. :... ....... .. .. .. ... ...... .................... .. .. .. .. .. .... . .................................... . .......... .. LIS :Ta :gam ....................................... ....................................... ....................................... Bic :....:....: �!"� PL1G'S c-�.L.....g.2d� G H G?... ....... .. ' .. ....:....:....:.... ......... ... .... ....... .. .. .. .. .. .. .. .. .. :... -��::...... ...T2<<....... -� .. 2u.1.So.4S'�e!✓�-'...... :.. �.a.f:........:....' .. ............. .- 1 ... . . :. ......:....:.. € S T ............... ...... .. ..... .. .. .. .. .. :.........:.........:..................:................ ... ......... ... ... ... ... .... ... ... ... ... ... ... ... .. ... .... . ...:... ...:... ...:... ..........:... . % <• -N) LIFT STATION (BELOW GRADE) A VALVE VAULT ...... GRADE)• APPROXIMATE L\ APPRO FE NCED AR 720 EA 'r (20FT.36FT) V Sy LIMITS OF CONTRACTOR OPERATIONS . . ......... GENE COULON MEMORIAL BEACH • % PARK ENTRANCE SITE PLAN SCALE: 1 "-40' FILE-- 8453-SRV C:\pw_worklng\projectvAse\elongoria\dms99193\Figurs-1 3-08-10 08:49am ELongoda XREFS: 8453-SRV ANTENNA (-20 FT TALL. TYP) I— 17-0- (TYP) - I tj S" (3,,,,,, Q-04-T-try 1"., t--A C6k-+ C) jl_A SECTION SCALE: 1"=5' FILE: - rlb'SECTION SCALE: 1"=5' FILE, - SECTION SCALE: 1"=5' FILE: - CHAIN LINK FENCE W1 PRIVACY SLATS (PRIVACY SLATS NOT SHOWN FOR CLARITY. TYP) L. ............. T-0"-6- -0" SHOWN T-D-) I Figure No. 1 SITE PLAN AND SECTIONS LAKE WASHINGTON BEACH LIFT STATION CITY OF RENTON ct -carr'P I Engineers...Working Wonders With Water ^ i) c tea. - THE LIFT i w 1 A� STATION SOLUTION The increasing number of "flushable" consumer products is presenting serious challenges for the standard non -clog lift station. With thousands of proven lift station applications, Vaughan chopper pumps are a proven solution to the toughest plugging problems. Raw incoming solids are chopped and pumped dependably with Vaughan chopper pumps, replacing standard non -clog pumps and eliminating the need for pre -grinders or comminutors used in troublesome lift stations. FEATURES & APPLICATIONS BENEFITS • Vaughan chopper pumps handle • Prisons higher solids concentrations than • Hospitals standard non -clog pumps. • Restaurants • Vaughan's patented chopping • Housing Developments action helps downstream processing. • Pulp and Paper Mills • With capacities of up to 10,000 • Campgrounds GPM, one Vaughan pump can • Pharmaceuticals handle what competitors can't. • Hotels • Multiple pump configurations are • Airports available. • Food Processing • With Vaughan Company's • Oil Refineries multi -million dollar inventory, down . Municipalities time is eliminated. web: www.chopperpumps.com email: info@chopperpumps-com phone: 1-888-249-2467 or (360)249-4042 fax: (360)249-6155 sk :v Mabel Bassett Correctional Center, McLoud, OK 10-0 rk R. North Tahoe PUD, Tahoe Vista, CA �� � mac.,!► Metropolitan Sewer District of Greater Cincinnati, Cincinnati, OH 4 s pk__14 vr w'"'..... 40 yc it's V M - THE LIFT STATION SOLUTION The increasing number of "flushable" consumer products is presenting serious challenges for the standard non -clog lift station. With thousands of proven lift station applications, Vaughan chopper pumps are a proven solution to the toughest plugging problems. Raw incoming solids are chopped and pumped dependably with Vaughan chopper pumps, replacing standard non -clog pumps and eliminating the need for pre -grinders or comminutors used in troublesome lift stations. FEATURES & APPLICATIONS BENEFITS • Vaughan chopper pumps handle • Prisons higher solids concentrations than • Hospitals standard non -clog pumps. • Restaurants • Vaughan's patented chopping . Housing Developments action helps downstream processing. •Pulp and Paper Mills • With capacities of up to 10,000 • Campgrounds GPM, one Vaughan pump can • Pharmaceuticals handle what competitors can't. • Hotels • Multiple pump configurations are • Airports available. • Food Processing • With Vaughan Company's • Oil Refineries multi -million dollar inventory, down . Municipalities time is eliminated. i� web: www.chopperpumps.com email: info@chopperpumps.com phone: 1-888-249-2467 or (360)249-4042 fax: (360)249-6155 POO 0 W" - dPow p Mabel Bassett Correctional Center, McLoud, OK ., {00 North Tahoe PUD, Tahoe Vista, CA .. qm =A '.. {; Metropolitan Sewer District of Greater Cincinnati, Cincinnati, OH _, we, ►ter 1218 THIRD AVENUE, SUITE 1600 SEATTLE, WASHINGTON 98101-3032 FAX: (206) 903-0419 PHONE: (206) 684-6532 PROJECT MEMORANDUM Project Name: Lake Washington Beach Lift Station Final Design and Construction Services Client: City of Renton Prepared By: Tyler Whitehouse Reviewed By: Brian Casey Subject: Final Siting Alternatives Memorandum Distribution: Carollo and City Project Team 1.0 PURPOSE Date: November 6, 2009 Project Number: 8235B.10 The purpose of this memorandum is to identify potential lift station locations for the Lake Washington Beach Lift Station at Gene Coulon Memorial Beach Park (Park) in Renton, Washington. Alternatives are analyzed with respect to gravity sewer length, force main length, power service, loss of vegetation, elimination of parking spaces, and facility operation and maintenance. Planning level cost estimates are included for key project elements that differ for each alternative. 2.0 BACKGROUND The existing lift station constructed in 1968 consists of a below -grade wet well and separate cylindrical -shaped dry pit, which houses the mechanical and electrical equipment, and an above -grade control panel. The existing facility is located in an island in the northern portion of the Park parking lot. The new lift station recommended in the Lake Washington Beach Alternatives Analysis (Carollo, Final, July 2009) includes a below -grade, duplex submersible type lift station with valve vault and above -grade control panel. For constructability reasons, it is anticipated that the new lift station will not occupy the footprint of the existing lift station. The existing facility will be abandoned in place once the new lift station is online. City of Renton (City) operation and maintenance (O&M) staff have expressed that the existing lift station is difficult to service in the summer when the parking lot is full. O&M staff indicate they rarely find an available parking space next to the lift station and typically have to block part of the roadway during service calls, which occur daily during the summer season. It is anticipated that the new lift station design will reduce service calls as a result of using chopper type pumps. However, access during the peak use season will remain a significant issue. FINAL - November 6, 2009 pw:\\oco-pw-app:Carollo\Documents\Cllent\WA\Renton\8235810\Deliverables\Siting Aternatives Memorandum.doc PROJECT MEMORANDUM 3.0 LIFT STATION LOCATION ALTERNATIVES Carollo conducted a site visit with City staff on October 22, 2009 to identify potential lift station locations. Five different location alternatives were discussed and are listed below, with locations shown in Figure 1. • Alternative A: Utilizing two parking spaces adjacent to the existing lift station on either the north side or south side of the existing station. • Alternative B: Utilizing two parking spaces north of the Park entrance. • Alternative C: Utilizing the vegetated area along the north side of the Park entrance. • Alternative D: Utilizing the grass roundabout at the Park entrance. • Alternative E: Utilizing one parking space and open area at the south end of the parking lot. All sites were selected for their location away from the active Park area. Comparison of these potential sites include: gravity sewer extension, force main extension, power service extension, loss of parking spaces, and potential loss of vegetation. As information from Puget Sound Energy (PSE) is not yet available, power extension considerations are based on the distance from the existing facility site. Gravity sewer extensions for Alternatives A, B, and C assume that the existing wet well is converted to a flow -through manhole. It is assumed that construction in or adjacent to the existing facility will not impact the existing trees. Should construction of the gravity sewer interfere with the existing trees, a new manhole located in the parking lot travel lane would be required to intercept and divert the gravity sewer to an alternate location. The costs for the new manhole are not included for these three alternatives. Alternative A Alternative A includes a new lift station located adjacent to the existing facility site. It is anticipated that two parking spaces, either on the north side or the south side of the existing facility, will be required for the new lift station facilities. • Advantages: o Shortest gravity sewer piping, 10 linear feet (LF) o No extension of power service o Reuse existing wet well as flow -through manhole • Disadvantages: o Longest force main, 360 LF FINAL - November 6, 2009 2 pw :�\oco-pw-app:Carollo\Documents\Client\WA\Renton\8235B10\Deliverables\Siting Alternatives Memorandum.doc PROJECT MEMORANDUM Loss of two parking spaces Probable tree loss at existing facility island Alternative B Alternative B includes a new lift station located in two parking spaces along the north side of the Park entrance. • Advantages: o Short force main, 230 LF o Reuse existing wet well as flow -through manhole • Disadvantages: o Gravity sewer extension required, 110 LF o Loss of two parking spaces o Potential tree loss at existing facility island o Extension of power service, 110 LF Alternative C Alternative C includes a new lift station located in a vegetated area along the north side of the Park entrance. • Advantages: o Shortest force main, 220 LF o Reuse existing wet well as flow -through manhole o No loss of parking spaces • Disadvantages: o Gravity sewer extension required, 130 LF Potential tree loss at existing facility island o Extension of power service, 130 LF Loss of vegetation at new site Alternative D Alternative D includes a new lift station located in the grass roundabout at the Park entrance. FINAL - November 6, 2009 3 pw:\loco-pw-app.Carollo�DocumentslClienHWAlRenton\8235B10\Deliverables\Siting Altematives Memorandum.doc PROJECT MEMORANDUM • Advantages: o Short force main, 230 LF o No loss of parking spaces o Unimpeded access to site for larger service vehicles o Least concern for cars blocking access to facility o Potential to incorporate Park entrance sign as part of project • Disadvantages: o Gravity sewer extension required, 140 LF o Extension of power service, 150 LF o New manhole required o High visibility will require landscaping or Park sign to screen view from entrance Alternative E Alternative E includes a new lift station located in an open area at the south end of the parking lot directly south of the grass roundabout. It is anticipated that one parking space would be required for access to the lift station. • Advantages: o Short force main, 260 LF o Lower visibility area away from Park • Disadvantages: o Loss of one parking space o Longest gravity sewer extension, 240 LF o Longest power service extension, 250 LF o New manhole required FINAL - November 6, 2009 4 pw:\loco-pw-app:Carollo\Documents\Client\WA\Renton\8235B10\Deliverables\Siting Alternatives Memorandum.doc 4.0 COST ANALYSIS The costs for each alternative include estimated planning level construction costs for four differing project elements; gravity sewer piping, force main piping, power service extension, and a new manhole. The costs presented do not represent all project elements. For example, the cost for the lift station and facility operation and maintenance is not included, as the cost for these project elements are not anticipated to differ between the site locations. Planning level construction costs for each alternative for differing project elements are provided in Table 1. Prepared By: Tyler Whitehouse FINAL - November 6, 2009 5 pw:\\oco-pw-app:Carollo\Documents\Client\WA\Renton\8235B10\Deliverables\Siting AltemaGves Memorandum.doc LEGEND ALTERNATIVE SITE GRAVITY FORCE LOCATION SEWER('r MAIN(" A(' q \\ B \ C --- \\ E (1) Two potential locations represented. s (2) 8-inch diameter PVC gravity sewer pipe. Existing Lift (3) 4-inch diameter PVC force main. New Station COMMON FORCE MAIN — — — — Manhole Existing \ FLOW DIRECTION Wet Well 1 inch = 45 feet Q - Feet 0 45 90 o Q , 00 _ • • • f n\. J ate`____ `� P T • � -"tom GENE COULON MEMORIAL BEACH PARK ENTRANCE Q6 �✓ Q Figure 1 LIFT STATION LOCATION ALTERNATIVES LAKE WASHINGTON BEACH LIFT STATION FINAL DESIGN AND CONSTRUCTION SERVICES �rcarolln CITY OF RENTON E.ghy ..Wm9MWM..mw - m z D r VA 0 co 3 0- CD rn N O 0 c0 Table 1 Planning Level Construction Cost Estimates For Differing Project Elements Lake Washington Beach Lift Station Final Design and Construction Services City of Renton Alternative Project Element Unit Cost(4) A B C D E Gravity sewer piping(') $380/LF $4,000 $42,000 $50,000 $54,000 $91,000 Force main piping(2) $150/LF $54,000 $35,000 $33,000 $35,000 $39,000 Power service extension (3) $160/LF $0 $18,000 $21,000 $24,000 $40,000 New manhole $22,000 EA N/A(5) N/A(5) N/A(5) $22,000 $22,000 Estimated Construction Cost For Differing $58,000 $95,000 $104,000 $135,000 $192,000 Project Elements Additional Cost From Lowest Alternative $0 $37,000 $46,000 $77,000 $134,000 Notes: 1. 8-inch diameter polyvinyl chloride (PVC) sewer pipe installed in parking lot. Average installation depth equal 13 feet. 2. 4-inch diameter C-900 PVC pressure pipe installed in parking lot. Average installation depth equal 4 feet. 3. 4-inch diameter PVC conduit with No. 8 cable installed in parking lot. Average installation depth equal 4 feet. Power service extension based on distance from existing facility site. 4. Representative of planning level construction unit costs. 5. Assumes existing wet well is converted to a flow -through manhole. Abbreviations: EA each LF linear foot N/A not applicable 40 Meeting Minutes Lake Washington Beach Lift Station Final Design and Construction Services City of Renton Meeting October 22, 2009 Date: Work Order No.: 8235B.10 Time: 8:00 a.m. - 12:00 p.m. Location: City of Renton, Lake Washington Beach Lift Station, and City Shops Attendees: City Dave Christensen John Hobson Mike Benoit Oscar Cantu Stan Job Distribution: Attendees Purpose: Design Standards Meeting and Site Visit Significant information, Decisions, and Action Items. Consultants (Carollo) Brian Casey Adam O'Leary Tyler Whitehouse 1. Site Visit a. Five potential sites were discussed for analysis in the Siting Alternatives Analysis Memorandum. 1) Two parking spots adjacent to the existing lift station (no preference as to which side). 2) Two parking spots on the east side of the parking lot near the park entrance. 3) A bushed and open dirt area near the park entrance. 