Loading...
HomeMy WebLinkAboutWWP2703592 (2) v1234Insituform City of Renton, WA Sanitary Sewer Rehabilitation 2011 Project No. 202140 Pre & Post CCTV Inspection Reports Media 01 to 03 MAINLINE INSPECTION INVENTORY /rwi*uf wM, vS Project# 202140 Project Description: City of Renton, WA Sanitary Sewer Rehabilitation 2011 Video Package 1 Media # 01 Inspect UpStream DownStream Pipe Media # Type ManHole ManHole Diameter Length Material/Type Pre 5304-110 5304-101 8 194 RCP 01 Post 5304-110 5304-101 8 194 CIPP-ILS O1 Pre 5304-101 5304-100 8 296 RCP O1 Post 5304-101 5304-100 8 296 CIPP-ILS O1 Pre 5304-100 5304-099 8 302 RCP 01 Post 5304-100 5304-099 8 302 CIPP-ILS O1 Pre 5304-099 5304-098 8 449 RCP 01 Post 5304-099 5304-098 8 449 CIPP-ILS O1 Pre 5304-098 5304-095 8 250 RCP O1 Post 5304-098 5304-095 8 250 CIPP-ILS O1 Pre 5304-095 5309-547 8 53 RCP O1 Post 5304-095 5309-547 8 53 CIPP-ILS 01 Pre 5309-547 5309-122 8 186 RCP O1 Post 5309-547 5309-122 8 186 CIPP-ILS 01 Pre 5309-122 5309-123 8 361 RCP 01 Post 5309-122 5309-123 8 361 CIPP-ILS O1 Pre 5309-123 5309-124 8 349 RCP O1 Post 5309-123 5309-124 8 349 CIPP-ILS O1 9 Total Segments 2,440 Total Install for Media # 01 Video Package 1 Media # 02 Inspect UpStream DownStream Pipe Media # Type ManHole ManHole Diameter Length Material/Type Pre 5309-124 5309-125 8 391 RCP 02 Post 5309-124 5309-125 8 391 CIPP-ILS 02 Pre 5309-125 5309-126 8 269 RCP 02 Post 5309-125 5309-126 8 269 CIPP-ILS 02 Pre 5309-126 5309-131 8 205 RCP 02 Post 5309-126 5309-131 8 205 CIPP-ILS 02 Pre 5309-153 5309-152 8 212 RCP 02 Post 5309-153 5309-152 8 212 CIPP-ILS 02 Pre 5309-152 5309-151 8 222 RCP 02 Post 5309-152 5309-151 8 222 CIPP-ILS 02 Pre 5309-151 5309-149 8 370 RCP 02 Post 5309-151 5309-149 8 370 CIPP-ILS 02 Video Package 1 Inspect UpStream DownStream Type ManHole ManHole Pre 5309-149 5309-003 Post 5309-149 5309-003 Pre 5309-024 5309-025 Post 5309-024 5309-025 8 Total Segments Video Package 1 Inspect UpStream DownStream Type ManHole ManHole Pre 5309-155 5309-154 Post 5309-155 5309-154 Pre 5309-154 5309-153 Post 5309-154 5309-153 Pre 5309-323 5309-322 Post 5309-323 5309-322 3 Total Segments 20 Grand Total Segments Media # 02 Pipe Media # Diameter Length Material/Type 8 354 RCP 02 8 354 CIPP-ILS 02 8 235 RCP 02 8 235 CIPP-ILS 02 2,258 Total Install for Media # 02 Media # 03 Pipe Media # Diameter Length Material/Type 8 414 VCP 03 8 414 CIPP-ILS 03 8 86 VCP 03 8 86 CIPP-ILS 03 8 261 03 8 261 CIPP-ILS 03 761 Total Install for Media # 03 5,459 Grand Total Install o (9) /nsitufarr» Customer Name Job Name Job No. Map # Ci ICity of Renton, WA I ISanitary Sewer 1202140 lRenton, WA Rehabilitation 2011 Surveyed B Operator Location - Road Name Date Size dia x Len th Bravo Environmental ISunset Blvd 1 111/28/2011 81 194 Shot-Seq Number Start Manhole No. Finish Manhole No. Depth Direction Media Number 001-001 1 15304-101 5304-110 Upstream 1 101 Comments - General Material Job Type Concrete Pre -Main Dist. (ft.) Code Description Clock Remarks (Diameter, Intrusion, etc.) 0.0 MH Manhole 5304-101 6.0 SWM Surface damage, wear medium 9 to 3 Aggregate visible, Start continuous defect 01 22.0 SWM Surface damage, wear medium 22.0 SWM Surface damage, wear medium zz r 92.0 SWM Surface damage, wear medium DOC ID: ITI/FR RRCD4MH Manhole EFF.DATE: 12/01/03 9 to 3 Aggregate visible, Finish continuous defect 01 8 to 4 Aggregate visible, Start continuous defect 02 8 to 4 Aggregate visible, Finish continuous defect 02 APPRE AAUCOMPANY MGT. REP.: ON -FILE (6) /nsituforni Customer Name Job Name Job No. Map # Cit City of Renton, WA Sanitary Sewer 202140 Renton, WA Rehabilitation 2011 Surveyed B (Operator) Location - Road Name Date Size dia x Length_ Raul Tavera JINE Sunset BLVD 1 112/12/2011 L 811 194 Shot-Seg Number Start Manhole No. Finish Manhole No. Depth Direction Media Number 001-001 5304-110 5304-101 25 IDownstream 1101 Comments - General Material Job Type CIPP Post -Main Dist. (ft.) Code Description 0.0 MH Manhole r z2 r 9.0 MH Manhole DOC ID: ITI/FRM-OPR-04 Clock Remarks (Diameter, Intrusion, etc.) 5304-110 5304-101 EFF.DATE: 12/01/03 APPROVAL: COMPANY MGT. REP.: ON -FILE (6) /nsitufarr» Customer Name Job Name Job No. Map # Cit City of Renton, WA Sanitary Sewer 202140 Renton, WA Rehabilitation 2011 Surveyed B (Operator) Location - Road Name Date Size dia x Length Bravo Environmental ISunset Blvd 11/28/2011 81 1 296 Shot-Seg Number Start Manhole No. Finish Manhole No. Depth Direction Media Number 001-002 5304-100 5304-101 U stream 1 101 Comments - General Material Job Type Concrete Pre -Main Dist. (ft.) Code Description Clock Remarks (Diameter, Intrusion, etc.) 0.0 MH Manhole 5304-100 hEN 5.0 SWM Surface damage, wear medium 9 to 3 Aggregate visible, Start continuous defect b V 01 00O SWM Surface damage, wear medium 9 to 3 Aggregate visible, Finish continuous defect 01 SWM Surface damage, wear medium 8 to 4 Aggregate visible, Start continuous defect 02 CNI Intruding Connection SWM Surface damage, wear medium MH Manhole EFF.DATE:12/01/03 2 Live 8 to 4 Aggregate visible, Finish continuous defect 02 APPREWID'COMPANY MGT. REP.: ON -FILE (9) /nsitufariri Customer Name Job Name Job No. Map # Cit City of Renton, WA Sanitary Sewer 202140 Renton, WA Rehabilitation 2011 Surveyed B (Operator) Location - Road Name Date Size dia x Length Raul Tavera INE Sunset BLVD 12/12/2011 1 L 811 296 Shot-Seg Number Start Manhole No. Finish Manhole No. Depth Direction Media Number 001-002 5304-101 1 15304-100 25 Downstream 1 101 Comments - General Material Job T e CI PP Post -Main Dist. (ft.) Code Description Clock Remarks (Diameter, Intrusion, etc.) OR 0.0 MH Manhole 5304-101 1 5.0 CN Connection 1.0 MH Manhole DOC ID: ITI/FRM-OPR-04 10 Open 5304-100 EFF.DATE: 12/01/03 APPROVAL: COMPANY MGT. REP.: ON -FILE (a) insituforrri Customer Name Job Name Job No. Map # Ci City of Renton, WA Sanitary Sewer�1202140 iRenton, WA Rehabilitation 2011 Surveyed B (Operator) Location - Road Name Date Size dia x Length Bravo Environmental ISunset Blvd 11/28/2011 L 81 302 Shot-Seg Number Start Manhole No. Finish Manhole No. Depth Direction Media Number 002-003 1 15304-100 5304-099 1 Downstream 1 101 Comments - General Material Job Type Concrete Pre -Main Di]15.0 t(ft.) Code Description Clock Remarks (Diameter, Intrusion, etc.) 0.0 MH Manhole 5304-100 2.0 SWM Surface damage, wear medium 8 to 4 Aggregate visible, Start continuous defect 01 CN Connection 11 Live 92.0 RF Roots, Fine 9 to 3 138.0 CN Connection 11 Live 250.0 CN Connection 11 Live 300.0 SWM Surface damage, wear medium DOC ID: ITI/FRI1�3BR()4MH Manhole EFF.DATE: 12/01/03 8 to 4 Aggregate visible, Finish continuous defect 01 APPIRM)"99;OMPANY MGT. REP.: ON -FILE (6) /nsituf+nrn Customer Name Job Name Job No. Map # Ci City of Renton, WA ISanitary Sewer 1202140 Renton, WA Rehabilitation 2011 Surveyed B (Operator) Location - Road Name Date Size dia x Length Raul Tavera JINE Sunset BLVD 12/13/2011 1 L 81 1 302 Shot-Seg Number Start Manhole No. Finish Manhole No. Depth Direction Media Number 002-003 5304-100 1 15304-099 IDownstream 1 101 Comments - General Material Job T e CIPP Post -Main Dist (ft.) Code Description Clock Remarks (Diameter, Intrusion, etc.) v V0.0 MH Manhole 5304-100 s 15.7 CN Connection 10 Open zz v 1 5.0 CN Connection 10 Open 3.5 CN Connection 11 Open 2.0 MH Manhole 5304-099 DOC ID: ITI/FRM-OPR-04 EFF.DATE: 12/01/03 APPROVAL: COMPANY MGT. REP.: ON -FILE (a) /nsitufiorni Customer Name Job Name Job No. Map # Cit City of Renton, WA ISanitary Sewer 1202140 Renton, WA Rehabilitation 2011 Surveyed B (Operator) Location - Road Name Date Size (dia) x Len th Bravo Environmental ISunset Blvd 11/29/2011 ® 449 Shot -Sec Number Start Manhole No. Finish Manhole No. Depth Direction Media Number 002-004 5304-099 5304-098 1 Upstream 1 101 Comments - General Material Job Type Concrete Pre -Main t(ft.) Dii29.0 Code Description Clock Remarks (Diameter, Intrusion, etc.) 0.0 MH Manhole 5304-098 lav 2.0 WL Water Level Sag 5.0 CNI Intruding Connection 3 Abandoned 9.0 DEG Debris, Grease 11 to 12 SWM Surface damage, wear medium 8 to 4 Aggregate visible, start continuous defect 01 107.0 CNI Intruding Connection 3 Live 109.0 CN Connection 3 Live 110.0 B Broken Pipe 12 to 12 181.0 RF Roots, Fine 9 to 3 239.0 B Broken Pipe 12 to 12 zz 261.0 B Broken Pipe 12 to 12 v 261.0 RF Roots, Fine 8 to 4 263.0 CN Connection 2 Live 264.0 RF Roots, Fine 8 to 2 264.0 DE Debris 8 to 10 Deposits settled, compacted. 5% loss 293.0 RF Roots, Fine 9 to 2 374.0 CN Connection 2 Live VITI/FR 26.0 DE Debris 7 Deposits settled, compacted. 5% loss 31.0 DE Debris 7 Deposits settled, compacted. 5% loss 51.0 SWM Surface damage, wear medium 8 to 4 Aggregate visible, finish continuous defect 01 DOC IBRO)4MH Manhole EFF.DATE: 12/01/03 APPBED99EOMPANY MGT. REP.: ON -FILE Page 1 of 1 Generated on 1 /23/2012 at 3:37 PM by the PipeTech® TV inspection system. (6) /nsituforni Customer Name Job Name Job No. Map # Cit Icity of Renton, WA Sanitary Sewer 11202140 lRenton, WA Rehabilitation 2011 Surveyed B (Operator) Location - Road Name Date Size d�ia �x Len th Raul Tavera 11NE Sunset BLVD 1 112/13/2011 t 449 Shot-Seg Number Start Manhole No. Finish Manhole No. Depth Direction Media Number 002-004 5304-099 1 15304-098 11 12 IDownstream 1 101 Comments - General Material Job Type CIPP Post -Main Dist. (ft.) Code Description Clock Remarks (Diameter, Intrusion, etc.) 'Ell0.0 MH Manhole 5304-099 r v� 1 4.7 C N 3.0 C N 2.3 CN 4.1 C N 0.0 MH DOC ID: ITI/FRM-OPR-04 Connection 10 Open Connection 9 Open Connection 9 Open Connection 9 Open Manhole 5304-098 EFF.DATE: 12/01/03 APPROVAL: COMPANY MGT. REP.: ON -FILE (6) /nsituforn Customer Name Job Name Job No. Map # Cit City of Renton, WA Sanitary Sewer 202140 laton, WA Rehabilitation 2011 Surveyed B (Operator) Location - Road Name Date Size dia x Length Bravo Environmental ISunset Blvd 11/29/2011 1 L 81L— Shot-SegNumber Start Manhole No. Finish Manhole No. Depth Direction Media Number 003-005 5304-098 5304-095 0 IDownstream 1 101 Comments - General Material Job Type Concrete Pre -Main Dist. Lit(ft.) Code Description Clock Remarks (Diameter, Intrusion, etc.) 0.0 MH Manhole 5304-098 2.0 SWM Surface damage, wear medium 8 to 4 Aggregate visible, Start continuous defect 01 CNI Intruding Connection 9 Live DOC ID: 42.0 RF Roots, Fine 7 to 9 •87.0 WL Water Level 20% •88.0 DEG Debris, Grease 4 5% •88.0 DEG Debris, Grease 8 5% •96.0 WL Water Level 20% •96.0 DEG Debris, Grease 4 5% •96.0 DEG Debris, Grease 8 5% 141.0 WL Water Level 10% 150.0 GO General observation 9 