Loading...
HomeMy WebLinkAboutC_OnHoldLetter_OasisAcademyCenter_250723July 23, 2025 Hector Vigna Legacy Construction Group 2803 S 301st Ln Federal Way, WA 98003 SUBJECT: "On Hold" Notice Oasis Academy Center / LUA25-000195 Dear Hector, The Planning Division of the City of Renton accepted the above master application for review on July 8, 2025. During our review, staff has determined that additional information is necessary in order to proceed further. The following information will need to be submitted before October 21, 2025 so that we may continue the review of the above subject application: See attached comments from Development Engineering. See attached comments from Planning. At this time, your project has been placed “on hold” pending receipt of the requested information. The maximum time for resubmittal shall be within ninety (90) days of this notice. Please contact me at (425) 430-7238 if you have any questions. Sincerely, Mariah Kerrihard Associate Planner cc: Estate Highlands LLC / Owner(s) Hector Vigna / Applicant Duwamish Tribal Historic Preservation / Party(ies) of Record DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT M E M O R A N D U M DATE: TO: FROM: SUBJECT: July 23, 2025 Mariah, Associate Planner Heather Bray, Civil Plan Reviewer Oasis Home Daycare 4508 NE 4th Street, Renton, WA LUA25-000195 I have reviewed the application for Oasis Home Daycare located at 4508 NE 4th Street and have the following comments: The following comments represent additional information or corrections that are required to be made: 1.The site plan does not address the septic sewer system decommissioning and new 6-inch sewer stub. This will need to be done prior to land use acceptance. 2.The new sewer stub work will occur in the 100-year flood plain which triggers Targeted Drainage review. A new TIR addressing all applicable core requirements per the 2022 RSWDM will need to be provided. 3.The 100-year floodplain needs to be shown on the site plan. The following comments represent additional information or corrections that should be made when considering site layout: 1.ADA compliance needs to be demonstrated within the parking lot. If the existing pavement is not compliant, it will need to be regraded to meet ADA standards. This could increase impervious surface and trigger more stormwater requirements. 2.One of the driveways will need to be removed and restored as sidewalk. This will increase impervious surface area calculations and need to be addressed in the storm drainage report. 3.A separate water meter will need to be proposed for the trailer. 4.Total land disturbing activity including the new sewer stub and decommissioning of the septic will need to be included in the new TIR. DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT M E M O R A N D U M DATE: TO: July 23, 2025 FROM: Mariah Kerrihard, Planning Reviewer SUBJECT: Oasis Home Daycare 4508 NE 4th Street, Renton, WA LUA25-000195 I have reviewed the application for Oasis Home Daycare located at 4508 NE 4th Street and have the following comments: The following comments represent additional information or corrections that are required to be made: 1.Ensure all site plans properly identify the proposal. 2.It is unclear if fencing would meet requirements as a fence or retaining wall design was not provided. Proposed fencing or retaining walls would need to meet fence or retaining wall requirements. Include fence or retaining wall materials, colors, and architectural design. 3.Address the access within the site plan. There shall be no more than one driveway for each one hundred sixty-five feet (165') of street frontage serving any one property or among properties under unified ownership or control. Driveways shall not be closer than five feet (5') to any property line. 4.The parking analysis is to include the total number of parking spaces required and provided, number of compact and “ADA accessible” spaces provided, and parking space dimensions. 5.For parking stalls A minimum and maximum of 1.0 for each employee and 2.0 drop- off/pick-up spaces within 100 feet of the main entrance for every 25 clients of the program. (One of the proposed ADU stalls may be a pickup/drop off stall, however, four (4) parking stalls are required for pick-up and drop off based on the proposal. 6.All parking areas will be required to meet surface parking lot requirements to include minimum drive aisle width, parking stall size, landscaping etc. Hector Vigna Oasis Home Daycare LUA25-000195 Page 2 of 2 2 7.Provide square footage of landscaping for each area, for interior parking lot landscaping, and total. 8.Screening detail for Refuse and Recycling is required: A detailed plan drawing, prepared to scale, showing location within property boundaries, heights, elevations, and building materials of proposed screening or of proposed plantings. 9.The project narrative is not complete – please refer to the submittal requirements. 10.The site plan needs to identify the following: -Total square footage of existing natural/undeveloped area; -Total pavement square footage, both existing pavement to remain plus new pavement proposed to be installed; -Square footage of any on-site wetlands; -Provide the specific sq. ft. of the proposed playground on all submittal items -Ensure the site plan matches what is proposed on all submittal documents including the trip generation assessment. -Provide location and dimensions of all easements referenced in the title report with the recording number and type of easement (e.g. access, sewer, etc.) -Provide building setbacks on the site plan