4) In the grass roundabout at the park entrance. 5) One parking spot and open dirt area south of the grass roundabout. b. 480V, three phase power preferred. 1) Carollo to provide cost for 480V, three-phase power in Siting Alternatives Analysis Memorandum. c. City will provide telemetry equipment (RUGID unit) and telemetry programming. Contractor to install. d. Existing antennas will be used for new pump station. Additional space in control panel will be provided for future telemetry equipment. Depending on selected location, City will provide radio test for signal strength. e. Water for wash down will be provided at the new lift station. 1) Hot Box for reduced pressure backflow preventer will be located at grade. 2) Hose bibb will be located in Hot Box as well. f. City to verify existing force main discharge location. g. City to provide PSE contact. pw:\\oco-pw-app:Carollo\Documents\Client\WAIRenton\8235B10\Meetings\Minutes\102209_Design Standards Meeting Minutes —Lake WA.doc h. Manufacturer cables run all the way to the control panel without junction box. Provide "air gap" to comply with NFPA 820 code and surround cables with perforated SST plate to protect cables from vandals. 2. Design Standards Meeting a. Spare parts are not desired for any equipment. b. Provide intrusion switches on wet well, valve vault, and control panel. c. Provide limit switches on check valves. d. Isolation valves to be plug valves - horizontal axis of rotation. e. Provide a tap for pressure gauges upstream and downstream of the check valve. f. Flow measurement device is not required. g. Provide safety netting over wet wells. No safety grating is desired. In. Provide L&W hatches with odor gasket and drain channel. i. City will provide standard CAD borders and typical details where applicable. j. Provide "T" on influent pipe into wet well with ends open. k. Provide gate on influent line. I. Listing one manufacturer and model number for the design pump without an "or equal" clause in the specifications is acceptable. Provide "detailed" specification. m. Provide sump pump in vaults for code compliance. n. All control panel components (including supports) shall be constructed of stainless steel. o. City to discuss desired wet well coatings internally. p. Carollo to research double rail guide rail for potential pumps. q. WSDOT Specifications - CSI specification format for Section 10, Special Provisions. Attachments: Action Items END OF NOTES DESIGN STANDARDS MEETING AND SITE VISIT October 22, 2009 pw:\loco-pw-app:Carollo\Documents\ClientlWA\Renton\8235B10\Meetings\Minutes\102209_Design Standards Meeting Minutes —Lake WA.doc 2 • , , - l�'iI �ii� '` `�� 1r` • 'tom � f'� • �` - ' r' r - st 46 •ys_ .tom � "� � �� ' ' � ! 4-1 OAL CIM3 ��`•�A' `-.Y.r� ,�.. �•+'� �" �s '� .�r_..f _ ��...7CyI�F� yam. � +.� �► �"` � �,- �--�-_ � _. s low r t Michael A Benoit From: Tyler Whitehouse [TWhitehouse@carollo.com] Sent: March 31, 2010 8:39 AM To: David Christensen; Michael A Benoit Cc: Brian Casey; Lara Kammereck; Adam O'Leary Subject: Lake Wa Beach New Site Plan Figure 2 Attachments: Figure-2.pdf Dave and Mike, See attached new site layout. The below additional costs are based on the Siting Alternatives Memo we presented earlier. Gravity sewer $380/1-F Force main $150/1-F Power extension $160/1-F Total 60 LF = $22,800 60 LF = $9,000 70 LF = $11,200 $43,000 Please note, additional costs that would be associated with doubling the capacity of the station are not included. As presented in the alternatives analysis, the station includes 1 hour of emergency storage. If we keep the station as is, we would be reducing the emergency storage capacity if we double the pump capacity, otherwise the station will have to be deeper to maintain emergency storage capacity. Things to consider: In talking with Brian, he pointed out that although we are constructing north of the island with the single tree in it, the tree may still have to be removed based on extent of rooting. I say this because I didn't want you to promise Parks that by taking the four spaces north of the island, we are necessarily able to save the tree to the south. Please let me know if you have any questions or comments. Thanks, Tyler Whitehouse Carollo Engineers 1218 Third Ave, Suite 1600 Seattle, WA 98101 Office: 206-684-6532 Fax: 206-903-0419 twhitehouseCabcarollo.com Michael A Benoit From: Leslie A Betlach Sent: April 05, 2010 10:40 AM To: Michael A Benoit; Kelly Beymer Subject: RE: Lake Washington Lift Station Replacement OK, thanks zed4- 14. Fed"'IfIf Parks Planning and Natural Resources Director City of Renton 1055 South Grady Way Renton, WA 98057 Phone: 425-430-6619 Fax: 425-430-6603 Ibetlach@rentonwa.gov From: Michael A Benoit Sent: Monday, April 05, 2010 9:08 AM To: Leslie A Betlach; Kelly Beymer Subject: RE: Lake Washington Lift Station Replacement We are going to be able to re -coop 3 of the 4 stalls lost. End result will be the loss of one stall and the easterly island as discussed when you asked us to look at the additional option. Mike From: Leslie A Betlach Sent: April 05, 2010 8:59 AM To: Kelly Beymer; Michael A Benoit Subject: RE: Lake Washington Lift Station Replacement This is fine. Do you think 3 stalls can be re -cooped or just 2? Leslie Zee&e 4 Ve&4e4 Parks Planning and Natural Resources Director City of Renton 1055 South Grady Way Renton, WA 98057 Phone: 425-430-6619 Fax: 425-430-6603 Ibetlach@rentonwa.gov From: Kelly Beymer Sent: Monday, April 05, 2010 8:00 AM To: Michael A Benoit; Leslie A Betlach Subject: RE: Lake Washington Lift Station Replacement Hi Michael, I'm ok with the small revision. It is in the same location, and we are still netting a loss of only one stall and the island - and I like saving the center island. Leslie? Thanks, Kelly From: Michael A Benoit Sent: Wednesday, March 31, 2010 10:30 AM To: Leslie A Betlach; Kelly Beymer Subject: Lake Washington Lift Station Replacement Here is a copy of the proposed layout to place the station at the east side of the parking lot as we discussed. Preliminary estimates are that the cost increase is within an acceptable range. We have shifted the station to the north, planning to save the trees in the center island. That means, instead of replacing 3 stalls and the island with 2 stalls, we will replace four stalls and the island with 3 stalls. End result, as we discussed, will still be the loss of the island and 1 parking stall. Michael Benoit Project Manager Wastewater Utility City of Renton (425) 430-7206 0, (D 0 0 0 0 U IF- IF WIDE ROLL GATE LIMITS OF CONTRACTOR OPERATIONS LIFT STATION (BELOW GRADE) ANTENNA CONTROL PANEL VALVE VAULT (BELOW GRADE) APPROXIMATE FENCED AREA (1:80 SO FT FT x 38 FT) rr NE COULON MEMORIAL BEACH Figure No. 2 SITE PLAN LAKE WASHINGTON BEACH LIFT STATION (ANSITE PLAN CITY OF RENTON SCALE: 1"�� FILE: 8453-SRV C-.Xpw_working\projectwise\hgarcia\dms99193\Figure-2 3-30-10 03:14pm HGarcia XREFS: 8453-SRV Working Wonders With Water R E Ttv o tv Cit of Renton, Washington Map Title is for reference only. Data layers that appear on this map may or may not be accurate, current, or otherwise reliable. THIS MAP IS NOT TO BE USED FOR NAVIGATION Legend �] Lakes and Rivers 13 Parcels Jurisdictions Bellevue Des Moines Issaquah Kent King County Mercer Island Newcastle RENTON SeaTac Seattle Tukwila Aerial (June 2009) ■ Red: Band-1 0 Green: Band-2 E Blue: Band 3 1: 625 @ 11" x 17" Notes Enter Map Description LIMITS OF CONTRACTOR OPERATIONS LIFTS ATtON (BELOW GRADE) ANTENNA CONTROL PANEL VALVE VAULT (BELOW GRADE) APPROXIMATE FENCEDAREA = 680 SO FT (18 FT x 38 FT) COULON MEMORIAL BEACH Figure No. 2 SITE PLAN LAKE WASHINGTON BEACH LIFT STATION GSITE PLAN CITY OF RENTON SCALE: 1-47 FILE: 8453-SRV 0►0- //' C:\pw"rkingkprgectwise\hgarcia\dms99193\Figure-2 3-30-10 03:14pm HGarcia XREFS:8453-SRV Workng Wonders With Water ' 8 UP Up UP ASPH LT 8" 15 CB N RIM=25.65 E. 8-CMP(NW)=21 -.35 I.E. 12"CMP(NE)=21.40 15" 18" SSMH VDIA. CONC. D RIM=27-.93 D. I.E. 8"(W)=16.39 BOTTOM=11.93 . .. ... PUMP STA ON 15" 2 PIPES ON BOTTOM 3.4' DIA. P STIC LID 0 FEEDING PUMP STATION 15" 15" ss ss lo" 14 20 POWE SWITCH CABINET 14 0 ASPHALT 1 . ..... 12 0 0 22" A HALT 4 635C-31.4 M/WCP N ASPHAL N=1867 .15 E=1302 60.25 ELEV. 27.50 -- - - ------------- 10 o" FLAGPOLE 0 K 12-rj- 0 " CB RIM=26.05 4-PLASi X(SW)=24.25 I.E. CMP(E)=23.85 iALT SD CB RIM=26.72 I.E. 8-CMP(W)=23.22 I.E. 8"CMP(E)=23.17 SD 15"CEDA SD I.E.I8.CONC(S .E. B-CONC(SW)=21.77 ASPHALT 0 10" Zk CP# 5 8" 635C-31.5 R/C N=186554.95 E=1302371.85 ELEV.=28.29 30"MAPLE I.E. 72" MP 8. I.E.72" MP 18. Tn r. = 1 TEL I Engineers... Working Wonders With Water" CITY OF RENTON 2009 WASTEWATER LIFT STATION PRE -DESIGN LAKE WASHINGTON BEACH ALTERNATIVES ANALYSIS FINAL July 2009 1218 THIRD AVENUE - SUITE 1600 - SEATTLE, WASHINGTON 98101-3032 - (206) 684-6532 - FAX (206) 903-041S pwlbco-pw-app Carol b0owmentslCbentlWAlR ton18235X001DeiverabbslRpt - LakeWABeach.doc CITY OF RENTON 2009 WASTEWATER LIFT STATION PRE -DESIGN LAKE WASHINGTON BEACH ALTERNATIVES ANALYSIS TABLE OF CONTENTS Page 1.0 INTRODUCTION.........................................................................................................1 2.0 BACKGROUND...........................................................................................................1 3.0 LIFT STATION REPLACEMENT ALTERNATIVES.....................................................1 3.1 O&M Staff Concerns..........................................................................................1 3.2 Lift Station Replacement Alternative Summary .................................................2 3.2.1 Alternative 1....................................................................................... 2 3.2.2 Alternative 2....................................................................................... 5 3.2.3 Force Main Replacement Alternative ................................................. 5 4.0 GRAVITY SEWER ROUTE ALTERNATIVES.............................................................6 4.1 Gravity Sewer Route Alternative Summary .......................................................6 5.0 COST ANALYSIS........................................................................................................8 5.1 Total Project Costs............................................................................................8 5.2 Life Cycle Costs.................................................................................................9 5.3 Annual Cost Method Analysis..........................................................................10 6.0 RECOMMENDATIONS..............................................................................................11 7.0 REFERENCES..........................................................................................................12 LIST OF APPENDICES APPENDIX A Preliminary Geotechnical Evaluation APPENDIX B Cost Analysis Spreadsheets LIST OF TABLES Table 1 Total Project Cost Summaries (2009 Dollars) .................................................. 9 Table 2 Life Cycle Cost Summaries (2009 Dollars) ..................................................... 10 Table 3 Annual Cost Method Analysis (2009 Dollars) ................................................. 11 LIST OF FIGURES Figure 1 Typical Submersible Lift Station Layout, Alternatives 1 and 2.......................... 3 Figure 2 Gravity Sewer Route Alternative 3................................................................... 4 July 21, 2009 - FINAL pw \bco-pw-app Carol lo0ocuments\Client\WPRenton\8235X00\Deliverables\Rpt - LakeWABeach doc City of Renton LAKE WASHINGTON BEACH ALTERNATIVES ANALYSIS 1.0 INTRODUCTION The purpose of this report is to evaluate lift station replacement alternatives and perform a route analysis to determine if the Lake Washington Beach Lift Station may be abandoned and replaced with a new gravity sewer. Two lift station replacement alternatives and one gravity sewer route alternative have been evaluated to determine the service alternative for the area. 2.0 BACKGROUND The Lake Washington Beach Lift Station located at Gene Coulon Memorial Beach Park (Park) is a small sewage lift station constructed in 1968. The lift station includes a below grade concrete wet well and separate cylindrical shaped steel dry pit which houses two 3 horsepower (hp) non -clog sewage pumps and other mechanical and electrical equipment. City of Renton (City) operation and maintenance (O&M) staff have expressed concerns regarding operation difficulties stemming from sewage influent abnormalities and the facility type. Based on lift station age and reliability, the City has determined that full lift station replacement is necessary at this location. Alternatives for lift station replacement are presented in this report. The City prefers to serve customers via a gravity sewer pipeline, rather than a lift station whenever feasible. A gravity system eliminates electricity costs for pumping and equipment maintenance, which greatly reduces annual O&M costs. Based on survey data, conversion to a gravity system is possible at this location; however, additional hydraulic factors discussed in this analysis eliminate this as a viable alternative. 3.0 LIFT STATION REPLACEMENT ALTERNATIVES The alternatives presented each include complete lift station replacement of the Lake Washington Beach Lift Station, as recommended by the City. 3.1 O&M Staff Concerns City O&M staff have expressed the following concerns with the Lake Washington Beach Lift Station. • Swimsuits. towels, shirts, and other large rag -type materials comprise the influent sewage and clog the existing pumps. • O&M staff installed a basket on the influent line to collect the rags and protect the pumps; however, during peak summer season, daily cleaning of the basket is required and the wet well is vactor cleaned nearly twice per week. July 21, 2009 - FINAL 1 pw \bo"w-app Carol lo0ocuments\Client\WA\Renton\8235X00CeliverableslRpt - LakeWABeach doc Access to the lift station for maintenance is difficult in the summer months when the Park is crowded. 