to 3 Repair patch 170.0 MC Material Change 180.0 MC Material Change 229.0 WL Water Level 247.0 SWM Surface damage, wear medium 2AIb4MH Manhole EFF.DATE:12/01/03 Ductile iron Reinforced concrete pipe 10% 8 to 4 Aggregate visible, Finish continuous defect 01 APPAMA-PtOMPANYMGT. REP.: ON -FILE (6) /nsituforr» Customer Name Job Name Job No. Map # Cit City of Renton, WA Sanitary Sew 1202140 Renton, WA Rehabilitation 2011 Surveyed B (Operator) Location - Road Name Date Size dia x Length Raul Tavera INE Sunset Blvd 12/12/2011 250 Shot-Seg Number Start Manhole No. Finish Manhole No. Depth Direction Media Number 003-005 5304-098 5304-095 Downstream 1 101 Comments - General Material Job Tvpe CIPP 1post-Main DiV5.2 t(ft.) Code Description Clock Remarks (Diameter, Intrusion, etc.) 0.0 MH Manhole 5304-098 v CN Connection 9 Open 1 3.0 MH Manhole 5304-095 DOC ID: ITI/FRM-OPR-04 EFF.DATE: 12/01/03 APPROVAL: COMPANY MGT. REP.: ON -FILE (9) /nsituforrri Customer Name Job Name Job No. Map # Ci City of Renton, WA Sanitary Sewer 1202140 lRenton, WA Rehabilitation 2011 Surveyed B (Operator) Location - Road Name Date Size dia x Length Bravo Environmental ISunset Blvd 1 111/29/2011 81 1 53 Shot-Seg Number Start Manhole No. Finish Manhole No. Depth Direction Media Number 003-006 5309-547 5309-095 U stream 1 101 Comments - General Material Job T e Concrete Pre -Main Dist. (ft.) Code Description Clock Remarks (Diameter, Intrusion, etc.) MH Manhole 5309-547 IMP0.0 2.0 SWM Surface damage, wear medium 8 to 4 visible, Start continuous defect OAggregate DOC 11 WL Water Level SWM Surface damage, wear medium MH Manhole EFF.DATE:12/01/03 30% 8 to 4 Aggregate visible, Finish continuous defect 01 APP13EDYU9EOMPANY MGT. REP.: ON -FILE (9) /nsituform Customer Name Job Name Job No. Map # Cit ICity of Renton, WA ISanitary Sewer 1202140 Renton, WA Rehabilitation 2011 Surveyed B (Operator) Location - Road Name Date Size dia x Length Raul Tavera NE Sunset BLVD 12/12/2011 1 F_53 Shot-Seg Number Start Manhole No. Finish Manhole No. Depth Direction Media Number 003-006 5304-095 1 15304-547 1 Downstream 1 101 Comments - General Material Job T e CIPP Post -Main Dist. (ft.) Code Description Clock Remarks (Diameter, Intrusion, etc.) tag •0.0 MH Manhole 5304-095 r 52.0 MH Manhole 5304-547 DOC ID: ITI/FRM-OPR-04 EFF.DATE: 12/01/03 APPROVAL: COMPANY MGT. REP.: ON -FILE (6) /nsitufrvrni Customer Name Job Name Job No. Map # Cit lCity of Renton, WA Sanitary Sewer 1202140 Renton, WA Rehabilitation 2011 Surveyed B (Operator) Location - Road Name Date Size dia x Length Bravo Environmental ISunset Blvd 1 111/29/2011 186 Shot-Seg Number Start Manhole No. Finish Manhole No. Depth Direction Media Number 003-007 1 15309-547 5309-122 0 IDownstream 1 101 Comments - General Material Job T e Concrete Pre -Main Dist. (ft.) Am Code Description Clock Remarks (Diameter, Intrusion, etc.) 0.0 MH Manhole 5309-547 2.0 SWM Surface damage, wear medium 8 to 4 Surface aggregate visible, Start continuous N v defect 01 4.0 CNI Intruding Connection 9 Abandoned 51.0 DEG Debris, Grease 62.0 DEG Debris, Grease 85.0 DEG Debris, Grease 103.0 DEG Debris, Grease v 110.0 CNI Intruding Connection 177.0 CN Connection 183.0 SWM Surface damage, wear medium DOC ID: ITI/RRCD4MH Manhole EFF.DATE: 12/01/03 10 11 to 1 10to1 10to1 12 Live 9 Live 8 to 4 Surface aggregate visible, Finish continuous defect 01 APPBMA421✓OMPANY MGT. REP.: ON -FILE Page 1 of 1 Generated on 1/23/2012 at 3:35 PM by the PipeTech® TV inspection system. (9) /nsitufvrrrt Customer Name Job Name Job No. Map # Cit lCity of Renton, WA ISanitary Sewer 1202140 Renton, WA Rehabilitation 2011 Surveyed B (Operator) Location - Road Name _ Date Size dia x Length Raul Tavera JINE Sunset Blvd —� 12/12/2011 81 186 Shot-Seq Number Start Manhole No. Finish Manhole No. Depth Direction Media Number 003-007 5309-547 5309-122 6 IDownstream 1 101 Comments - General Material Job T e CIPP Post -Main Di&_�� t(ft.) Code Description Clock Remarks (Diameter, Intrusion, etc.) 0.0 MH Manhole 5309-547 1� zz r 8.9 CN Connection 2.0 MH Manhole DOC ID: ITI/FRM-OPR-04 10 Open 5309-122 EFF.DATE: 12/01/03 APPROVAL: COMPANY MGT. REP.: ON -FILE (9) /nsituf+orrrt Customer Name Job Name Job No. Map # Ci City of Renton, WA I Sanitary Sewer�1202140 lRenton, WA Rehabilitation 2011 Surveyed By (Operator) Location - Road Name Date Size dia x Length Bravo Environmental ISunset Blvd [12/1/2011 81 1 361 Shot-Seg Number Start Manhole No. Finish Manhole No. Depth Direction Media Number 004-008 5309-122 5309-123 1 Downstream 1 101 Comments - General Material Job Type Concrete Pre -Main Dist. (ft.) Code Description Clock Remarks (Diameter, Intrusion, etc.) 0.0 MH Manhole 5309-122 v 28.0 CN Connection 10 Abandoned 55.0 CN Connection 10 Abandoned 55.0 RM Roots mass ... % cross -sectional area loss 9 to 10 Lateral R v DOC ID: •85.0 RF Roots, Fine 9 to 3 -91.0 RF Roots, Fine 9 to 3 108.0 DEG Debris, Grease 10 to 11 112.0 RF Roots, Fine 9 to 3 116.0 CN Connection 10 Abandoned 116.0 RF Roots, Fine 9 to 10 Lateral 118.0 RF Roots, Fine 8 to 4 Lateral 136.0 CC Circumferential Crack 3 to 9 140.0 RF Roots, Fine 4 147.0 CN Connection 10 Abandoned 147.0 RM Roots mass ... % cross -sectional area loss 8 to 10 15% 161.0 RF Roots, Fine 9 to 3 179.0 RF Roots, Fine 