3.2 Lift Station Replacement Alternative Summary The new lift station will be similar in design to existing City lift station facilities. The City requires a low impact, low cost solution to simplify and reduce maintenance operations. Both alternatives discussed in this section include a below grade, duplex submersible lift station. The new lift station is assumed to be located adjacent to the existing facility in the parking lot; however, locating the new lift station within or in the same location as the existing dry pit may reduce installation costs and should be further analyzed during pre -design. The lift station will be designed for one (1) hour of emergency storage and will utilize the new wet well, two existing manholes, and existing in -line piping for the storage. City lift station standard includes two (2) hours of storage; however, given the lift station's seasonal operation and accessible location, it was determined that one (1) hour of storage would be adequate. It is suggested that the existing parking spaces surrounding the new lift station be reserved for City personnel during the summer months to provide additional space for maintenance of the lift station. In addition to lift station replacement, the existing force main may also be replaced during this project. Permitting for construction of the new lift station is not anticipated to be a major component of the project schedule, as construction would involve replacement of an already existing lift station and force main (if desired). Two alternatives for lift station replacement are summarized in this section, as well as a separate additional alternative for force main replacement. A preliminary layout of the submersible lift station for Alternatives 1 and 2 is shown in Figure 1. The approximate location of the new lift station is shown for reference only in Figure 2 along with the proposed gravity sewer alignment discussed later in this report. 3.2.1 Alternative 1 Alternative 1 includes a duplex, submersible lift station using chopper type pumps. The lift station is assumed to be a packaged unit and include the following: Sloped bottom, reinforced fiberglass wet well approximately 8 foot in diameter and 17 feet deep with concrete base and dual galvanized steel access hatches. A concrete wet well will be analyzed during pre -design given the high groundwater conditions at the site. Separate accessible fiberglass valve vault including discharge check and isolation (plug type) valves with galvanized steel access hatch. A concrete valve vault will be analyzed during pre -design given the high groundwater conditions at the site. Explosion proof, 5 hp chopper pumps (two total) by Vaughan or equivalent. Ductile iron construction. July 21, 2009 - FINAL 2 pw 1bo"w-app Carol lo0ocumentslClientlWAlRenton18235X00Celiverables\Rpt-LakeWABeach doc `o a 0 O m co Q 0 0 ISO SCALE:NTS CHECK VALVE, 4- (1 OF 2) PLUG VALVE, 4' (1 OF 3) 4' ELBOW, 917 (1 OF 4) i � FI BE RGLASS ------- VALVE VAULT 060, I I � I � SECT ON I � 4' DISCHARGE PIPE I � I PRESSURE GAUGE r RE NFORCED BERGLASS WETWELL EL 27t 1117— STAINLESS STEEL FLOAT BRACKET STAINLESS STEEL GUIDE RAILS 8' INFLUENT, EL TBD FLOAT LEVELS (TYP) LEVEL TRANS 4r MIN (TYP) PLAN SCALE NTS CONTROL PANEL (UL LABELED) —ACCESS HATCH WITH LOCK AND HANDLE UPPER WIDE BRACKET 3' o \—PIPE SUPPORT 0 VALVE VAULT DRAIN W/ CHECK VALVE, 2' PVC INTERMEDIATE GUIDE BRACKET (ONE FOR EACH 1OFT) PIPE BRACE PUMP POWER CORDS STAINLESS STEEL CHAIN ASSEMBLY 4' PIPE, D.I. SUBMERSIBLE (1 OF 2) SECTION SCALE:NTS REFERENCE., DRAWING PROVIDED BY PUMPTECH INC. Figure 1 TYPICAL SUBMERSIBLE LIFT STATION LAYOUT ALTERNATIVES 1 AND 2 2009 WASTEWATER LIFT STATION PRE -DESIGN C Carw"� CITY OF RENTON „,0a�yZ r RECORD LEGAL DESCRIPTION: t 8 I,IANS LAKE WASNNGTOV GAII.N OF EDEN 95. BLOCKS 363 R 301 SAID •D MOM -OWIFER NM SHORCLANDS ADJACENT TOGETHER NTH PORT1045 OF ��^�JlAL1lT CL A SECTION 05. TOWvSMi 23 NORM, RANGE OS EAST AND SNORELANDS PLUG AND VACTOR FROM y�� ADJACENT DES(RIBEG AS FOLLOWS: 8 FUT. MANHOLE DURING ; 'ti `�C \ FRW IN ERSECTION OF GOVERNMENTTH °NEANER LIKE T. IAND SOU LNE OF SAID T SECTION 5, THENCE NORTH B9.32.07- WEST. 1221.78 FEET TO INNER HARGOR CONSTRUCTION OF 0/.�}p THEMiX SOUTH A5'45.00- WEST, 317.52 FELT; DOWNSTREAM MANHOLE ' �-mM I THENCE SOUTH AA19.00' EAST. 680 FEET MORE OR LESS TO THE SOUTH LNE OF yi.9OW(w111-LJW I SAC LINE OF S4D SECTION 5. THENCE EASTERLY ALONG SAID SOUTH UNE OF SAID SECTION 705.5 FEET MORE OR LESS TO ME WESTERLY BOUNDARY OF BURUNGTCH NORMERV 100 FOOT \ POTENTIAL LOCATION I RIGHT OF RAY. 48” DIA \ I I BBEEGINNINNENCE G TOGETIEN MIITI AREA IV ALONG N FRONT of LOTS BOUNDARY TO I BLOCc MO OF MANHOLE AM �.t] OF OF NEW LIFT STATION I I HILNANS LAKE WASHNOT04 GARDEN OF MEN 95 (FOR REFERENCE ONLY) (TYP) �b / oA NA• I CRAP -IC SCALE Fl U 7E' I LEGEM a - I I WATER YAI.Y£ _ ( IN FLLI ) d NWkml WATER METER F,A r an , ®� MANHOLE (SS/57) -0- PDftR/U RU I PO_L 8" DIA PVC ASTM D I F GUY ANCHOR POWER TRANSFORMER3034 GRAVITY SEWER J l AMMALI I POWFR NIIONC VAULT FTFR PIPE (TYP) --�� I I D TELEPNOI RISER r N GILS VALUE 8" DIA PVC ASTM D I b12 GAS TIG LIGHT II I WD 3034 GRAVITY SPOT ELEVATOR n sKa ' SEWER PIPE Wi ( MAILBOX o«ERr nmm) 16" DIA STEEL 1 J R \ =� CASING PIPE CON FCROUS �2EE / —.1-1 TRT aFIWMM W Y. / L i I B FOND CASED MONUMENT IONTAP .� J T UL 7rRAM-17,w � I MIND, ..� - Sr. I I IL 77O11+.1e �9 \ ' FRDADKAv uuwENr d�' I - CIN'ER JNES • /I 12 lKMv.l ,.lu P tf<. NG. fxEl9N PNOPERIY UNES 1 NW -OF -WAY UN-- f� I LOT LINES ENTRY PIT �_� }r1j''r �_/� ,o. I DITCH LINE WATER LINE -36 FEET X 12 FEET li' _ I 30' I 3O, llSAINT ANY S_WL GRAIN SE L X 15 FEET DEEP Lrt9Rmo•n.7, I �.. i — I AAFM.M II - ' G GAS LINE r NDfRCiWNC TFI FR WFS 9 I J - IMOfRfAOUNC: CABLE TV INFS 1 )Gunll}7Aro T �,� j~r UNDERGROUNC CABLE N USES OVERHEAD POTHER LINES �•P W� „ YARN I CHAIN LIVKU RICE TILITY LINES IAL R 1. �� `Jg-, \ �� ' I I ' un FIBER CPTICS LINE F y a ) _ ' I _ / w i ` i . �I �-_� I fASFMENT [IMF RAIL _NE RECEIVING PIT, -10 FEET X 8 FEET Ill z X 20 FEET DEEP�/ NOTES. W I NOR 20NKII TAL DATUM: NORTH AICAN DATUM OF 19015 / 19T ADJUSTMENT, s (HAD 9/91). NASMINGTDN NORM ZONE - •IOLONO COORDINATE VALUES FOR Cr or RENTON CONTRO_ NUMBERS 57 AND 71 r /lI ml VER.L GATLM: NSRM AMERCAN MER ICAL AT. OF 1. )/ �I / KC'LtwAToB �. I CONTROLLING BFN04MARKS: CITY OF RENTON KNCMMARKS 37 AND 2119 -~ i `_ , \\\\\\,' � ��� r• I 2 ALL DISTANCES SHORN AGE GROUND DISTANCES UVLESS OTHERWISE NOTED. -� ^\ ,�, L, \\\� ) R 0/19P VX cma WAApA� y / THE LOCATION AND DESCRIPTION OF ALL SURVEY MARKERS SHOWN HEREON ARE // P ]� STIINtdI CApL' D/ 1-MI II' r L"']C]5➢6 ]] / / ! 1 } BASED ON F. OBSEAVAT ONS TAKEN IN NOVEM3ER, 2008. UNLESS O'NERMSE \ INDICATED. "` ems` \ \ I I A♦1.97N ) WORK PERFORMED IN CLWJUNCROV MTF M15 SURVEY UTILIZED ME F010NVO -® f _� _ i (/ J `v) '► ` I I �h ` I eWL oltME1. w'(Kl?,o.T �, ( ECUIPMEVT AND PROCDURES', (A) 2GECONE-ER 600 SERIES ELECTRONIC TOTAL STATION, MANTANED TIC TIIE MANUFACTUR7YS SFCCIICATIONS PER W.A.C. 332-I31-107( . B) FIELD TRAVERSE. EXCEEDING REQUIREMENTS SET - RM N It , W.A.L.32 C. -130-090 m --. _- _ —__ - - \ `` ��� , C. +i'G. lMI.]G]• �� \ 1 aI \ / 1 /' THIS SURVEY WAS PERFORMED WITHOUT ME BENEFIT Or A POLE RCPOR- AVO '/ � DOES NOT PURPORT TO snow ALL CASEMENTS. E IRoc 1)+SM M.7v KING COUNTY EASTSIDE THIS TOPOORAPNIC S.rRVEY COURSE E OF T ACCURATELY 4DERG O ND LTICC ES TURES SHOWN INTERCEPTOR HEREON REDURINGBA THE LILT C Of 1M5 SURVEY PROVIDED BY O HERS S SHOWN q INK THEREON ARE BASED SOICL" LPOIJ NESPOIN IN PRCR A U OTHERS AND PACE THrR ARS. NG. DOES NOT FACCEP-TTNFS RECONTRACT0 OR ASSUME LIABII M FOR MFw Af7F ANY ,0 fII, P PlIjOR 5 ONSTRUCTOi/fNf. NFFRS WAIT LFRIfY fXAI FOR CA - IITIII PRKwiI f.ONSMIIf"TALKY f.Ml FOR IMATf� IITI IIY IOfATIOV SFR Afi• 1YN1-42!5-YL^.f. /� PKN[P I1MR roFr t+Hf llNwfR All MOAIIMFNTS NMfATFIf AS FDUW, WFRF RFCOVFPM MIRING. IMF CYIURG- °F CONNECT TO �_,__ � / / �• I /! / THIS SURVEY AT THE DA-E SHOWN IN T•E SURVEYOI•S CERTNICATE, UNLESS 12 ]'Ivxfsf -a,3+ /9) �-� � V� nru¢]w c.mt' ° -eW MJIPLT EXISTING KING COUNTY MANHOLE (, i' M•(W,,, / —� DIRECTION OF FLOW 21rP ram: rm°c'x R02-10 12'x9F.X5]E}97x _ ASTMITdl -r / Rc turolpw+}ia>] L) `\ •GEM ,-A_ rrwa PAte' WIN � m"�09MTD�iPoY J 1 `LC Wo."I•^W.]• �.• \ Figure 2 GRAVITY SEWER ROUTE ALTERNATIVE 3 rsu� j' 2009 WASTEWATER LIFT STATION PRE -DESIGN / / Y CITY OF RENTON • 4-inch diameter cement mortar lined ductile iron discharge pipe. • NEMA 4X control panel. telemetry unit, and junction boxes located on a galvanized steel stand at grade. • Generator receptacle for portable generator usage. • Submersible level transducer with backup float levels for pump control. • Stainless steel pump guide rails for pump removal. • Stainless steel anchors and supports. A chopper pump is designed for shredding rag materials and solids such as plastics, heavy rags, grease and hairballs, wood, and paper products as it pumps the product. Chopping is accomplished by action of cupped and sharpened leading edges of impeller blades moving across a cutter bar at the intake openings. Chopper pumps have proven durability and excellence in a wide range of severe pumping applications such as food processing plants, chemical and petrochemical facilities, automotive and steel industries, paper and wood product facilities, as well as other municipal installations. Chopper pumps typically require more power and thus have a higher rated horsepower compared to a non -clog pump. The capital cost of a chopper pump is on average higher than a non -clog sewage pump. 3.2.2 Alternative 2 Alternative 2 includes a duplex, submersible lift station using non -clog pumps. The lift station is assumed to be a packaged unit and will include all accessories and details discussed for Alternative 1 with exception to the following: • Explosion proof, 3 or 5 hp non -clog pumps (two total). Ductile iron construction. Non -clog sewage pumps are designed for sewage and sludge containing solid or fibrous particles. The existing non -clog pumps at the Lake Washington Beach Lift Station were designed to pass 3-inch solids without clogging. O&M staff have indicated that the pumps have become clogged in the past prior to the influent basket being in place. It is anticipated that if non -clog pumps are selected for the replacement lift station, an influent screening device may be required, similar to the existing configuration, to prevent pump clogging. 3.2.3 Force Main Replacement Altemative The existing 4-inch diameter force main is roughly 40 years old. During construction of the new lift station, the force main could be replaced at a lower cost than if it were replaced as a separate project in the future. It is anticipated that the force main will be replaced with 4-inch diameter polyvinyl chloride (PVC) pressure sewer pipe in accordance with American Water Work Association (AWWA) C-900. Replacement of the force main will enhance the pump selection, as existing hydraulics for an aged force main are more difficult to estimate. The force July 21, 2009 - FINAL 5 pw 1boo-pw-app Carol b\Documents\ClientlWAlRenton18235X00\Deliverables\Rpt - LakeWABeach doc main can be installed via open cut trenching methods under minimum 3 feet cover. Groundwater is not anticipated to be encountered. See Appendix A for site geotechnical evaluation prepared by HWA Geosciences Inc. for further information. Pipe bursting is also a potential pipeline installation method; however, is anticipated to be a less favorable and economical option based on the following: • Three (3) insertion/reception pits required based on current pipeline alignment shown in record drawings. Multiple equipment set-ups will be required. • Parking lot site restoration required. • Multiple equipment set ups required. • Shallow pipeline depth may produce surface heave in the parking lot. Additional restoration may be required. • Cleaning/pigging of the line may be required. • Additional bypass pumping or vactor cleaning required compared to open cut trenching replacement. 4.0 GRAVITY SEWER ROUTE ALTERNATIVES The gravity sewer route analyzed for this alternative includes approximately 460 feet of 8-inch diameter PVC gravity sewer pipe per American Society for Testing and Materials (ASTM) D 3034. The proposed alignment for the pipeline is shown in Figure 2. Alternative 3 is summarized below identifying construction methods, potential conflicts, and assumptions for installation. 4.1 Gravity Sewer Route Alternative Summary Alternative 3 includes a new pipeline starting at a new 48-inch diameter manhole cut into an existing 8-inch sewer line roughly 30 feet upstream of the existing lift station. The pipeline travels south and east through a series of manholes and connects to existing King County Manhole R02-10. During construction of the new manhole, the 8-inch diameter sewer line can be plugged at an upstream manhole and the sewage vactor cleaned as necessary. The pipeline can be constructed via open cut trenching methods and horizontal auger boring. Approximately 250 feet of pipeline will be open cut while the remaining 210 feet will be horizontally auger bored under three existing 72-inch diameter corrugated metal pipe culverts. Open cut trench depths average 11 feet for the first approximately 130 feet of the pipeline. Solid shoring with wood planks, stringers and cross bracing is assumed for trench support. The pipeline will cross beneath an existing water line, underground power line, and storm drain. These utilities will have to be potholed prior to pipeline construction. July 21, 2009 - FINAL 6 pw-\bco-pw-app Carol b\DocumentslClient\WA\Renton\8235XOO\DelrverableMRpt-LakeWABeach doc An entry pit roughly 36 feet by 12 feet by 15 feet deep will be required to house the horizontal boring machine and steel casing in increments of 20 feet length. The entry pit can be shortened in length if 10 foot casing lengths are used but accuracy is reduced and labor increased due to additional welding of the casing. The soils are determined suitable for jack and bore trenchless pipeline installation based on a preliminary geotechnical evaluation (see Appendix A). A 16- inch diameter steel pipe is assumed to be bored for the carrier pipe casing. If rocks were suspected in the soils, a 24-inch diameter casing would be installed such that if needed, a worker could dislodge an interfering rock. The auger boring machine will utilize a steering head and water level gage affixed to the top of the casing pipe to control grade. Horizontal drilling experts claim this process is accurate in good soil conditions. A receiving pit approximately 10 feet by 8 feet by 20 feet deep will be required to make the connection to the receiving manhole. A new 48-inch diameter manhole will be located in both the entry and receiving pits as shown on Figure 1. For both the entry and receiving pit, sheet pile shoring is recommended. A clearance of 3 feet between the top of the casing pipe and bottom of the culvert is recommended to avoid potential settling conflicts and construction errors. The pipeline will cross under several utilities; however, based on depth of installation, no problems are foreseen to occur. The final section of pipe connecting to the King County manhole will be open cut trenched to a depth of 20 feet. Sheet pile shoring is assumed for trench support. The pipeline will cross beneath two existing water lines, which will require potholing prior to pipeline construction. The pipeline will also cross beneath a 72-inch diameter storm drain proposed to be installed as part of the 1-405 Congestion Relief and Bus Rapid Transit Projects. Precautionary measures should be taken during installation of this section of pipe. Based on current survey of the area, an existing 8-inch diameter pipe stub extends from the King County manhole-, however, if connected to, would only permit about 1 foot of clearance beneath the existing culverts. A new 8-inch diameter sewer line is assumed to be core drilled at the base of the manhole for connection to maintain a safe clearance below the existing culverts during boring. Based on the investigations conducted by HWA Geosciences Inc. (see Appendix A), the soil conditions present at pipeline installation depths can be generally classified as native silty sand alluvium. A wellpoint dewatering system at intervals of 25 to 50 feet along the alignment and at both the entry and receiving pit is recommended based on the anticipated soil instability below groundwater level. It is recommended that the groundwater level be depressed and maintained at a level not less than 3 feet below the invert of the pipeline or structure prior to and until all installation is completed and properly backfilled. Permitting for construction of the new gravity pipeline is not anticipated to be a major component of the project schedule, as the site already includes several gravity sewer pipelines and utilities. During analysis of this alternative, the City was informed that the King County Eastside Interceptor to which King County Manhole R02-10 is connected to. may surcharge under peak July 21, 2009 - FINAL 7 pw \\o o w-app Carol lo\Documents\Client\WA\Renton18235X00\Deliverables\Rpt - LakeWABeach doc flow events. During a surcharge, the anticipated high flow elevation exceeds the elevation of the new starting manhole in the Park by over two feet; this puts the Park at significant risk of a sewage overflow during a peak winter event. The City internally analyzed the option of utilizing various forms of back -check valves on the gravity line to prevent flow back from the interceptor. However, seasonal flow patterns, combined with unusual debris periodically entering the line led the City to a determination that the potential for material to hang-up in the check valve was highly likely, therefore, not allowing the valve to be reliable. 5.0 COST ANALYSIS The cost analysis for the sewer route and lift station replacement alternatives include total estimated construction and project costs and 25-year life cycle costs (expected accuracy range of +50 percent to -30 percent). Each alternative is also evaluated by the annual cost method described at the end of this section. See Appendix B for detailed cost estimate spreadsheets. 5.1 Total Project Costs The construction costs for each alternative were calculated assuming the following: • Contingency = 30 percent. • Contractor overhead, profit, and risk = 10 percent. • Sales Tax = 9.5 percent. • General conditions = 5 percent. • Costs associated with environmental and permitting measures not included. • The cost estimate herein is based on our perception of current conditions at the project location. This estimate reflects our professional opinion of accurate costs at this time and is subject to change as the project design matures. Carollo Engineers have no control over variances in the cost of labor, materials, equipment; nor services provided by others, contractor's means and methods of executing the work or of determining prices, competitive bidding or market conditions, practices or bidding strategies. Carollo Engineers cannot and does not warrant or guarantee that proposals, bids or actual construction costs will not vary from the costs presented as shown. The total project cost includes an additional 30 percent of the construction cost to account for all allied costs (i.e. construction and engineering). The total project cost for each alternative is shown in Table 1. The total project cost for Alternatives 1, 2, and 3 is 5370,000, S340,000, and $710,000, respectively. Alternatives 1 or 2 could be enhanced to include a new force main. This would increase construction costs an additional S41,000 (554,000 total project cost). The cost includes • July 21, 2009 - FINAL 8 pw\bw-pw-app.Carolb\Documents\Client\WAlRenton\8235X00UeliverableslRpt-LakeWABeach doc replacement of approximately 360 feet of existing 4-inch diameter force main with 4-inch diameter PVC pressure sewer pipe. Table 1 Total Project Cost Summaries (2009 Dollars) 2009 Wastewater Lift Station Pre -Design City of Renton Alternative 1 - Alternative 2 - Alternative 3 - Chopper Pump Non -clog Pump Gravity Sewer Estimated Costs Lift Station Lift Station Route Construction` $280,000 $260,000 $540,000 Allied (30 percent) S84,000 S78,000 $162,000 Total Project Cost(') $370,000 S340,000 $710,000 Notes: (1) Rounded up to nearest ten thousand dollars. 5.2 Life Cycle Costs Life cycle costs for each alternative were calculated over a 25-year period. The following assumptions were made in calculating the costs for all alternatives: • Interest Rate = 5 percent. • O&M staff hourly rate = S40 per hour. • Rate of inflation = 3 percent per year. The following assumptions were made for calculating the life cycle costs for Alternatives 1 and 2: • Mechanical, electrical, and instrumentation equipment life = 20 years. • Electrical power costs = S0.06/kW-hr. • Submersible pump efficiency = 30 percent. • Lift station operation = 6 hours per day, 5 months per year. • Routine maintenance for Alternative 1 = two O&M staff at 8 hours each per month for 5 months. • Routine maintenance for Alternative 2 = two O&M staff at 16 hours each per month for 5 months. • Vactor cleaning assumed twice per year for chopper lift station. • Vactor cleaning assumed ten times per year for non -clog lift station. July 21, 2009 - FINAL 9 pwlbco-pw-app Carol lo0ocuments\Client\WA\Renton\8235X000eliverableslRpt - LakeWABeach doc • Miscellaneous yearly equipment replacement = 0.5 percent of replacement cost. • Structural modifications to wet well in 25-year life span not included. The following assumptions were made for calculating the life cycle costs for Alternative 3: • Routine maintenance = two O&M staff at 16 hours each per year. The 25-year life cycle cost for each alternative is shown in Table 2 along with the total project cost for reference. Lift station replacement Alternatives 1 and 2 are roughly a half the total project cost of gravity sewer Alternative 3; however, in a 25-year life cycle cost comparison, the three alternatives are more comparable. The 25-year life cycle costs for Alternatives 1, 2, and 3 are $650,000, $720,000 and $740,000, respectively. Alternative 2 has higher life cycle costs than Alternative 1 due to the anticipated additional maintenance required for cleaning the influent basket, vactor cleaning the wet well, and servicing the pumps. Alternative 3 has the highest life cycle cost, as the project cost of this alternative is high to begin with. Table 2 Life Cycle Gost Summaries (2009 Dollars) 2009 Wastewater Lift Station Pre -Design Citv of Renton Alternative 1 - Alternative 2 - Alternative 3 - Chopper Pump Non -clog Pump Gravity Sewer Cost Lift Station Lift Station Route Total Project Cost 25-Year Life Cycle Cost $370,000 $650,000 5.3 Annual Cost Method Analysis $340, 000 S720, 000 $710,000 $740,000 The annual cost method (also called the annual return method or capital recovery method) is used to compare alternatives with unequal lives. This method assumes that each alternative will be replaced by an identical twin at the end of its useful life. The alternatives are ranked by calculating an equivalent uniform annual cost (EUAC). Annual O&M costs are based on the same assumptions discussed previously for the life cycle cost analysis. The EUAC for each alternative is listed in Table 3. All three alternatives yield roughly the same EUAC at just under $40, 000. July 21, 2009 - FINAL 10 parr\\oco-pw-app Carol b\Documents\Ghent\WA\Renton\8235X000eliverables\Rpt-LaheWABeach doc Table 3 Annual Cost Method Analysis (2009 Dollars) 2009 Wastewater Lift Station Pre -Design City of Renton Alternative 1 - Alternative 2 - Alternative 3 - Chopper Pump Non -clog Pump Gravity Sewer Lift Station Lift Station Route Design Life 20 20 80(2) Total Project Cost $370,000 $340,000 $710,000 Annual Estimated O&M Cost $5,800 S11,500 $1,300 EUAC(') $36,000 S39,000 $38,000 Notes: (1) Interest rate assumed 5 percent. (2) Based on City of Renton Long -Range Wastewater Management Plan, Review Draft January 2009, Carollo Engineers. 6.0 RECOMMENDATIONS All project alternatives based on life cycle and annual cost fiscal criteria are very similar. Gravity sewer Alternative 3 would be preferred to service the Gene Coulon Memorial Beach Park to eliminate the O&M efforts of a lift station at the Park. However, based on the risk of a sewage overflow with the City Park, it was concluded that the gravity sewer is not a feasible alternative. Should policy change in the future to prevent surcharge in the King County Eastside Interceptor, this alternative should be reevaluated. Alternative 1, which includes a submersible lift station with chopper pumps, is recommended for implementation at the Lake Washington Beach Lift Station site. Although the total project costs are slightly higher than Alternative 2, maintenance operations for this type of pump are anticipated to be less than with a non -clog type pump for the sewage environment at the Lake Washington Beach Lift Station site. It is anticipated that overall O&M operations will be simplified and life cycle maintenance costs reduced for Alternative 1 July 21, 2009 - FINAL 11 pw:lbco-pw-app CarolblDocuments\ClientlWAlRenton18235X00\Deliverables\Rpt - LakeWABeach doc 7.0 REFERENCES Carollo Engineers. January 2009. City of Renton Long -Range Wastewater Management Plan, Planning Considerations and Design Criteria, Review Draft. City of Renton. 2008. Renton Municipal Code. Title IV Development Regulations, Chapter 6 Street and Utility Standards. HWA Geosciences Inc. July 2009. Preliminary Geotechnical Evaluation, Task 2. Lake Washington Lift Station, Renton, Washington. Simicevic, Jadranka and Raymond L. Sterling. March 2001. Guidelines for Pipe Bursting. TTC Technical Report #2001.02. Washington State Department of Ecology. August 2008. Criteria for Sewage Works Design. July 21, 2009 - FINAL 12 pw \bco-pw-app:Carol o Documents\Client\WA1Renton\8235X000eliverables\Rpt - LakeWABeach.doc APPENDIX APPENDIX A PRELIMINARY GEOTECHNICAL EVALUATION RLT k HWA GEOSCIENCES INC. UGeotecimical & Paremcnt Engineering - Hydrogeology - Gcoetwirolimewal - Inspection & Testing July 09, 2009 HWA Project No. 2009-05 8-2 1 /Task 2 Carollo Engineers 1218 3rd Avenue, Suite 1600 Seattle, Washington 98101 Attention: Ms. Lara Kammereck, P.E. SUBJECT: PRELIMINARY GEOTECHNICAL EVALUATION Task 2. Lake Washington Lift Station Renton, Washington Dear Ms. Kammereck; As authorized in an Agreement for Professional Services, dated April 24, 2009, HWA GeoSciences Inc. (HWA) completed a preliminary geotechnical evaluation for the proposed Lake Washington Lift Station improvements, as part of the 2009 Wastewater Lift Station Pre -Design Contract that Carollo Engineers (Carollo) has entered into with the City of Renton. Task 2 of three tasks authorized by the Agreement for Professional Services is reported herein, with the remaining two submitted under separate cover and dealing with the Westview Lift Station (Task 1.) and the East Renton Lift Station (Task 3.). In general conformance with the scope of work, described for Task 2 of our Agreement for Professional Services with Carollo, this report presents our preliminary geotechnical evaluation related to pre -design efforts for the subject facility. In general, however, we understand that the City is considering its options of either replacement of the existing lift station with a new structure, or an alternative gravity sewer instead. PROJECT DESCRIPTION Though its location was not immediately apparent, during our brief site reconnaissance, we understand that the Lake Washington Lift Station is situated in the parking lot at the south entrance to Gene Coulon Memorial Beach Park. Survey plans indicate the station is situated within a treed island in the central part of the parking lot section located to the north of a grassed traffic circle island near the south entrance into the park. We understand the station is currently in need of replacement as it is aged and not performing to the City's expectations. We understand that the lift station replacement would be either on the same footprint as the existing station or right next to it in the parking lot. The lift station is estimated to be 8 feet in diameter and 17 feet deep. 19730 - 64th Avenue W. Suite 200 Lynnwood, WA 98036.5957 Tel: 425.774.0106 Fax: 425.774.2714 www.hwageo.com July 09, 2009 HWA Project No. 2009-05 8-2 1 /Task 2 In addition to evaluation of alternatives for lift station replacement, elimination of the lift station in favor of a new gravity sewer line is part of the pre -design task. Carollo has indicated that the potential new gravity sewer alignment will begin at a new manhole located directly upstream (west) of the existing lift station and travel south roughly 110 feet to a new manhole located in the grassed traffic circle island. The pipeline will then extend in a direction east and somewhat south to another new manhole location to be constructed within the roadway running along the east park boundary. This portion of the alignment is linear and entails of the order of 210 feet of new sewer, which passes beneath two, center boulevard, shrubbery beds separating the entry/exit lanes to the parking lot. The new manhole to be constructed in the entranceway will then joined by another new section of sewer line that will be extended southeast some 100 feet to an exiting manhole comprising a part of the King County Eastside Interceptor. We understand that the portion of sewer line traversing from the traffic circle to the new manhole and beneath the shrubbery beds will be an 8-inch diameter PVC line and must be installed by trenchless methods due to the sensitivity of the existing shrubbery beds. It is anticipated that tie-ins to the new section of sewer from the new manhole west of the existing pump station location, and from the new manhole at the parking lot entrance to the existing King County manhole, may be installed by open -trench methods. Preliminary information provided by Carollo indicates that the new lines will be installed at depths of 10 to 20 feet below existing grades from its start to the new manhole location. The project site location is indicated on the Vicinity Map, Figure 1, attached. Figure 2, Site and Exploration Plan, which was developed by PACE through survey of the immediate site area, shows the possible alternative gravity sewer alignment along with site topography and features. SITE CONDITIONS As indicated above, the subject sewer lift