8 to 4 183.0 DEG Debris, Grease 10 to 2 5% 188.0 RF Roots, Fine 8 to 9 214.0 CN Connection 10 Abandoned, root ball 216.0 RF Roots, Fine 10 to 4 216.0 CC Circumferential Crack 6 to 9 222.0 RF Roots, Fine 8 to 4 240.0 RF Roots, Fine 8 to 4 244.0 CN Connection 10 Abandoned, root ball lateral 279.0 RF Roots, Fine 8 to 4 288.0 RF Roots, Fine 9 to 3 292.0 DEG Debris, Grease 10 to 2 297.0 RF Roots, Fine 10 to 3 298.0 CN Connection 10 Abandoned, root ball 324.0 RF Roots, Fine 9 to 3 358.0 SWM Surface damage, wear medium 8 to 4 Surface aggregate visible, Finish continuous defect 01 3BBZ®4MH Manhole EFF.DATE: 12/01/03 APPI38i'} AUTOMPANY MGT. REP.: ON -FILE (9) /nsituf+orr» Customer Name Job Name Job No. Map # Cit City of Renton, WA Sanitary Sewer 1202140 lRenton, WA Rehabilitation 2011 Surveyed B (Operator) Location - Road Name Date Size dia x Length Raul Tavera — NE Sunset Blvd 12/13/2011 8 361 Shot-Seg Number Start Manhole No. Finish Manhole No. De th Direction Media Number 004-008 5309-122 1 15309-123 IDownstream 101 Comments - General Material Job Type CIPP Post -Main Dist. (ft.) Code Description Clock Remarks (Diameter, Intrusion, etc.) �0.0 MH Manhole 5309-122 0 zz 1 1.0 MH Manhole 5309-123 DOC ID: ITI/FRM-OPR-04 EFF.DATE: 12/01/03 APPROVAL: COMPANY MGT, REP.: ON -FILE (9) /nsitufarfri Customer Name Job Name Job No. Map # Ci City of Renton, WA Sanitary Sewer 202140 Renton, WA Rehabilitation 2011 Surveyed B (Operator) Location - Road Name Date Size dia x Length Bravo Environmental ISunset Blvd 1 112/1/2011 811 349 Shot-Seg Number Start Manhole No. Finish Manhole No. Depth Direction Media Number 004-009 5309-123 5309-129 1 0 Downstream 1 101 Comments - General Material Job T e Concrete I Pre -Main Dist. (ft.) Code Description Clock Remarks (Diameter, Intrusion, etc.) 0.0 MH Manhole 5309-123 2.0 SWM Surface damage, wear medium 8 to 4 Surface aggregate visible, Start continuous defect 01 10.0 RF Roots, Fine 8 to 4 13.0 RF Roots, Fine 2 to 4 16.0 RF Roots, Fine 8 to 4 17.0 CN Connection 10 Abandoned, root ball 23.0 CNI Intruding Connection 10 Live 46.0 RF Roots, Fine 9 to 3 56.0 RF Roots, Fine 8 to 4 63.0 CN Connection 10 Abandoned, root ball 65.0 RF Roots, Fine 2 to 4 97.0 CN Connection 10 Abandoned, root ball 98.0 RF Roots, Fine 9 to 3 107.0 RF Roots, Fine 9 to 3 111.0 RF Roots, Fine 9 to 3 121.0 DEG Debris, Grease 10 to 2 135.0 RF Roots, Fine 8 to 4 154.0 CN Connection 10 Abandoned, root ball 156.0 RF Roots, Fine 9 to 3 162.0 RF Roots, Fine 8 to 4 165.0 RF Roots, Fine 8 to 4 169.0 RF Roots, Fine 2 to 4 178.0 RF Roots, Fine 8 to 4 188.0 CN Connection 10 Abandoned, root ball lateral 204.0 CN Connection 10 Live 1 205.0 RF Roots, Fine 9 to 3 208.0 RF Roots, Fine 9 to 3 223.0 RF Roots, Fine 1 to 4 226.0 RF Roots, Fine 8 to 2 248.0 RF Roots, Fine 8 to 2 248.0 DEG Debris, Grease 10 to 2 269.0 RF Roots, Fine 8 to 2 285.0 RF Roots, Fine 8 to 4 291.0 RF Roots, Fine 8 to 4 292.0 CN Connection 10 Abandoned, root ball lateral 294.0 RF Roots, Fine 9 to 3 DOC ID: 344.0 CN Connection 348.0 SWM Surface damage, wear medium ��i3 &4MH Manhole EFF.DATE: 12/01/03 9 Abandoned 8 to 4 Surface aggregate visible, Finish APPM9roddFAtY1MGT. REP.: ON -FILE (6) /nsituforrri Customer Name Job Name Job No. Map # Cit ICity of Renton, WA Sanitary Sewer 202140 Renton, WA Rehabilitation 12011 Surveyed B (Operator) Location - Road Name Date Size dia x Len th Raul Tavera JINE Sunset Blvd 12/13/2011 349 Shot-Seg Number Start Manhole No. Finish Manhole No. Depth Direction Media Number 004-009 5309-123 1 15309-124 12 Downstream 1 101 Comments - General Material Job Type CIPP Post -Main Dist. (ft.) Code Description Clock Remarks (Diameter, Intrusion, etc.) 0.0 MH Manhole 5309-123 Y23.9 CN Connection 10 Open 9.1 CN 8.0 M H DOC ID: ITI/FRM-OPR-04 Connection 11 Open Manhole 5309-124 EFF.DATE: 12/01/03 APPROVAL: COMPANY MGT. REP.: ON -FILE (6) /nsituforr» Customer Name Job Name Job No. Map # Cit City of Renton, WA I ISanitary Sewer 1202140 Renton, WA Rehabilitation 2011 Surveyed B (Operator) Location - Road Name Date Size dia x Length Bravo Environmental ISunset Blvd 12/1/2011 1 L 811 391 Shot-Seg Number Start Manhole No. Finish Manhole No. Depth Direction Media Number 005-010 5309-129 1 15309-125 1 0 IDownstream 1 102 Comments - General Material Job T e Concrete Pre -Main Dist. (ft.) s Code Description Clock Remarks (Diameter, Intrusion, etc.) 0.0 MH Manhole 5309-124 'EM2.0 SWM Surface damage, wear medium 8 to 4 Surface aggregate visible, Start continuous r defect 01 7.0 V37.0 RF Roots, Fine 2 to 4 16.0 RF Roots, Fine 8 to 4 22.0 RF Roots, Fine 8 to 4 26.0 CN Connection 9 Abandoned, root ball lateral RF Roots, Fine 8 to 4 81.0 CN Connection 109.0 CN Connection 162.0 WL Water Level 172.0 RF Roots, Fine 184.0 RF Roots, Fine 199.0 RF Roots, Fine 211.0 CC Circumferential Crack 213.0 CN Connection 214.0 RF Roots, Fine 219.0 CN Connection 230.0 CN Connection 234.0 CNI Intruding Connection 236.0 RF Roots, Fine 239.0 RF Roots, Fine 248.0 RF Roots, Fine 254.0 RF Roots, Fine 264.0 CN Connection 295.0 CN Connection 306.0 FC Circumferential Fracture 312.0 RF Roots, Fine 315.0 RF Roots, Fine 327.0 RF Roots, Fine 337.0 RF Roots, Fine 352.0 RF Roots, Fine 376.0 RF Roots, Fine 1.0 SWM Surface damage, wear medium DOC ID: ITI/FR