station is situated within a treed island in the north arm of the parking lot near the south entrance to Gene Coulon Memorial Beach Park. From the topographic mapping provided by Carollo (see Figure 2), it is apparent that the ground elevation at the existing lift station is approximately 28 feet, which is approximately 1 foot higher than the ground elevation of the traffic circle pavement and center grassed island. The ground surface rises gradually to the east and is at approximate elevation 31 feet where the new manhole is to be installed in the entrance road to the park. From this point to the tie-in with the King County system the ground continues to rise slightly to elevation 32 feet, but the King County manhole lies within a localized depression with a base elevation of about 28 feet. As may be expected for park development, the existing ground surface is covered by grassed and treed areas, as well as extensive asphaltic pavement in the area of the gravity sewer alignment. However, the alignment also crosses a creek which flows northward through the park and ultimately into Lake Washington. The new sewer will pass under the creek and, at the crossing location, will also pass under three, side -by -side, 72-inch diameter, corrugated metal pipe (CMP) culverts that conduct the creek flow beneath the parking lot access roadway. The survey plan Final Letter Report Task 2 2 HWA GeoSciences Inc. July 09, 2009 HWA Project No. 2009-05 8-2 1 /Task 2 (Figure 2) indicates that the invert elevations of the culverts range from about 18 to 18.9 feet at the upstream inlet ends to about 16.8 to 17.9 feet at their downstream outlet ends. These culverts appear to be of the order of 100 feet in length and the proposed trenchless section of sewer alignment will be approximately below their center. Based on existing contour information, it appears that the culvert crowns are about 4.5 to 5.5 feet below roadway pavement level. The culvert levels and their approximate locations are schematically indicated on Figure 3, which provides a ground profile along the sewer alignment based on the topographic information from the survey plan. Also indicated on the profile are the proposed sewer invert elevations, as indicated to us by Carollo, along with our interpretation of subsurface and ground water conditions from our site exploration borings BH-1 and BH-2, which are discussed later. Based on U.S. Army Corp of Engineers hydrometric data for Lake Washington, available from their website, the current water level in Lake Washington at the Ship Canal gauging station is approximately elevation 21.4 feet. Though the Lake water level fluctuates with time and seasonal conditions, it appears to be of the order of 5.5 to 9.5 feet lower than the ground surface level in the alternative sewer alignment location. Other existing site features that exist in close proximity of or near the alternative sewer alignment include parks buildings about 50 feet north of the alignment, a hydro -power transmission tower about 100 feet south of the alignment, and private residential development 150 feet or more from the alignment. Numerous other underground and/or above ground services criss-cross the alignment site. Some, none, or all of these other features may or may not be influenced by or have an influence on the sewer, as discussed later. GEOLOGY According to the Geologic Map of King County, Washington, by Derek P. Booth and Aaron P. Wisher (Booth et al, 2006), a portion of which is reproduced on Figure 4, the site is underlain by wetlands deposits (Qw on the map). Typically, one would surmise that these deposits would be largely organic and peaty in nature. The mapping also indicates a narrow band of alluvial deposits (Qal) adjoining the wetlands deposits on the east, and a large area of modified land (m) or artificial fill (af) to the south. These deposits are indicated to be non -glacial materials of Holocene Age, and the alluvial deposits are anticipated to be comprised of sand and/or gravel associated with post -glacial drainage courses, the local creek likely being a remnant drainage feature. The modified land or artificial fill is associated with man -initiated land reclamation and use activities and soil types are unknown as they are probably largely undocumented. In general, it is anticipated that the soil deposits in the site area are likely to be loose to medium dense in nature and of highly variable character and composition. REVIEW OF EXISTING DATA For the purposes of this assessment, HWA also reviewed existing subsurface data derived from previously conducted geotechnical investigations within the local area, as referenced below: Final Letter Report Task 2 3 HWA GeoSciences Inc. July 09, 2009 HWA Project No. 2009-05 8-2 1 /Task 2 Geotechnical Engineering Study, Proposed Southport Mixed -Use Development, I101 Lake Washington Boulevard, Renton, Washington, consultant report prepared for Seco Development (Geotech Consultants, Inc., 1999). A number of explorations were conducted in the residential development area east and south of Gene Coulon Memorial Park, which is relatively close to the project the site. A portion of the referenced report and the logs of the subsurface explorations considered pertinent to this assessment were reviewed, but since they are somewhat removed from the site are not included herein. Nevertheless, they do provide some indication of soil conditions within the mapped geologic units identified on Figure 4, and probable ground water conditions that may exist on and in close proximity to the lift station site. SUBSURFACE CONDITIONS Available geological and subsurface information for the general site area was supplemented by two exploration borings (BH-1 and BH-2) by HWA advanced on May 19, 2009. The approximate locations of these borings are indicated on the Site and Exploration Plan, Figure 2, and are in the vicinity of the entry and exit pits, respectively, that would be required for a trenchless construction installation of the sewer line. The boring depths ranged from 51.5 to 31.5 feet for BH-1 and BH-2, respectively. The borings were advanced by a truck -mounted, hollow -stem auger (HSA), drill rig, owned and operated by Holocene Drilling, Inc., under sub -contract to HWA. A geotechnical engineer from HWA directed the drilling operations, acquired samples for follow-up laboratory testing, and logged subsurface conditions. Detailed logs of the borings are included herewith, as Figures A-2 and A-3, and are preceded by Figure A-1, which is a Legend of Terms and Symbols used on Exploration Logs. This legend provides an aid to the interpretation of the logs. It is to be recognized, however, that the boundaries between soil units shown on the logs as distinct contacts are, in fact, likely to be indistinct and transitional in nature. Moreover, the conditions represented on the logs are for those specific locations only and conditions between these locations may vary substantially from either of the logs. Samples of the subsurface soil units were obtained from the borings by in situ Standard Penetration Test (SPT) sampling and testing means. The depth intervals of the SPT samples are indicated on the logs along with the penetration resistance values, represented as the number of blows for each 6-inch increment of penetration depth, or the actual depth of penetration for 50 blows if the penetration interval depth was less. The total number of blows to achieve the final 12 inches of penetration is considered to be the SPT N-value, and is an indicator of the in situ relative density or strength of the soil material, based on empirical correlations. The samples were returned to our laboratory and representative specimens of selected samples were tested to define engineering characteristics of the soils and refine their classifications. The testing was performed in accordance with standard ASTM testing procedures for the specific tests. Results of the tests, which included natural moisture content determinations, and particle Final Letter Report Task 2 4 HWA GeoSciences Inc. July 09, 2009 HWA Project No. 2009-05 8-2 1 /Task 2 size distributions, are presented on the boring logs in Appendix A, or on the Particle -Size Analysis of Soil plots, Figure B-1 and B-2, in Appendix B. Review of our exploration data, and that presented in the report referenced above, indicates that in general the area of the existing lift station and the proposed gravity sewer alignment is most likely underlain by man-made fill, underlain by an extensive depth of alluvium. The fill is comprised of a surficial cover of organic soils associated with landscaping activities in the park, or asphaltic concrete pavement placed for roadway and parking lots. These surficial materials were less than 6 inches in thickness at the boring locations, and are underlain by a fine to medium sand fill, which extends to depths of 3.5 feet and somewhat greater than 7 feet at the locations of BH-1 and BH-2, respectively. Some fine gravel and a boulder were noted near the base of the sand fill in BH-1. The sand is of variable density ranging from dense to very loose. Immediately underlying the sand fill, a layer of coal fill, with a thickness of approximately 5 to 6 feet, was observed in both borings. This coal fill was comprised of discrete, angular to sub -angular, clasts or particles and has the characteristics of a very loosely placed aggregate deposit. Native alluvial soils were observed in both of our borings directly below the coal fill at depths of approximately 10 and 12.5 feet in BH-1 and BH-2, respectively. In general, the alluvium is comprised of silty fine sand with occasional fine sandy silt interbeds or layers. This deposit is of variable density ranging from very loose to medium dense. In BH-1 a medium stiff, sandy, organic silt interbed was encountered at a depth interval of 45 to 50 feet. A coarse gravel layer was encountered at a depth of 30 feet in BH-2. Similar interbedding in the alluvium was noted in the borehole explorations for the private development to the south of the sewer alignment. On completion of our borings, ground water was observed only within BH-1, and at a depth of approximately 8 feet, which is approximately elevation 19 feet, and is lower than the current lake level elevation of 21.4 feet. It is probable that the measured water level did not represent stabilized conditions and we anticipate the approximate ground water level below the sewer project site to be at or somewhat above lake level at any point in time. CONCLUSIONS AND RECOMMENDATIONS In view of existing topographic and subsurface conditions at the Lake Washington Beach Lift Station site, it is our opinion that improvements may take the form of replacement of the existing station, at its present location or near by. Alternatively, replacement of the existing station with a new gravity line including new manhole structures is also a viable option from a geotechnical perspective. However, some design and construction constraints are presented by prevailing subsurface conditions at the site. The existing fill and native sandy alluvium soils present some challenges to construction of sewer facilities on this site, particularly at depths below the water table. Severe excavation wall and base instability is to be anticipated in these materials when extended below the water table, and this condition is to be anticipated for the proposed new gravity sewer and appurtenant Final Letter Report Task 2 5 HWA GeoSciences Inc. July 09, 2009 HWA Project No. 2009-05 8-2 1 /Task 2 manhole structures, whose inverts could be as much as 10 feet below ground water level at the project site. It will be necessary to dewater any open excavations extending below ground water level, and will be required for entry and exit pits for a trenchless installation method for the gravity sewer, for any associated manhole structures, and for any portions of the sewer that will be constructed by open -trench methods. The same would, of course, apply for excavation in conjunction with anew replacement lift station structure. In general, we believe that a well point dewatering system may be successfully employed at this site to dewater the silty sand alluvium expected at proposed invert elevations of the line, as represented on Figure 3. Although the contractor should be responsible for the design, installation, and operation of the dewatering system, we would anticipate dewatering well points in the vicinity of each of the access pits, at the manhole structures ,and at intervals of the order of 25 to 50 feet along the alignment. In our view, the ground water level should be depressed and maintained at a level not less than 3 feet below the invert level of any of the facilities to be constructed prior to and until all of the facilities are completed and properly backfilled, as appropriate. We recommend that sheet pile shoring be employed to provide stable entry and exit pit excavation walls and limit the lateral extent of these temporary construction elements. This consideration would also apply for a new lift station structure and any new manholes. At this time, we anticipate that sheet lengths of the order of 40 feet or greater will be necessary to provide for suitable base stability, for excavations of the order of 20 feet in depth and 10 feet in width, in the absence of any dewatering other than internal sumps. The sheet depth may be reduced depending on dewatering provisions and bracing layout, but the shoring and dewatering systems should be designed on behalf of the contractor by a professional engineer experienced in these aspects of construction. In consideration of the proposed sewer pipe size (8-inch diameter), and the access constraints of the site, we believe that a pipe jacking or jack and bore operation with advance dewatering of the alignment will be best suited to installation of the gravity sewer line for the trenchless interval. Typically, an over -sized casing is advanced by progressive jacking from the entry pit and removal of soils from the casing interior by horizontal auger drilling equipment. We understand that casing sizes ranging from 6 to 36 inches are common for such operations. Pipe ramming is another method that is similar to jack and bore methods and consists of pneumatic hammer advancement of the casing. Soil cleanout is undertaken either during advancement, to facilitate pipe penetration, or on completion, and the cleanout may be achieved by auger, air or hydraulic means. Typically, ramming methods are limited to smaller pipe sizes and lengths of 150 feet or less, but may be viable for the cohesionless alluvial soils at this site. In either case, the carrier pipe is inserted into the installed casing with suitable spacer provisions between the two and any void spaces are grouted. Though micro -tunneling equipment and methods are available that can install underground services in cohesionless soils without the need for dewatering, such installations are generally limited to pipe sizes not less than 1 foot in diameter, and more commonly are applied for installations considerably larger. The micro -tunneler is inserted into the entry pit and controlled remotely from the pit exterior. Stability of the cut face is controlled by compensating pressure Final Letter Report Task 2 6 HWA GeoSciences Inc. July 09, 2009 HWA Project No. 2009-05 8-2 1 /Task 2 applied to the face and soils are removed through the cutting head as the tunneler is advanced. However, we do not believe that this method would be suitable for this project due to the small pipe size proposed. Horizontal directional drilling (HDD) pipe installation methods have been successfully employed on many occasions to install underground services of the size proposed herein in unstable water bearing soils. However, the confined locations of the entry and exit pits, particularly the latter, would make it very difficult to achieve the invert profile proposed. Normally, the entry and exit locations are selected as a function of the curvature limits of the drill stem and the pipe element to be installed. This requires that the entry and exit locations need to be setback sufficiently from the end target installation points to permit the drill stem to follow a curvilinear path that will coincide with the desired pipe profile. We do not believe that this could be achieved very readily, if at all, at this site. The presence of underground obstructions, typically consisting of boulders, logs or other woody debris, or construction materials included in fills, can be problematic for all of the trenchless installation methods if they occur within the path of the advancing casing pipe, and could also pose problems for advancement of sheet piles for shoring purposes. Obstructions are particularly problematic for small diameter casing that are not large enough to permit man -entry to clear the obstruction. It is apparent that the site has received fill materials associated with operations undertaken by man on the site in the past. The presence of the coal fill, for example, is understood to be related to former coal handling facilities that existed in this area of the lake shore in the past. Although the on -site fill material is situated above the pipe profile, it is unknown if old piling may have been driven in this area to support former dock or other structures associated with these coal handling operations, but this could be a possibility. The alluvium in which the pipe will be installed may also contain logs and woody debris that may have been transported by water to the site location. Boulders could also be encountered in the alluvium, but their presence is considered less likely. Though our borings did not encounter any obstructions, we recommend that contractual language be included in the project bid documents to indicate their possible presence to contractors, such that the associated construction risks may be included in the contract bid prices. For the open -trench portions of the sewer pipe installation, we recommend that the contract documents require that the contractor provide positive shoring methods, in conjunction with advance dewatering, to limit the extent of the trench excavations and their impact on the access roads to the park and the parking lot areas. We anticipate that pavement within the trench limits will be saw -cut and the excavation will be suitably supported to prevent trench wall collapse and undermining of the pavement. Trench boxes may be utilized for worker safety, but they should be of the type that permit jacking of the shield walls to provide positive contact and support for the excavated soils. Dewatering along the open -trench excavation alignment should ensure that ground water is depressed and maintained at least 3 feet below trench base level. Care should be exercised in trimming of the trench base to final grade and we recommend a smooth -edge excavator bucket Final Letter Report Task 2 7 HWA GeoSciences Inc. July 09, 2009 HWA Project No. 2009-05 8-2 1 /Task 2 be utilized to minimize disturbance and the need for recompaction. If excessively softened or disturbed materials remain at trench base level, or organic or other deleterious materials are present, they should be sub -excavated a minimum depth of 1 foot and the area backfilled with bedding material. Typically, pipes should be bedded and trenches backfilled with the appropriate materials meeting the requirements stated in the 2008 WSDOT Standard Specifications for Road; Bridge, and Municipal Construction. A minimum 6-inch thickness of bedding material is recommended beneath pipes placed in open trenches, and this should be shaped to provide uniform support for the pipe and extend at least 1 foot above the crown. Trench backfill should comprise Gravel Borrow as specified in the 2008 WSDOT Standard Specifications, or it may consist of Native Material for Trench Backfill, as approved by the project geotechnical engineer subsequent to examination. Beneath roadway areas, areas to be paved or areas where settlement is a concern, backfill placed above the pipe zone and to within 2 feet of the ground surface should be compacted to at least 90 percent of the Modified Proctor maximum dry density (MDD), and backfill placed within 2 feet of the ground surface should be compacted to at least 95 percent of the Modified Proctor MDD. Manholes or a new lift station structure should be supported on a prepared pad of granular fill comprising either 4-inch minus quarry spalls or granular bedding material utilized for pipe support. We recommend a minimum 1-foot thickness of this material for support of the precast bases for manholes or a new lift station structure. CLOSURE We have prepared this assessment for Carollo Engineers and the City of Renton for use in preliminary design of this project. The conclusions and interpretations presented in this report are based upon review of pre-existing field data supplemented by a couple of borings at the extremities of a section of a potential alternative gravity sewer that would necessitate installation by trenchless methods. The subsurface conditions described and/or portrayed herein should not, however, be construed as our warranty of existing actual subsurface conditions. Experience has shown that soil and ground water conditions can vary significantly over small distances. Inconsistent conditions can occur between exploration locations and may not be detected by a geotechnical study of this nature. If, during future site operations, subsurface conditions are encountered which vary appreciably from those described herein, HWA should be notified for review of the recommendations of this report, and revision of such if necessary. Sufficient geotechnical monitoring, testing, and consultation should be provided during detailed design and subsequent construction to confirm that the actual conditions encountered are consistent with those indicated by the explorations, to provide recommendations for design changes should conditions revealed during construction differ from those anticipated, and to verify that geotechnical aspects of construction comply with the contract plans and specifications. Final Letter Report Task 2 8 HWA GeoSciences Inc. July 09, 2009 HWA Project No. 2009-05 8-2 1 /Task 2 Our work scope did not include environmental assessments or evaluations regarding the presence or absence of wetlands or hazardous substances in the soil, surface water, or ground water at this site. O ' O We appreciate the opportunity to provide geotechnical services on this project. Sincerely, HWA GEOSCIENCES INC. Lorne A. Balanko, P.E. Geotechnical Engineer, Principal Attachments: Figure 1 Vicinity Map Figure 2 Site and Exploration Plan Figure 3 Ground & Geologic Profile Figure 4 Geologic Map Appendices: Appendix A Field Investigation Appendix B Laboratory Testing Final Letter Report Task 2 9 HWA GeoSciences Inc. July 09, 2009 HWA Project No. 2009-058-21/Task 2 REFERENCES Booth, Derek P and Wisher, Aaron P, 2007; Geologic Map of King County, Washington. Geotech Consultants, Inc., 1999; Geotechnical Engineering Study, Proposed Southport Mixed - Use Development, 1101 Lake Washington Boulevard, Renton, Washington, consultant report prepared for Seco Development. Final Letter Report Task 2 10 HWA GeoSciences Inc. L a A e W 1 h i n g t o n 6 Taft St Lakeridga i' cC p' Bryn Mawr e S 1121h SI 3 115tn Pt F��il� rat, tt%th It I I - �� L� Z 15 -- Q L AAj ILA T C s li Soo - ..- <ess asoi Lil rJ;rd ns�- �Si4th t � �iTv r I- DE-KITnKI r ,/� - •t / w VICINITY MAP HWAGEOSCIENCES INC. LAKE WASHINGTON LIFT STATION RENTON, WASHINGTON )JECT SITE t t rI 7 R �„ p r / 4 NOTTO S.=-_= DRAWN BY EFK FIGURE N0. CHECK BY LB PROJECT N0. DATE 06.17.09 2009-058-21 P w—w eN :11— ■ 4a- - -- _- LEGEND BH-1 BOREHOLE DESIGNATION AND APPROXIMATE LOCATION BASE MAP PROVIDED BY PACE — FROM PDF DATED MAY 4TH 2O09 ti F EXISTING PUMP STATION f � ` I I � I I ALTERNATIVE GRAVITY SEWER ALIGNMENT s- 01 is Ili 1 s (r /* i �� r-•- r� I1' j r 1 us �', � ` i ! � �---:��- l �i-rP � sow�r•�wr rr«a. fJJ / ti r� ', •tea mii�[ .e+w.a ca.• ,• � - ! �� f � • � i• % t r HWAGEOSCIENCESINC LAKE WASHINGTON LIFT STATION RENTON, WASHINGTON 0' 30' 60' 120' SITE AND EXPLORATION PLAN FIGURE NO. DRAWN BY EFK 2- CHECK BY LB PROJECT NO. DATE 06.17.09 2009-058-21 0 40 35 30 25 20 15 10 5 0 -5 -10 -15 -20 -25 RH-1 --- (FILL) ----- ------------------- " DIA PVC E. 13.0± (ALLUVIUM) INN 0 20 40 60 80 100 120 DISTANCE ALONG BASELINE (FEET) INFERRED GEOLOGIC CONTACT - - - - APPROXIMATE GROUND WATER LEVEL BH-2 140 160 180 200 40 35 30 25 20 15 10 5 0 -5 -10 -15 -20 -25 ` HWAGEOSCIENCES INC. LAKE WASHINGTON LIFT STATION RENTON, WASHINGTON LITHOLOGY GRAPHICS Topsoil Asphalt USCS Silty Sand USCS Poorly -graded Sand (FILL) Coal (FILL) USCS Poorly -graded Sand with Silt USCS Low Plasticty Organic silt or clay 0' 10' 20' 40' SCALE: 1:1 FIGURE NO. DRAWN BY EFK GROUND & GEOLOGIC 3 CHECK BY LB PROFILEPRO]ECf NO. DATE 06.17.09 2009-058-21 S:\2009 PROJECTS\2009-058-21 RENTON LIFT STATIONS PHASE 1\CAD 2009-058\HWA2009-058 LW.DWG <FIG 4> Plotted: 7/8/2009 1:28 PM LAKE WASHINGTON T" f. 4:pt Qal ■ C off 0 ■ 4,4 KE ' Qw ■ Qvr -, Description of Map Units ■ Nonglaclal Deposits (Holocene) O Ow - Wetland deposts ■ O Gal - Alluvium O m or of - Modified lands/Artiflcal fill Deposit of Fraser Glaciation (Pleistocene) O Qvr - Vashon recessional outwash deposits ■ O Gvt -Vashon subglaclal meltout till Older glacial and nonotaclal deposits (Pleistocene) Gpf - Pre -Fraser deposits, undifferentiated ■ Bedrock Tpt - Tukwila Formation ■ This section is from "Geologic map of King County" ■ by Derek, P. Booth & Aaron P. Wisher - February 2006 GEOLOGIC MAP HWAGEOSCIENCES INC LAKE WASHINGTON LIFT STATION RENTON, WASHINGTON LJ -- 1 ( Ili NOT TO SCALE w •l Cl DRAWN BY EFK FIGURE NO. CHECK BY LB 4 PROJECT NO. DATE 06.17.09 2009-058-21 1 RENTON LIFT APPENDIX A FIELD INVESTIGATION RELATIVE DENSITY OR CONSISTENCY VERSUS SPT N-VALUE COHESIONLESS SOILS COHESIVE SOILS Approximate Density IN(blows/ft) Approximate Consistency N (blowstft) Undrained Shear Relative Density(°h) Strength (psf) Very Loose 0 to 4 0 - 15 Very Soft 0 to 2 <250 Loose 4 to 10 15 - 35 Soft 2 to 4 250 - 500 Medium Dense 10 to 30 35 - 65 Medium Stiff 4 to 8 500 - 1000 Dense 30 to 50 65 - 85 Stiff 8 to 15 1000 - 2000 Very Dense over 50 85 - 100 Very Stiff 15 to 30 2000 - 4000 Hard Iover 30 >4000 USCS SOIL CLASSIFICATION SYSTEM MAJOR DIVISIONS GROUP DESCRIPTIONS Gravel and GW Well -graded GRAVEL Coarse Clean Gravel •' Grained Gravelly Soils (l the or no fines) o Q GP Poorly graded GRAVEL Soils More than 50% of Coarse Gravel with o GM Silly GRAVEL Fraction Retained Fines (appreciable on No. 4 Sieve amount of fines) GC Clayey GRAVEL Sand and Clean Sand •• SW Well -graded SAND More than Sandy Soils (little or no fines) SP Poorly -graded SAND 50% Retained 50% or More on No. of Coarse Sand with SM Silty SAND 200 Sieve Fines (appreciable Fraction Passing Size amount of fines) SC Clayey SAND No. 4 Sieve ML SILT Fine Sift CL Lean CLAY Grained and Liquid Limit Soils Less than 50% Clay _ OL Organic SILT/Organic CLAY MH Elastic SILT 50% or More Sift Liquid Limit Passing and 50% or More CH Fat CLAY No. 200 Sieve Clay y Size OH Organic SILT/Organic CLAY Highly Organic Soils PT PEAT COMPONENT DEFINITIONS COMPONENT SIZE RANGE Boulders Larger than 12 in Cobbles 3 in to 12 in Gravel 3 in to No 4 (4.5mm) Coarse gravel 3 in to 314 in Fine gravel 3/4 in to No 4 (4.5mm) Sand No. 4 (4.5 mm) to No. 200 (0.074 mm) Coarse sand No. 4 (4.5 mm) to No. 10 (2.0 mm) Medium sand No. 10 (2.0 mm) to No. 40 (0.42 mm) Fine sand No. 40 (0.42 mm) to No. 200 (0.074 mm) Silt and Clay Smaller than No. 200 (0.074mm) TEST SYMBOLS %F Percent Fines AL Atterberg Limits: PL = Plastic Limit LL = Liquid Limit CBR California Bearing Ratio CN Consolidation DID Dry Density (pcf) IDS Direct Shear GS Grain Size Distribution K Permeability MD Moisture/Density Relationship (Proctor) MR Resilient Modulus PID Photoionization Device Reading PP Pocket Penetrometer Approx. Compressive Strength (tsf) SG Specific Gravity TC Triaxial Compression TV Torvane Approx. Shear Strength (tsf) UC Unconfined Compression SAMPLE TYPE SYMBOLS ® 2.0" OD Split Spoon (SPT) (140 lb. hammer with 30 in. drop) IShelby Tube 3-1/4" OD Split Spoon with Brass Rings OSmall Bag Sample Large Bag (Bulk) Sample Core Run Non-standard Penetration Test (3.0" OD split spoon) GROUNDWATER SYMBOLS Q_ Groundwater Level (measured at time of drilling) 1 Groundwater Level (measured in well or open hole after water level stabilized) COMPONENT PROPORTIONS PROPORTION RANGE DESCRIPTIVE TERMS < 5% Clean 5 - 12% Slightly (Clayey, Silty, Sandy) 12 - 30% Clayey, Silty, Sandy, Gravelly 30-50% Very (Clayey, Silty, Sandy, Gravelly) Components are arranged in order of increasing quantities. NOTES: Soil classifications presented on exploration logs are based on visual and laboratory observation. Soil descriptions are presented in the following general order: Density/consistency, color, modifier (if any) GROUP NAME, additions to group name (if any), moisture content. Proportion, gradation, and angularityofconstituents, additional comments. (GEOLOGIC INTERPRETATION) Please refer to the discussion in the report text as well as the exploration logs for a more complete description of subsurface conditions. U0111 HMGEOSCIENCES INC. Renton Lift Stations Phase 1 MOISTURE CONTENT DRY Absence of moisture, dusty, dry to the touch. MOIST Damp but no visible water. WET Visible free water, usually soil is below water table. LEGEND OF TERMS AND SYMBOLS USED ON EXPLORATION LOGS PROJECT NO.: 2009-058-21 FIGURE: A-1 LEGEND 2009058.GPJ 6/18/09 DRILLING COMPANY: Holocene Drilling, Inc LOCATION: See Figure 2: Site and Exploration Plan DRILLING METHOD: HSA DATE STARTED: 05/15/2009 11:00:00 AM SAMPLING METHOD: SPT-AUTO DATE COMPLETED: 05/15/2009 2:00:00 PM SURFACE ELEVATION: 27.00 t feet LOGGED BY: D. Maloney g U J 0 a U o U)i 0 ---1 r-rr-7-- 5- 1 10- SM 1 15- 1 20- 1 25 - w U m Z W IL L Q ~Lu Z LU F Lu to W Z d d N z ? x O ¢ ¢ Lu o DESCRIPTION C6 rn o- 8 O 0 Organic rich topsoil. Dense, brown to gray, silty, fine to medium SAND with trace fine gravel, moist. [FILL] Driller Notes: Boulder encountered, difficult to maintain I S-1 3-14-16 vertical orientation in drill stem Very loose, black, sandy, fine, angular to sub angular, COAL S-2 4-7-11 clasts, wet. [COAL FILL] ® S-3 2-5-5 Q Very loose, gray, silty, fine SAND with lenses of medium to coarse sand, wet. [ALLUVIUM] Becoming Silty Loose, dark gray, silty, SAND to sandy SILT, wet. Fine to coarse [ALLUVIUM] Becoming Medium Dense Driller Notes: Couple inches of heave, adds water I� S-4 0-1-2 GS S-5 1-1-1 S-6 0-0-2 GS S-7 0-0-7 S-8 3-6-13 INS-9 7-8-7 30 For a proper understanding of the nature of subsurface conditions, this exploration log should be read in conjunction with the text of the geotechnical report. NOTE: This log of subsurface conditions applies only at the specified location and on the date indicated and therefore may not necessarily be indicative of other times and/or locations. Standard Penetration Test (140 lb. weight, 30" drop) ♦ Blows per foot 10 20 30 40 0 20 4U bu tju Water Content (%) Plastic Limit 1--0 Liquid Limit Natural Water Content 2 a w 50 0 -i r0 F-10 I 1--15 1 F— 20 1 1-- 25 1 -J L-- 30 I 100 BORING: gooRenton Lift Stations Phase 1 BH-1 fMGEOSCIENCES INC. PAGE: 1 of 2 PROJECT NO.: 2009-058-21 FIGURE: A-2 BORING 2009058.GPJ 6/24/09 DRILLING COMPANY: Holocene Drilling, Inc LOCATION: See Figure 2: Site and Exploration Plan DRILLING METHOD: HSA DATE STARTED: 05/15/2009 11:00:00 AM SAMPLING METHOD: SPT-AUTO DATE COMPLETED: 05/15/2009 2:00:00 PM SURFACE ELEVATION: 27.00 t feet LOGGED BY: D. Maloney to 5 U J_ J O U a Co U 0 U) LU D 30 ---1 1 35 - 1 40- 1 45 - 1 50 - 1 55 - 1 60- DESCRIPTION Terminated at 51.5 feet bgs. Ground water encountered at 8 feet bgs. w U LLI m Z- H W CL Z � L U Lu r Lu ~ a a (O N W Z Z) 2 Z 7 Lu S O can va i a Z o ((7 0 S-10 3-6-8 f XS-11 2-7-12 X S-12 XS•13 0-2-5 XS-14 5-9-11 For a proper understanding of the nature of subsurface conditions, this exploration log should be read in conjunction with the text of the geotechnical report. NOTE: This log of subsurface conditions applies only at the specified location and on the date indicated and therefore may not necessarily be indicative of other times and/or locations. Standard Penetration Test (140 lb. weight, 30" drop) A Blows per foot d y 10 20 30 40 50 0 . r— 30 i f— 35 1 F-45 1 1--50 1 �— 55 1 0 20 40 60 80 100 Water Content (%) Plastic Limit ' 0 Liquid Limit Natural Water Content BORING: Renton Lift Stations Phase 1 BH-1 HMGEOSCIENCES INC. PAGE: 2 of 2 PROJECT NO.: 2009-058-21 FIGURE: A-2 BORING 2009058.GPJ 6/24/09 DRILLING COMPANY: Holocene Drilling, Inc LOCATION: See Figure 2: Site and Exploration Plan DRILLING METHOD: HSA DATE STARTED: 05115/2009 SAMPLING METHOD: SPT-AUTO DATE COMPLETED: 05/15/2009 SURFACE ELEVATION: 31.00 t feet LOGGED BY: D. Maloney 1 10- 1 15 - 1 20- 1 25 - DESCRIPTION Pavement - 4 inches w U Lu m Z- W D} L U Q Z N r Lu LU d _J x y w Z 2 2zo x x o vai vai a a O ( NS-1 2-2-1 Very loose, olive -brown, fine to medium SAND, moist. [FILL] S-2 1-1-1 ---------------------- XS-3 0-1-1 GS Very loose, black, sandy, fine, angular to sub angular, COAL S-4 1-2-2 clasts, wet. [COAL FILL] ML S-5 0-1-1 SM Driller Notes: Wet Rods at 15 feet. Very soft, gray, sandy, SILT with lenses of medium to coarse S-6 0-1-1 GS sand, wet. [ALLUVIUM] Medium Dense, gray, silty, fine to coarse SAND with trace S-7 3-8-8 fine gravel, wet. � N XS-8 2-3-9 30w.i'u'L - ---- ----------------------' For a proper understanding of the nature of subsurface conditions, this exploration log should be read in conjunction with the text of the geotechnical report. NOTE: This log of subsurface conditions applies only at the specified location and on the date indicated and therefore may not necessarily be indicative of other times and/or locations. Standard Penetration Test (140 lb. weight, 30" drop) ♦ Blows per foot 10 20 30 40 n 9n An sn Bn if Water Content (%) Plastic Limit lam—] Liquid Limit Natural Water Content —10 1 1— 20 1 1-- 25 1 L-30 0 BORING: Renton Lift Stations Phase 1 BH-2 HMGEOSCIENCES INC. PAGE: 1 of 2 PROJECT NO.: 2009-058-21 FIGURE: A-3 BORING 2009058.GPJ 6124/09 DRILLING COMPANY: Holocene Drilling, Inc LOCATION: See Figure 2: Site and Exploration Plan DRILLING METHOD: HSA DATE STARTED: 05/15/2009 SAMPLING METHOD: SPT-AUTO DATE COMPLETED: 05/15/2009 SURFACE ELEVATION: 31.00 t feet LOGGED BY: D. Maloney CO W � 5LuW U a.j i L U) J J W W F- W C W = m U) cn J o_ J n. N � � _ Lou O N j DESCRIPTION U)i w a s 30 S-9 5-8-10 GP Note: No recovery, resampled using modified call mia ° sampler Medium dense, gray, sandy, fine to coarse GRAVEL, wet. Terminated at 31.5 feet bgs. No Ground water observed in hole. 1 35 - 1 40 - 1 45 - 50 - 55 - 60- For a proper understanding of the nature of subsurface conditions, this exploration log should be read in conjunction with the text of the geotechnical report. NOTE: This log of subsurface conditions applies only at the specified location and on the date indicated and therefore may not necessarily be indicative of other times and/or locations. o: Standard Penetration Test (140 lb. weight, 30" drop) o♦ Blows per foot Z = Z F LLJ 0 20 40 60 80 Water Content (%) Plastic Limit 1--0 Liquid Limit Natural Water Content —35 —45 150 55 J L 60 100 BORING: Renton Lift Stations Phase 1 BH-2 HMGEOSCIINCES INC. PAGE: 2 of 2 PROJECT NO.: 2009-058-21 FIGURE: A-3 BORING 2009058.GPJ 6/24/09 APPENDIX B LABORATORY TESTING U.S. STANDARD SIEVE SIZES 3/4" 3" 1-1/2" 5/8" 3/8" #4 #10 #20 #40 #60 #100 #200 100 I I I I I I I I I I I I I I 90 I I I I I I I I I I I I I I I I I I I F- $0 I I I I I I I I I = I I I I I I I I I I w 70 I I I I I I I I I I 2 I I I I I I I I I I } 60 I I I I I I I I I coI I I I I I I I I W 50 I I I I I I I I I I z LL I I I I I 1 I I I I 1 I I I I I I 1 I I H 40 I I I I I I I 1 I I Z I I I I I I I I I W I I I I I I I I I U 30 W I I I I I I I I I I 11 I I I I I I I I I 20 i I I I I I I I I I I I I I I I I I I I 10 I I I I I I I I I I I I I I I I I I I I 0 50 10 5 1 0.5 0.1 0.05 0.01 0.005 0.001 0.0005 GRAIN SIZE IN MILLIMETERS GRAVEL GRAVEL SAND SILT CLAY Coarse Fine Coarse Medium Fine SYMBOL SAMPLE DEPTH (ft) CLASSIFICATION OF SOIL- ASTM D2487 Group Symbol and Name % MC LL PL PI Gravel Sand Fines • BH-1 S-4 10.0 - 11.5 (SM) Very dark brown, silty SAND 33 1.8 74.7 23.5 ■ BH-1 S-6 15.0 - 16.5 (ML) Dark olive brown, SILT 66 0.0 8.7 91.3 A BH-2 S-3 7.5 - 9.0 (SM) Brown, silty SAND 26 5.3 75.5 19.3 1 PARTICLE -SIZE ANALYSIS Renton Lift Stations Phase 1 OF SOILS HWAGEOSCIENCES INC. METHOD ASTM D422 PROJECT NO.: 2009-058-21 FIGURE: B-1 HWAGRSZ 2009056.GPJ 6/24/09 1 PARTICLE -SIZE ANALYSIS Renton Lift Stations Phase 1 OF SOILS HWAGEOSCIENCES INC. METHOD ASTM D422 PROJECT NO.: 2009-058-21 FIGURE: B-1 HWAGRSZ 2009056.GPJ 6/24/09 U.S. STANDARD SIEVE SIZES 3/4" 3" 1-1/2" 5/8" 3/8" #4 #10 #20 #40 #60 #100 #200 100 I I I I I I I I I I I I I I I I 90 I I I I I I I I I I I I I I I I I I I H 80 I I I I I I I I I I = I I I I I I I I I I w 70 I I I I I I I I I I 2 I I I I I I I I I I 6o I I I I I I I I I I m I I I I I I I I I I � I I I I I I I I I 1 w 5o I I I I I I I I I I Z I I I I I I I I I I LL I I I I I I I I I I I— 40 Z I I I I I I I I I I w I I I I I I I I I I U 30 IY I I I I I I I I I I d I I I I I I I I I I 20 I I I I I I I I I I I I I I I I I I I I 10 0 �il I I I I I I I I I I I I I I I I I I I 1 1 __IJ I III 50 10 5 1 0.5 0.1 0.05 0.01 0.005 0.001 0.0005 GRAIN SIZE IN MILLIMETERS GRAVEL GRAVEL SAND SILT CLAY Coarse Fine Coarse Medium Fine SYMBOL SAMPLE DEPTH (ft) CLASSIFICATION OF SOIL- ASTM D2487 Group Symbol and Name % MC LL PL pl Gravel Sand Fines • BH-2 S-6 15.0 - 16.5 (ML) Dark olive gray, SILT 43 0.1 13.0 86.9 Renton Lift Stations Phase 1 OF SOILS HWAGEOSCIENCES INC. METHOD ASTM D422 PROJECT NO.: 2009-058-21 FIGURE: B-2 PARTICLE -SIZE ANALYSIS HWAGRSZ 2009058.GPJ 6/24/09 Renton Lift Stations Phase 1 OF SOILS HWAGEOSCIENCES INC. METHOD ASTM D422 PROJECT NO.: 2009-058-21 FIGURE: B-2 PARTICLE -SIZE ANALYSIS HWAGRSZ 2009058.GPJ 6/24/09 APPENDIX B COST ANALYSIS SPREADSHEETS COST ANALYSIS SUMMARY SHEET - LAKE WASHINGTON BEACH LIFT STATION ALTERNATIVES ANALYSIS Total Direct Cost Contingency General Contractor Overhead, Profit, and Risk Sales Tax 9.5% General Conditions 5% Total Construction Cost Allied Costs Total Project Cost 26- Year Life Cycle Cost -- Cost Factors -- 30°% 10°% 30% -- Project Alternatives Alternative 1 - Lift Station Replacement $166,300 $49,900 $21 700 $22,700 $13,100 $280,000 $84,000 $370,000 $660,000 Alternative 2 - Lift Station Replacement $158 000 $47,400 $20,600 $21 500 $12 400 $260,000 $78,000 $340,000 $720,000 Force Main Replacement Alternative $24,300 $7,300 $3.200 $3,400 $2,000 $41,000 $13,000 $54,000 — Alternative 3 - Gravitv Sewer Route $326,700 $98.100 $42.500 $44.400 $25.600 S640.000 $162.000 S710.000 5740.000 The cost estimate herein is based on our perception of current conditions at the project location. This estimate reflects our professional opinion of accurate costs at this time and is subject to change as the project design matures. Carollo Engineers have no control over variances in the cost of labor, materials, equipment nor services provided by others, contractor's means and methods of executing the work or of determining prices, competitive bidding or market conditions, practices or bidding strategies. Carollo Engineers cannot and does not warrant or guarantee that proposals, bids or actual construction costs 411 not vary from the costs presented as shown. Project: City of Renton Wastewater Lift Stations Job #: 8235A00 Location: Renton. WA Element: 01 Lake WA Beach New LS DETAILED COST ESTIMATE Date : By : Reviewed: June 4, 2009 Tyler Whitehouse Brian Casey SPEC. NO. DESCRIPTION QUANTITY UNIT UNIT COST SUBTOTAL TOTAL Division 02 - Site Construction 02000 Misc Site Restoration Allowance LS 1.00 LS $2,000.00 $2,000.00 02220 02220 Asphalt Pavement Cuttin Remove 2"-3" Asphaft Pavement 192.00 inFT 256.00 SF $.78 $.37 $150 $96 02220 Asphalt Pavement Cutting 90.00 irfT $.78 $70 02220 Remove 2"-3" Asphaft Pavement 75.00 SF $.37 $28 02220 02240 02260 02260 Core Drilling, 12" Diameter 10Hp Submersible Pump, 3" Elect Sheet Piling, 27VSf To 20' Deep, Pulled & Salvaged (Pits Only) Solid Shoring, 16 D, Wood Planks, Stringers & X-Bracing 0.50 20.00 952.00 15.00 LF DAY SF LF $157.10 $144.42 $37.32 $83.12 $79 $2.888 $35,525 $1,247 02300 Cat 225 Trackhoe, 314Cy Bucket, Gass B (Medium Digging), 0-16 D 123.41 CY $6.83 $843 02300 20 Cy Dump Truck, 10 Miles/Round Trip 31.85 CY $5.14 $163 02300 Cat 225 Trackhoe, 3/4Cy Bucket, Class B (Medium Digging), 0-16' D 20.00 CY $6.83 $137 02300 10 Cy Dump Truck, 10 Miles/Round Trip 2.78 CY $9.30 $26 02300 Imported Pipe Bed & Zone/Confined Structure Backfill, Class B Material 2.78 CY $68.64 $191 02300 Native Trench Backfill/Unconfined Struct Bf, Class B Material 17.22 CY $17.31 $298 02300 Native Trench Backfill/Unconfined Struct. Bf, Class B Material 98.96 CY $17.31 $1,679 02742 3" Pavement Replacement On 6" Abc Over Trench 256.00 SF $6.18 $1.583 02742 3" Pavement Replacement On 6" Abc Over Trench 75.00 SF $6.18 $464 Total $47,454 Division 03 - Concrete 03300 6" Flat Non -Formed Slab On Grade 1.45 CY $368.82 $535 03300 6" Edge Forms Flat Slabs On Grade, Add 31.42 LF $4.97 $156 Total $691 Division 05 - Metals 05000 Influent Basket 0.00 LS $1,101.34 $.00 Total $0 Division 11 -Equipment 11000 Vaughan Packaged Duplex Chopper Pump LS 1.00 LS $88,315.00 $88,315.00 11000 H dromatic Packaged Duplex Non -clog Pump LS 0.00 LS $78,964.00 $.00 Total $88,315 Division IS - Mechanical 15000 Misc Mechanical LS 1.00 LS $4,345.07 $4.345.07 15000 4" Force Main Connection Installation 20.00 LF $103.90 $2,078.00 15265 8" Class 150 Dr.18 C-900 Pvc Pipe In Trench 15.00 LF $15.46 $232 Total $6,656 Division 16 - Electrical 16000 Misc ElectricaUlnstrumentation 1.00 LS $4.218.34 $4,218.34 16000 Standard Control Panel 1.00 LS $16.873.36 $16,873.36 16000 Electrical Connection Allowance 1.00 LS $2.000.00 $2,000.00 Total $23,092 Grand Total $166,217 W ua rM 9"M us cer 90USM "uke WA See new is Page 1 of 1 FOW ryr �,.,. 'C ca•y- �, Project: City of Renton Wastewater Lift Stations Job #: 8235A00 Location: Renton, WA Element: 01 Lake WA Beach New LS DETAILED COST ESTIMATE Date: June 4, 2009 By : Tyler Whitehouse Reviewed: Brian Casey SPEC. NO. DESCRIPTION QUANTITY UNIT UNIT COST SUBTOTAL TOTAL 02000 Division 02 - Site Construction Misc Site Restoration Allowance LS 1.00 LS $2,000.00 $2,000.00 02220 Asphalt Pavement Cutting 192.00 inFT $.78 $150 02220 Remove 2"-3" Asphalt Pavement 256.00 SF $.37 $96 02220 Asphalt Pavement Cutting 90.00 inFT $.78 $70 02220 Remove 2"," Asphalt Pavement 75.00 SF $.37 $28 02220 Core Ddlfi , 12" Diameter 0.50 LF $157.10 $79 02240 10Hp Submersible Pump, 3" Elect. 