ZR(D41VIH Manhole EFF.DATE: 12/01/03 10 10 1 to 4 2 to 4 8to4 8to4 10 9 to 3 10 8to4 9 8to4 2 to 4 8to4 8to4 10 10 4to8 8to4 8to4 9to3 9to3 8to4 8 to 4 Abandoned Abandoned, root ball lateral 20% Abandoned, root ball lateral Abandoned Live Abandoned, root ball lateral 100% Abandoned, root ball lateral 100% 8 to 4 Surface aggregate visible, Finish continuous defect 01 APPIREMA12COMPANY MGT. REP.: ON -FILE (6) /nsituforrri Customer Name Job Name Job No. map # Cl City of Renton, WA IlSanitary Sewer 1202140 lRenton, WA Rehabilitation 2011 Surveyed B (Operator) Location - Road Name Date Size dia x Length Raul Tavera JINE Sunset Blvd 12/16/2011 1 L 8 391 Shot-Seq Number Start Manhole No. Finish Manhole No. Depth Direction Media Number 005-010 5309-124 1 15309-125 115 Downstream 1 102 Comments - General Material Job T e CIPP Post -Main Dist. (ft.) Code Description Clock Remarks (Diameter, Intrusion, etc.) �0.0 MH Manhole 5309-124 ,A v� 1 8.1 CN Connection 0.0 MH Manhole DOC ID: ITI/FRM-OPR-04 9 Open 5309-125 EFF.DATE: 12/01/03 APPROVAL: COMPANY MGT. REP.: ON -FILE (9) /nsitufarfri Customer Name Job Name Job No. Map # Cit Cit of Renton, WA Sanitary Sewer 202140 Renton, WA Rehabilitation 2011 Surveyed B (Operator) Location - Road Name Date Size dia x Length Bravo Environmental IlSunset Blvd 1 112/2/2011 L 81 1269 Shot-Seg Number Start Manhole No. Finish Manhole No. Depth Direction Media Number 005-011 5309-125 5309-126 1 Downstream 1 102 Comments - General Material Job T e Concrete Pre -Main (ft.) Dist.U131.0 Code Description Clock Remarks (Diameter, Intrusion, etc.) 0.0 MH Manhole 5309-125 2.0 SWM Surface damage, wear medium 4 to 8 Surface aggregrate visible, Start continuous v 12.0 defect 01 CN Connection 10 Abandoned CN Connection 10 Abandoned r 54.0 CM Multiple Cracks 73.0 RF Roots, Fine 77.0 CN Connection 100.0 RF Roots. Fine 117.0 CN Connection 181.0 CN Connection 182.0 RF Roots, Fine 232.0 CN Connection 4to7 3to5 10 Abandoned 8to1 10 Abandoned 10 9to12 10 Abandoned Capped 266.0 DEG Debris, Grease 10 to 3 267.0 SWM Surface damage, wear medium 8 to 4 Surface aggregrate visible, Finish continuous defect 01 DOC ID: ITI/FR 9eCp4MH Manhole EFF.DATE: 12/01/03 APPB§66k 2&OMPANY MGT. REP.: ON -FILE (6) insitufarn Customer Name Job Name Job No. Map # Cit lCity of Renton, WA ISanitary Sewer 1202140 lRenton, WA Rehabilitation 2011 Surveyed B (Operator) Location - Road Name Date Size di�a ) x Len th Raul Tavera INE Sunset Blvd 12/16/2011 I__J 269 Shot-Seq Number Start Manhole No. Finish Manhole No. Depth Direction Media Number 005-011 5309-125 1 15309-126 1 Downstream 1 102 Comments - General Material Job Type CIPP I Post -Main 'p zz r ^'-4. 'K ` Code Description MH Manhole MH Manhole DOC ID: ITI/FRM-OPR-04 Clock Remarks (Diameter, Intrusion, etc.) 5309-125 5309-126 EFF.DATE: 12/01/03 APPROVAL: COMPANY MGT. REP.: ON -FILE (a) /nsitufnr"i Customer Name Job Name Job No. Map # Cit City of Renton, WA Sanitary Sewer 202140 Renton, WA Rehabilitation 2011 Surveyed B (Operator) Location - Road Name Date Size dia x Length Bravo Environmental ISunset Blvd 12/2/2011 205 Shot-Seg Number Start Manhole No. Finish Manhole No. Depth Direction Media Number 006-012 5309-126 5309-131 IDownstream 102 Comments - General Material Job T e Concrete Pre -Main t(ft.) DiV4.0 Code Description Clock Remarks (Diameter, Intrusion, etc.) 0.0 MH Manhole IMP 0.0 SWM Surface damage, wear medium 8 to 4 Surface aggregate visible, Start continuous defect 01 CN Connection 10 Capped r DOC 11 ,6.0 CN Connection �1.0 B Broken Pipe 5.0 CN Connection 7.0 CN Connection 6.0 H Hole in Pipe 2.0 SWM Surface damage, wear medium "Ft0)4MH Manhole EFF.DATE:12/01103 10 Capped 12 to 12 10 Capped 10 Capped 5to7 8 to 4 Surface aggregate visible, Finish continuous defect 01 APP13SX13'COMPANY MGT. REP.: ON -FILE (a) /nsitufarr» Customer Name Job Name Job No. Map # Cit City of Renton, WA JjSanitary Sewer 1202140 lRenton, WA Rehabilitation 2011 Surveyed B (Operator) Location - Road Name Date Size dia x Len th Raul Tavera JINE Sunset Blvd & 12th St 12/14/2011 205 Shot-Seg Number Start Manhole No. Finish Manhole No. Depth Direction Media Number 006-012 5309-126 1 15309-131 15 Downstream 1 102 Comments - General Material Job Tvpe CIPP Post -Main r zz v 1 ^°-• tC4 Code Description 0.0 MH Manhole 8.0 MH Manhole DOC ID: ITI/FRM-OPR-04 Clock Remarks (Diameter, Intrusion, etc.) 5309-126 5309-131 EFF.DATE: 12/01/03 APPROVAL: COMPANY MGT. REP.: ON -FILE (6) /nsitufori» Customer Name Job Name Job No. map # Cit City of Renton, WA Sanitary Sewer 1202140 1 IRenton, WA Rehabilitation 2011 Surveyed B (Operator) Location - Road Name Date Size dia x Length Bravo Environmental 112th Ave NE 1 112/2/2011 212 Shot-Seg Number Start Manhole No. Finish Manhole No. Depth Direction Media Number 007-013 1 15309-153 5306-152 Downstream 1 102 Comments - General Material Job T e Concrete Pre -Main Dist. (ft.) Code Description Clock Remarks (Diameter, Intrusion, etc.) ZW -0.0 MH Manhole 5309-153 r zz r _ • 2.0 B • 2.0 SA DOC ID: ITI/FRM-OPR-04 Broken Pipe 12 to 4 Void visible Survey Abandoned Broken pipe EFF.DATE: 12/01/03 APPROVAL: COMPANY MGT. REP.: ON -FILE (6) /nsituf+orni Customer Name Job Name Job No. Map # Cit City of Renton, WA I Sanitary Sewer 1202140 Renton, WA