20.00 DAY $144.42 $2,888 02260 Sheet Piling, 27#1Sf To 2V Deep, Pulled & Salvaged (Pits Only) 952.00 SF $37.32 $35,525 02260 Solid Shoring, 16' D, Wood Planks, Stringers & X-Bracing 15.00 LF $83.12 $1,247 02300 Cat 225 Trackhoe, 314Cy Bucket, Class B (Medium Digging), 0-16 D 123.41 CY $6.83 $843 02300 20 Cy Dump Truck, 10 Miles/Round Trip 31.65 CY $5.14 $163 02300 Cat 225 Trackhoe, 3/4Cy Bucket, Class B (Medium Digging), 0-16' D 20.00 CY $6.83 $137 02300 10 Cy Dump Truck, 10 Miles/Round Trip 2.78 CY $9.30 $28 02300 02300 Imported Pipe Bed & Zone/Confined Structure Backfill, Class B Material Native Trench BackfilUUnconfined Struct. Bf, Class B Material 2.78 17.22 CY CY $68.64 $17.31 $191 $298 02300 Native Trench Backfill/Unconfined Struct. Bf, Class B Material 96.96 CY $17.31 $1,679 02742 3" Pavement Replacement On 6" Abc Over Trench 256.00 SF $6.18 $1,583 02742 3" Pavement Replacement On 6" Abc Over Trench 75.00 SF $6.18 $464 Total $47,464 Division 03 - Concrete 03300 6" Flat Non -Formed Slab On Grade 1.45 CY $368.82 $535 03300 6" Edge Forms Flat Slabs On Grade, Add 31.42 LF $4.97 $156 Total $691 Division 05 - Metals 05000 Influent Basket 1.00 LS $1,101.34 $1,101.34 Total $1,101 Division 11 -Equipment 11000 Vaughan Packaged Duplex Chopper Pump LS 0.00 LS $88,315.00 $.00 11000 Hydromatic Packaged Duplex Non -clog Pump LS 1.00 LS $78.964.00 $78,964.00 Total $78,964 Division 15 - Mechanical 15000 Misc Mechanical LS 1.00 LS $4,345.07 $4,345.07 15000 4" Force Main Connection Installation 20.00 LF $103.90 $2,078.00 15265 8" Class 150 Dr.18 C•900 Pvc Pipe In Trench 15.00 LF $15.46 $232 Total $6,655 Division 16 - Electrical 16000 Misc ElectricaUlnstrumentation 1.00 LS $4,218.34 $4,218.34 16000 Standard Control Panel 1.00 LS $16,873.36 $16,873.36 16000 Electrical Connection Allowance 1,00 LS $2.000.00 $2,000.00 Total $23,092 Grand Total $157,967 fix LM* Ww I,.m 10s am Em"d#."l uw wx 13-h raw is Page 1 of 1 F- Ftw. 200eAm Ar Project: City of Renton Wastewater Lift Stations Job #: 8235A00 Location: Renton, WA Element: 03 New Force Main DETAILED COST ESTIMATE Date : By : Reviewed: June 4, 2009 Tyler Whitehouse Brian Casey SPEC. NO f DESCRIPTION QUANTITY UNIT UNIT COST SUBTOTAL TOTAL 02000 02000 02220 Division 02 - Site Construction Misc Site Restoration Allowance FM Connection Allowance Asphalt Pavement Cuttlng 1.00 1.00 2,160.00 LS LS irtFT $2,000.00 $1,000.00 $.78 $2,000.00 $1,000.00 $1,683 02220 Remove 2'-3' Asphalt Pavement 1,260.00 SF $.37 $470 02220 Concrete Curb/Gutter Demolition 50.00 LF $5.02 $251 02300 Imported Trench Backfill/Unconfined Struct. Bf, Class B Material 30.00 CY $37.26 $1.118 02300 20 Cy Dump Truck, 10 Miles/Round Trip 30.00 CY $5.14 $154 02300 Tractor/Backhoe, 12" Bucket Class B (Medium Digging), 0- S D 80.00 CY $43.80 $3.504 02300 Native Trench BackfilllUnconfined Struct. Bf, Class B Material 50.00 CY $17.31 $866 02742 3' Pavement Replacement On 4" Abc Over Trench 1,260.00 SF $5.75 $7,240 02772 24' Curved Conc Curb And Gutter, Hand Formed 50.00 LF $25.01 $1,251 Total $19,537 Division 15 - Mechanical 15000 Misc Mechanical FM 1.00 LS $2,701.40 $2,701.40 15265 4' Class 150 Dr.18 C-900 Pvc Pipe In Trench 360.00 LF $5.67 $2,042 Total $4,743 Grand Total $24,280 fM Lak. WA Bach LS Cost EStlmeta As-03 No, Forcs Main Page 1 of 1 F.. wr. 1C0lLar Project: City of Renton Wastewater Lift Stations Job #: 8235A00 Location: Renton. WA Element: 01 Lake WA Beach Gravity DETAILED COST ESTIMATE Date: June 4, 2009 By: Tyler Whitehouse Reviewed: Brian Casey SPEC. NO. DESCRIPTION QUANTITY UNIT UNIT COST SUBTOTAL TOTAL 02000 02000 02000 Division 02 - Site Construction Misc Site Restoration Allowance Horizontal Boring, Ind 20" Steel Casing Only Microtunneling 1.00 210.00 0.00 LS LF LF $10,000.00 $301.50 $800.00 $10,000.00 $63,315.00 $.00 02000 VactorAllowance 3.00 Da $1,000.00 $3,000.00 02000 Misc Connections Allowance 1.00 LS $1 000.00 $1 000.00 02000 Additional Dewatering Allowance 1.00 LS $15.000.00 $15,000.00 02000 Utility Allowance 1.00 LS $2,078.00 $2,078.00 02220 Asphalt Pavement Cutting 1,020.00 inFT $.78 $795 02220 Remove 2-3Asphalt Pavement 850.00 SF $.37 $317 02220 Asphalt Pavement Cutting 264.00 inFT $.78 $206 02220 Remove 2"-3' Asphalt Pavement 240.00 SF $.37 $90 02220 Core Drilling, 12" Diameter 0.50 LF $157.10 $79 02240 35Hp Submersible Pump, 4" Elect. 40.00 DAY $197.41 $7,896 02240 35Hp Submersible Pump, 4" Elect. 40.00 DAY $197.41 $7,896 02260 Solid Shoring, 15 D, Wood Planks, Stringers & X-Bracing130.00 LF $83.12 $10,806 02260 Sheet Piling, 27#/Sf To 20r Deep, Pulled & Salvaged (Pits Only) 1,152.00 SF $37.32 $42,989 02260 02280 Sheet Piling, 27#/Sf To 20' Deep, Pull & Salvage (Trenches On) Sheet Piling, 27#/Sf To VY Deep, Pulled & Salvaged (Pits On) 3,200.00 1,440.00 SF SF $17.95 $37.32 $57,456 $53,736 02300 Imported Pipe Bed & Zone/Confined Structure Backfill, Class B Material 40.82 CY $68.64 $2.802 02300 Cat 225 Trackhoe, 3/4Cy Bucket, Class B (Medium Digging), 0-16 D 94.81 CY $6.83 $648 02300 10 Cy Dump Truck, 20 Miles/Round Trip 40.82 CY $15.03 $614 02300 Cat 235 Trackhoe 1.12Cy Bucket, Class B (Medium Digging), 0.20' D 391.11 CY $4.23 $1,658 02300 Cat 235 Trackhoe 2.75Cy Bucket, Class B (Medium Digging), 0-2(Y D 240.00 CY $1.99 $478 02300 10 Cy Dump Truck, 20 Miles/Round Trip 14.89 CY $15.03 $224 02300 Native Trench Backfill/Unconfined Struct. Bf, Class B Material 350.29 CY $17.31 $6,065 02300 Native Trench Backfill/Unconfined Struct. Bf, Class B Material 240.00 CY $17.31 $4,155 02300 Native Trench Backfill/Unconfined Struct. Bf, Class B Material 94.81 CY $17.31 $1,642 02580 48' X 8' Deep Precast Manhole, No Ring & Cover, No Earthwork 3.00 EA $1.793.10 $5,379 02580 48" Manhole Precast Slab Top Or Bottom, 8' Thick 3.00 EA $317.73 $953 02580 GaIv. Steel Standard Steps (Precast In Manhole) 48.00 EA $16.21 $778 02580 24" Dia. X 350 Lb Waterfight Manhole Frame & Cover 3.00 EA $5%.53 $1,667 02580 2' Precast Grade Ri , 4-Piece, 20" - 26" Diameter 3.00 EA $522.45 $1,567 02580 Concrete Manhole Invert, Single Channel 3.00 EA $305.66 $917 02580 48" Precast Manhole, Xtra Depth Over 8' 25.00 VLF $235.44 $5,886 02742 3" Pavement Replacement On 6' Abe Over Trench 850.00 SF $6.18 $5,255 02742 3" Pavement Replacement On 6" Abc Over Trench 240.00 SF $6.18 $1,484 02772 24' Curved Conc Curb And Gutter, Hand Formed 40.00 LF $25.01 $1,001 02900 Sodding 2,827.44 SF $.91 $2,585 Total $322,411 Division 15 - Mechanical 15265 8" Sdr-26 Pvc Sewer Pipe, In Trench 460.00 LF $9.19 $4,227 Total $4,227 Grand Total $326,638 f/ L.. WA B.-c Gr" Cost EV).M..1,41 Ldk. WA 8-h G," Page 1 of 1 FOtm Rw. 2008,* M Lake WA Beach Lin StaUun Anaenellw 1 - L01 Stal on RopUPenw iL Choppw NunYler a Oda-0 oa,s Pel — 152 MPS oWeak: W, reai 6214 O5H SUIT Salary-8.n .(WI) 1 4000 Par Ted E4�tical Pawsr C09a(115W 1)1 006 INW=1NHP P— 0-.— W.— —D. 8 Baxd on Cac TAL PROJECT COSTS RRATION A MAINTENANCE COSTS ilaeon (lnera00n Slaean Fuuaa: aana�ai.. L cNarwou: Eoapment SENT VALE df COSTS SENT VALUE of BENEFIT LAATNE PRESENT VALUE of COSTS LLATNE PRESENT VALUE of BENEFITS ILATNE PRESENT VALUE t&CI REST RATE UL PRESENT VALUE of COSTS 5L PRESENT VALUE of BENEFITS -FIT to COST RATIO ►REEDIT VALUE Pu'N 5310,11M 10 u b a a b n d 0 '-j l.-I b—I —t I b51 I b.id91 90J21 S—I 95b2 375,798 5,667 6.579 5.472 6.350 5.All 5.106 5967 4.671 4A76 4.163 062 4003 4A16 4,410 4,345 4.282 4.101 376796 391.405 367AM 302.SM 307A114 40.1,170 400.336 113.403 410.374 423.250 426.033 432,725 437.370 NIN3 446,272 460.617 454A70 450.M 375,798 301.486 - 307AK/ - 302,630 307.04 - 403,170 - 400,335 413.403 - 419,374 - 423.250 - 42003 - 432.725 - 437,328 MIA43 - 446.272 - 460A17 45070 466,= 6.0% 50% 7A% 6 640AN 1 840A70 f 571.107 f 0 i 41A0 000 000 ♦ gem d40Ai0 4 571.107 702000 P40e 1 U 3 Late WA Beach Lin Stahpn Aft—ative 1 - Lift Station Raplacenwnt, Choppt wl lgun v�<er- y.i r e.r c II S.I.vY wUi Ber�elit; lAmr1 �[leariwl Pmrer Cays It1AVLLRr1 Purip 09eri4ng L�ur.liun nrvDay YEAR 01QT OVA OV29 OV30 01411 OV37 0143 OV34 OV35 OV36 OV37 OV38 01139 0WO 0U41 OW2 01N3 01N/ OtNS PERIOD NO 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 CAPITAL COSTS U0 Sc.— Repl.cemeM 400957 TOTAL PROJECT COSTS 0 0 400.957 0 0 0 0 0 0 0 0 9 0 0 0 9 0 0 0 OPERATION S MANCTENANCE COSTS uOSlaoon Operation 163 19tl I 200 206 212 219 121 uS SLi—R... M.... rte 6A48 5,611 5.780 5.953 6.132 0,316 0.505 8,T01 Mrp:eYneovs EputOrrent 3.IS 3,2.a 3,311 3.i9_ 3,W 1,061 9.)M 3,9/1 Oeam — y "N 1.122 1, 156 1.191 1.228 1,203 1.801 1.m TOTAL OPERATNO COSTS 891. 101M 10.171 1 0,195 I1,109 II442 11T85 1 12139 RISK COSTS TOTAL RISK COSTS TOTAL COSTS 9.870 10,186 41108 10.)85 11,100 11.442 111m 12.1M EYiEMB OTAL EENEFftB 5.0 % Case— . PRESENT VALUE of COSTS 4,101 4,023 155.003 3.8)1 3.797 3.725 3.854 3.585 - - - PRESENT VALUE of BENEFIT - - - - CIAAU.LATNE PRESENT VALUE of COSTS 463.161 481,IM 622,246 628.118 V9.915 833,M0 07,291 640.879 M0,879 M0,879 M0.879 640.879 Man M0979 B0879 .0879 6A0,819 140B79 M0819 CU3LLATNE PRESENT VALUE of BENEFITS - - - - - - - - - - CUMLATNEPRESENTVALUEIS-CI 463161 _ 467,1M _ 622.24 626,118 - 629.915 - W3.W - 831,2& M0B79 - M0,919 - MOBM - M0,919 M9879 - M0879 MOB79 MOB79 6e0879 - MOB79 M0879 M0879 INTERESTRATE - TOTAL PRESENT VALUE of COSTS TOTAL PRESENT VALUE d BENEFITS BENEFIT 11COST RATIO 1., 2W3 Lake VIA Beach LIR Station A9erna11— 2 - Lift Stallon Replaoallmll, Non -Cloy Nun NTP ulSg LaB-Der real 152 wer 5ue1eB Nkeka per Year 5714 OBa15u11 Salary wm Beeef,D,c lrlf 400 Par TOO EMtlnul Ppver Cogs(f6.WHr1 S 006 1m. NHP Punp Operamo D.—NreOd aBal.aoh Cale YEAR 0IM 01110 0/11 01/12 01/13 Will O1M6 01/16 01117 0111W 01A9 OIM DIM O1,22 011n BIM OVM BVM PERIOD NO 0 1 2 3 4 5 G 7 6 9 10 11 12 13 16 15 16 17 CAPITAL COSTS ult 11 " I .. n.1000 L PROJECT COSTS IAT1ON 6 BIAM7ilANCF COSTS mn Ruu nuMaaomiane us EouDmnl Cleanxp NN VALUE O COSTS TENT VALUE CC BENEFIT LLATIVE PRESENT VALUE N COSTS LLA7NE PRESENT VAILE of BENEFITS ULATNE PRESENT VALE (B-C) REST RATE LL PRESENT VALUE of COSTS iL PRESENT VALUE of BENEFITS =FIT 1. COST RATIO PRESENT VALUE (NP1) o u u D 0 0 0 0 u u 0 0 o a 0 0 IDB 11J 117 12 26 12 132 13o 1e0 Iaa 149 153 166 111 IL/ 171 178 e 100 B.No 6BE, 7203 7AIB 7M: ?Bil 8101 8.361 0601 8859 9,126 9,N9 OB81 2,011 10,270 10.576 1.700 I.EDJ 1858 1113 IBII 2,D30 2.001 2.154 7210 2.285 2,353 2A74 2,a07 2,511 2649 ]178 ZOO 3 :00 .ro 3,3B5 3007 3602 7.710 3871 3,036 4854 JI'S 4.301 aA30 1,562 4 ,692 e,910 4.9B5 5,136 5186 351AO9 11,750 12,102 12.45 12,639 13,714 13,821 14AN 14A I NAB1 16,331 16,791 IBM 18762 17255 11773 18,308 18,855 RATE 351 i08 11.100 10.9 7 10.700 10,583 10.302 10,I04 9.971 8.701 95" 0.12 9.237 0A57 OBoa 9715 8.549 B,3B6 6.220 3614. 3B259B 373.575 381.343 WEOB 405.267 415.137 425r03 435.183 444110 aW.IBB 463A22 672,4i6 481,383 e90,077 401fi26 501812 515,7A 351.008 - 3675% 373575 - 304.343 - 394.905 . 405.207 • 416.432 • 425.402 - 435.103 . N/,719 . e54,189 453,422 - 472,478 481.303 - 490877 490626 - 607,012 1 515.239 B 7MiY f aMilabl0 f re27.a6 6 B f - 6.98 Om 0.00 i TM,yl.1 .. 14,616 3 621,015 Page 1 of 3 Lake WA Beach Lin Station Alternative 2 - Lift Station Replac—mint, Non -CM „.. .rr', OA/s Ver xeer els per Year '.LUI Stall Saary wN Benel6lfmr) EleoTcai Power Coas IfMNHri r . i y 'yei gong QaYlen HraDay Pape 2d3 Lake WA Yeach LV1 SUldoo Alfo7na11- 3-Gf411B37{SIMf MWAs 11ftM i1I1 �alny rvVLi�nelea itn �rl f YEAR - -- - 01Ns 01A0 01/11 0v12 01213 01114 01/15 01A5 01117 01115 Gins OlfA 01M 01122 01ro 01G1f 01M OV23 PEFRI00110 _ _ _ _ _ _ 0 1 _ 2 3 4 5 5 7 s 9 10 11 12 13 1/ 15 16 17 Cr AL COSTS Cr �.., , 1 f11J.WU `sewer RcuMeMnnlmaKe 1180 1318 1,358 13BB I,MI 1ABJ 1b78 1,574 1.821 Ib1U 117U 1,777 1976 1380 Iti3B 13B4 3051 2,118 ;ENT VALUE d COSTS ;ENT VALUE of BENEFIT ILLATIVE PRESENT VALUE of COSTS LAATNE PRESENT VALUE of BENEFITS LLATIVE PRESENT VALUE IB-C) RESTRAM LL PRESENT VALE of COSTS LL PRESENT VALUE of BENEFITS -FlT to COST RATI0 ►RES6R VALUE ORP15 111,:80 1.210 1,23_ 12Btl I,ItlS I,In3 I, I 1,119 1091 IA77 1,ose 1035 1018 Bey Bye 959 041 023 711,2B0 712.636 713.787 714,915 745,181 711,323 719.8R 719593 INN 721.757 722,013 723,BaB IN.5 "1— IN o 7217% 728740 72803 1112. 712,530 713.757 - 714,975 - 119781 111323 710.464 119583 7]I7.590 721.757 122,013 ID iluN - 1".,.5 125.2 126 WB 127 IN 129.740 M.831 sex 60M 70% — f 738A1 f 135,N2 f 731.526 f 0 f 0M ow am 4 130A1 -735,N2 -f 731,525 17flr20BB pa Lake WA Buca LM Station AAamaflra 3 • OravKV So Rout OBM slMl salary wai Benel4s If-i YEAR PERIOD NO CNRAL COBTf � r 4v 5ener Reule A4ernallv4 3 MON L MAKTWARCE Com teener Fa Wne M anllenailcc SENT VALLE of COSTS SENT VALLE d BENEFIT UATNE PRESENT VALUE of COSTS U.ATNE PRESENT VALUE of BENEFITS ILATNE PRESENT VALUE IB-CI RESTRATE LL PRESENT VAIUE of COSTS LL PRESENT VALUEd BENEFITS =FI T Io COST RATIO PRESENT VALUE (NPV) 0 au 0 0 0 0 0 0 1.I79 1,'[44 2,112 :3E1 ]453 2.528 2,807 2,6611 L - - _ 1 005 BBB 871 855 E36 on 807 791 - - - - 730,56E 731,457 732.32E 733.183 7NA21 734,BN 735.850 736,N2 nd.442 736.442 738,442 738,442 738A42 736A42 736.N2 736,442 736,442 736.442 738.442 730,58E - 731.467 - 732,328 - 733.IM - 734221 . 734,8N . 735A50 - 730.442 - 730.N2 - 736.442 - 736.442 - 738042 - 736.442 - 736.442 - 736,442 - 738.442 - 736.442 . 736,442 - 738,N2 Page 2 d 3 J%j­ y ­ - , 4, 1, -.: —){fir � . , :.,. 1_ 6­ jr," Y,_­2 1 A� , f j4 U3 . .71&2_ta� -9A la 40-1�47Tx Mvin Cst. IF- I Ml- AV 24g . "Mi M-Me— M" R key - w eg ED& _PA �Va_ .%-A E-r 7 - -v 4 .1. V.Zga- 11 AT Vo- jrk Vf WAY "A _w�t - 4,-&— N7, ;1� ft V�z gg� �Sp No•SOW _211 ROM, vPk.% ;j:­,!_,P­ A ��I. �50 fq:� Jr • ad I �ex f1gy 41 F" T. •l. t zg7r L b 7: �,X - g - W­4 Nil t �'2.W 1PVQL SIM 2; who -A AZ 6 'SM t Ki T� Aq 'A - RrI INATS .0 WIN? 5 QA SAW — j , , , -- "F, ­ , ­11 - - - - , r 4� D I Its __AMWM m Ow I '" ' , Vr t'll. - - _7 !SiF I r2 N-A - �fg, - Tza iw, I TV Al • 4 Lj- `M4P i4 f, ew �1 P -7 y 0 M Win silly iliac, r PIT hN 5 72; Pih .�t IVU MM h F, r Q. _TQ _�j! km NRt� _-Tor - i 00A All Mug rL IjOSL a 0 1 RR R 412-M T7. 1 1, MIT. pop - Rou MIR!" M�f !Q-X SAM-- S4 -this. 104 .101 tak Tl�_: B4 w, rjr,- r G-7 A, Vi •2;P � SO OM 14 1L ,WP-M Qw. 0 - .4 fit - OK _. -C F, 1 AR7 Zw -41 GRAPHIC SCALE 20 0 20 40 ( IN FEET ) 1 inch = 20 ft. ss A :23.58 6"(N,W) 8"(E) CTR. CHANNEL=18.33 ss \, 22" l CB RIM=25.42 \\ 9, I.E.12"CMP(SW)=20.67 \ �� GENERATOR VAULTS I.E. 12"CMP(NE)=20./ L \ �X ON CONCRETE PAD J` 15"PI E0 28 \ GENERATOR CABINE ON CONCRETE P D 18"PINE 18"PINE ASPHALT UP 1� LEGEND UP m WATER VALVE 8.. Up • -6- HYDRANT UP 113 WATER METER ASPH LT 8., (3 ® MANHOLES (SS/SD) 8" ❑ CB • -O- POWER/UTILITY POLE GUY ANCHOR 1 • E--- } CB A POWER TRANSFORMER RIM=25.65 G i P T POWER/TELEPHONE VAULT .E. 8 CMP(NW)=21.35 !!! I.E. 12"CMP(NE)=21.40 � � 1 POWER METER 15" o TELEPHONE/TV RISER t11 GAS VALVE GAS METER 0 ¢--- STREET LIGHT SSMH 2' DIA. CONC. D 18" RIM=27.93 p•❑ LUMINAIRE " ` ! X SPOT ELEVATION I.E. 8 (W)=16.39 PUMP STA ON I Ir- BOTTOM=11.93 I i SIGN 34 15 2 PIPES ON BOTTOM .DIA. P ASTIC LID f + X o MAILBOX FEEDING PUMP STATION Co 1 C� ROCKERY 15 15" CONIFEROUS TREE ss ss ss 1 ss ss ss DECIDUOUS TREE UT FOUND CASED MONUMENT CENTER L 14" 10" TEL — j j I PRO ER YINES LINES I Ef j t. RIGHT—OF—WAY LINES 20" PO WE SWITCH CABINET ? j ( — — LOT LINES 0 ! I / . . . . — DITCH LINE ASPHALT �? f {{ � I � � — FLOW LINE 14 I ! i ` w WATER LINE !j ss SANITARY SEWER LINE j a 281�D SD STORM DRAIN LINE x G GAS LINE 12" UP UNDERGROUND POWER LINES ' W X I !j t J UT UNDERGROUND TELEPHONE LINES 22" w ASPHALT t ! 1 UTV UNDERGROUND CABLE TV LINES CP 4 w ! P OVERHEAD POWER LINES 635C-31.4 M/W VRN ASPHAL 1 i OHL OVERHEAD UTILITY LINES N=1867 6.15 2 — 0 — 0-0-0-0— CHAIN LINK FENCE E=1302 60.25 — x — x — x — x — x — WIRE FENCE ELEV.#27.50 + WOOD FENCE / UFO FIBER OPTICS LINE �— — EASEMENT LINE 10" I i X 15 \ ; RAIL LINE 6 281 FLAGPOLE f f 6.. I I` 18" CONCRETE (i \ ( ; DRINKING I.E. ' 2"CMP=17.80 \ FOUNTAI ' BENCH JQ 3 il..72"CMP=16.78 ROADWAY EASEMENT i s PER REC. NO.6201854 \ I.E.72"CMP=17.85 SD 12 SD 15"CEDA " JQ SD CB CB RIM=26.72 LE.8"CONC(SW)=21.77 "CED RIM=26.05 I.E. 8"CMP(W)=23.22 0 I.E.4"PLAS FLEX(SW)=24.25 I.E.8"CMP(E)=23.17 _ BUI I.E. "CMP(E)=23.85 ASPHALT ` l ` • 1 \"CE AR i ASPHALT JQ 6" • TEL _ _ _ _ / 15 w CO • N RE C • 8. / (J w----__ q __ ` WM ` C HCRE� l • w CURB • • ,�, CYC c��R • \ Gq 1 w \ CON�Re'F w • \ � 010" K 16" 5 8 ` ` 3 635 635C-31.5 R/C w N=186554.95 \ j E=1302371.85 8" \ ELEV.=28.29 8" C, ` > 016 fie& ` 15„ 30"MAPLE CG�F,Q CP# 1 ~ \ 635C-31.1 MON I.E. 7" MP 18. 122" MP 8. N=186494.71 " r E=1302526.22 I.E. 72 ELEV.=3t.88--� - \ TO _ CALC. .E.= .1