Rehabilitation 2011 Surveyed B (Operator) Location - Road Name Date Size dia, �x Len th Bravo Environmental Kirkland Ave NE 11/30/2011 L� 212 Shot-Seg Number Start Manhole No. Finish Manhole No. Depth Direction Media Number 007-013 5309-152 5309-153 0 Upstream 1 102 Comments - General Material Job T e Concrete Pre -Main Dist. (ft.) Code Description Clock Remarks (Diameter, Intrusion, etc.) 0.0 MH Manhole 5309-152 2.0 SWM Surface damage, wear medium 8 to 4 Surface aggregate visible, Start continuous defect 01 �3 r DOC CN Connection 2 B Broken Pipe 4 to 8 Abandoned MC Material Change PVC CN Connection 10 Live MC Material Change Concrete CNI Intruding Connection 2 Abandoned CNI Intruding Connection 9 Abandoned B Broken Pipe CNI Intruding Connection SWM Surface damp", &A f SA Survey Abandoned 3 to 7 Void visible 10 Abandoned 8 to 4 APPf���tl�llvi��. F� ON -FILE con inuous a ect 01 (9) /nsituforrri Customer Name Job Name Job No. Map # Cit Cit of Renton, WA Sanitary Sewer 202140 Renton, WA Rehabilitation 2011 Surveyed B (Operator) Location - Road Name Date Size dia x Length Raul Tavera INE Sunset Blvd & 12th St 12/14/2011 8 212 Shot-Seg Number Start Manhole No. Finish Manhole No. Depth Direction Media Number 007-013 5309-153 1 15309-152 115 Downstream 1 102 Comments - General Material Job T e C I P P I Post -Main Dist. (ft.) Code Description Clock Remarks (Diameter, Intrusion, etc.) 0=0.0 MH Manhole 5309-153 CA' zz r 9.8 CN Connection 5.0 MH Manhole DOC ID: ITI/FRM-OPR-04 2 Open 5309-152 EFF.DATE: 12/01/03 APPROVAL: COMPANY MGT. REP.: ON -FILE (a) /nsituforr» Customer Name Job Name Job No. Map # Cit City of Renton, WA I ISanitary Sewer 1202140 Renton, WA Rehabilitation 2011 Surveyed B (Operator) Location - Road Name Date Size dia x Len th Bravo Environmental INE 12th St 11/30/2011 811 222 Shot-Seg Number Start Manhole No. Finish Manhole No. Depth Direction Media Number 007-014 1 15309-152 5309-151 Downstream 1 102 Comments - General Material Job Type Concrete Pre -Main Am Dist. (ft.) Code Description Clock Remarks (Diameter, Intrusion, etc.) 0.0 MH Manhole 5309-152 0.0 SWM Surface damage, wear medium 8 to 4 Surface aggregate visible, Start continuous ir defect 01 R 1 DOC ID: .0 CN Connection 63.0 CN Connection 89.0 CNI Intruding Connection 92.0 CNI Intruding Connection 116.0 CNI Intruding Connection 144.0 CNI Intruding Connection 153.0 CN Connection 221.0 SWM Surface damage, wear medium 2QR0)4MH Manhole EFF.DATE:12/01/03 2 Abandoned 10 Abandoned 2 Abandoned 9 Live 2 Abandoned 2 Abandoned 9 Abandoned 8 to 4 Surface aggregate visible, Finish continuous defect 01 APPSENAt5'COMPANY MGT. REP.: ON -FILE (9) /nsitufarrvi Customer Name Job Name Job No. map # City City of Renton, WA Sanitary Sewer 202140 Renton, WA Rehabilitation 2011 Surveyed B (Operator) Location - Road Name Date Size dia x Length Raul Tavera NE Sunset Blvd & 12th St 12/14/2011 222 Shot-Seg Number Start Manhole No. Finish Manhole No. Depth Direction Media Number 007-014 5309-152 1 15309-151 115 Downstream 1 102 Comments - General Material Job T e CIPP Post -Main Dist. (ft.) Code Description Clock Remarks (Diameter, Intrusion, etc.) 0.0 MH Manhole 5309-152 v� 1 CN Connection 10 Open MH Manhole 5309-151 DOC ID: ITI/FRM-OPR-04 EFF.DATE: 12/01/03 APPROVAL: COMPANY MGT. REP.: ON -FILE (9) /nsituform Customer Name Job Name Job No. Map # Cit Icity of Renton, WA Sanitary Sewer 202140 Renton, WA Rehabilitation 2011 Surveyed B (Operator) Location - Road Name Date Size dia x Length Bravo Environmental 11NE 12th St 11/30/2011 1 L 8 370 Shot-Seg Number Start Manhole No. Finish Manhole No. Depth Direction Media Number —� 008-015 5309-151 5309-149 10 Downstream 1 102 Comments - General Material Job Type Concrete Pre -Main DiV21.0 t(ft.) Code Description 0.0 MH Manhole 2.0 SWM Surface damage, wear medium rGO General observation 125.0 CNI Intruding Connection 133.0 CNI Intruding Connection 161.0 CNI Intruding Connection 193.0 CN Connection 236.0 CN Connection 268.0 CN Connection 270.0 DEG Debris, Grease 297.0 CN Connection 322.0 CNI Intruding Connection 337.0 CN Connection 368.0 CC Circumferential Crack 371.0 DEG Debris, Grease DOC ID: ITI/ M- W%4SWM Surface damp , �9'� Mi9O3 371.0 MH Manhole Clock Remarks (Diameter, Intrusion, etc.) 5309-151 8 to 4 Surface aggregate visible, Start continuous defect 01 9 to 3 Repair patch defective 2 Abandoned 2 Live 2 Abandoned 10 Abandoned 2 Abandoned 2 Abandoned 9 to 3 Start continuous defect 02 10 Abandoned 3 Live 2 Abandoned 9to3 9 to 3 Finish continuous defect 02 8 to 4 APPconinuuou�sfeC(J11�� ON -FILE gg 5309-149 (6) /nsituforrri Customer Name Job Name Job No. Map # Cit City of Renton, WA Sanitary Sewer 202140 Renton, WA Rehabilitation 2011 Surveyed B (Operator) Location - Road Name Date Size dia x Length Raul Tavera INE Sunset Blvd 1 112/16/2011 1 L 8 370 Shot-Seg Number Start Manhole No. Finish Manhole No. Depth Direction Media Number 008-015 5309-151 5309-149 115 Downstream 1 102 Comments - General Material Job Type C I P P Post -Main Dist. (ft.) Code Description Clock Remarks (Diameter, Intrusion, etc.) � &=0.0 MH Manhole 5309-151 Q 0.5 CN Connection 2 Open 3.0 CN Connection 3 Open 9.0 MH Manhole 5309-149 DOC ID: ITI/FRM-OPR-04 EFF.DATE: 12/01/03 APPROVAL: COMPANY MGT. REP.: ON -FILE (9) insituforni Customer Name Job Name Job No. map # Cit City of Renton, WA Sanitary Sewer 202140 Renton, WA Rehabilitation 2011 Surveyed B (Operator) Location - Road Name Date Size dia x Length Bravo Environmental 112th Ave NE 12/2/2011 L 8 354 Shot-Seg Number Start Manhole No. Finish Manhole No. Depth Direction Media Number 008-016 1 153_09-149 5309-003 u downstream 02 Comments - General Material Job T e Concrete Pre -Main (ft.) Dist.F246.0 Code Description Clock Remarks (Diameter, Intrusion, etc.) 0.0 MH Manhole 5309-149 2.0 SWM Surface damage, wear medium 8 to 4 Surface aggregate visible, Start continuous defect 01 5.0 WL Water Level 20% 2.0 CN Connection 10 Abandoned 0.0 CN Connection 2 Abandoned H Hole in Pipe 6 to 7 DOC 0 RF Roots, Fine 0 CN Connection 0 CN Connection 0 CN Connection D CN Connection D CN Connection D DEG Debris, Grease D DEG Debris, Grease D SWM Surface damage, wear medium -04 EFF. DATE: 12/01 /03 D MH Manhole 12to2 10 Live 2 Live 2 Abandoned 2 Live 10 Live 10 to 2 Start continuous defect 02 10 to 2 Finish continuous defect 02 8 to 4 Surface aggregate visible, Finish APPI3~fto@_0MFANYIMGT. REP.: ON -FILE 5309-003 (9) /nsitufirrri Customer Name Job Name Job No. Map # Cit lCity of Renton, WA IlSanitary Sewer 1202140 lRenton, WA Rehabilitation 2011 Surveyed B (Operator) Location - Road Name Date Size dia x Length Raul Tavera 11NE Sunset Blvd 12/16/2011 L 811 354 Shot-Seg Number Start Manhole No. Finish Manhole No. Depth Direction Media Number 008-016 5309-149 1 J5309-003 115 Downstream 1 102 Comments - General Material Job Type CIPP Post -Main Dist. (ft.) Code Description Clock Remarks (Diameter, Intrusion, etc.) 0.0 MH Manhole 5309-149 r 2� r 4 CN 9 CN 3 CN 5 CN 3 MH DOC ID: ITI/FRM-OPR-04 Connection 10 Open Connection 2 Open Connection 2 Open Connection 10 Open Manhole 5309-003 EFF.DATE: 12/01/03 APPROVAL: COMPANY MGT. REP.: ON -FILE (9) /nsituforrri Customer Name Job Name Job No. Map # Cit Icity of Renton, WA I ISanitary Sewer 202140 Renton, WA Rehabilitation 2011 Surveyed B (Operator) Location - Road Name Date Size dia x Length Bravo Environmental IlEdmonds Ave NE 11/28/2011 235 Shot-Seg Number Start Manhole No. Finish Manhole No. Depth Direction Media Number 009-017 5309-025 5309-024 10 Upstream 1 102 Comments - General Material Job T e Concrete Pre -Main (ft.) Dist�0.0 Code Description Clock Remarks (Diameter, Intrusion, etc.) MH Manhole 5309-025 5.0 WL Water Level 15% 1/ 7.0 WL Water Level 35% 8.0 SWM Surface damage, wear medium 8 to 4 Aggregate visible, Start continuous defect 01 28.0 GO General observation 11 to 1 Repair patch 38.0 CNI Intruding Connection 10 Live �v� 1 147.0 GO General observation 10 to 2 Repair patch 154.0 B Broken Pipe 3 to 10 Soil visible 178.0 B Broken Pipe 3 1 78.0 B Broken Pipe 9 201.0 GO General observation 9 to 3 Repair patch 205.0 WL Water Level 25% 207.0 B Broken Pipe 10 to 2 Soil visible 210.0 DE Debris 4 to 6 Deposits settled, compacted 219.0 B Broken Pipe 10 to 2 Soil visible 232.0 SWM Surface damage, wear medium 8 to 4 Aggregate visible, Finish continuous defect 01 DOC ID: ITI/FR l3R0)4MH Manhole EFF.DATE: 12/01/03 APPI9M%602,COMPANY MGT. REP.: ON -FILE (6) /nsitufvrrri Customer Name Job Name Job No. Map # city City of Renton, WA ISanitary Sewer 1202140 Renton, WA Rehabilitation 2011 Surveyed B (Operator) Location - Road Name Date Size dia x Len th Raul Tavera lEdmonds Ave NE 12/15/2011 235 Shot-Seg Number Start Manhole No. Finish Manhole No. Depth Direction Media Number 009-017 5309-025 5309-024 115 Downstream 1 102 Comments - General Material Job Type CIPP Post -Main Dist. (ft.) Code Description Clock Remarks (Diameter, Intrusion, etc.) UP 0.0 MH Manhole 5309-025 1A ;8.5 CN Connection 8.0 MH Manhole DOC ID: ITI/FRM-OPR-04 2 Open 5309-024 EFF.DATE: 12/01/03 APPROVAL: COMPANY MGT. REP.: ON -FILE 0 w (6) /nsituforrti Customer Name Job Name Job No. Map # Cit City of Renton, WA ISanitary Sewer 1202140 Renton, WA Rehabilitation 2011 Surveyed B (Operator) Location - Road Name Date Size dia x Length Bravo Environmental ISunset Blvd 11/30/2011 414 Shot-Seg Number Start Manhole No. Finish Manhole No. Depth Direction Media Number 011-019 1 15309-155 5309-154 0 IDownstream 1 103 Comments - General Material Job Type Concrete Pre -Main Dist (ft.) Code Description Clock Remarks (Diameter, Intrusion, etc.) 0.0 MH Manhole 5309-155 v 1 s1.00 CNI Intruding Connection 10 Abandoned 1 C� v 68.0 GO 77.0 CNI 91.0 SWM 105.0 CNI 108.0 CNI 165.0 EL 166.0 CNI General observation Intruding Connection Surface damage, wear medium Intruding Connection Intruding Connection Encrustation light Intruding Connection 201.0 CNI Intruding Connection 258.0 RF 258.0 CNI 265.0 RF 267.0 RF 289.0 CNI Roots, Fine Intruding Connection Roots, Fine Roots, Fine Intruding Connection 12.0 SWM Surface damage, wear medium DOC ID: ITI/FRNh@I?R )4MH Manhole EFF.DATE:12/01/03 7 to 8 Deposits settled compacted 10 Abandoned 2 to 10 Surface aggregate visible, Start continuous defect 01 12 Live 10 Abandoned 5to7 10 Abandoned 10 Abandoned 9to3 10 2 1 to 3 10 Abandoned Abandoned 2 to 10 Surface aggregate visible, Finish continuous defect 01 APPHWi A15COMPANY MGT. REP.: ON -FILE (9) /nsituforn Customer Name Job Name Job No. Map # Cit�l lCity of Renton, WA Sanitary Sewer 1202140 Renton, WA Rehabilitation 2011 Surveyed B (Operator) Location - Road Name Date Size dia x Len th Raul Tavera NE Sunset Blvd 12/16/2011 L 88 444 Shot-Seg Number Start Manhole No. Finish Manhole No. Depth Direction Media Number O11-019 5309-155 1 15309-154 15 Downstream 1 103 Comments - General Material Job Type CIPP Post -Main Dist. (ft.) Code Description Clock Remarks (Diameter, Intrusion, etc.) - •0.0 MH Manhole 5309-155 r 102.3 CN Connection 401.0 MH Manhole DOC ID: ITI/FRM-OPR-04 12 Open 5309-154 EFF.DATE: 12/01/03 APPROVAL: COMPANY MGT. REP.: ON -FILE (a) insituforrri Customer Name Job Name Job No. Ma # Ci Cit of Renton, WA Sanitary Sewer 202140 Renton, WA Rehabilitation 2011 Surveyed B (Operator) Location - Road Name Date Size dia x Length Bravo Environmental Sunset Blvd 11/29/2011 8 86 Shot-Seg Number Start Manhole No. Finish Manhole No. Depth Direction Media Number 011-020 1 15309-154 5309-153 1 Downstream 103 Comments - General Material Job Type Concrete Pre -Main Dist (ft.) Code Description Clock Remarks (Diameter, Intrusion, etc.) 0.0 MH Manhole 5309-154 2.0 SWM Surface damage, wear medium 1 toil Surface aggregate visible, Start continuous ss defect 01 7.0 CN Connection 1.0 SWM Surface damage, wear medium --•83.0 MH DOC ID: ITI/FRM-OPR-04 Manhole E FF. DATE: 12/01 /03 10 Live 1 to 11 Surface aggregate visible, Finish continuous defect 01 5309-153 APPROVAL: COMPANY MGT. REP.: ON -FILE Page 1 of 1 Generated on 1/23/2012 at 3:36 PM by the PipeTeche TV inspection system. (6) /nsituforiri Customer Name Job Name Job No. Map # Cit ICity of Renton, WA I ISanitary Sewer 1202140 Renton, WA Rehabilitation 2011 Surveyed B (Operator) Location - Road Name Date Size dia x Len th Raul Tavera NE Sunset Blvd 12/16/2011 8 86 Shot-Seg Number Start Manhole No. Finish Manhole No. De th Direction Media Number 011-020 5309-154 15309-153 15 Downstream 1103 Comments - General Material Job T e CIPP Post -Main ^ (ft.) Code Description 0.0 MH Manhole 9.0 CN Connection 3.0 MH Manhole Clock Remarks (Diameter, Intrusion, etc.) 5309-154 10 Open 5309-153 DOC ID: ITI/FRM-OPR-04 EFF.DATE: 12/01/03 APPROVAL: COMPANY MGT. REP.: ON -FILE (6) /nsitufarn i Customer Name Job Name Job No. Map # Cit City of Renton, WA ISanitary Sewer 1202140 Renton, WA Rehabilitation 2011 Surveyed B (Operator) Location - Road Name Date Size dia x Length Raul Tavera INE 9th St 12/15/2011 L 811261 Shot-Seg Number Start Manhole No. Finish Manhole No. De th Direction Media Number 012-021 5309-323 1 15309-322 15 Downstream 1 103 Comments - General Material Job T e Concrete 7 lPre-main s Dist(ft.) Code Description Clock Remarks (Diameter, Intrusion, etc.) 0.0 MH Manhole 5309-323 v r27.3 CN Connection 2 Live 0.6 CN Connection 1.5 CN Connection 9.4 CN Connection ov-252.0 MH DOC ID: ITI/FRM-OPR-04 Manhole 11 Live 2 Live 10 Live 5309-322 EFF.DATE: 12/01/03 APPROVAL: COMPANY MGT. REP.: ON -FILE (9) insitufarni Customer Name Job Name Job No. Map # Cit City of Renton, WA Sanitary Sewer 202140 Renton, WA Rehabilitation 2011 Surveyed B (Operator) Location - Road Name Date Size dia x Length Raul Tavera INE 9th St 1 112/15/2011 1 L 811261 Shot-Seg Number Start Manhole No. Finish Manhole No. Depth Direction Media Number 012-021 5309-323 1 15309-322 11 15 IDownstream 1 103 Comments - General Material Job Type CIPP Post -AM Main Dist. (ft.) Code Description Clock Remarks (Diameter, Intrusion, etc.) Val 0.0 MH Manhole 5309-323 1 jr27.5 CN Connection 2 Open 0.7 CN Connection 1.7 CN Connection 9.6 CN Connection or-252.1 MH DOC ID: ITI/FRM-OPR-04 Page 1 of 1 Manhole 10 Open 2 Open 10 Open 5309-322 EFF.DATE: 12/01/03 APPROVAL: COMPANY MGT. REP.: ON -FILE Generated on 1/23/2012 at 3:37 PM by the PipeTech® TV inspection system. Insituform Sales Representative Agency Name Please rank our performance by circling one number in each row. Pre -Proposal Service and Sales Assistance Project Name Project Number Date of Work m d y @ U U 0 X O > O C W (7 Q a 5 4 3 2 1 DAM Project Management and Performance 5 4 3 2 1 Timely • • - . • ork�. Safety Measures and Jobsite Cleanliness 5 4 3 2 1 Timely Post-] nstallation Services (video package, billing, etc.) 5 4 3 2 1 Likelihood to Use Trenchless Technologies Again 5 4 3 2 1 Likelihood to Give Positive Reference on Behalf of Insituform 5 4 3 2 1 For best follow-up and improvement results, please fill in all fields and include as much information as possible. Describe the best aspect of your experience. Were you dissatisfied with any part of your experience? If so, please describe. Any other comments? Completed by: Name Title Address Email City, State, Zip Phone Number To complete this survey online, please visit http://www.insituform.com/CustomerSurvey. ,J ,J AOW3H REMOVE EE TO EXPOSE AOHESIV3. To mail, fold in half and seal. REMOVE TO EXPOSE AOHESIVE 3AI83HO` I©VE TO EXPOSE ADHESIVE 3AIS3HOV aSOd' ` *-w=+�Cr' non f-f E.^SYV P'. �AIS3HOV-3Sf��i X-3 Of y (V Insituform ' IN Aojuis1b011Corp.l7�lf✓.xg9 ` 9ZU-90099 OW MAI-. 2]AiS�IHO 9710 - X09 Od ONI `SEIISMONHOE]l m:jo:jniiSN1 AAA2j 1S 2jEmoisno 18SS3b(TQV ,1fI QIVd 1911IM 99V.LSOd OIN'SInO"T'IS 86'ON.IAM9d ITV4NSSV"IO-ISMI3 "IIVW AIM SsgNlSIlS S+IV.LS (I:A IIN: 1 3IIl NI (19-nv d m [2IVSSHDHN If)VISOd ON ssojppW u_Inlo-[ YOUR OPINION COUNTS AT INSITUFORM!